10.07.2018 Views

Proposal & Quotation- Waterfront Mall

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

QU OTATION<br />

Client: The <strong>Waterfront</strong>,Karen<br />

Quote no.3501 09/07/2018<br />

1) Broomed Concrete Section @ The <strong>Waterfront</strong><br />

Description Rate per m 2 Area coverage(m 2) Cost (Ksh)<br />

Surface preparation, priming &<br />

Asphalt coating( 2 layers)<br />

1,900.00 1,785 3,391,500.00<br />

16% VAT 542,640.00<br />

3,934,140.00<br />

S<strong>amp</strong>le images for asphalt coating:<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!