Peer review<br />
Determination of whether the existing OE process meets the best internationally accepted<br />
practices including the <strong>IAEA</strong> <strong>Safety</strong> St<strong>and</strong>ards <strong>and</strong> identification of areas for future<br />
improvement. Determination of whether the operational experience process is being<br />
effectively managed, that the stated expectations <strong>and</strong> st<strong>and</strong>ards are being achieved <strong>and</strong><br />
maintained. That significant generic issues are being adequately identified <strong>and</strong> timely<br />
rectified. Also that an adequate comprehensive operational experience process is in place to<br />
enhance the operational safety performance.<br />
<strong>IAEA</strong>-led <strong>PROSPER</strong> missions are an international peer review of many facets of all these<br />
programmes.<br />
3.3. PROTOCOL<br />
Preparation for a <strong>PROSPER</strong> mission will be initiated only after the <strong>IAEA</strong> has been formally<br />
approached by a Member State <strong>and</strong> funding has been established. The scope of the mission is<br />
agreed between relevant organizations (e.g. a utility or NPP) <strong>and</strong> the <strong>IAEA</strong> at this stage.<br />
The report prepared by an <strong>PROSPER</strong> mission will be confidential to the Member State visited<br />
unless specifically stated otherwise. The decision to implement any recommendations of the<br />
report lies entirely with the utility or NPP concerned.<br />
3.4. METHODOLOGY<br />
3.4.1. Preparation<br />
After a request for an <strong>PROSPER</strong> mission has been received from a Member State <strong>and</strong> funding<br />
has been established, the designated team leader will arrange for:<br />
• the establishment of liaison contacts with the utility or NPP which will host the<br />
<strong>PROSPER</strong> mission,<br />
• necessary preparatory activities, which could include a preparatory meeting, a seminar<br />
on suggested self-assessment activities <strong>and</strong> assistance during the self-assessment; if<br />
necessary,<br />
• the recruitment <strong>and</strong> briefing of team members.<br />
At the same time, the host organization should nominate a counterpart, who will be the<br />
primary contact with the <strong>PROSPER</strong> team during the review.<br />
The preparatory activities will include the consideration of <strong>and</strong> an agreement on:<br />
• the type of review requested (i.e. oriented on programmatic, significant issue or<br />
combined);<br />
• the scope of the review (e.g. comprehensive review; focused on a specific significant<br />
issue or issues);<br />
• the composition of the team;<br />
• the work plan;<br />