17.12.2012 Views

Engineering Instrumentation and Measurement Experiments

Engineering Instrumentation and Measurement Experiments

Engineering Instrumentation and Measurement Experiments

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Experiment No. 2 Calibration of a Electronic Load Cell <strong>and</strong> a Bourdon Tube-Type Pressure Gage<br />

5.3 Sample Calculation<br />

The sample calculations are implicitly expressed in the calculated tabular data above <strong>and</strong> background<br />

theory discussion. The calculations for Bourdon Gage linear coefficient are show below<br />

Table 3: Curve Fit Calculation for Bourdon Gage<br />

Xi Yi Error load Error 2 Xi × Y i X 2 i<br />

0 0 36 1324 0 0<br />

100 125 -42 1731 12500 10000<br />

300 555 -18 309 166500 90000<br />

500 990 11 131 495000 250000<br />

700 1400 15 239 980000 490000<br />

1200 2400 1 0 2880000 1440000<br />

1700<br />

� �<br />

3410<br />

�<br />

-4<br />

�<br />

20<br />

�<br />

5797000<br />

�<br />

2890000<br />

4500 8880 0 3753.7 10331000 5170000<br />

The intercept can be calculated as follows, using summation values from table 3<br />

a0 = XiXi × Yi − Yi × X 2 i<br />

XiXi − 7X 2 i<br />

= 4500 × 10331000 − 8880 × 5170000<br />

4500 2 − 7 × 5170000<br />

The slope can be calculated as follows, using summation values from table 3<br />

a1 = XiYi − 7Xi × Yi<br />

XiXi − 7X 2 i<br />

= 4500 × 8880 − 7 × 10331000<br />

4500 2 − 7 × 5170000<br />

9<br />

= −36.3802<br />

= 2.0299

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!