- Page 1 and 2: OPERATIONAL & MAINTENANCE MANUAL 19
- Page 3 and 4: CONTENTS CONTACT LIST INTRODUCTION
- Page 5: Regional Service Manager • Mr. Vi
- Page 9 and 10: Other site co- Sl. Item Description
- Page 11 and 12: 3.3 Electrical systems M/s. Takshil
- Page 13 and 14: FUME HOOD Fume hood is a safety enc
- Page 15 and 16: CABINET FACE Flush corner construct
- Page 17 and 18: shall be accomplished by washing wi
- Page 19 and 20: Two sets of eleven parallel lines 1
- Page 21 and 22: DUCT CONSTRUCTION The fabricated du
- Page 23 and 24: TECHNICAL DETAILS 21
- Page 25 and 26: TECHNICAL DETAILS Name of the Equip
- Page 27 and 28: TECHNICAL DETAILS Name of the Equip
- Page 29 and 30: TECHNICAL DETAILS Name of the Equip
- Page 31 and 32: TECHNICAL DETAILS Name of the Equip
- Page 33 and 34: TECHNICAL DETAILS 2. EQUIPMENT DESC
- Page 35 and 36: TECHNICAL DETAILS Sl.No. Component
- Page 37 and 38: TECHNICAL DETAILS 3. General Specif
- Page 39 and 40: TECHNICAL DETAILS 2. SYSTEM DESCRIP
- Page 41 and 42: TECHNICAL DETAILS 18 | P a g e
- Page 43 and 44: High Performance Bench Fume Hood wi
- Page 45 and 46: Supreme Air Fume Hood Technical Dat
- Page 47 and 48: Solvent Storage Fume Hood Base Cabi
- Page 49: Fume Hood Filters & Canopy Hoods Fi
- Page 55 and 56: Research Collection Steel Cabinet I
- Page 57 and 58:
10u 10u 10u 10u Research Collection
- Page 59 and 60:
6u 6u 6u 6u 6u Research Collection
- Page 61 and 62:
E44M372242L____ 42"L E44M372242-___
- Page 63 and 64:
Research Collection Steel Standing
- Page 65 and 66:
Research Collection Steel Full Heig
- Page 67 and 68:
Bi-Fold Self-Closing Doors Each doo
- Page 69 and 70:
The optimal design for laboratory e
- Page 71 and 72:
250 Several configurations to meet
- Page 73 and 74:
20110427 Reach at recommended insta
- Page 75 and 76:
G5022 Eye Wash/Drench Hose Units G5
- Page 82 and 83:
DUNE ® RH99 BENEFITS • Premium s
- Page 84 and 85:
' ' FANS CMV 450 - 1250 Medium sure
- Page 86 and 87:
COLASIT Asia Pte Ltd. • Plastic c
- Page 88 and 89:
COLASIT Asia Pte Ltd. • Plastic c
- Page 90 and 91:
COLASIT Asia Pte Ltd. • Plastic c
- Page 96:
MI1 MI2 MI3 MI4 MI5
- Page 104 and 105:
FRP Lining Procedure: FRP lining ge
- Page 106 and 107:
Electrical motors from a world lead
- Page 108 and 109:
5 6 Pole Ambient 45 O C Output Fram
- Page 110 and 111:
12 HX 71...132 (Foot Mounted) Mount
- Page 112 and 113:
Shipping dimensions Frame Length Wi
- Page 114 and 115:
Supreme Air Series FUME HOODS K E W
- Page 116 and 117:
Operating Procedures Supreme Air Se
- Page 118 and 119:
Maintenance Instructions Supreme Ai
- Page 120 and 121:
Recommended Work Practices (continu
- Page 122 and 123:
Recommended Work Practices (continu
- Page 124 and 125:
PREVENTIVE MAINTENANCE PROGRAM FOR
- Page 126 and 127:
STAINS, LIME BUILD UP, S TUCK ON FO
- Page 128 and 129:
RECOMMENDED LAB PRACTICES FOR OPERA
- Page 130:
TEST CERTIFICATES 89
- Page 147 and 148:
COMMISSIONING REPORT 123
- Page 149:
AS-BUILT DRAWINGS 124