12.09.2018 Views

TPi_Magazine__February_2018

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EQUIPSON OPEN DAY<br />

Below: Lightshark Product Manager, Alejo Cervera; Joan La Roda, Equipson’s Senior Loudspeaker Designer in the company’s anechoic chamber;<br />

Equipson’s CEO José Luis Vila and COO/CMO Juan José Vila.<br />

thanks to its powerful built-in DSP. Each unit can be set manually via its<br />

interface and controls placed at the rear part of the enclosure, which allows<br />

for the user to navigate through the menu and the different parameters of<br />

the system.<br />

As well as surveying some of the latest offerings for Equipson, <strong>TPi</strong><br />

also had a chance to meet some of the R&D team that were responsible<br />

for the creations of Equipson’s products. Lead by General R&D Manager,<br />

Olegario Perez, the team located on the top floor of the of the HQ diligently<br />

troubleshoots all products prior to release as well as creating prototype<br />

components for all its products with the company’s 3D printer.<br />

Prior to leaving Valencia, Vila talked <strong>TPi</strong> through one the other major<br />

parts of the Equipson Group, WORK PRO Lifters. “For the last 20 years we<br />

have been producing some of the highest quality lifters within the industry.<br />

The brand has now recognised around the world as a high quality product.”<br />

However, the company almost became a victim of its own success and<br />

saw a sudden, huge demand for its products.<br />

“We knew we needed to expand the business,” commented Vila. “This<br />

coincided with an opportunity to buy out another Valencia-based lifter<br />

manufacturer, Fantek back in 2015.”<br />

Since the purchase, as well as taking on all the experienced Fantek staff,<br />

Equipson has also implemented a whole technical management team to<br />

expand the lifters R&D department. “This was vital as we need such a team<br />

to ensure we could take WORK PRO Lifters to the next level. We also wanted<br />

to improve the manufacturing process to make it as efficient as possible.”<br />

Last September WORK PRO Lifters has moved into a new 4,000sqm<br />

warehouse, down the road from the original Equipson HQ.<br />

<strong>TPi</strong><br />

Photos: Equipson and <strong>TPi</strong><br />

www.equipson.es<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!