30.09.2019 Views

SYNTHESIS ISSUE 2 2018: BUILDING OUR HOMES AND COMMUNITIES

The magazine can be download on our department website at https://rmc.upm.edu.my/majalah_synthesis/majalah_synthesis_2018-10215

The magazine can be download on our department website at https://rmc.upm.edu.my/majalah_synthesis/majalah_synthesis_2018-10215

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A simulation<br />

is produced<br />

to predict the<br />

demand for<br />

personnel<br />

corresponding<br />

with IBS<br />

implementation<br />

and as a phase<br />

to accept<br />

Industry 4.0.<br />

demand and supply of construction personnel, analysis of<br />

training programs and skills overlap for personnel, critical<br />

skill requirement analysis, competencies and positions in<br />

construction industries besides industries challenges and<br />

issues. A simulation is produced to predict the demand for<br />

personnel corresponding with IBS implementation and as a<br />

phase to accept Industry 4.0.<br />

Assoc. Prof. Dr. Rusmawati Said<br />

Department of Economics<br />

Faculty of Economics and Management<br />

Tel: 03-8946 7580<br />

E-mail: rusmawati@upm.edu.my<br />

<strong>SYNTHESIS</strong> <strong>2018</strong> | 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!