TECHNOLOGY | Russula Newsletter No. 18 | November 2018

Standard laying head technology

Pipe change-out time: 30-45 minutes pipe

Russula laying head technology

Pipe change-out time: 15-30 minutes

On average standard laying head technology has

14 support clamps and it takes between 30 to 45

minutes to change the pipe.

Russula has reduced the number of support clamps

to 9, which speeds up the change out time to 15-30

minutes.

Simplified pipe support speeds- up laying head pipe change

In today’s rolling environment of intense speeds, the

production of small diameter wire rod can burn up

the laying head pipe and require periodic replacement.

The question is not if, but when, and a reality

that many wire rod producers must address during

every rolling campaign. No one wants to stop production

to change out the laying head pipe.

Typically, laying head pipes have 14 clamps. Russula

has redesigned the pipe support and reduced the

number of clamps to 9, without reducing product

integrity, functionality or durability. Now mill operators

can change the laying head pipe easily and in

less time.

Difficult access to the laying head pipe increases

production downtime. Current laying head designs

require the removal of multiple segment plates,

most have an average of five plates, or ten separate

pieces, which need to be removed in order to

access and change the burned out pipe. Russula

has simplified the process by reducing the number

of plates to four pieces that require replacement,

thus making it much easier for the mill operators

to access the pipe and change it out in record time.