25’ VERTICAL CLEAR BRIDGE OPTION
ESTIMATED COST:
$4 Million
500 FT TO GRADE
PIER TRACK BRIDGE: Several bridge designs and heights were considered during the development of the Pathway Update. After determining that a movable bridge
would potentially be a long term maintenance concern, consensus was reached that a fixed bridge with a 25-foot vertical clearance balanced the needs of the marine
community, typical vessel heights for Lake Erie, and the desire to bring the Pathway along the waterfront.
ABOVE: While the development of the Pier Track alignment faced several constraints, there was an opportunity to create a thoughtfully designed, iconic experience
for users of the trail. With the incorporation of color and lighting elements into the bridge support structures, users can view the lights and excitement of Cedar Point
across the bay at dusk (LEFT), or commute to work on their bicycle in the glow of the morning sunrise (RIGHT).
PIER TRACK BRIDGE
PIER TRACK BRIDGE