25’ VERTICAL CLEAR BRIDGE OPTION

ESTIMATED COST:

$4 Million

500 FT TO GRADE

PIER TRACK BRIDGE: Several bridge designs and heights were considered during the development of the Pathway Update. After determining that a movable bridge

would potentially be a long term maintenance concern, consensus was reached that a fixed bridge with a 25-foot vertical clearance balanced the needs of the marine

community, typical vessel heights for Lake Erie, and the desire to bring the Pathway along the waterfront.

ABOVE: While the development of the Pier Track alignment faced several constraints, there was an opportunity to create a thoughtfully designed, iconic experience

for users of the trail. With the incorporation of color and lighting elements into the bridge support structures, users can view the lights and excitement of Cedar Point

across the bay at dusk (LEFT), or commute to work on their bicycle in the glow of the morning sunrise (RIGHT).

PIER TRACK BRIDGE

PIER TRACK BRIDGE