election 2010 - cfmeu
election 2010 - cfmeu
election 2010 - cfmeu
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
AWARDS<br />
STATE BUILDING & CONSTRUCTION INDUSTRY AWARD<br />
Rates payable from the first pay period on or after 26 November 2009.<br />
CLASSIFICATION<br />
PER<br />
HOUR<br />
TIME<br />
AND A HALF<br />
DOUBLE<br />
TIME<br />
PER<br />
38 HOURS<br />
ACCRUAL OF<br />
0.4 HOURS<br />
Carpenter, stonemason,<br />
bridge & wharf carpenter<br />
20.15 30.23 40.30 765.70 8.06 76.18<br />
Bricklayer, tilelayer hard floor coverer 19.94 29.91 39.88 757.72 7.98 75.40<br />
Plasterer, floorlayer 20.03 30.05 40.06 761.14 8.01 75.73<br />
Roof tiler, slate ridge/roof fixer 19.81 29.72 39.62 752.78 7.92 74.68<br />
Stonemason machinist 18.83 28.25 37.66 715.54 7.53 71.27<br />
Carver (stoneworker) 20.75 31.13 41.50 788.50 8.30 78.41<br />
Marker/setter out, lettercutter 20.15 30.23 40.30 765.70 8.06 76.18<br />
Special class trade 20.75 31.13 41.50 788.50 8.30 78.18<br />
Quarryperson 18.83 28.25 37.66 715.54 7.53 71.27<br />
Signwriter 19.61 29.42 39.22 745.18 7.84 73.94<br />
Painter 19.00 28.50 38.00 722.00 7.60 71.90<br />
Refractory bricklayer 21.67 32.51 43.34 823.46 8.67 81.60<br />
Refractory bricklayer’s assistant 19.40 29.10 38.80 737.20 7.76 73.39<br />
GROUP 1<br />
Rigger, dogman 18.83 28.25 37.66 715.54 7.53 71.27<br />
GROUP 2<br />
Scaffolder, powder monkey, hoist winch<br />
driver, foundation shaftsperson, steel<br />
fixer including tackwelder,<br />
concrete finisher<br />
18.29 27.44 36.58 695.02 7.32 69.27<br />
GROUP 3 17.90 26.85 35.80 680.20 7.16 67.82<br />
PRO RATA ANNUAL<br />
LEAVE PLUS<br />
LOADING<br />
Trades labourers, demolition work, gear hand, pile driver, tackle hand, jackhammer, mixer driver, concrete steel erector, gantry hand, crane hand,<br />
crane chaser, cement gun operator, concrete cutting or drilling machine operator, concrete gang including concrete floater, roof layer (malthoid or<br />
similar material), dump cart operator, underpinner, concrete formwork stripper.<br />
FARES ALLOWANCE PER DAY: $16.50<br />
��� Where an employer requests a worker to transfer from one site to another site during working hours with<br />
his/her own vehicle, an extra $0.89 per kilometre must paid.<br />
���Where a worker using his/her car to a job outside the required work boundaries in the award an extra $0.47<br />
per kilometre must be paid.<br />
��The fares allowance must be paid on all days worked plus rostered days off.<br />
LEADING HANDS ALLOWANCES PER HR<br />
In charge of 1 person $0.44<br />
In charge of 2–5 persons $0.96<br />
In charge of 6–10 persons $1.22<br />
In charge of 11 persons or more $1.63<br />
The applicable leading hand rate should be added to the hourly rates and applies for all purposes of the award.<br />
MEAL ALLOWANCE: $12.50<br />
UNITY 25