Initial Operating Segment<br />

Additional information is provided in this section on <strong>the</strong> initial operating segment (IOS) as a sample <strong>of</strong><br />

information available on <strong>the</strong> proposed <strong>Maglev</strong> project. <strong>The</strong> IOS has four stations from West LA <strong>to</strong><br />

Ontario. <strong>The</strong>re are three alignments under consideration. <strong>The</strong> criteria generally applied in <strong>the</strong><br />

determination <strong>of</strong> alignments for this and o<strong>the</strong>r segments include (SCAG, 2006):<br />

• Use <strong>of</strong> Public Rights‐<strong>of</strong>‐Way<br />

• Develop fully grade‐separated alignment<br />

• Maximize Speed<br />

• Minimize Impacts<br />

• Minimize Costs<br />

<strong>The</strong> alignment along Interstate 10 plans for stations at West LA, Union Station, West Covina, and Ontario<br />

Airport. <strong>The</strong> alignment along State Route 60 plans for stations at <strong>the</strong> same locations except Puente Hills<br />

instead <strong>of</strong> West Covina. <strong>The</strong> route via <strong>the</strong> Union Pacific Railroad (UPRR) right‐<strong>of</strong>‐way would include a<br />

s<strong>to</strong>p at City <strong>of</strong> Industry instead <strong>of</strong> West Covina. O<strong>the</strong>r segments portray similar types <strong>of</strong> variations in<br />

alignment. Details are included in Appendix 1.<br />

IOS Cost Estimate<br />

SCAG (2006) identifies eight main categories <strong>of</strong> cost for <strong>the</strong> project overall. Table 3 shows a cost<br />

comparison <strong>of</strong> <strong>the</strong> three different alignments <strong>of</strong> <strong>the</strong> IOS in <strong>the</strong>se eight categories. <strong>The</strong> costs include<br />

those for system implementation, environmental impact mitigation, management, and o<strong>the</strong>r<br />

contingencies.<br />

<strong>The</strong> estimates depict <strong>the</strong> SR‐60 alignment as <strong>the</strong> most costly; however, this alignment also has <strong>the</strong><br />

lowest cost per mile. Overall, <strong>the</strong> cost differences for each alignment are small, with <strong>the</strong> same costs for<br />

vehicle and maintenance facilities and operating equipment for all alignments.<br />