26.04.2023 Views

20181105_dstf_construction_and_operations_plan

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DRY STACK TAILINGS FACILITY – PHASE II EXPANSION REVISION 1

FILE: W14103548-01 | JUNE 2, 2015 | ISSUED FOR USE

7.0 CLOSURE

We trust this report meets your present requirements. If you have any questions or comments, please contact the

undersigned.

Respectfully submitted,

Tetra Tech EBA Inc.

Justin Pigage, P.Eng.

J. Richard Trimble, P.Eng., FEC

Geotechnical Engineer, Arctic Region

Principal Consultant, Arctic Region

Direct Line: 867.668.9213 Direct Line: 867.668.9216

Justin.Pigage@tetratech.com

Richard.Trimble@tetratech.com

Attachments: Figures (3)

Appendix A

Appendix B

Appendix C

Appendix D

Appendix E

Tetra Tech EBA’s General Conditions

Testpit Logs

Slope Stability Results – Fully Frozen

Slope Stability Results – Fully Thawed

Slope Stability Results – Foundation Materials

REVISION I SUMMARY:

Added synthetic foundation components to stability analysis

Added preliminary design of surface water management structures

9

DSTF Phase II Expansion Preliminary Design_IFU Rev 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!