20181105_dstf_construction_and_operations_plan
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DRY STACK TAILINGS FACILITY – PHASE II EXPANSION REVISION 1
FILE: W14103548-01 | JUNE 2, 2015 | ISSUED FOR USE
7.0 CLOSURE
We trust this report meets your present requirements. If you have any questions or comments, please contact the
undersigned.
Respectfully submitted,
Tetra Tech EBA Inc.
Justin Pigage, P.Eng.
J. Richard Trimble, P.Eng., FEC
Geotechnical Engineer, Arctic Region
Principal Consultant, Arctic Region
Direct Line: 867.668.9213 Direct Line: 867.668.9216
Justin.Pigage@tetratech.com
Richard.Trimble@tetratech.com
Attachments: Figures (3)
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Tetra Tech EBA’s General Conditions
Testpit Logs
Slope Stability Results – Fully Frozen
Slope Stability Results – Fully Thawed
Slope Stability Results – Foundation Materials
REVISION I SUMMARY:
Added synthetic foundation components to stability analysis
Added preliminary design of surface water management structures
9
DSTF Phase II Expansion Preliminary Design_IFU Rev 1