11.01.2013 Views

Special Print, Vehicles, Weigh-In-Motion - Traffic Data Systems GmbH

Special Print, Vehicles, Weigh-In-Motion - Traffic Data Systems GmbH

Special Print, Vehicles, Weigh-In-Motion - Traffic Data Systems GmbH

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Fig. 2: WIM system with quartz sensors installed in the Monte Ceneri<br />

Tunnel<br />

3. System Characteristics<br />

• The WIM traffic data system consists of 32 quartz<br />

crystal WIM sensors (Lineas Type 9195C from<br />

Kistler) on 4 traffic lanes, and a data retriever<br />

(Marksman 660 from Golden River), including data<br />

transmission, software, and processor power supply<br />

• induction loops triggering infrared detectors for the<br />

height control system, in the South – North direction<br />

• video cameras including installation for permanent<br />

recording of traffic flow<br />

• stationary signals, partly with folding mechanism for<br />

adaptive signalisation<br />

• local control facilities<br />

STAMPANTE<br />

STAMPANTE<br />

North<br />

MONITOR<br />

VGA<br />

MONITOR<br />

VGA<br />

Fig. 3: Remote WIM system overview – Tunnel control center and static weighing<br />

Dakota<br />

Dakota<br />

Media<br />

Converter<br />

Media<br />

Converter<br />

HUB<br />

Media<br />

Converter<br />

The ”Monte Ceneri Tunnel” consists of two tunnel<br />

tubes with two (Northbound) and three (Southbound)<br />

lanes per tube, all equipped with the traffic control<br />

system.<br />

Improvements in traffic flow can be achieved among<br />

other means through harmonization of speeds on the<br />

individual traffic lanes of the motorway by<br />

• warning of overloaded vehicles, etc.<br />

• warning of traffic jams<br />

• traffic-adapted speed limit signalisation<br />

• avoidance of traffic obstructions<br />

The operational principle of the traffic control system<br />

can be described as follows:<br />

3.1 <strong>Data</strong> Acquisition<br />

<strong>Traffic</strong> flow data and environmental data (speeds,<br />

traffic volumes, precipitation, etc.) are acquired<br />

locally by the electronics installed in roadside stations,<br />

including<br />

• the individual axle loads and the gross vehicle<br />

weights of all vehicles<br />

• the distances between vehicles<br />

• traffic statistics per vehicle class, speed and time<br />

intervals<br />

Monte Ceneri Tunnel<br />

Lighting zone<br />

Lux = 104 min – Lux = 120 max<br />

WIM system<br />

M660<br />

High control<br />

HUB<br />

Media<br />

Converter<br />

South<br />

MONITOR<br />

VGA<br />

PC Switch<br />

WIM<br />

Power supply<br />

GAEM<br />

Dist. 230 Vac<br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!