Compliance Deadbands<br />

• The current <strong>IESO</strong> compliance deadbands will be extended to<br />

variable generators.<br />

– For facilities >30 MW, deadband is greater of ± 15 MW or ± 2% of the<br />

dispatch instruction<br />

– For facilities < 30 MW, deadband is ± 10 MW from the dispatch<br />

instruction<br />

• Compliance to dispatch instructions will only be enforced when<br />

Obligation Indicator is Mandatory and sufficient fuel exists.<br />

• The market participant must notify the <strong>IESO</strong> if they cannot operate<br />

within the compliance deadband during a mandatory dispatch due<br />

to:<br />

– Safety concerns;<br />

– Damage to equipment; or<br />

– Violation of any applicable law<br />