Compliance Deadbands<br />
• The current <strong>IESO</strong> compliance deadbands will be extended to<br />
variable generators.<br />
– For facilities >30 MW, deadband is greater of ± 15 MW or ± 2% of the<br />
dispatch instruction<br />
– For facilities < 30 MW, deadband is ± 10 MW from the dispatch<br />
instruction<br />
• Compliance to dispatch instructions will only be enforced when<br />
Obligation Indicator is Mandatory and sufficient fuel exists.<br />
• The market participant must notify the <strong>IESO</strong> if they cannot operate<br />
within the compliance deadband during a mandatory dispatch due<br />
to:<br />
– Safety concerns;<br />
– Damage to equipment; or<br />
– Violation of any applicable law<br />