1.3.1.4 Deviations from the work planned in the last detailed<br />
implementation plan.<br />
Deviations associated with specific work-packages:<br />
WP2. Site Characterization at the Canary Islands’ Observatories:<br />
WP2.1: <strong>Co</strong>-<strong>ordination</strong> of night-time seeing measurements with DIMMs: Almost all of<br />
the activities initially planned in this workpackage have been carried out during 2005. An<br />
anticipated campaign using a Generalized Seeing Monitor (GSM) at the ORM was not carried<br />
out, given that it was impossible to bring this instrument from the Nice University (GSM’s<br />
owner). Since this facility is unique, and required elsewhere world-wide for other site<br />
surveys, the working group decided to withdraw this (non-essential) deliverable.<br />
<strong>Co</strong>ncerning the DIMMA, and due to the late arrival of <strong>OPTICON</strong> funds, it was possible to<br />
carry out this urgent development by optimised cash-management of the IAC’s whole<br />
Opticon budget (139000 EUR). This prevented any postponement of the whole activity.<br />
Some other planned activities which are less time-critical will be re-phased. This will be<br />
reported accordingly in the future.<br />
WP2.3 Joint actions for meteorology, dust, extinction and Sky Background: The<br />
installation of the Automatic Weather Station (AWS) depends on the time required to pass the<br />
administrative proceedings. It is expected that this Milestone will be achieved in the first four<br />
months of 2006. The Automatic Weather Station (AWS) already tested by the working group<br />
is pending local government planning authorization to install it at the proposed site.<br />
The METEO and WEB network planned as a deliverable for month 22 has not been set up as<br />
initially expected. In spite of sharing data to use a common database, institutions (NOT, ING,<br />
TNG, Mercator) agreed on the development of a joint platform (website) providing<br />
information about their stations, with direct access to the several database available:<br />
http://www.otri.iac.es/na2/weather_observatories.html<br />
1.3.1.5. Milestones and Deliverables achieved:<br />
Name of<br />
deliverable/milesto<br />
ne<br />
D1. Updated<br />
Progress report and<br />
revised roadmap<br />
M1: Regular ENO<br />
meetings<br />
M1: Regular ENO<br />
meetings<br />
M2: Meetings<br />
among telescope<br />
operators<br />
Activity<br />
(NAx;<br />
JRAy)<br />
Work-package<br />
/Task<br />
NA2 WP1.1 Dissemination of<br />
good practices.<br />
NA2 WP1.1 Dissemination of<br />
good practices.<br />
NA2 WP1.1 Dissemination of<br />
good practices.<br />
NA2 WP1.2: A co-ordinated<br />
Laser Traffic <strong>Co</strong>ntrol<br />
System (LTCS) for the<br />
ORM<br />
Delivered by<br />
<strong>Co</strong>ntractor(s)<br />
Planned<br />
(in months)<br />
Achieved<br />
(in months)<br />
IAC 24 24<br />
IAC, IOA-KUL,<br />
INAF, THEMIS,<br />
IFAE, UCAM,<br />
Jodrell Bank.<br />
IAC, IOA-KUL,<br />
INAF, THEMIS,<br />
IFAE, UCAM,<br />
Jodrell Bank.<br />
PPARC, IAC,<br />
IOA-KUL,<br />
IFAE, NOTSA,<br />
INAF<br />
16 17<br />
22 22<br />
14 18<br />
16 <strong>Co</strong>ntract [RII3-CT-2004-001566]<br />
<strong>Annual</strong> <strong>Report</strong>