1.3.1.4 Deviations from the work planned in the last detailed<br />

implementation plan.<br />

Deviations associated with specific work-packages:<br />

WP2. Site Characterization at the Canary Islands’ Observatories:<br />

WP2.1: <strong>Co</strong>-<strong>ordination</strong> of night-time seeing measurements with DIMMs: Almost all of<br />

the activities initially planned in this workpackage have been carried out during 2005. An<br />

anticipated campaign using a Generalized Seeing Monitor (GSM) at the ORM was not carried<br />

out, given that it was impossible to bring this instrument from the Nice University (GSM’s<br />

owner). Since this facility is unique, and required elsewhere world-wide for other site<br />

surveys, the working group decided to withdraw this (non-essential) deliverable.<br />

<strong>Co</strong>ncerning the DIMMA, and due to the late arrival of <strong>OPTICON</strong> funds, it was possible to<br />

carry out this urgent development by optimised cash-management of the IAC’s whole<br />

Opticon budget (139000 EUR). This prevented any postponement of the whole activity.<br />

Some other planned activities which are less time-critical will be re-phased. This will be<br />

reported accordingly in the future.<br />

WP2.3 Joint actions for meteorology, dust, extinction and Sky Background: The<br />

installation of the Automatic Weather Station (AWS) depends on the time required to pass the<br />

administrative proceedings. It is expected that this Milestone will be achieved in the first four<br />

months of 2006. The Automatic Weather Station (AWS) already tested by the working group<br />

is pending local government planning authorization to install it at the proposed site.<br />

The METEO and WEB network planned as a deliverable for month 22 has not been set up as<br />

initially expected. In spite of sharing data to use a common database, institutions (NOT, ING,<br />

TNG, Mercator) agreed on the development of a joint platform (website) providing<br />

information about their stations, with direct access to the several database available:<br />

http://www.otri.iac.es/na2/weather_observatories.html<br />

1.3.1.5. Milestones and Deliverables achieved:<br />

Name of<br />

deliverable/milesto<br />

ne<br />

D1. Updated<br />

Progress report and<br />

revised roadmap<br />

M1: Regular ENO<br />

meetings<br />

M1: Regular ENO<br />

meetings<br />

M2: Meetings<br />

among telescope<br />

operators<br />

Activity<br />

(NAx;<br />

JRAy)<br />

Work-package<br />

/Task<br />

NA2 WP1.1 Dissemination of<br />

good practices.<br />

NA2 WP1.1 Dissemination of<br />

good practices.<br />

NA2 WP1.1 Dissemination of<br />

good practices.<br />

NA2 WP1.2: A co-ordinated<br />

Laser Traffic <strong>Co</strong>ntrol<br />

System (LTCS) for the<br />

ORM<br />

Delivered by<br />

<strong>Co</strong>ntractor(s)<br />

Planned<br />

(in months)<br />

Achieved<br />

(in months)<br />

IAC 24 24<br />

IAC, IOA-KUL,<br />

INAF, THEMIS,<br />

IFAE, UCAM,<br />

Jodrell Bank.<br />

IAC, IOA-KUL,<br />

INAF, THEMIS,<br />

IFAE, UCAM,<br />

Jodrell Bank.<br />

PPARC, IAC,<br />

IOA-KUL,<br />

IFAE, NOTSA,<br />

INAF<br />

16 17<br />

22 22<br />

14 18<br />

16 <strong>Co</strong>ntract [RII3-CT-2004-001566]<br />

<strong>Annual</strong> <strong>Report</strong>