3. AQUIFER TEST PROGRAM<br />

When the impacts resulting from a proposed ground-water withdrawal cannot be adequately predicted, the<br />

<strong>District</strong> may request that the applicant develop and implement an Aquifer Test Program (ATP). This is<br />

typically the case where withdrawals are requested which appear to have the potential to cause significant<br />

adverse impacts, and in areas with insufficient or conflicting aquifer characteristics information.<br />

An ATP is a hydrogeologic investigation intended to define aquifer characteristics such as transmissivity,<br />

leakance, and storage, for one or more aquifers or producing zones. Because ATPs generally require<br />

considerable time and expense, applicants are encouraged to discuss their intentions in a pre-application<br />

meeting with <strong>District</strong> staff, so that any aquifer testing needs may be identified early in the development<br />

process. In most cases, it is preferable to complete any needed aquifer tests prior to submittal of the<br />

permit application.<br />

If the ATP is not accomplished prior to application submittal, it may be requested as additional<br />

information in support of a permit application, or may be required as a permit condition. If the test<br />

program is not intended to provide information in support of a <strong>Water</strong> Use Permit application, and the<br />

wells will not be used after the test for withdrawals, an ATP should still be submitted so that the <strong>District</strong><br />

can review it regarding potential impacts. In such a case, test well construction permits must be obtained<br />

and the <strong>District</strong> will request the results of the testing for informational purposes.<br />

As an aid to permit applicants the <strong>District</strong> has compiled a set of guidelines for developing and<br />

implementing an ATP. The guidelines describe the basic elements of an ATP, and may be modified as<br />

necessary to address specific situations. Since the <strong>District</strong> does not formally approve ATPs, it is the<br />

applicant's responsibility to ensure that the Program provides the information needed to support the<br />

application. For this reason, it is essential that the applicant discuss the ATP with <strong>District</strong> staff, and<br />

inform staff of any modifications to the program once implemented.<br />

The successful completion of an ATP will not necessarily result in a staff recommendation for the<br />

quantity of water requested by the Applicant. The data collected during an ATP, however, often supports<br />

a request for the withdrawal of ground-water.<br />

These guidelines include a discussion of the following topics:<br />

A. Initial Site Investigation<br />

B. Single-well Aquifer Tests<br />

C. Multi-well Aquifer Tests<br />

D. Aquifer Test Program Report<br />

E. References and Bibliography<br />

A. Initial Site Investigation<br />

1. The initial site investigation should be performed as the first step in an ATP. During the<br />

initial site investigation, the following items should be identified:<br />

a. The hydrologic units to be tested (surficial, intermediate, <strong>Florida</strong>n aquifers.)<br />

b. The most probable drilling depth and yield for a proposed test production well.<br />

These should be determined by reviewing existing data such as geologic and<br />

geophysical well logs and hydrogeologic reports. A preliminary cross-section<br />

C3-1