22.01.2013 Views

JITS jovanovic IT solutions / Curriculum Vitae Radovan Jovanovic

JITS jovanovic IT solutions / Curriculum Vitae Radovan Jovanovic

JITS jovanovic IT solutions / Curriculum Vitae Radovan Jovanovic

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>J<strong>IT</strong>S</strong> <strong>jovanovic</strong> <strong>IT</strong> <strong>solutions</strong> / <strong>Curriculum</strong> <strong>Vitae</strong> <strong>Radovan</strong> <strong>Jovanovic</strong><br />

Personal data<br />

Goals<br />

Name <strong>Radovan</strong> <strong>Jovanovic</strong><br />

Birthday 15. November 1958<br />

Citizen Swiss, Berikon AG<br />

Address Schaffhauserstrasse 637<br />

CH-8052 Zürich<br />

Telefon / Mobile +41-79-501 8046<br />

E-mail<br />

Web<br />

info@jits.ch<br />

www.jits.ch<br />

Graduation Dipl. El. Eng (Master) / University Belgrade 1983<br />

Recent position <strong>IT</strong> Senior Project Manager<br />

Possible begin 01-Jan-2012<br />

Contractor or<br />

permanent position<br />

for:<br />

Know-how<br />

Senior Project and Program Management (complex projects)<br />

Software Configuration Management, concepts and tools<br />

<strong>IT</strong> Architecture, Software Engineering<br />

Test and Quality Management<br />

Business Engineering, System-Engineering<br />

Main competence Project management and lead of complex, multi-platform <strong>IT</strong> projects<br />

Software Configuration management processes and implementation<br />

Software Engineering, <strong>IT</strong>-consulting and training, Security Engineering, Internet<br />

& Intranet Architecture<br />

Quality and Process Management<br />

Business Analysis, Planning and implementation of the software development<br />

processes and infrastructure, test level concepts,<br />

Systems management, concepts of the <strong>IT</strong> architecture<br />

OS UNIX (Linux, Solaris, AIX), Windows 3.x/95/98 /NT/ 2000 /XP / 7, DOS, OS/2<br />

Hardware PC, Unix-WS, heterogeneous networks, LAN/WAN<br />

Technology Software Change und Configuration Management, CMMI, <strong>IT</strong>IL, PMI, Internet, Intranet,<br />

WebLogic, Networks, Protocols: TCP/IP, UCP, IXO, V.24, P3964R, LDAP, HTTP/s,<br />

XML, J2EE<br />

Languages Java, Smalltalk, Visual Basic, C, HTML, XML, SQL, MS Access, Shellscripts (VB, Tcl/Tk,<br />

Expect, Kornshell, Perl), dBase, Clipper, Clarion, Step 5/S7<br />

Most important<br />

products<br />

Languages<br />

BEA/Oracle WLP/WLS, Serena Dimensions, PVCS Professional, IBM<br />

ClearCase/ClearQuest, Borland StarTeam, GEPA VersionWorks, IBM VisualAge Family,<br />

TARSEC Web Entry Server, Siemens Corporate Directory, TeamConnection, MS Office,<br />

Lotus Notes, MS Office, Visio, Mind Manager, UML Poseidon<br />

German: very good<br />

English: very good (Certificate Advanced English II)<br />

Russian: good<br />

French, Spanish: Basics<br />

22.09.2011 Page 1


CV <strong>Radovan</strong> <strong>Jovanovic</strong> / <strong>J<strong>IT</strong>S</strong><br />

Education<br />

High School, Faculty<br />

(Master)<br />

University Belgrade –Serbia (Yugoslavia)<br />

Faculty for Electrical Engineering:<br />

Dep. for Information Technology and Computer Science 1977 –1983<br />

Training Courses Project Management, CMMI (Credit Suisse/EDS, Siemens AG)<br />

Software Change and Configuration Management (SQS, CS)<br />

PVCS Dimensions Administration (Merant/Serena, SQS)<br />

Windows NT, 2000 Server Academy (Compaq)<br />

Management Assessment Training 1 (AC1)<br />

Communication and presentation in general<br />

ACM courses in Project Management, Middleware-Architecture<br />

Work experience<br />

01.2011 –today Credit Suisse, CH-Zurich<br />

<strong>IT</strong> Senior Project Manager (Contractor)<br />

Project 1. LICO –Life Insurance COoperation Credit Suisse –ZFS / Wave 2 (50%)<br />

Activities<br />

Project<br />

Activities<br />

Project Management incl. all planning and monitoring activities based on the<br />

CMMI L3 process.<br />

Strong coordination, planning and solution based activities between external<br />

company (ZFS) and Credit Suisse.<br />

Maintenance of the existing solution and work on the enhancements including<br />

mainly data transfer optimization, monitoring improvements and concept for the<br />

new <strong>IT</strong> security solution.<br />

Establishement of the appropriate operations and support organization<br />

adjustments.<br />

2. CSLP –CS Life & Pension Enhancements (50%)<br />

Coordination of all activities related to the enhancements and ongoing<br />

requirements and change requests for the CS Life & Pensions products and<br />

infrastructure.<br />

It includes several integrated applications and components, running on different<br />

platforms and places.<br />

Reference Stefan Kunze (Provider) / Florian Haussmann (Business Lead)<br />

11.2009 –12.2010 Credit Suisse, CH-Zurich<br />

<strong>IT</strong> Senior Project Manager (Contractor)<br />

Project 1. LICO –Life Insurance COoperation Credit Suisse –ZFS / Wave 1 & 2<br />

Activities<br />

Project Management incl. all planning and monitoring activities based on the<br />

CMMI L3 process.<br />

Strong coordination, planning and solution based activities between external<br />

company (ZFS) and Credit Suisse.<br />

Integration of additional application interfaces for Depotbuchaltung DBH<br />

(Mainframe), Management Information System (DWH), Mittelfluss-Rechnung<br />

(Mainframe), Account Informations System (Mainframe), considering other<br />

surrounding systems as well.<br />

22.09.2011 Page 2


CV <strong>Radovan</strong> <strong>Jovanovic</strong> / <strong>J<strong>IT</strong>S</strong><br />

Project<br />

Activities<br />

Establishment of a secure dedicated VPN channel between CS and ZFS for file<br />

transfer (FTPS) and access to the ZFS web based applications (https).<br />

Establishement of the appropriate operations and support organization<br />

adjustments.<br />

2. CoWo –Colaboration Workflow, integration with FrontNet (20%)<br />

Coordination of all activities related to the integration of the new Service tool<br />

CoWo in FrontNet, incl. project management, rollout to the pilot and final users,<br />

clarification of business requirements and existing integration solution.<br />

Reference Stefan Kunze (Provider) / Mario Bernasconi (Business Lead)<br />

01.2007 –11.2009 Credit Suisse, CH-Zurich<br />

<strong>IT</strong> Senior Project/Program Manager (Contractor)<br />

Projects 1. Single Portal FX /Money Market for FX Expert amd FX Options (GFS)<br />

2. IFX Insourcing FX –Partner Bank B4B solution<br />

3. eATS Enhancements: Sub-projects DLZ and RTNS (STP Notification)<br />

4. eFX /gFX FX Spot Trade implementation<br />

5. <strong>IT</strong> Architecture and Proposal for extension of SPIR<strong>IT</strong> for EAMs (MEC)<br />

Activities Project Management incl. all planning and monitoring activities based on the<br />

CMMI process.<br />

1. Building of a Single Portal for the Trading applications (Money Market,<br />

Forex Trading, FX structured products, FX Options, etc…), at the same time<br />

contributing to establishment of a CS Standard Portal based on the CS JAP<br />

technology, OBP/GFS Portal Framework and BEA/Oracle Web Portal Server.<br />

Build and Deployment of the appropriate Framework and Portal Modules<br />

(Portlets, Consumers and Producers).<br />

Delivery of Partner Bank Portal (JAP 4.1) and pre-delivery of Expert Net<br />

Portal (JAP 5.0), both complex Internet business applications.<br />

2. Implement offering of Forex Trading Services for external Partner Banks<br />

(B4B) considering White Labeling, consisting of several JAP, non-JAP<br />

applications, integration to Back-End and external Partner Bank<br />

infrastructure.<br />

Integration to the Pilot version of the BEA Portal (OBP) based on JAP 4.1<br />

3. Build of an automatic electronic Trade-Notification (STP) to Customers<br />

using two different technologies: Point-to-Point (DLZ) and RTNS/TOF.<br />

4. Build and ongoing extensions of electronic international Trading Flow<br />

Network in Forex Trading based on Business-Requirements<br />

5. Proposal for <strong>IT</strong> architecture with time and effort estimation to extend the<br />

product SPIR<strong>IT</strong> (structured equities) for EAMs and further user segments.<br />

Contribution for CS CMMI Level II appraisal as full scope focused project (SCAMPI<br />

A) in strong colaboration with Quality Management in 2008.<br />

Change and configuration management for the Project Portfolio, using tools such<br />

a Sharepoint, CVS, SDSS, ClearQuest, Simple Tracker and JAP internal tool chain.<br />

Business and Requirements Engineering and work on <strong>IT</strong> architecture<br />

JAP Single Point of Contact to Trading applications covering standard processes<br />

and infrastructure.<br />

Reference Beat Liver/Iain Dennison (Team Lead); Hans Korman (Program Manager)<br />

22.09.2011 Page 3


CV <strong>Radovan</strong> <strong>Jovanovic</strong> / <strong>J<strong>IT</strong>S</strong><br />

11.2004 –12.2006 Credit Suisse, CH-Zurich<br />

Java Application Platform Consultant (Contractor)<br />

Project<br />

Activities<br />

Java Application Platform (JAP) Services<br />

Pro-active support of business and <strong>IT</strong> applications and projects from JAP Kick off<br />

to Go live, covering mainly development processes, testing, deployment, change<br />

and configuration management, using tools such a CVS, SDSS, ClearQuest and JAP<br />

internal tool chain.<br />

Single Point of Contact to applications for all kind of process-based and technical<br />

support regarding JAP<br />

Quality Management for applications running on JAP (e.g. PO/RO reviews, Test<br />

documents, Change Requests tracking)<br />

Coordination of different external and internal service providers of the Java<br />

Application Platform<br />

Change Management application tracking (Test, Production test and Production)<br />

Coordination with JAP Operations regarding applications implementation and on<br />

going support, incl. problem and service management.<br />

Reference Stefan Küffer/Thomas Koch (Sector Lead); Bernd Hobrack/Georg von Itzenplitz<br />

(Team Lead)<br />

04.2004 –11.2004 Raiffeisen Informatik AG, CH-St.Gallen / CH-Dietikon<br />

Release-, Change- and Configuration Manager (Contractor)<br />

Project RAInova Programm –Datenintegration<br />

DWH-Environment: Data integration using NCR Teradata, ETL-Powercenter,<br />

Websphere (Portal). CM using Serena Dimensions und Documentum eRoom<br />

Activities<br />

Definition of the end-to-end processes in overall Lifecycle of the product<br />

Providing of the Concept of the Configuration and Change Management (KM-<br />

Handbuch)<br />

Versions check of all configurations and deliverables contained in a release<br />

(Configuration Management)<br />

Coordination of all development baselines and releases of all involved products<br />

(Release Management)<br />

Coordination with Quality Management Process and its deliverables.<br />

Short evaluation and implementation of a project Collaboration-Tool<br />

(Documentum eRoom)<br />

Configurations administration using Tools: Serena Dimensions, CVS and<br />

Documentum eRoom<br />

Reference Ernst Bucher (Project) / Atanasios Mantzanas (Program)<br />

11.2003 –03.2004 SBB AG, CH-Bern<br />

Release, Change, Configuration and Test Manager (Contractor)<br />

Project MCT - Multichannel Ticketing, synchronisation of all Ticket-Selling channels<br />

RUP-Iteration-based development<br />

J2EE-Environment: Java, Eclipse, Together, WebSphere, CVS, SMR/FM<br />

Activities<br />

Performing assessments and appropriate evaluation in SCCM-Environment<br />

Definition (Manual) and ongoing optimisation of the deployment processes<br />

between development teams and platform provider<br />

Establishment of an overall and project specific release plan based on project<br />

22.09.2011 Page 4


CV <strong>Radovan</strong> <strong>Jovanovic</strong> / <strong>J<strong>IT</strong>S</strong><br />

plans<br />

Generation and fully documentation of all releases (release notes)<br />

Versions check of all documents and objects contained in a release<br />

(Configuration Management)<br />

Providing of a change and configuration management concept and contribution to<br />

the Project Quality Management.<br />

Definition of the processes in the development and in change, release and<br />

configuration management<br />

Operative change management. Coordination of all changes and test defects in<br />

development and tests<br />

Reference Nicolas Balmer (Program Lead)<br />

08.2003 –11.2003 Roche Diagnostics GmbH, D-Penzberg<br />

Senior SCCM <strong>IT</strong> Consultant (Contractor)<br />

Projects Evaluation and Implementation of a SCCM-Tool for Automation Department<br />

Configuration and Implementation of Software Change und Configuration<br />

Management (SCCM) for the software in the automation<br />

Evaluation of SCCM Tools (CVS, Dimensions, ClearCase, etc…), Testing,<br />

Implementation and Project Management<br />

Definition of the appropriate processes and build of a SCCM-Infrastructure based<br />

on FDA and validation requirements<br />

Reference Martin Weinmann (Team Lead)<br />

02.2003 –07.2003 Training<br />

ACM Web-based courses<br />

Themes Contemporary Project Management (Prince 2, PMI)<br />

Configuration Management (CMM), PVCS Dimensions<br />

Middleware Architecture (Web, B2B, Security, EAI)<br />

Oracle 8, Java Technology<br />

10.2001 –02.2003 Swiss Reinsurance Company, CH-Zurich/Adliswil<br />

Project Manager Single Sign-On Intranet (Web Entry Server) (Contractor)<br />

Projects <strong>IT</strong>-Project Manager Single Sign-On Intranet (Web Entry Server)<br />

Project management including all corresponding activities as team lead,<br />

controling, organisation, coordination and communication with internal and<br />

external interfaces, contracts support; accomplishment of project offers,<br />

concepts, documentation and manuals, information and presentations.<br />

Co-work on the definition of the Security Architecture and integration of several<br />

platforms and applications into Single Sign-On Domain, such as:<br />

TARSEC Secure Entry Server and Login Service (protocols: HTTP/s, IIOP/s,<br />

SOAP, XML)<br />

Siemens Corporate Directory (LDAP, XML)<br />

SwissRe *net JAVA-Framework (WebSphere and Orbix ORB)<br />

Portal (Plumtree), Domino, Documentum, Oracle<br />

Reference Stephan Tuor, Werner Winiger<br />

05.2001 –08.2001 Mount10 Service AG, CH-Dubendorf<br />

Senior System Engineer UNIX/Linux (Contractor)<br />

22.09.2011 Page 5


CV <strong>Radovan</strong> <strong>Jovanovic</strong> / <strong>J<strong>IT</strong>S</strong><br />

Activities Responsibility, Concepts, Realisation and Administration of UNIX (SUN/Solaris,<br />

Compaq/RH-Linux) for the external and internal projects in area AIP and ASP.<br />

Building of the Standard-Servers (Web, App, DB, Mail, File) for Unix and Linux<br />

Building of the Standard-Processes of the Change, Configuration and Release<br />

Management<br />

Projects Customer specific AIP-Infrastructure consisting of SUN/Solaris (Web-Server with Bea<br />

WLS 6.x and DB-Server with Oracle) and dedicated high-secure Linux-Server (RedHat<br />

7.1 & Compaq ProLiant) including the concept, evaluation and realisation.<br />

1995 –2001 Credit Suisse Financial Services (Technology and Services), CH-Zurich<br />

Project Manager, System engineer III<br />

Projects <strong>IT</strong>-PL Software Configuration Management central Server<br />

Project management with all corresponding activities as team lead, controling,<br />

organisation, coordination, internal and external interfaces and communication,<br />

contracts, project offers, concepts, documentation and manuals, information<br />

(Intranet), presentations and training<br />

Definition and implementation of the Configuration and Change Management<br />

processes<br />

Build and maintenance of the SCM-infrastructure and coordination of<br />

implementation of the software projects in area UNIX central Server (DWH,<br />

PeopleSoft, eCommerce)<br />

Tools evaluation and implementation<br />

Technical support of the implementation of the SCM-tools: AIX-administration,<br />

TeamConnection and PVCS Dimensions in the Credit Suisse with all necessary<br />

customizations, implementation of the interfaces (API, CLI) and workflow<br />

automation.<br />

Build of the central web-based support<br />

Implementation and rollout of the PVCS Dimensions as central Software<br />

Configuration Management Tool for central server (Unix) in the Credit Suisse<br />

<strong>IT</strong>-PL Smalltalk Infrastructure<br />

Building and maintanence of the Smalltalk development environment<br />

infrastructure and development processes<br />

Build of the central web- and Lotus Notes-based support<br />

Coordination and synchronisation of various development teams<br />

Implementation of the additional tools and utilities (Replicator, GUI-Frameworks,<br />

Reuse, Rational Rose, UML)<br />

Infrastructure Applications<br />

Lotus Notes Server<br />

MS Access Problem Management Database / Intranet<br />

Reference Oliver Ilk, Irina Rajwitscher<br />

1993 –1995 Siemens Schweiz AG, CH-Zurich<br />

Project Manager, System engineer II, Pre-sales<br />

Activities Technical pre-sales support of the sale team during the pre-sales periode of the<br />

projects in the area of the gas and water supply systems<br />

Realisation of the cross-platform concepts of the automation and visualisation<br />

with focus to the LAN/WAN-communication<br />

Projekt lead of the projects mentioned below<br />

Partialy or complete realisation and implementation<br />

22.09.2011 Page 6


CV <strong>Radovan</strong> <strong>Jovanovic</strong> / <strong>J<strong>IT</strong>S</strong><br />

Projects Gasversorgung Zurich (EGZ) (Gas supply maintenance)<br />

Project management, concept realisation of the multi-platform network<br />

structure (local and dial-up), realisation and implementation of the remote<br />

system for the optimisation of the gas usage, consisting mainly of the Simatic S5<br />

central and external stations, PC with Linux-OS, Tcl/Tk and Expect-scripts.<br />

Industrielle Werke Basel (IWB) (Water supply control)<br />

(Partialy) project management (communication part), realisation and<br />

implementation of the control and visualisation system of the city’s water supply<br />

system, consisting manly of the SUN-Solaris Workstations and Simatic S5 central<br />

and external stations, connected in a LAN/WAN system.<br />

Gas Wasser Versorgung Bern (GWB) (Gas and water supply control)<br />

Project management, realisation and implementation of the control and<br />

visualisation system of the city’s water supply systems.<br />

The functionality similar with IWB (see above), but with completely other<br />

configuration.<br />

Reference Lorenz Grunder (Rittmeyer AG)<br />

1989 –1993 Contractor (JAS –<strong>Jovanovic</strong> Automation Systems), CH-Berikon AG<br />

Automatisation and system enginner, Junior Project Manager<br />

Projects Acquisition, consulting, sales and installation of the own developed software<br />

product for the data acqusition and management of the field signals with<br />

interface between Simatic S5 PLC and PC (DOS, Windows, dBase, Clipper,<br />

Clarion, C).<br />

Concepts, realisation, electrical and software implementation of the various<br />

industry sites with focus in automation and optimization, visualisation and data<br />

acquisition as Subcontractor worldwide:<br />

Alumina supply systems for the aluminium electrolysis: China (Guizhou,<br />

Qinghai), Venezuela (Puerto Ordaz)<br />

Water cleaning systems: Switzerland (Zurich, Allschwil)<br />

Chemistry: Germany (Wacker-Burghausen), Switzerland (Novartis-Basel)<br />

Data acquisition and management, production planning and optimization of<br />

the Schlatter welding systems: Finland, Scottland, Germany<br />

Office automation (Enable, Novell): Alesa Alusuisse AG, Zurich<br />

Further smaller projects<br />

The major customers: Alesa Alusuisse AG Zurich, Schlatter AG Schlieren, Karl<br />

Schweizer AG Basel, Jowa AG Birsfelden.<br />

If needed the detailed projects overview could be delivered.<br />

Reference Dieter Bühler (e~con engineering)<br />

1984 –1989 GEFA KG, CH-Zurich<br />

Automation engineer<br />

Activities Acquisition, Sales and lead of the subsidiary in Zurich<br />

Software development and implementation of the automation of the water<br />

cleaning system for city of Zurich (ARA Werdhölzli, ...) as subcontractor for<br />

Siemens-Albis AG (Simatic S5, Step5).<br />

Development of the interface between PC and Simatic S5 (Protocol P3964R and<br />

dBase, C), training and marketing<br />

Leisure activities<br />

Singing in several choirs incl. choir of Noëmi Nadelmann, Project Audio Studio<br />

22.09.2011 Page 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!