Table 8. Total Whole Rock Metal and Sulfur Geochemistry, M4 Sample<br />

M4 CMRI (1998)<br />

Settling time estimated 30 minutes<br />

A-37<br />

<strong>Kensington</strong> <strong>Gold</strong> <strong>Project</strong> <strong>Final</strong> SEIS<br />

Appendix A<br />

CMRI 1998<br />

CMRI C2 CMRI C3 CMRI C4 CMRI C5<br />

(detection CMRI D2 Leach Decant Leach Decant Leach Decant Leach Decant <strong>Kensington</strong> Mine<br />

Parameter limit) DUPLICATES C2 Water<br />

Water<br />

Water<br />

Water<br />

Water 1998<br />

Met. lab name CMRI CMRI CMRI CMRI CMRI CMRI<br />

Anal. lab name MW/BNL MW/BNL MW/BNL MW/BNL MW/BNL MW/BNL MW/BNL<br />

Process recycle recycle recycle recycle recycle<br />

Date test 1998 1998 1998 1998 1998 9/18/1998<br />

No. samples 1 1 1 1 1 1<br />

Composite 3.7 ton 3.7 ton 3.7 ton 3.7 ton 3.7 ton grab<br />

Aluminum (µg/L) 500 2,700 2,800 3,900 250 1,100 3,200<br />

Arsenic (µg/L) 0.02