y the Engineer-in-Charge or his authorized representative at any time as desired by the<br />
Engineer-in-Charge.<br />
3.1.4. The contractor shall supply free of charge the cement required for testing. The cost of tests<br />
shall be borne by the contractor/ BSNL in the manner indicated below:<br />
i) By the contractor, if the results show that the cement does not conform to relevant BIS<br />
codes.<br />
ii) By BSNL, if the results show that the cement conforms to relevant BIS specifications.<br />
However in both the cases all the expenditure involved in the testing of cement (except the<br />
testing charges charged by approved testing laboratory as per case ii) above) including the<br />
cost of cement, its packing, forwarding etc shall have to be borne by contractor. The Engineer<br />
in charge shall have full right to prescribe from time to time the name of the testing<br />
laboratory from where the cement shall be got tested.<br />
3.1.5 Contractor shall ensure that the cement arranged, procured and stored by him shall be<br />
consumed in the work within 3 months of the date of its manufacture. No Cement after expiry<br />
of this 3 months period from the date of its manufacture shall be used in the work. Contractor<br />
shall be bound to remove all such old cement from the cement godown/ store at his own cost<br />
failing which the Engineer-in-Charge shall have the authority to remove such old cement at<br />
the risk and cost of the contractor.<br />
3.1.6 Contractor shall be bound to submit the certified copies of supply orders, invoices, delivery<br />
challans, vouchers, certificates etc for each consignment of cement arranged and procured by<br />
him for bona fide use in the work failing which the Engineer-in-charge shall have authority to<br />
out rightly reject, apart from taking other actions as per agreement, such items of work in<br />
which cement from such consignment has been used for which the proper documents have<br />
not been submitted by contractor.<br />
3.1.7 All Cement bags and similar perishable items shall be stored by the contractor in a separate<br />
godown/ store which shall be exclusively constructed by the contractor for this purpose at his<br />
own cost as per general guidelines given in the “Typical Sketch for Cement Godown” under<br />
clause 3.2.1.4 of the Specifications and page 130 of the “Standard Form No. BSNLW- 7 / 8”.<br />
The dimensions given in the said sketch are only indicative and the contractor shall be bound<br />
to construct the storage godown of sufficient size so as to properly store the quantity of<br />
cement required for consumption for not less than ONE MONTH. Such godown shall have<br />
weather proof roof and walls. The godown shall be provided with a single door with<br />
arrangement for locking it simultaneously with two locks. The keys of one of the locks shall<br />
always remain in possession of the authorized subordinate representative of the Engineer-In-<br />
Charge and that of the other lock shall be with the authorized agent of the contractor available<br />
at the site of the work so that the cement is removed from the godown according to the daily<br />
requirement only with the knowledge of the both the parties and the account of cement shall<br />
be maintained in the register having the proforma approved by the Engineer-in-charge for the<br />
purpose. The contractor shall be fully responsible for the safe custody of the all the materials<br />
issued to him by the department even if the materials are kept and stored under double lock<br />
system. The account of daily receipts and issues of the cement bags shall be maintained in the<br />
said register which shall be signed daily by the contractor or by his duly authorized agent in<br />
token of correctness of the entries.<br />
3.2. Steel<br />
3.2.1. The procurement of TMT bars conforming to relevant BIS code shall be made from<br />
secondary producers having BIS license to produce TMT bars as specified in schedule –F.<br />
However, if the stipulation is for procurement of steel from secondary producer then if the<br />
contractor uses steel from primary producers the same shall be allowed but nothing extra<br />
shall be payable on this account.<br />
The contractor shall be bound to obtain and furnish to the Engineer in Charge the<br />
manufacturer’s test certificates of each consignment arranged and procured by him for<br />
bonafide use in the work. Samples shall also be taken and got tested by the Engineer in<br />
Contractor 21<br />
Executive Engineer