Residential Floor & Roof Systems Installation Guide - Sistemas ...
Residential Floor & Roof Systems Installation Guide - Sistemas ...
Residential Floor & Roof Systems Installation Guide - Sistemas ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Engineered Lumber <strong>Installation</strong> <strong>Guide</strong><br />
General Notes for Multiple-Piece G-P Lam ® LVL Members<br />
1. Top and bottom rows of connectors should be 2� from edge.<br />
2. Bolt holes are to be the same diameter as the bolt. Every bolt must extend through the full thickness of the member. Use washers under<br />
head and nut. Carriage bolts may be used, but the outermost portion of the head may not be drawn in beyond flush with the outside face<br />
of the LVL member.<br />
3. For three-piece members attached with nails or screws, specified attachment is from each side. Stagger fasteners from opposite sides<br />
by half the fastener spacing to avoid splitting.<br />
4. To minimize rotation, 7" wide members should only be used when loads are applied to both sides, or completely across the top<br />
of the member.<br />
5. 7" wide members, regardless of depth, must be attached using bolts or screws.<br />
Fastening Recommendations for Top-Loaded,<br />
Multiple-Piece Members<br />
Connection reference (A, B, C, etc.) refers to the fastening pattern on page 18.<br />
17<br />
Member Depth 3 1 /2�– 5 1 /4� Wide Multiple Piece Member 7� Wide Multiple Piece Member<br />
9 1 /4�–11 7 /8�<br />
14�–18�<br />
2 rows 16d nails at 12� o.c.<br />
(pattern A)<br />
3 rows 16d nails at 12� o.c.<br />
(pattern B)<br />
Wall of same thickness as multiple-piece G-P Lam LVL and centered<br />
over beam. Multiple-piece LVL beam should not be placed directly<br />
below plumbing walls. LVL beams are not to be notched or drilled<br />
except as noted on pages 16 and 19.<br />
2 rows 1 /2� bolts at 24� o.c.<br />
(pattern C)<br />
or<br />
2 rows 1 /4� x 6� wood screws at 24� o.c.<br />
(see note 3 on page 18)<br />
Joist bearing completely across<br />
top of multiple-piece beam<br />
Top-loaded conditions may result from I-joist details similar to F9, F10 and R3.<br />
In details F9 and F10, the supporting wall may be replaced with properly sized multiple-piece G-P Lam LVL.<br />
Georgia-Pacific Corporation, September 2003