,dh—r tyxzg.k {ks= izca/ku dk;ZØe f}rh; iUuk<br />

foLr`r dk;Z dk izkadyu<br />

dk;Z dk uke % [ksr rkykc xzke dk uke% IkkBk [kljk Øekad% fyLV ds vuqlkj<br />

xzke-iapk;r dk uke% jgqfu;k fodkl [kaM % iUuk<br />

Objective of Work<br />

1) To Reduce the Velocity of Runoff water for Conservation of Soil.<br />

1) Stop the Soil erosion; improve the Moisture in Land & Increase the Production.<br />

1) Earth work in rough excavation, filling excavated earth into depression on banking as<br />

304 directed, top be leveled and neatly dressed.<br />

Standard measurement: 1) 1× 2m +0.90 m ×1.0 = 1.45 cum<br />

2<br />

Total Field Bund:<br />

19268 R.m.× 1.45cum = 27938.60 cum<br />

Total net Qty<br />

Total Amount =Rs, 349000.00<br />

(Says Amount is Rs, 349000.00)<br />

= 27938.6cum<br />

16% Deduct = 4470.0 cum<br />

Total Net Voluble Qty = 23468.0 cum<br />

23468 cum×@ 49.10 =Rs, 1152278.00<br />

22 % Extra = Rs 253501.0<br />

Contingencies charges 2% =Rs, 28115.00<br />