23.11.2014 Views

Patha - Watermissionmp.org

Patha - Watermissionmp.org

Patha - Watermissionmp.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

,dh—r tyxzg.k {ks= izca/ku dk;ZØe f}rh; iUuk<br />

foLr`r dk;Z dk izkadyu<br />

dk;Z dk uke % pSdMSe fuekZ.k xzke dk uke% IkkBk xzke-iapk;r dk uke% jgqfu;k fodkl [kaM % iUuk<br />

pSdMSe Øekad % 01 [kljk dzekad % 184<br />

S.No.<br />

Item<br />

Detailed Estimate ( Measurement with Abstract sheet )<br />

Measurement<br />

Qty. Unit Rate Amount<br />

No. L B H/D<br />

1. 2. 3. 4. 5. 6. 7. 8. 9. 10.<br />

1/0102 Cleaning and dressing upto 15 cm. of the<br />

proposed site 1 25.0 15.0 375.00 Sqm 3.40 1275.00<br />

2/0301 Excavation for foundation in<br />

Central Portion/Head wall<br />

(b) Hard soil 1 12.0 2.0 0.50 12.00 Cum 54.30 651.60<br />

(c) Hard moorum 1 12.0 2.0 0.80 19.20 Cum 72.00 1382.40<br />

Side wall<br />

(b) Hard soil 2 3.0 1.5 1.20 10.80 Cum 54.30 586.44<br />

(c) Hard moorum 2 3.0 1.5 1.20 10.80 Cum 72.00 777.60<br />

U/S wing wall<br />

(b) Hard soil 2 2.0 1.0 1.20 4.80 Cum 54.30 260.64<br />

(c) Hard moorum 2 2.0 1.0 1.20 4.80 Cum 72.00 345.60<br />

D/S wing wall<br />

(b) Hard soil 2 2.0 1.0 1.20 4.80 Cum 54.30 260.64<br />

(c) Hard moorum 2 2.0 1.0 1.20 4.80 Cum 72.00 345.60<br />

Apron<br />

(c) Hard moorum 1 12.0 1.5 0.50 9.00 Cum 72.00 648.00<br />

3/0413(b) P.C.C. 1:3:6<br />

Central Portion/Head wall 1 12.0 2.0 1.25 30.00 Cum 2030.00 60900.00<br />

Page | 126

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!