,dh—r tyxzg.k {ks= izca/ku dk;ZØe f}rh; iUuk<br />
foLr`r dk;Z dk izkadyu<br />
dk;Z dk uke % rkykc fuekZ.k xzke dk uke% IkkBk xzke-iapk;r dk uke% jgqfu;k fodkl [kaM % iUuk<br />
rkykc Øekad % 01 [kljk dzekad % 37@1<br />
Sn./CSR ite<br />
Item of Work Detailed Qty Unit Rate Amount<br />
No.<br />
01 Site Clearance, cutting grass ,ranking into heaps and removing off the premises<br />
1) 60m ×150m = 9000 sqm<br />
9000 sqm 1.10 9900.0<br />
02<br />
2301<br />
304<br />
10%<br />
Over rate<br />
03<br />
2304<br />
304<br />
Striping the seat of embankment of all foreign materials, vegetation and other<br />
earth work growth like grass roots etc. and removing the rubbish up to a<br />
distance of 50m including dressing but excluding jungle clearance .<br />
1) 130 m ×23 m × 0.15 = 448.50 Cum<br />
Excavation the puddle trench for earthen embankment to proper side slope and<br />
bed grade including shoring wherever necessary dressing 50m lead and 1:5m<br />
lift up to 3m depth<br />
1) 20 m ×2.1 +1.2 m × 1.80 = 59.4 Cum<br />
2<br />
100% Hard Moorum<br />
448.50 Cum 54.01 24223.<br />
59.40 Cum 55.20 3279.0<br />