04.04.2022 Views

MARCELOTEIXEIRA_ARCHITECTURE_PORTFOLIO_2021

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Paricarana’s Heart: A space for the integration of scientific knowledge

2018 UFRR FINAL PROJECT

THE RESEARCH

PROJECT PARTI

The research was the first step to find the reasons of the lack

of integration, an online survey was applied to the students,

professors and employees of the university. That raised basic

problems that hindered their mobility and their stay at the

university during the whole day, they are mainly:

To create more space and increase mobility, the inner

streets and parking lots were removed, and a detour on

the main accesses was made (image bellow).

PWD*

CAF

MAIN

ACCESS

• Lack of shading (trees);

• Lack of illumination;

• Lack of a place to integrate with others;

• Lack of a place to rest/chill;

• Some had a job, others children, and stayed at the university

only on the period of the classes.

MAIN ACCESS

DETOUR

INNER STREETS

AND PARKING LOTS

LAW/MUSIC

BUILDING

NPPGCT

IGEO

PROF BUILDING

BUILDING 2

ANNEX

BUILDING 3

IGEO

NUPENERG LAB

BUILDING 5

ANNEX

RNP

BULDING 5

ENGEL

WAREHOUSE

NUPENGE

MED BUILDING

SOCIAL SCIENCES

CENTER

PROCISA

PRONAT

HYDROS

The second step was also covered because the survey

helped to locate the place students and professors had in

common inside the campus, which happened to be the

library. Fortunately the library was almost in the center of the

campus and I knew that the integration space had to be close

to it.

BUILDINGS 6 e 7

HUMAN

SCIENCE

CENTER

DCE

INAN

ANNEX

DCE

RESTAURANT

NPS OBSERVARR

NUPEPA

NUCELE

NUDOCHIS NPJDDH NAPRI NEEDS

WATER

TOWER

BASIC

CYCLE

LIBRARY

LIVING

CENTER

CECOMP

RECTORY

PROINFRA

ARCHIVE

DRH

PRPPG

CBIO

BUILDING 4

SECONDARY

ACCESS

BUILDING 1 BUILDING 2

HEALTH

DIRECTORY

MEDICAL

CLINIC

INSIKIRAN

NUHSA

DECAR

LABCOM

50 0 50 100

More space was revealed when the streets were removed

but there were still two buildings on the way (CECOMP

and RNP). One of the premises of this project was a free

field of view, so if the main building continued the shape

of the library, those buildings could be used as foundations

as showed beside.

*PREDOMINANT WIND DIRECTION

PORTFOLIO MARCELO TEIXEIRA 2021

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!