29.10.2013 Views

Customer Reference Book 2009 - Snow Machines, Inc.

Customer Reference Book 2009 - Snow Machines, Inc.

Customer Reference Book 2009 - Snow Machines, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

14<br />

yAbUlI & SUN MOUNtAIN rESOrtS, CHINA<br />

The sister resorts of Yabuli and Sun Mountain have completed an extensive expansion<br />

of their snowmaking capacity, ending their reliance on natural snow with 98 new SMI®<br />

snow machines that now deliver 90% coverage of all skiable trails. As a result, ski<br />

area officials have been able to open the resorts three weeks earlier than in past years,<br />

despite steadily declining natural snowfalls and marginal weather.<br />

Six different SMI designs have been installed, bringing the total to 105, along with 13<br />

new pumps in six different stations and three reservoirs totaling 700,000 m3. To serve<br />

more than 1300 meters of vertical drop on the Yabuli side, engineers installed four new<br />

stations, with one main pump, one central booster and two upper boosters. Utilizing<br />

SMI’s Smart<strong>Snow</strong> software, the pumping stations and tower fans are fully automated,<br />

and the carriage fans and Viking <strong>Snow</strong>Towers are semi-automated, with manual start<br />

and auto-adjustment. Overall, start-up is extremely easy, with staff members able to<br />

have the entire fleet of machines running within an hour.<br />

SMI worked in close collaboration with the resort team on both mountains to assess<br />

the technical challenges and develop the best engineering solutions to meet them. Construction<br />

crews overcame some difficult conditions including 58 days of rain and some<br />

of the steepest and rockiest terrain in all of China. With the snowmaking capabilities<br />

now in place, Yabuli and Sun Mountain are pursuing their goal of becoming the largest<br />

ski destination in the country. The site has already hosted the <strong>2009</strong> World University<br />

Winter Games, and has also applied to be a location for the Winter Olympics in 2018.<br />

TECHNICal DaTa<br />

Pumping capacity added:<br />

• 6 new stations / 13 new pumps<br />

Water reservoirs: 600,000 m3, 50,000 m3 and 50,000 m3<br />

Level of Automation:<br />

• 30% fully automated / 70% semi-automatic<br />

<strong>Snow</strong> Guns added:<br />

• 40 Super Wizzards (carriage)<br />

• 25 Super Polecats (carriage)<br />

• 19 Viking <strong>Snow</strong>Towers<br />

• 6 Super Wizzards (tower)<br />

• 6 Super PoleCats (tower)<br />

• 2 Kid Wizzards (carriage)<br />

Start-up capacity: 105 machines in one hour<br />

Supplemental snowmaking capacity: 1,200 m3 /<br />

hour (600 m3 at each resort)<br />

Coverage: 100% of skiable terrain -- 102 hectares (250+ acres)<br />

of trails from 365 hydrants<br />

DONNEES TECHNIQUES<br />

Capacité de pompage en plus:<br />

• 6 nouvelles stations / 13 nouvelles pompes<br />

Retenues d’eau : 600,000 m3, 50,000 m3 and 50,000 m3<br />

Niveau d’automatisation:<br />

• 30% en mode automatique / 70% en semi-automatique<br />

Les enneigeurs ajoutés:<br />

• 40 Super Wizzards (sur roue)<br />

• 25 Super Polecats (sur roue)<br />

• 19 Viking <strong>Snow</strong>Towers<br />

• 6 Super Wizzards (sur tour)<br />

• 6 Super PoleCats (sur tour)<br />

• 2 Kid Wizzards (sur roue)<br />

Capacité au démarrage: 105 machines en 1 heure<br />

Capacité supplémentaire : 1,200 m3 /<br />

heure ( 600 m3 sur chaque station)<br />

Couverture: 100% du domaine skiable - 102 hectares de pistes<br />

desservis par 365 hydrants<br />

lES StAtIONS DE yAbUlI Et SUN MOUNtAIN, CHINE<br />

Les stations voisines du domaine de Yabuli Resort et Sun Mountain viennent d’investir<br />

dans 98 nouveaux enneigeurs SMI et peuvent désormais couvrir 90% du domaine skiable.<br />

Ainsi, les stations ont pu ouvrir officiellement 3 semaines plus tôt que les années<br />

passées, et ce malgré des chutes de neige naturelle en constante baisse et des températures<br />

marginales.<br />

6 modèles différents d’enneigeurs ont été installés, soit au total 105 enneigeurs, 13 nouvelles<br />

pompes dans 6 bâtiments différents et 3 retenues d’eau avec une capacité totale<br />

de 700.000m3. Pour faire face aux 1300 mètres de dénivelé côté Yabuli, les ingénieurs<br />

ont installés 4 nouvelles stations de pompage, composées d’une pompe principale et de<br />

trois pompages booster. Les stations de pompage et les ventilateurs sur tour sont complètement<br />

automatisés grâce à la supervision Smart<strong>Snow</strong> de SMI. Les ventilateurs sur<br />

roue et perches Viking <strong>Snow</strong>Towers sont semi automatiques avec démarrage manuel<br />

et réglage du débit automatique. De manière générale, le démarrage des machines est<br />

extrêmement simple et peut être fait en moins d’une heure par les équipes techniques.<br />

SMI a travaillé en étroite collaboration avec les équipes techniques des 2 domaines afin<br />

d’évaluer les enjeux techniques et de proposer des solutions correspondant au mieux à<br />

leurs attentes. Les équipes de la construction ont du affronter 58 jours de pluie et venir<br />

à bout de l’un des terrains les plus escarpés et rocailleux de Chine. Avec de tels moyens,<br />

les domaines de Yabuli Resort et Sun Mountain peuvent désormais continuer à poursuivre<br />

leur objectif et devenir le plus grand domaine skiable du pays. Le site a accueilli<br />

en <strong>2009</strong> les Universiades et également posé sa candidature pour les Jeux Olympiques<br />

d’hiver en 2018.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!