12.07.2015 Views

Manuel d'utilisation et d'entretien DRY 16 à 225 corrigé.pdf - Abac

Manuel d'utilisation et d'entretien DRY 16 à 225 corrigé.pdf - Abac

Manuel d'utilisation et d'entretien DRY 16 à 225 corrigé.pdf - Abac

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ENGLISH2.2 INSTALLATION SITEWhile preparing a proper site for the installation of the dryer, please take into account the followingrequirements The machine must be protected from atmospheric agents and not directly exposed to sun light. A seating base flat and capable to hold the weight of the machine. Ambient temperature complying with the nominal data of the dryer. A clean, dry and without forced draft (we suggest to blow the warm air outside the installation site). Make sure to leave sufficient clearance around the dryer in order to allow an adequate cooling ofthe machine and for maintenance and/or control operations.The incoming air must be free from smoke or flammable vapours which could lead to explosion or firerisks.2.3 INSTALLATIONBefore attempting any installation operation, make sure that No part of system is under pressure. No part of the system is electrically powered. Tubing to be connected to the dryer are impurities free.After having verified the points listed above, you can proceed to the installation of the machine.1. Connect the dryer to the compressed air lines indicated in the diagrams below. If not alreadyexisting, we suggest to install a by-pass allowing to insulate the machine from the plant, thus tofacilitate eventual maintenance operations.2. Check the condensate drainage assembly, and connect the drain flexible hose to the draining line,keeping in mind that the condensate separated by the dryer contains oil particles, therefore,in order to dispose it in compliance with the local rules in force, we suggest a water-oilseparator having adequate capacity.3. Power the dryer after having checked that the nominal voltage and line frequency are constantand matching the nominal values of the machine. The user must provide the installation withan adequate line protection and a ground terminal complying with the electrical ruleslocally in force.1 Air Compressor2 Aftercooler3 Condensate Separator4 Receiver5 Automatic Drain6 Ceramic Prefilter 257 Dust Filter 58 Dryer9 Solenoid drain valve10 Coalescing Filter 1 - 0.1 mg/m 311 Coalescing Filter 0.1 – 0.01 mg/m 312 Activated carbon filter 0.008 mg/m 313 Water/Oil SeparatorEcotronWaterEcotronWaterIn order to optimise the use of the dryer, we suggest to place it in such a way that all the controlinstruments of the machine will result easily visible.Installing a ceramic pre-filter on the air inl<strong>et</strong> of the dryer, this will be b<strong>et</strong>ter protected from eventual solidparticles, as it prevents the accumulation of oily materials on the heath exchangers.Cod. 710.0131.03.00 Rev0B – 03.2006 14 - 58

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!