03.05.2013 Views

6. Bab VI Potensi Konservasi Energi dan Reduksi Emisi di Industri ...

6. Bab VI Potensi Konservasi Energi dan Reduksi Emisi di Industri ...

6. Bab VI Potensi Konservasi Energi dan Reduksi Emisi di Industri ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Laporan Akhir<br />

”Implementation of Energy Conservation and CO CO2 Emission Reduction In <strong>Industri</strong>al Sector (Phase 1)”<br />

Kementerian Perindustrian<br />

4. Fajar Surya Wisesa<br />

No Langkah <strong>Konservasi</strong> <strong>Energi</strong><br />

1<br />

2<br />

Jadual pemeliharaan boiler<br />

dari 3 bulan menja<strong>di</strong> 6 bulan<br />

Sub Total Low Cost<br />

Pemasangan incinerator baru<br />

Sub Total High Cost<br />

Total<br />

PT. Energy Management Indonesia (Persero)<br />

Gambar <strong>6.</strong>11 Konsumsi <strong>Energi</strong> <strong>dan</strong> <strong>Emisi</strong> CO 2<br />

PPE/tahun<br />

GJ %<br />

RE/tahun<br />

Penghematan<br />

Biaya<br />

per Tahun (Rp)<br />

4.666,3 0,62 2.623,43 8.534.754.840<br />

4.666,3 0,6 2.623,4 8.534.754.840,0<br />

Perkiraan Biaya<br />

Investasi (Rp)<br />

2.141.654,0 27,60 113.882,88 192.052.265.625 36<strong>6.</strong>277.500.000 1,91 High Cost<br />

2.141.654,0 27,60 113.882,88 192.052.265.625 36<strong>6.</strong>277.500.000<br />

158.634,9 28,22 11<strong>6.</strong>506,31 200.587.020.465,00 36<strong>6.</strong>277.500.000,00<br />

6-19<br />

0 0,00 No Cost<br />

0,0<br />

Simple<br />

Payback<br />

(Thn)<br />

2011<br />

Kelompok<br />

Investasi

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!