03.05.2013 Views

6. Bab VI Potensi Konservasi Energi dan Reduksi Emisi di Industri ...

6. Bab VI Potensi Konservasi Energi dan Reduksi Emisi di Industri ...

6. Bab VI Potensi Konservasi Energi dan Reduksi Emisi di Industri ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Laporan Akhir<br />

”Implementation of Energy Conservation and CO 2 Emission Reduction In <strong>Industri</strong>al Sector (Phase 1)”<br />

Kementerian Perindustrian 6-31<br />

DESKRIPSI<br />

UNIT/ KETERANGAN<br />

2011 2012 2013<br />

TIMELINE PERKIRAAN IMPLEMENTASI<br />

2014 2015 2016 2017 2018 2019 2020<br />

Pertumbuhan produksi rata-rata 5%/tahun ton<br />

50.731,8 53.268,4 55.931,8 58.728,4 61.664,8 64.748,0 67.985,4 71.384,7 74.953,9 78.701,6<br />

Kebutuhan energi (BAU) GJ<br />

520.694,2 54<strong>6.</strong>728,9 574.065,4 602.768,6 632.907,1 664.552,4 697.780,0 732.669,0 769.302,5 807.767,6<br />

Produksi emisi (BAU) by energy consume t-CO2<br />

69.341,6 72.808,7 7<strong>6.</strong>449,1 80.271,6 84.285,1 88.499,4 92.924,4 97.570,6 102.449,1 107.571,6<br />

Penghematan <strong>Energi</strong> Dengan Implementasi <strong>Konservasi</strong> <strong>Energi</strong><br />

Perawatan preventif<br />

GJ<br />

t-CO2<br />

PPE<br />

RE<br />

3.124,17<br />

416,05<br />

3.280,37<br />

1.164,94<br />

11.481,31<br />

1.528,98<br />

12.055,37<br />

1.605,43<br />

12.658,14<br />

1.685,70<br />

13.291,05<br />

1.769,99<br />

13.955,60<br />

1.858,49<br />

14.653,38<br />

1.951,41<br />

15.386,05<br />

2.048,98<br />

1<strong>6.</strong>155,35<br />

2.151,43<br />

Monitoring <strong>Energi</strong> <strong>dan</strong> Sistem Manajemen<br />

GJ<br />

t-CO2<br />

PPE<br />

RE<br />

390,52<br />

52,01<br />

1.776,87<br />

236,63<br />

2.870,33<br />

382,25<br />

3.013,84<br />

401,36<br />

3.164,54<br />

421,43<br />

3.322,76<br />

442,50<br />

3.488,90<br />

464,62<br />

3.663,35<br />

487,85<br />

3.846,51<br />

512,25<br />

4.038,84<br />

537,86<br />

Merecovery uap blowdown<br />

GJ<br />

t-CO2<br />

PPE<br />

RE<br />

937,25<br />

59,40<br />

4.264,49<br />

270,28<br />

<strong>6.</strong>888,78<br />

436,61<br />

7.233,22<br />

458,44<br />

7.594,88<br />

481,37<br />

7.974,63<br />

505,43<br />

8.373,36<br />

530,71<br />

8.792,03<br />

557,24<br />

9.231,63<br />

585,10<br />

9.693,21<br />

614,36<br />

Pengendalian proses pembakaran dalam GJ PPE 1.230,81<br />

5.600,16 9.046,42 9.498,74 9.973,68 10.472,36 10.995,98 11.545,78 12.123,07 12.729,22<br />

steam boiler<br />

t-CO2 RE 379,52<br />

796,99<br />

836,84 878,68 922,62 968,75 1.017,19 1.068,05 1.121,45 1.177,52<br />

TOTAL PENGHEMATAN ENERGI DAN GJ PPE 5.682,74<br />

14.921,89 30.286,84 31.801,18 33.391,24 35.060,80 3<strong>6.</strong>813,84 38.654,53 40.587,26 42.616,62<br />

REDUKSI EMISI<br />

Ton CO2 RE 906,98<br />

2.468,84 3.184,68 3.343,92 3.511,11 3.686,67 3.871,00 4.064,55 4.267,78 4.481,17<br />

No Langkah <strong>Konservasi</strong> <strong>Energi</strong><br />

1 Perawatan preventif<br />

2 Monitoring <strong>Energi</strong> <strong>dan</strong> Sistem Manajemen<br />

SUB TOTAL LOW COST<br />

3 Merecovery uap blowdown<br />

SUB TOTAL MEDIUM COST<br />

Pengendalian proses pembakaran dalam<br />

4<br />

steam boiler<br />

SUB TOTAL HIGH COST<br />

TOTAL<br />

TIMELINE PERKIRAAN IMPLEMENTASI<br />

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020<br />

PT. Energy Management Indonesia (Persero) 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!