Num.Ord.<br />

TARIFFA<br />

DESIGNAZIONE DEI LAVORI<br />

pag. 15<br />

D I M E N S I O N I<br />

I M P O R T I<br />

Quantità<br />

par.ug. lung. larg. H/peso unitario TOTALE<br />

R I P O R T O 94.080,420 812.882,28<br />

CORPO C3: PIANO TERRA:<br />

PLINTI:<br />

TIPO 2 e3 - Bipalo (tot.7)<br />

5d.16 sup L=400 *(par.ug.=7*5) 35,000 4,000 1,578 220,920<br />

10d.20 inf L=400 *(par.ug.=7*5) 35,000 4,000 2,466 345,240<br />

1+1d.12 L=274 *(par.ug.=7*2) 14,000 2,740 0,888 34,060<br />

St.d.12/20 L=360 *(par.ug.=7*15) 105,000 3,600 0,888 335,660<br />

1+1d.12 L=100 *(par.ug.=7*2) 14,000 1,000 0,888 12,430<br />

PLATEA:<br />

rete sup. d.8 20x20 (vedi apposita voce<br />

reti)<br />

Aggiuntivi nei collegamenti longit. fra<br />

plinti:<br />

long. 6+6d.16 *(lung.=5,20+6,80+7,00+<br />

5,20+6,80+7,10+3,80+5,20+6,90+4,50+<br />

3,00+2,00) 12,000 63,500 1,578 1.202,440<br />

trasv. 1+1d.8/20 L=120 *(par.ug.=2*250) 500,000 1,200 0,395 237,000<br />

Aggiuntivi nei collegamenti trasv. fra<br />

plinti:<br />

long. 6+6d.16 *(lung.=10,70+10,50+6,50) 12,000 27,700 1,578 524,530<br />

trasv. 1+1d.8/20 L=120 *(par.ug.=2*115) 230,000 1,200 0,395 109,020<br />

cavallotti d.8 L=0.70 (inc.0.30/mq)<br />

mq270*0.30=81 81,000 0,700 0,395 22,400<br />

CORDOLO SU PLINTI:<br />

vert. 1+1d.10/20 L=2.10 (5*2.80=14.00/<br />

0.20=70) *(par.ug.=2*70) 140,000 2,100 0,617 181,400<br />

CORDOLO SU PLATEA:<br />

ST. vert. d.10/20 L=3.20 (l=33.60/<br />

0.20=168) 168,000 3,200 0,617 331,700<br />

orizz. su cordolo plinti/platea:<br />

2d.16 2,000 49,000 1,578 154,640<br />

sovrapp. *(par.ug.=2*4) 8,000 0,700 1,578 8,840<br />

orizz. rip. 1+1d.8/20 *(par.ug.=2*5) 10,000 49,000 0,395 193,550<br />

sovrapp. *(par.ug.=2*4) 8,000 0,500 0,395 1,580<br />

FOND. SETTO FIANCO FILO C3-03.1<br />

orizz. 5+5d.16 *(par.ug.=2*5) 10,000 4,800 1,578 75,740<br />

st. d.8/20 L=320 24,000 3,200 0,395 30,340<br />

attese 1+1d.20/20 *(par.ug.=2*10) 20,000 2,000 2,466 98,640<br />

attese 1+1d.16/20 *(par.ug.=2*15) 30,000 2,000 1,578 94,680<br />

BAGGIOLI PILASTRI (tot. n.7):<br />

8 vert d.16 *(par.ug.=7*8) 56,000 2,400 1,578 212,080<br />

st. d.10/20 *(par.ug.=7*10) 70,000 2,000 0,617 86,380<br />

COMMITTENTE:<br />

PIANO TERRA - CORPO C3 - SOLAI IN<br />

C.A.<br />

Armatura integrativa alla rete:<br />

long. d.8/20 inf. 167,000 5,000 0,395 329,830<br />

long. 3+3d.16 6,000 6,500 1,578 61,540<br />

st. d.12/20 28,000 1,700 0,888 42,270<br />

trasv. 2+2d.20 4,000 1,800 2,466 17,760<br />

d.12/20 5,000 1,500 0,888 6,660<br />

3+3d.16 6,000 4,500 1,578 42,610<br />

2+2d.20 4,000 2,500 2,466 24,660<br />

d.12/20 7,000 1,500 0,888 9,320<br />

ferri ad U di chiusura reti sul bordo -<br />

1d.12/20 395,000 1,500 0,888 526,140<br />

idem c.s. verso i cavedi 53,000 1,500 0,888 70,600<br />

st. vert. d.10/20 sul cordolo perimetrale 156,000 1,600 0,617 154,000<br />

st. d.8/20 verso i cavedi 53,000 1,700 0,395 35,590<br />

2d.16 in testa al cordolo perimetrale 2,000 31,200 1,578 98,470<br />

AGGIUNT. ALLA BASE PILASTRO: 4+<br />

4d.16 sup *(par.ug.=2*8) 16,000 2,000 1,578 50,500<br />

cavallotti sostegno rete (inc.0.49/mq)<br />

mq270*0.49=132 d.16 132,000 1,100 1,578 229,130<br />

*********************************<br />

PIANO 1°<br />

PIANO 1°- CORPO C1 - SOLAI IN C.A.<br />

A R I P O R T A R E 100.292,770 812.882,28