11.07.2015 Views

NOVELLINI GROUP

NOVELLINI GROUP

NOVELLINI GROUP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Prodotti speciali / Special Products12min. 10 cmfi ssaggio a murofrontale / front wallinstallationGiada F special 1fi ssaggio a murolaterale / lateral wallfi xingGiada F special 234Giada F special 3Giada F special 4Per la fattibilità delle misure speciali rivolgetevi alla novellini o su: http://store.novellini.comTo check the feasibility of special sizes, please contact your Novellini dealer.Come rilevare le misure / How to take the measurementRilevare le misure da muro a bordo internodel piatto doccia. Le misure devono essererilevate sulla parete fi nita, a rivestimenti posati,secondo gli schemi riportati.Take the measurements from the wall to theinternal edge of the shower tray. Measurementsmust be taken once the walls are fi n-ished and tiled, according to the above drawings.Rilevare le misure da muro a muro, in basso,in alto, al centro e utilizzare quella di valoreinferiore. Le misure devono essere rilevatesulla parete fi nita, a rivestimenti posati,secondo gli schemi riportati.Take the measurements from wall to wall atthe bottom, at the top, in the middle and usethe smallest. Measurements must be takenonce the walls are fi nished and tiled, accordingto the above drawings.30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!