11.07.2015 Views

NOVELLINI GROUP

NOVELLINI GROUP

NOVELLINI GROUP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Dati tecnici / Technical dataVetri / Glass typesManiglie / HandlesYOUNGTrasparenteClearAquaSatinFinitura Profi li / Profi le coloursManiglia Bianca (optional)White Handle (optional)Codice/Code €R40MAYC1-30 15Maniglia Cromo (in dotazione)Chrome handle (standard supply)SilverOptionalBiancoWhiteCromoChromeBarra di sostegno a muro cm 5252 cm wall support bracketFinituraProfi leCodiceCodePrezzoPriceBianco / White R80LUFI-A € 55Silver / Silver R80LUFI-B € 62Cromo / Chrome R80LUFI-K € 62Barra di sostegno a muro cm 3737 cm wall support bracketFinituraProfi leCodiceCodePrezzoPriceBianco / White R80FIS46-A € 32Silver/CromoSilver/ChromeR80FIS46-B € 38Barra di rinforzo 150 cm150 cm support bracketFinituraProfi leCodiceCodePrezzoPriceBianco / White R80YOFIS15-A € 40Silver / Silver R80YOFIS15-B € 48Cromo / Chrome R80YOFIS15-K € 48Come rilevare le misure / How to take the measurementRilevare le misure damuro a bordo interno delpiatto doccia. Le misuredevono essere rilevatesulla parete fi nita, a rivestimentiposati, secondogli schemi riportati.Take the measurementsfrom the wall to the internaledge of the showertray. Measurementsmust be taken once thewalls are fi nished andtiled, according to theabove drawings.Rilevare le misure da muro a muro, in basso, in alto, al centro e utilizzarequella di valore inferiore. Le misure devono essere rilevatesulla parete fi nita, a rivestimenti posati, secondo gli schemi riportati.Take the measurements from wall to wall at the bottom, at thetop, in the middle and use the smallest. Measurements must betaken once the walls are fi nished and tiled, according to the abovedrawings.55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!