Hoogheemraadschap <strong>Delfland</strong><br />
9 januari 2013<br />
Definitief rapport<br />
9R6945.I8<br />
Definitief Ontwerp - <strong>bruggen</strong><br />
Brug 4, 5 en 22
Documenttitel Definitief Ontwerp - <strong>bruggen</strong><br />
Brug 4, 5 en 22<br />
Verkorte documenttitel <strong>DO</strong> brug 4, 5 en 22<br />
Status Definitief rapport<br />
Datum 9 januari 2013<br />
Projectnaam Alternatief Afvoertracé Pijnackerse Vaart<br />
Projectnummer 9R6945.I8<br />
Opdrachtgever Hoogheemraadschap <strong>Delfland</strong><br />
Referentie 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Auteur(s) ing. E.T.J.M. Janssen MSEng/ Ing. S. van Velp<br />
Collegiale toets ir. M.M. Somhorst/ Ing. T. Linthof<br />
Datum/paraaf 9 januari 2013 i.o.<br />
Vrijgegeven door ing. H.T. Nieuwhof<br />
Datum/paraaf 9 januari 2013<br />
HASKONINGDHV NEDERLAND B.V.<br />
RIVERS, DELTAS &COASTS<br />
Barbarossastraat 35<br />
Postbus 151<br />
6500 AD Nijmegen<br />
(024) 328 42 84 Telefoon<br />
info@nijmegen.royalhaskoning.com E-mail<br />
www.royalhaskoningdhv.com Internet<br />
Almere 56515154 KvK<br />
A company of Royal HaskoningDHV
INHOUDSOPGAVE<br />
1 INLEIDING 1<br />
1.1 Projectomschrijving 1<br />
1.2 Doel en reikwijdte document 2<br />
1.3 Leeswijzer 2<br />
2 RANDVOORWAARDEN EN UITGANGSPUNTEN 3<br />
2.1 Ontwerpbasis 3<br />
2.1.1 Programma van Eisen (voorontwerp) 3<br />
2.1.2 Wijzigingen t.o.v. het Programma van Eisen 3<br />
2.2 Bijbehorende documenten 3<br />
2.3 Ontwerplevensduur en betrouwbaarheid 4<br />
2.4 Globlale bouwfasering fasering 4<br />
2.5 Overige uitvoeringstechnische aspecten 4<br />
2.6 Vormgeving 5<br />
3 GEOMETRIE 6<br />
3.1 Brug 4 6<br />
3.1.1 Definitief lengteprofiel 6<br />
3.1.2 Dwarsdoorsnede 6<br />
3.2 Brug 5 7<br />
3.2.1 Definitief lengteprofiel 7<br />
3.2.2 Dwarsdoorsnede 7<br />
3.3 Brug 22 8<br />
3.3.1 Definitief lengteprofiel 8<br />
3.3.2 Dwarsdoorsnede 8<br />
3.4 Opbouw dekconstructie 9<br />
3.4.1 Wegverharding 9<br />
3.4.2 Afwerking en meubilair 10<br />
3.4.3 Stootplaten 10<br />
3.4.4 Zeeg 10<br />
3.5 Landhoofden 11<br />
4 MATERIAALGEGEVENS 12<br />
4.1 Beton 12<br />
4.1.1 Materiaaleigenschappen 12<br />
4.1.2 Partiële materiaalfactoren 12<br />
4.1.3 Toegepaste betonkwaliteiten 12<br />
4.1.4 Afwerking betonoppervlaktes 13<br />
4.1.5 Milieuklasse 13<br />
4.1.6 Cement 13<br />
4.1.7 Dekking 14<br />
4.2 Betonstaal 15<br />
4.2.1 Materiaaleigenschappen 15<br />
4.2.2 Partiële materiaalfactoren 15<br />
5 BELASTINGEN EN BELASTINGCOMBINATIES 16<br />
5.1 Permanente belastingen 16<br />
5.1.1 Eigen gewicht liggers en druklaag 16<br />
<strong>DO</strong> brug 4, 5 en 22 - i - 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013<br />
Blz.
5.1.2 Rustende belasting 16<br />
5.1.3 Eigen gewicht afwerking 16<br />
5.1.4 Grondbelasting 16<br />
5.1.5 Krimp en kruip 16<br />
5.1.6 Zettingen 17<br />
5.2 Veranderlijke belastingen 17<br />
5.2.1 Belastingen op brugleuningen 17<br />
5.2.2 Verkeersbelasting 17<br />
5.2.3 Belasting door remmen of aanzetten 19<br />
5.2.4 Mobiele belasting nabij landhoofden en grondkerende<br />
constructies 20<br />
5.2.5 Sneeuw 20<br />
5.2.6 Windbelasting 20<br />
5.2.7 Temperatuur 20<br />
5.3 Buitengewone belastingen 21<br />
5.3.1 Aanrijdingsbelastingen op stootranden 21<br />
5.4 Belastingcombinaties 21<br />
5.4.1 Grenstoestanden 21<br />
5.4.2 Belastingcombinaties uiterste grenstoestanden 22<br />
5.4.3 Belastingcombinaties bruikbaarheidsgrenstoestanden 22<br />
5.4.4 Belastingcombinaties en –factoren voor geotechnische controles 23<br />
6 AANPAK BEREKENINGEN 24<br />
6.1 Ontwerp dekconstructie 24<br />
6.2 Standaard model: ontwerp landhoofden op palen 24<br />
6.2.1 Geometrie en statisch systeem 24<br />
6.2.2 Belastingen en belastingcombinaties 27<br />
6.2.3 Krachtsverdeling haaks op de wegas 28<br />
6.2.4 Vleugelwanden 29<br />
6.2.5 Stootplaten 29<br />
6.3 Optimalisaties brug 4 30<br />
6.4 Optimalisaties brug 22 30<br />
7 RESULTAAT BEREKENINGEN 31<br />
7.1 Landhoofden 31<br />
7.2 Vleugelwanden 32<br />
7.3 Stootplaten 33<br />
7.4 Wapeningshoeveelheden 33<br />
7.5 Paalkopwapening en toetsing draagvermogen 33<br />
8 GEOTECHNIEK 34<br />
8.1 Grondonderzoek en bodemopbouw 34<br />
8.2 Uitgangspunten fasering 35<br />
8.3 Zettingen 35<br />
8.4 Fundering 37<br />
<strong>DO</strong> brug 4, 5 en 22 - ii - 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
BIJLAGEN<br />
A Tekeningen<br />
B Ontwerp brug 4, 5 en 22<br />
B1 Bepaling prefab dekconstructie<br />
B2 Ontwerp landhoofd – geometrie + statisch systeem<br />
B3 Ontwerp landhoofd – belastingen en belastingcombinaties<br />
B4 Ontwerp landhoofd – raamwerkmodel (dwarsrichting)<br />
B5 Ontwerp landhoofd – krachtsverdeling haaks op de wegas<br />
B6 Ontwerp landhoofd – bepaling wapening<br />
B7 Ontwerp landhoofd – bepaling paalkopwapening<br />
B8 Ontwerp landhoofd – ontwerp vleugelwanden<br />
C Beschouwing optimalisaties brug 4<br />
D Beschouwing optimalisaties brug 22<br />
E Geotechniek<br />
E1 Paaldraagvermogen<br />
E2 Zettingsberekeningen<br />
<strong>DO</strong> brug 4, 5 en 22 - iii - 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
1 INLEIDING<br />
1.1 Projectomschrijving<br />
De Oude Polder van Pijnacker, de Nieuwe of Drooggemaakte Polder en de Noordpolder<br />
van Delfgauw wateren af op de boezemwatergang Pijnackerse Vaart. Als gevolg van<br />
ruimtelijke ontwikkelingen zal de maatgevende afvoer vanuit deze polders in de<br />
toekomst toenemen. Deze ruimtelijke ontwikkelingen houden onder andere in de aanleg<br />
van de Vinex-locaties Tuindershof en Keijzershof. De Pijnackerse Vaart is een bekend<br />
hydraulisch knelpunt in het boezemsysteem van <strong>Delfland</strong> en een vergroting van de<br />
afvoer zal tot extra opstuwing en overlast leiden. Om deze reden is door het<br />
Hoogheemraadschap van <strong>Delfland</strong> een project opgestart voor de realisatie van een<br />
bypass. Het project heet ‘Alternatief Afvoertracé Pijnackerse Vaart’.<br />
Het Alternatief Afvoertracé is in overleg met belanghebbenden verder uitgewerkt tot een<br />
definitief ontwerp van de watergangen. In de onderstaande afbeelding is het definitief<br />
ontwerp van het Alternatief Afvoertracé weergegeven.<br />
Figuur 1.1: Overzicht Alternatief afvoertracé + locatie brug 4, 5 en 22<br />
Ten gevolge van het ontwerp van de watergangen zullen een aantal kunstwerken in het<br />
huidige traject aangepast of vervangen moeten worden.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 1 - 9 januari 2013
1.2 Doel en reikwijdte document<br />
Het doel van dit document is het vastleggen van het Definitief Ontwerp van de <strong>bruggen</strong><br />
4,5 en 22 om daarmee aan te tonen dat het ontwerp voldoet aan het document<br />
“Programma van Eisen <strong>bruggen</strong> <strong>Delfland</strong>” en de van toepassing zijnde normen en<br />
richtlijnen.<br />
Met het Definitief Ontwerp worden de dimensies van de constructieonderdelen en de<br />
materialen (wapening) zodanig vastgelegd dat een duidelijk beeld ontstaat van de<br />
gehele constructie. Het ontwerp geeft een volledig en duidelijk beeld van de omvang,<br />
materiaal en kwaliteit. Hieruit kunnen de realisatiekosten en realisatietijd bepaald<br />
worden.<br />
De uitgangspunten voor deze ontwerpnota zijn vastgelegd in het document “Programma<br />
van Eisen <strong>bruggen</strong> <strong>Delfland</strong>”. Hierin zijn de algemene uitgangspunten vastgelegd voor<br />
het definitief ontwerp van de drie <strong>bruggen</strong>.<br />
Deze ontwerpnota bevat alleen de constructie beoordeling van de landhoofden en de<br />
steunpuntswapening t.b.v. het dek. Het dek, op de steunpuntswapening na, wordt<br />
uitgewerkt door de prefab leverancier. De prefab palen worden uitgewerkt door de<br />
prefab leverancier. Het funderingsadvies van de drie <strong>bruggen</strong> is ook toegevoegd aan dit<br />
document.<br />
1.3 Leeswijzer<br />
Naast de beschrijving en de constructieve onderbouwing van het Definitief Ontwerp in<br />
voorliggende ontwerpnota is het Definitief Ontwerp tekentechnisch vastgelegd op<br />
bijbehorende <strong>DO</strong>-tekening(en). Deze <strong>DO</strong>-tekening(en) maken onlosmakelijk onderdeel<br />
uit van voorliggende ontwerpnota en worden samen met deze ontwerpnota ingediend.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 2 - 9 januari 2013
2 RANDVOORWAARDEN EN UITGANGSPUNTEN<br />
Voor de algemene eisen, de randvoorwaarden en de uitgangspunten wordt verwezen<br />
naar het “Programma van Eisen”.<br />
In dit hoofdstuk worden de randvoorwaarden, uitgangspunten en referenties<br />
samengevat die specifiek voor de constructieve berekening van dit kunstwerk van<br />
toepassing zijn.<br />
2.1 Ontwerpbasis<br />
In onderstaande paragrafen is de ontwerpbasis voorafgaand aan het <strong>DO</strong> vastgelegd.<br />
2.1.1 Programma van Eisen (voorontwerp)<br />
In de voorgaande fase is door Royal HaskoningDHV een Programma van Eisen<br />
opgesteld. Dit Programma van Eisen is in document [D1] vastgesteld en dient als<br />
ontwerpbasis voor het Definitief Ontwerp.<br />
2.1.2 Wijzigingen t.o.v. het Programma van Eisen<br />
De breedte van de randliggers voor brug 22 zijn gewijzigd t.o.v. het Programma van<br />
Eisen. In het Programma van Eisen is een breedte van 250 mm aangehouden voor de<br />
randliggers. Dit is in het definitief ontwerp gewijzigd naar 500 mm.<br />
Verder zijn er geen wijzigingen t.o.v. het Programma van Eisen te benoemen.<br />
2.2 Bijbehorende documenten<br />
Voor het opstellen van de <strong>DO</strong> berekeningen is een Programma van Eisen geschreven<br />
[D1] waarin uitgangspunten zijn opgenomen die van toepassing zijn voor de drie<br />
<strong>bruggen</strong>. Dit Programma van Eisen maakt onlosmakelijk deel uit van deze ontwerpnota.<br />
Bijbehorende <strong>DO</strong>-documenten:<br />
[D1] Programma van Eisen <strong>bruggen</strong> <strong>Delfland</strong> – definitief versie 1.0 d.d. 26-11-2012<br />
Referentie: 9R6945.I8/R0006/ETJ/MJANS/Nijm.;<br />
Bijbehorende <strong>DO</strong>-tekeningen:<br />
[T1] 2641-001 Landbouwbrug 4 nieuwe situatie;<br />
[T2] 2641-002 Landbouwbrug 5 nieuwe situatie;<br />
[T3] 2641-003 Landbouwbrug 22 nieuwe situatie.<br />
Normen en richtlijnen<br />
Voor de gebruikte normen en richtlijnen wordt verwezen naar de bovengenoemde<br />
Programma van Eisen. De drie <strong>bruggen</strong> zijn uitgewerkt op basis van de Eurocode.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 3 - 9 januari 2013
2.3 Ontwerplevensduur en betrouwbaarheid<br />
In de onderstaande tabel is de levensduur en gevolgklasse conform [D1] weergegeven.<br />
Tabel 2.1: Overzicht levensduureisen per onderdeel<br />
Titel Levensduur Betrouwbaarheidsklasse<br />
Hoofddraagconstructie 100 jaar RC1<br />
Leuning (brug 22) 25 jaar RC1<br />
2.4 Globlale bouwfasering fasering<br />
Voor de bouwvolgorde wordt de volgende aanname gedaan:<br />
Aanbrengen duiker min. Ø600 t.b.v. ophoging voorbelasten ondergrond;<br />
Aanbrengen ophoging t.b.v. voorbelastingen ondergrond;<br />
Ontgraven t.b.v. aanbrengen landhoofden;<br />
Realisatie bouwkuipen t.b.v. bouw landhoofden;<br />
Aanbrengen prefab palen;<br />
Snellen paalkoppen;<br />
Aanbrengen werkvloer;<br />
Realisatie van landhoofdbalken;<br />
Realisatie vleugelwanden;<br />
Liggers leggen, van binnen naar buiten;<br />
Aanbrengen druklaag;<br />
Aanvullen grond;<br />
Afbouw kunstwerken.<br />
Het voorbelastingen en zettingen hebben invloed op de krachtswerking in de<br />
constructies. Om deze reden is in paragraaf 8.2 een meer uitgebreide bouwfasering<br />
beschreven.<br />
2.5 Overige uitvoeringstechnische aspecten<br />
De zeeg van de prefab liggers dient voor het plaatsen te worden ingemeten. Prefab<br />
liggers zo veel mogelijk sorteren zodat onderlinge zeegverschillen worden<br />
geminimaliseerd.<br />
De ankers van de leuningen dienen in de randliggers te worden aangebracht. De<br />
voorkeur betreft de ankers van te voren in te storten i.v.m. risico doorboren<br />
voorspanning. De afstand van hart anker tot rand betonnen constructie dient minimaal<br />
100 mm te bedragen.<br />
Vellingkanten 15x15 mm (uitwendige hoeken).<br />
In verband met duurzaamheid van de betonconstructie is het niet toegestaan om<br />
hulpstaven binnen de te hanteren dekking te plaatsen.<br />
T.b.v. in het werk gestorte landhoofden wordt een werkvloer van 70 mm aangebracht.<br />
Op locaties waar op het ontgravingsniveau geen zandpakket aanwezig is, rekening<br />
houden met een grondverbetering (zand) van 0,3 m.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 4 - 9 januari 2013
2.6 Vormgeving<br />
Voor brug 22 is het vormgevingsdocument “Brug Ackerdijkse bossen” opgesteld. Hierin<br />
zijn extra eisen gesteld aan het uiterlijk van het dek, landhoofden, randliggers en<br />
leuning.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 5 - 9 januari 2013
3 GEOMETRIE<br />
3.1 Brug 4<br />
In dit hoofdstuk wordt een beschrijving gegeven van de constructieve opbouw van<br />
brug 4,5 en 22 en zijn de ontwerpkeuzes vastgelegd.<br />
3.1.1 Definitief lengteprofiel<br />
Voor de toeritten is een maximaal hellingspercentage van 12% aangehouden met<br />
topbogen met een straal van 25 m en dalbogen met een straal van 50 m.<br />
Voor het profiel van vrije ruimte in verticale richting onder de brug is uitgegaan van<br />
0,4 m (geen doorvaarthoogte) + 0,050 m uitvoeringstolerantie. De overspanning<br />
bedraagt 7,5 m tussen de landhoofden.<br />
Figuur 3.1: Overzicht lengteprofiel + dwarsdoorsnede watergang t.p.v. brug 4<br />
3.1.2 Dwarsdoorsnede<br />
In de onderstaande figuur een dwarsdoorsnede van het brugdek van brug 4<br />
weergegeven. Brug 4 heeft een breedte van 4,5 m tussen de schampkanten.<br />
Figuur 3.2: Dwarsdoorsnede brugdek, brug 4<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 6 - 9 januari 2013
3.2 Brug 5<br />
3.2.1 Definitief lengteprofiel<br />
Voor de toeritten is een maximaal hellingspercentage van 12% aangehouden met<br />
topbogen met een straal van 25 m en dalbogen met een straal van 50 m.<br />
Voor het profiel van vrije ruimte in verticale richting onder de brug is uitgegaan van<br />
1,0 m (doorvaarthoogte) + 0,050 m uitvoeringstolerantie. De overspanning bedraagt<br />
7,5 m tussen de landhoofden.<br />
Figuur 3.3: Overzicht lengteprofiel + dwarsdoorsnede watergang t.p.v. brug 5<br />
3.2.2 Dwarsdoorsnede<br />
In het onderstaande figuur is een dwarsdoorsnede van het brugdek van brug 5<br />
weergegeven. Brug 5 heeft een breedte van 4,5 m tussen de schampkanten.<br />
Figuur 3.4: Dwarsdoorsnede brugdek, brug 5<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 7 - 9 januari 2013
3.3 Brug 22<br />
3.3.1 Definitief lengteprofiel<br />
Voor de toeritten is een maximaal hellingspercentage van 12% aangehouden met<br />
topbogen met een straal van 25 m en dalbogen met een straal van 50 m.<br />
Voor het profiel van vrije ruimte in verticale richting onder de brug is uitgegaan van<br />
1,0 m (doorvaarthoogte) + 0,050 m uitvoeringstolerantie. De overspanning bedraagt<br />
6,0 m tussen de landhoofden.<br />
Figuur 3.5: Overzicht lengteprofiel + dwarsdoorsnede watergang t.p.v. brug 22<br />
3.3.2 Dwarsdoorsnede<br />
In de onderstaande figuur een dwarsdoorsnede van het brugdek van brug 22<br />
weergegeven. Brug 22 heeft een breedte van 4,0 m tussen de schampkanten.<br />
Figuur 3.6: Dwarsdoorsnede brugdek, brug 22<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 8 - 9 januari 2013
3.4 Opbouw dekconstructie<br />
De dekconstructie bestaat, voor alle drie de <strong>bruggen</strong>, uit geprefabriceerde volstortliggers<br />
die integraal verbonden worden aan de landhoofden. Om oneffenheden uit te<br />
vlakken worden de prefab liggers tijdelijk opgelegd op een EPDM oplegstrip.<br />
De drie <strong>bruggen</strong> hebben de volgende overspanningen tussen de landhoofden:<br />
Brug 4: 7,5 m;<br />
Brug 5: 7,5 m;<br />
Brug 22: 6,0 m.<br />
Er is uitgegaan van prefab liggers met een hoogte van 350 mm. De prefab liggers<br />
krijgen een druklaag met een dikte van 100 mm i.v.m. de steunpuntswapening. De totale<br />
constructieve hoogte bedraagt 450 mm.<br />
De kruisingshoek bedraagt 90 graden.<br />
Brug 22<br />
Voor brug 22 is het principe van de vorm van de randliggers weergegeven in figuur 3.3.<br />
Figuur 3.7: Vormgeving randliggers, conform het vormgevingsdocument “Brug Ackerdijkse bossen”<br />
De randligger van brug 22 loopt door over de vleugelwanden en wordt uitgevoerd<br />
zonder dilataties. De randligger krijgt een licht grijze betonkleur. De afmetingen van de<br />
randligger wijkt af van het vormgevingsdocument “Brug Ackerdijkse bossen”. De breedte<br />
van de randliggers bedraagt 500 mm i.p.v. 250 mm. Verder is voor de hoogte van de<br />
“neus” van de randligger 300 mm aangehouden i.p.v. 200 mm in verband met de<br />
bevestiging van de leuning aan de randligger, zie ook tekening [T3].<br />
3.4.1 Wegverharding<br />
Op brug 4 en 5 wordt geen wegverharding toegepast, het dek wordt “kaal” opgeleverd<br />
zonder verdere afwerking.<br />
Op brug 22 wordt een epoxy slijtlaag toegepast met instrooien met dezelfde kleur en<br />
grootte steenslag als op het bestaande pad, waar de nieuwe brug op aansluit.<br />
Er wordt geen verkanting toegepast.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 9 - 9 januari 2013
Afwatering van regenwater op het brugdek geschiet in de richting van de landhoofden.<br />
Het dek krijgt een zeeg, zie paragraaf 3.4.4.<br />
3.4.2 Afwerking en meubilair<br />
De <strong>bruggen</strong> 4 en 5 krijgen een schampkant met de afmetingen bxh = 250x100 mm.<br />
Voor brug 22 bedraagt de afmetingen van de schampkant bxh= 500x100 mm.<br />
Alleen op brug 22 dient een leuning te worden toegepast, conform het<br />
vormgevingsdocument “Brug Ackerdijkse bossen”, zie onderstaande afbeelding en<br />
Figuur 3.7.<br />
Figuur 3.8: Leuning, conform het vormgevingsdocument “Brug Ackerdijkse bossen”<br />
De leuning is niet berekend in deze ontwerpnota. De aannemer dient de berekening en<br />
detaillering van de leuning ter controle voor te leggen aan de opdrachtgever en<br />
landschapsarchitect.<br />
Op brug 4 en 5 komt geen leuning.<br />
Er worden geen verlichtingsarmaturen op de <strong>bruggen</strong> aangebracht.<br />
3.4.3 Stootplaten<br />
3.4.4 Zeeg<br />
Ter plaatse van de landhoofden zullen stootplaten worden toegepast. Het landhoofd van<br />
brug 4 en 5 komt ter plaatse van de bestaande watergang. In verband met restzettingen<br />
worden voor brug 4 en 5 stootplaten met de afmetingen (L x B x H) 5.000 x 1.000 x<br />
350 mm toegepast.<br />
Brug 22 wordt in het vrije veld gebouwd, hier zullen de restzettingen kleiner zijn. Voor<br />
brug 22 kunnen stootplaten met de afmetingen (L x B x H) 3.000 x 1.000 x 250 mm<br />
worden toegepast.<br />
Het dek heeft in rusttoestand een positieve zeeg van:<br />
w rust<br />
L<br />
<br />
<br />
1000<br />
0,<br />
40<br />
w<br />
var<br />
<br />
8000<br />
1000<br />
<br />
0,<br />
40<br />
w<br />
var<br />
8 <br />
0,<br />
40<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 10 - 9 januari 2013<br />
w<br />
var
3.5 Landhoofden<br />
De landhoofden zijn laaggelegen. De landhoofden worden gefundeerd op prefab palen<br />
vk 400. Aan de landhoofden komen vleugelwanden met een lengte van 3,0 m, die de<br />
grond van de toeritten keren. De vleugelwanden lopen evenwijdig aan de brug.<br />
Figuur 3.9: Doorsnede landhoofd<br />
In het vormgevingsdocument “Brug Ackerdijkse bossen” zijn eisen gesteld aan de<br />
vormgeving van de landhoofden. Zo dient de oppervlakte van de landhoofden en<br />
vleugelwanden van beton met een donker grijze kleur te zijn. Daarnaast krijgt de<br />
oppervlakte van de landhoofden en vleugelwanden een reliëf type Madras van Noe (een<br />
verticaalpatroon van stengels), zie onderstaande afbeelding.<br />
Figuur 3.10: Reliëf landhoofden, Madras van Noe<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 11 - 9 januari 2013
4 MATERIAALGEGEVENS<br />
4.1 Beton<br />
4.1.1 Materiaaleigenschappen<br />
De materiaaleigenschappen van beton zijn samengevat in de onderstaande tabel. In<br />
deze tabel zijn tevens de rekenwaarden van de grootheden aangegeven.<br />
Tabel 4.1: Eigenschappen beton<br />
Sterkteklasse fck<br />
fcd<br />
[N/mm 2 ] [N/mm 2 ] [N/mm 2 ] [N/mm 2 ] [N/mm 2 ]<br />
C12/15 12 8,0 0,73 1,57 27000<br />
C30/37 30 20,0 1,33 2,90 33000<br />
C45/55 45 30,0 1,77 3,80 36000<br />
C55/67 55 36,7 2,00 4,20 38000<br />
Thermische uitzettingscoëfficiënt voor beton bedraagt α = 1,0 x 10-5 K -1 .<br />
4.1.2 Partiële materiaalfactoren<br />
De te hanteren materiaalfactoren voor het bepalen van de rekenwaarde van de<br />
materiaalgrootheden zijn in onderstaande tabel vermeld.<br />
Tabel 4.2: Partiele materiaalfactoren beton<br />
Grootheid Symbool m<br />
Druksterkte fcd = fck/m fcd 1,5<br />
Treksterkte fctd = fctk,0,05 / m fctd 1,5<br />
4.1.3 Toegepaste betonkwaliteiten<br />
In de onderstaande tabel zijn de betonkwaliteiten voor de verschillende<br />
constructieonderdelen weergegeven.<br />
Tabel 4.3: Betonkwaliteiten<br />
Onderdeel Betonkwaliteit toepassing<br />
Betonaanvulling, werkvloer C12/15 in situ, ongewapend beton<br />
Landhoofden C30/37 in situ, gewapend beton<br />
Stootplaten C35/45 Prefab beton<br />
Prefab liggers C55/67 Prefab beton<br />
Druklaag dekconstructie C30/37 in situ, gewapend beton<br />
Prefab palen C45/55 Prefab beton<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 12 - 9 januari 2013<br />
fctd<br />
fctm<br />
[-]<br />
Ecm
4.1.4 Afwerking betonoppervlaktes<br />
In het zicht komende vlakken<br />
In afwijking op het “Handboek Civiele kunstwerken”, wordt voor de landbouw<strong>bruggen</strong> 4<br />
en 5 de eis gesteld dat het betonoppervlak dient te voldoen aan beoordelingsklasse A<br />
conform CUR aanbeveling nr. 100 i.p.v. beoordelingsklasse B1 conform [D.8].<br />
Voor brug 22 dient het betonoppervlak wel te voldoen aan beoordelingsklasse B1<br />
conform CUR aanbeveling nr. 100. Deze eis is van toepassing op betonvlakken in het<br />
zicht. Met betrekking tot de scheurwijdte dient voldaan te worden aan een scheurwijdteeis<br />
van wmax= 0,1 mm. De wapening wordt hier niet op gedimensioneerd, maar<br />
betonoppervlakken in het zicht die niet voldoen aan genoemde scheurwijdte-eis dienen<br />
nabehandeld te worden.<br />
Antigraffiti coating<br />
In afwijking op het “Handboek Civiele kunstwerken”, wordt voor de landbouw<strong>bruggen</strong> 4<br />
en 5 geen anti-graffiti coating toegepast.<br />
Voor brug 22 dient conform het “Handboek Civiele kunstwerken” wel een anti-graffiti<br />
coating te worden aangebracht. Alle in het zicht zijnde beton hiermee afwerken i.v.m.<br />
kleurverschil.<br />
Vellingkanten<br />
Voor brug 4, 5 en 22 dienen vellingkanten van 15 x15 mm te worden toegepast.<br />
4.1.5 Milieuklasse<br />
4.1.6 Cement<br />
Onderstaand zijn de van toepassing zijnde milieuklassen per constructieonderdeel<br />
weergegeven.<br />
Brugdek, schampkant en stootplaten: XC4 en XF3.<br />
Landhoofd: XC4, XF3 en XA2.<br />
Prefab palen: XC4, XA3.<br />
(XA milieuklasse heeft geen invloed op de betondekking en maximale scheurwijdte,<br />
alleen op de betonsamenstelling. De XA-milieuklasse zegt iets over de natuurlijke<br />
zuurtegraad van de stoffen in de bodem en het grondwater. Dit is plaatsafhankelijk en<br />
alleen aan te tonen met behulp van een milieukundig onderzoek.<br />
Gezien de aanwezigheid van veenlagen, wordt uitgegaan van XA3 voor de palen en<br />
XA2 voor het landhoofd.)<br />
De volgende cementsoorten en cementklassen mogen worden toegepast:<br />
In situ beton: Hoogovencement CEM III (>50% gegranuleerde hoogovenslak);<br />
Zie ook CUR 89, art 5.3.<br />
Prefab beton: Hoogovencement CEM III (>50% gegranuleerde hoogovenslak) of<br />
Portlandvliegascement CEM II/B-V (>25% poederkoolvliegas)<br />
Zie ook CUR 89, art 5.3.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 13 - 9 januari 2013
4.1.7 Dekking<br />
Tevens wordt de cementklasse aangehouden conform het volgende overzicht:<br />
In-situ beton: CEM III 42,5 N. (>50% gegranuleerde hoogovenslak)<br />
Prefab beton: CEM III 52,5 N; (>50% gegranuleerde hoogovenslak)<br />
CEM III 52,5 R; (>50% gegranuleerde hoogovenslak)<br />
CEM II/B-V 52,5 N; (>25% poederkoolvliegas)<br />
CEM II/B-V 52,5 R. (>25% poederkoolvliegas)<br />
De minimum dekking cnom is bepaald conform NEN-EN 1992-1-1 art. 4.4.1. De dekking<br />
is apart bepaald t.b.v. de steunpuntswapening voor het dek, de landhoofden en voor de<br />
prefab palen.<br />
Bepaling nominale dekking t.b.v. de steunpuntswapening van het dek en de<br />
landhoofden<br />
Uitgangspunten:<br />
Beginwaarde constructieklasse S4 (+4 klassen)<br />
Ontwerplevensduur 100 jaar (+2 klassen)<br />
Betonsterkteklasse C30/37 (+0 klasse)<br />
Plaatgeometrie (indien de kleinste hoofdafmeting > 1,0 m) (-1 klasse)<br />
Totaal constructieklasse +5 klassen (S5)<br />
Toepassen constructieklasse S5 met een cmin;dur= 35 mm<br />
De betondekking is als volgt opgebouwd:<br />
cnom cmin<br />
c<br />
dev<br />
c ; c c<br />
c<br />
c<br />
; 10mm<br />
cmin max min, b min, dur dur,<br />
y dur,<br />
st dur,<br />
add<br />
cmin,b= staafdiameter of –bundel øk<br />
∆cdur,y= 0 mm (NB art. 4.4.1.2 (6))<br />
∆cdur,st= 0 mm (NB art. 4.4.1.2 (7))<br />
∆cdur,add= 0 mm (NB art. 4.4.1.2 (8))<br />
cmin= 35 mm<br />
neem cmin,b = 25 mm<br />
cdev= 5 mm (NEN-EN 1992-1-1/NB art. 4.4.1.3).<br />
cnom= 35 + 5= 40 mm<br />
Beton gestort tegen een voorbereide ondergrond (incl. schraalbeton) dient de nominale<br />
dekking tenminste k1= cmin,dur + 10 mm= 35 te bedragen. cnom= 40 mm. (1992-1-1<br />
art. 4.4.1.3(4).<br />
** Standaard wordt voor de landhoofden overal een dekking van ctoegepast= 50 mm<br />
toegepast. **<br />
Voor de scheurvormingstoets mogen de scheurwijdtes zijn berekend met de<br />
reductiefactor kx= ctoegepast / cnom ≤ 2 conform NEN-EN 1992-1-1/NB art 7.3.1.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 14 - 9 januari 2013
Bepaling nominale dekking prefab palen<br />
Uitgangspunten:<br />
Beginwaarde constructieklasse S4 (+4 klassen)<br />
Milieuklasse XC4: (+0 klasse)<br />
Betonsterkteklasse ≥C40/50 (-1 klasse)<br />
Geen plaatgeometrie (+0 klasse)<br />
Ontwerplevensduur 100 jaar (+2 klassen)<br />
Totaal constructieklasse +5 klassen (S5)<br />
Toepassen constructieklasse S5 met een cmin;dur= 35 mm<br />
De betondekking is als volgt opgebouwd:<br />
cnom cmin<br />
c<br />
dev<br />
c ; c c<br />
c<br />
c<br />
; 10mm<br />
cmin max min, b min, dur dur,<br />
y dur,<br />
st dur,<br />
add<br />
cmin,b= staafdiameter of –bundel øk<br />
∆cdur,y= 0 mm (NB art. 4.4.1.2 (6))<br />
∆cdur,st= 0 mm (NB art. 4.4.1.2 (7))<br />
∆cdur,add= 0 mm (NB art. 4.4.1.2 (8))<br />
cmin= 35 mm<br />
neem cmin,b = 20 mm<br />
cdev= 5 mm (NEN-EN 1992-1-1/NB art. 4.4.1.3).<br />
cnom= 35 + 5= 40 mm<br />
** De toegepaste dekking (ctoegepast) voor de prefab palen bedraagt 40 mm. **<br />
4.2 Betonstaal<br />
4.2.1 Materiaaleigenschappen<br />
De materiaaleigenschappen van het betonstaal volgens NEN 6008:2008 zijn<br />
samengevat in de onderstaande tabel. In deze tabel zijn tevens de rekenwaarden van<br />
de grootheden aangegeven.<br />
Tabel 4.4: Eigenschappen betonstaal.<br />
Staalsoort fy,k<br />
fy,d<br />
Es<br />
εu,k<br />
[N/mm2] [N/mm2] [N/mm2] [%]<br />
Staven en gerichte draden B 500 B 500 435 200.000 5,00<br />
Gepuntlaste wapeningsnetten B 500 B 500 435 200.000 5,00<br />
4.2.2 Partiële materiaalfactoren<br />
De te hanteren materiaalfactoren voor het bepalen van de rekenwaarde van de<br />
materiaalgrootheden zijn in onderstaande tabel vermeld.<br />
Tabel 4.5: Partiële materiaalfactor betonstaal<br />
Grootheid Symbool m<br />
[-]<br />
Trek- en druksterkte fs 1,15<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 15 - 9 januari 2013
5 BELASTINGEN EN BELASTINGCOMBINATIES<br />
5.1 Permanente belastingen<br />
5.1.1 Eigen gewicht liggers en druklaag<br />
In deze fase is uitgegaan van dekconstructie bestaande uit prefab volstortliggers met<br />
hoogte van 350 mm en een druklaag met een hoogte van 100 mm. De totale<br />
constructiehoogte bedraagt 450 mm.<br />
Het eigen gewicht van de liggers en druklaag bedraagt: 0,45 * 25= 11,25 kN/m 2 .<br />
De dekconstructie wordt momentvast verbonden aan de landhoofden, waardoor een<br />
integraalconstructie ontstaat.<br />
5.1.2 Rustende belasting<br />
Op brug 4 en 5 komt geen afwerkingslaag (geen asfalt of slijtlaag). Op brug 22 komt wel<br />
een slijtlaag.<br />
In verband met toekomstvastheid en omdat het niet uit te sluiten is dat in de loop der tijd<br />
toch wat grond op het dek blijft liggen, is uitgegaan van een rustende belasting door<br />
asfalt of grond met een dikte van 50 mm. Dit resulteert in een rustende belasting van<br />
0,05 * 23= 1,2 kN/m 2 .<br />
5.1.3 Eigen gewicht afwerking<br />
Voor de afwerking zijn de volgende belastingen in rekening gebracht:<br />
Leuning (incl. stalen randplaat): 1,00 kN/m 1 (aanname)<br />
Betonnen schampkant: 5,50 kN/m 1 (1,1 m 1 x 0,20 m 1 x 25,0 kN/m 3 )<br />
5.1.4 Grondbelasting<br />
Op de landhoofden werkt een permanente belasting door gronddrukken. Het gewicht<br />
van de grond (uitgangspunt is zand) bedraagt bij benadering 18 kN/m 3 droog en<br />
20 kN/m 3 nat. De omrekening naar een horizontale belasting gebeurt met het toepassen<br />
van de neutrale gronddrukcoëfficiënt (n = 1,0). Hierbij is rekening gehouden oplopende<br />
gronddruk als gevolg van fluctuerende temperaturen (zie ROK 1.0 pag. 195).<br />
De grondbelasting tegen het landhoofd is uitgewerkt in bijlage B3.<br />
De horizontale grondbelasting betreft een driehoeksbelasting van 4,5 – 55 kN/m 2 .<br />
De verticale grondbelasting bedraagt: 43,2 kN/m 2 .<br />
5.1.5 Krimp en kruip<br />
Aangenomen is, op basis van ervaringsgetallen, dat de krimp- en kruipbelasting een<br />
vervorming van het dek (voor volstortiggers) geeft van maximaal 0,50 mm/m dek.<br />
Uitgaande van een overspanning van (7,5 + 2*0,65/2= 8,15 m bedraagt de verkorting<br />
2,2 mm per zijde van het dek. Deze belasting is in het TS-model ingevoegd als een<br />
temperatuursbelasting. Bij een temperatuur van -50°C treedt een verkorting op van<br />
2,2 mm per zijde van het dek.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 16 - 9 januari 2013
5.1.6 Zettingen<br />
De prefab liggers worden verbonden aan de landhoofden (integraalconstructie). Het<br />
statisch systeem van het eigen gewicht van het dek is in het begin statisch bepaald. In<br />
de loop van de tijd zal dit statisch systeem (alleen eigen gewicht dek) als gevolg van<br />
kruip veranderen naar statisch onbepaald. In de berekeningen is met beide situaties<br />
rekening gehouden.<br />
Een integraalconstructie is gevoelig voor verschilzettingen tussen de landhoofden. De<br />
palen worden in de vaste zandlaag geplaatst. De verschilzettingen tussen de<br />
landhoofden zijn hierdoor verwaarloosbaar klein. Daarnaast is de invloed van mogelijke<br />
verschilzettingen tussen de twee landhoofden beschouwd (niet toegevoegd aan dit<br />
document). De effecten op de krachtsverdeling zijn beperkt. Om deze reden is het<br />
belastingsgeval zettingen niet meegenomen in de raamwerkberekening.<br />
5.2 Veranderlijke belastingen<br />
5.2.1 Belastingen op brugleuningen<br />
Alleen op brug 22 wordt een leuning aangebracht. Conform NEN-EN 1991-2 art. 4.8,<br />
volgen de waarden van de krachten die op het brugdek worden overgedragen door<br />
leuningen uit:<br />
Een lijnbelasting van 3 kN/m (zone a), die zowel een keer horizontaal als verticaal<br />
moet zijn beschouwd, als variabele belasting op de bovenzijde van de leuning;<br />
Er wordt geen rekening gehouden met een stootbelasting (buitengewone<br />
belastingen).<br />
5.2.2 Verkeersbelasting<br />
Voor de belastingen door wegverkeer worden de belastingen volgens de<br />
NEN-EN 1991-2 aangehouden.<br />
Rijstrookindeling<br />
Conform de NEN-EN 1991-2 art. 4.2 dient de brug te worden ingedeeld in theoretische<br />
rijstroken, met elke rijstrook een breedte van 3,0 m. De <strong>bruggen</strong> zijn maximaal 4,5 m<br />
breed. Om deze reden wordt één theoretische rijstrook aangehouden en een reststrook<br />
van 1,5 m.<br />
Belastingsmodel 1 (BM1)<br />
Dit belastingmodel is bedoeld voor de toetsing van globale en lokale belastingeffecten.<br />
Het bestaat uit twee deelsystemen:<br />
a) Tandemstelsel (TS): twee geconcentreerde aslasten, elk met een karakteristieke<br />
waarde van QQk;<br />
b) Gelijkmatig verdeelde belasting (UDL): qqk.<br />
In overleg met de opdrachtgever is voor de <strong>bruggen</strong> een intensiteit van<br />
In onderstaande tabel zijn de in rekening te brengen belastingen per rijstrook volgens<br />
BM1 samengevat.<br />
Rijbanen met minder dan 3 theoretische rijstroken:<br />
Tabel 5.1: Belastingen volgens BM1 m.b.t. rijbanen met minder dan 3 theoretische rijstroken<br />
Belastingssysteem met Gelijkmatig verdeelde belasting per oppervlakte<br />
tandemstelsel (TS)<br />
(UDL)<br />
Qi;k; belasting per as (kN) qi;k (kN/m 2 ) qr;k (kN/m 2 )<br />
Rijstrook i=1 αQ;1 * 300= 273 αq;1 * 9,0= 8,2 -<br />
Reststrook 0 - αq;r * 2,5= 1,75<br />
In de volgende figuur is het belastingsmodel BM1 grafisch weergegeven.<br />
Figuur 5.1: Belastingsmodel BM1<br />
Belastingsmodel 2 (BM2)<br />
Dit belastingmodel dient afzonderlijk te worden beschouwd en is alleen bedoeld voor de<br />
toetsing van lokale belastingeffecten. Het model bestaat uit een enkele aslast die op<br />
iedere willekeurige positie op de rijweg moet zijn toegepast. De grootte van de aslast is<br />
(QQa;k) met Q = Q;1 = 1 en Qa;k = 400 kN.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 18 - 9 januari 2013
Figuur 5.2 Belastingsmodel BM2<br />
Belastingsmodel 3 (BM3)<br />
Dit belastingsmodel mag alleen zijn toegepast indien dit in de projectspecificatie is<br />
voorgeschreven, dit is echter niet het geval. Om deze reden is belastingsmodel 3 niet<br />
van toepassing.<br />
Belastingsmodel 4 (BM4)<br />
Voor belastingsmodel 4 (mensenmenigte) dient een gelijkmatig verdeelde belasting<br />
gelijk aan 5 kN/m 2 in rekening te worden gebracht. Hierin is een vergrotingsfactor voor<br />
dynamische effecten bij inbegrepen.<br />
De belasting door mensenmenigte is echter niet maatgevend t.o.v. het<br />
belastingsmodel 1 (BM1).<br />
5.2.3 Belasting door remmen of aanzetten<br />
De rembelasting is beschreven in NEN-EN 1991-2 art. 4.4.1. De remkracht is afhankelijk<br />
van de totale lengte van de brug en wordt berekend met de onderstaande formule:<br />
Fl;b;k = 0,6 * αQ;1 * (2 Q1;k) + 0,10 * αq;1 * q1;k * wth;1 * L ≤ 800kN<br />
Fl;b;k= 0,6*2*300*0,91 + 0,10*9,0*3,0*(7,5+2*0,65+2*3,0)*0,91= 364 kN.<br />
Rembelasting t.b.v. TS-model (per m 2 ):<br />
Pl;b;k= 364 / ((7,5+2*0,65+2*3,0) * 5,0)= 5,0 kN/m 2 .<br />
De remkracht grijpt aan in de lengte-as van de meest maatgevende rijstrook en mag in<br />
de lengterichting als gelijkmatig verdeeld in rekening zijn gebracht.<br />
Conform NEN-EN 1991-2 art 4.9.2 dient voor het ontwerp en de berekening van de<br />
frontmuren van een landhoofd een remkracht in lengterichting in rekening te zijn<br />
gebracht, met een karakteristieke waarde gelijk aan 0,6Q;1Q1;k, die gelijktijdig aangrijpt<br />
met de aslast Q;1Q1;k van belastingmodel 1 en met de gronddruk van de aanvulling. Van<br />
de aanvulling behoort te zijn aangenomen dat deze niet gelijktijdig wordt belast.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 19 - 9 januari 2013
5.2.4 Mobiele belasting nabij landhoofden en grondkerende constructies<br />
5.2.5 Sneeuw<br />
Conform NEN-EN 1991-2 art. 4.9 dient er bij het ontwerp van landhoofden en<br />
vleugelwanden rekening te worden gehouden met mobiele belasting t.g.v. BM1, zie ook<br />
paragraaf 6.2.4.<br />
Sneeuwbelasting is voor de <strong>bruggen</strong> niet maatgevend en wordt derhalve niet verder<br />
gespecificeerd.<br />
5.2.6 Windbelasting<br />
Windbelasting is voor de <strong>bruggen</strong> niet maatgevend en wordt derhalve niet verder<br />
gespecificeerd.<br />
5.2.7 Temperatuur<br />
De temperatuurbelasting is bepaald conform NEN-EN 1991-1-5. Hierbij is gerekend met<br />
de volgende temperatuurcomponenten:<br />
gelijkmatige temperatuurcomponent;<br />
verticale niet-lineaire temperatuurverschilcomponent.<br />
Gelijkmatige temperatuurcomponent<br />
De gelijkmatige temperatuurcomponent is afhankelijk van de minimale en maximale<br />
luchttemperatuur (Tabel 5.2 van NEN-EN 1991-1-5):<br />
Minimum luchttemperatuur in de schaduw (Tmin) = -27,8°C<br />
Maximum luchttemperatuur in de schaduw (Tmax) = 31,2°C<br />
Hieruit volgen, conform figuur NB.1 – 6.1 uit de Nationale Bijlage, voor een betonnen<br />
brugdek (type 3) de volgende gelijkmatige temperatuurcomponenten:<br />
Minimale gelijkmatige temperatuurcomponent Te,min = -20°C<br />
Maximale gelijkmatige temperatuurcomponent Te,max = 33,2°C<br />
Volgens NEN-EN 1991-1-5 bijlage A dient uitgegaan te worden van een<br />
aanvangstemperatuur T0 van 10°C.<br />
Het maximum bereik van de gelijkmatige temperatuurcomponenten van de brug bij een<br />
verkorting (∆TN;con) en een verlenging (∆TN;exp) is:<br />
∆TN;con = T0 - Te,min = 29,8°C + 23,2°C = +52,9°C i.v.m. integraalconstructie dienen<br />
opwarming en afkoeling te worden gesuperponeerd (opspaneffect).<br />
∆TN;exp = Te,max - T0 = 23,2°C<br />
Het totale bereik van de gelijkmatige temperatuurcomponent van de brug is:<br />
∆TN;con = Te,max - Te,min= 52,9°C.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 20 - 9 januari 2013
Verticale temperatuurcomponent (temperatuurgradiënt)<br />
De verticale temperatuurcompoment is bepaald volgens benadering 2 conform<br />
NEN-EN 1991-1-5+C1:2011/NB:2011 art. 6.1.4.2. Onderstaand is de verticale<br />
temperatuurcomponent weergegeven:<br />
5.3 Buitengewone belastingen<br />
5.3.1 Aanrijdingsbelastingen op stootranden<br />
Er is rekening gehouden met een aanrijdbelasting tegen de vleugelwanden of<br />
schampkanten van 100 kN, die aangrijpt op een hoogte van 0,05 m onder de bovenrand<br />
van de stootrand.<br />
5.4 Belastingcombinaties<br />
In deze paragraaf worden de basis uitgangspunten voor het maken van<br />
belastingcombinaties uitgelegd.<br />
5.4.1 Grenstoestanden<br />
Er moet onderscheid zijn gemaakt tussen uiterste grenstoestanden en<br />
bruikbaarheidsgrenstoestanden.<br />
Uiterste grenstoestanden<br />
Bij de toetsing dient uitgegaan te worden van de volgende grenstoestanden:<br />
STR Intern bezwijken of buitensporige vervorming van de constructie of constructieve<br />
elementen. Hierbij moet de volgende toets worden uitgevoerd: Ed ≤ Rd;<br />
GEO Bezwijken of buitensporige vervorming van de grond, waarbij de sterktes van<br />
grond bepalend zijn voor de te leveren weerstand.<br />
Bruikbaarheidsgrenstoestanden<br />
Deze grenstoestanden hebben betrekking op het functioneren van de constructie onder<br />
normaal gebruik, het comfort van mensen en het uiterlijk van de bouwwerken.<br />
De toetsing behoort te zijn gebaseerd op maatstaven die betrekking hebben op:<br />
a. Vervormingen;<br />
b. Trillingen;<br />
c. Schade die waarschijnlijk nadelig uitwerkt op uiterlijk, duurzaamheid of het<br />
functioneren van de constructie.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 21 - 9 januari 2013
5.4.2 Belastingcombinaties uiterste grenstoestanden<br />
Blijvende of tijdelijke ontwerpsituaties (fundamentele combinaties)<br />
Voor STR en GEO grenstoestanden geldt als combinatie de minst gunstige van de twee<br />
volgende combinaties:<br />
(6.10a)<br />
<br />
<br />
Ed E<br />
G,<br />
j Gk<br />
, j P P Q,<br />
1 <br />
0,<br />
1 Qk<br />
, 1 <br />
Q,<br />
i <br />
0,<br />
i Qk<br />
, i <br />
j1<br />
i1<br />
<br />
(6.10b)<br />
<br />
<br />
Ed E<br />
j <br />
G,<br />
j Gk<br />
, j P P Q,<br />
1 Qk<br />
, 1 <br />
Q,<br />
i <br />
0,<br />
i Qk<br />
, i <br />
j1<br />
i1<br />
<br />
Belastingsfactor voor permanente belastingen;<br />
G, j<br />
j<br />
Reductiefactor voor ongunstige blijvende belastingen G. ξ = 0,80<br />
volgens NEN-EN 1990:2011 NB12;<br />
Gk,j<br />
Belastingsgeval van de som van de representatieve waarden van de<br />
permanente belastingen;<br />
Q, i<br />
Belastingsfactor voor veranderlijke belastingen;<br />
Qk;1<br />
Belastingsgeval voor een representatieve waarden van de<br />
overheersende veranderlijke belasting (ranggetal 1);<br />
Qk;i<br />
Belastingsgeval voor een representatieve waarden van de andere<br />
veranderlijke belasting met ranggetal i;<br />
Combinatiefactor voor de veranderlijke belastingen.<br />
ψi<br />
Buitengewone ontwerpsituaties<br />
Voor de buitengewone ontwerpsituatie geldt als combinatie:<br />
<br />
<br />
(6.11) Ed E<br />
Gk<br />
, j P Ad<br />
<br />
1,<br />
1 Qk<br />
, 1 <br />
2,<br />
i Qk<br />
, i <br />
j1<br />
i1<br />
<br />
Ad Is de representatieve waarde van de buitengewone belasting.<br />
5.4.3 Belastingcombinaties bruikbaarheidsgrenstoestanden<br />
Karakteristieke combinatie<br />
De karakteristieke combinatie wordt normaliter gebruikt voor onomkeerbare<br />
grenstoestanden. Hiervoor geldt de volgende combinatie:<br />
<br />
<br />
(6.14) Ed E<br />
Gk<br />
, j P Qk<br />
, 1 <br />
0,<br />
i Qk<br />
, i <br />
j1<br />
i1<br />
<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 22 - 9 januari 2013
Frequente combinatie<br />
De frequente combinatie wordt normaliter gebruikt voor omkeerbare grenstoestanden,<br />
zoals trillingen en vervormingen. Daarnaast wordt de frequente combinatie ook gebruikt<br />
voor de toetsing van scheurvorming voor gewapende en voorgespannen elementen met<br />
voorspanning met en zonder aanhechting (NEN-EN 1992-1-1/NB tabel 7.1N) en voor de<br />
controle van vermoeiing van de niet-wisselende belastingen (NEN-EN 1992-1-1<br />
art 6.83).<br />
Hiervoor geldt de volgende combinatie:<br />
<br />
n<br />
(6.15) Ed<br />
E<br />
Gk<br />
, j P <br />
1,<br />
1 Qk<br />
, 1 <br />
2<br />
j1<br />
i1<br />
Quasi-blijvende combinatie<br />
De quasi-blijvende combinatie wordt normaliter gebruikt voor de langetermijneffecten en<br />
voor het uiterlijk van de constructie, bijvoorbeeld vervorming door blijvende belasting<br />
(bepaling zeeg), krimp en kruip NEN-EN 1992-1-1 art. 2.3.2.2(3) en scheurvorming in de<br />
uitvoeringsfase (NEN-EN 1992-2 art. (104)). Hiervoor geldt de volgende combinatie:<br />
n<br />
<br />
<br />
(6.16) Ed<br />
EGk<br />
, j P <br />
2,<br />
i Qk<br />
, i <br />
<br />
i1<br />
<br />
In het overzicht van de belastingcombinaties in bijlage C zijn de belastings- en<br />
combinatiefactoren verwerkt.<br />
5.4.4 Belastingcombinaties en –factoren voor geotechnische controles<br />
Volgens de NEN 9997-1 art. 2.4.7.3.4.1 moet voor alle geotechnische berekeningen<br />
ontwerpbenadering 3 zijn toegepast.<br />
Volgens NEN 9997-1 bijlage A.3.1 geldt dat voor een geotechnische belasting op een<br />
geotechnische constructie zijnde een fundering, de partiële factoren volgens tabel A.3<br />
kolom A1 moeten zijn toegepast. Dit komt overeen met de partiële factoren conform<br />
tabel NB.13 en NB.14 van NEN-EN 1990.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 23 - 9 januari 2013<br />
, i<br />
Q<br />
k , i
6 AANPAK BEREKENINGEN<br />
In dit hoofdstuk is een beschrijving gegeven van de wijze waarop de berekeningen zijn<br />
uitgevoerd en welke uitgangspunten daarbij zijn aangehouden.<br />
6.1 Ontwerp dekconstructie<br />
De brugdekken worden momentvast verbonden aan de landhoofden<br />
(integraalconstructie). Hierdoor zijn geen oplegblokken benodigd.<br />
Het constructief ontwerp van het dek ligt bij de leverancier van de prefab liggers. Wel is<br />
in deze ontwerpnota de steunpuntswapening bepaald. Ook de lengte van de<br />
steunpuntswapening is bepaald, rekening houdend met de verankering en de lengte<br />
voor de overlappingslassen. Voor de steunpuntswapening is uitgegaan van een<br />
dekconstructie met een constructieve hoogte van 450 mm (prefab liggers h= 350 mm +<br />
een druklaag van 100 mm).<br />
Voor het ontwerp van het dek en de landhoofden is één model gemaakt. Voor een<br />
verdere omschrijving van het ontwerp zie paragraaf 6.2.<br />
6.2 Standaard model: ontwerp landhoofden op palen<br />
Brug 4, 5 en 22 zijn niet geheel identiek aan elkaar. De overspanningen van brug 4 en 5<br />
zijn gelijk, namelijk 7,5 m tussen de landhoofden. De overspanning van brug 22 is<br />
kleiner, namelijk 6,0 m tussen de landhoofden. Daarnaast heeft brug 4 een kleiner<br />
Profiel van Vrije ruimte tussen de brug en de waterlijn dan brug 5 en 22. Toch is voor de<br />
drie <strong>bruggen</strong> 4, 5 en 22 één berekening gemaakt. Vervolgens is nog wel gekeken of<br />
voor brug 22 en brug 4 optimalisaties mogelijk zijn.<br />
In de volgende paragrafen is eerst de volledige berekening van de landhoofden voor<br />
brug 4, 5 en 22 beschreven. Daarna volgt een beschrijving van welke optimalisaties zijn<br />
beschouwd.<br />
De berekening van het landhoofd is weergegeven in bijlage B2 t/m B8.<br />
6.2.1 Geometrie en statisch systeem<br />
Voor brug 4, 5 en 22 is dus één standaard berekening gemaakt. In de onderstaande<br />
figuren is de geometrie van de landhoofden weergegeven.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 24 - 9 januari 2013
Figuur 6-1: Geometrie landhoofd inclusief vleugelwanden t.b.v. standaard berekening<br />
Figuur 6-2: Bovenaanzicht landhoofd t.b.v. standaard berekening<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 25 - 9 januari 2013
Het dek is momentvast verbonden aan de landhoofden. Om deze reden is een model<br />
gemaakt van de totale constructie (twee landhoofden en het dek). Onderstaand is het<br />
statisch systeem weergegeven.<br />
Figuur 6-3: Statisch systeem landhoofden + dek t.b.v. standaard berekening<br />
Voor het dek is een gescheurde E-modules aangehouden van Egem= 9465 N/mm 2 . Dit<br />
levert maximale steunpuntsmomenten in het dek op (niet het maximale veldmoment). In<br />
principe zal alleen de druklaag t.p.v. de steunpuntswapening scheuren, de<br />
voorgespannen prefab liggers zijn ongescheurd. Om deze reden is dit een conservatief<br />
uitgangspunt.<br />
Het betreft een model per stekkende meter. Om deze reden is een fictieve breedte voor<br />
de palen ingevoerd. Het landhoofd is 5,0 m breed en heeft 2 rijen van 3 palen. De<br />
fictieve paalbreedte bedraagt: 3 / 5 * 400= 240 mm.<br />
De palen zijn schoor 10:1 geplaatst omdat dit gunstig is voor eventuele paalzettingen.<br />
Voor de palen is als verticale veerstijfheid is Kv,laag= 25.000 kN/m op het paalpuntniveau<br />
aangehouden. Dit levert de maximale paalkopmomenten. Een hoge verticale<br />
veerstijfheid (Kv,hoog) levert iets hogere verticale paalbelastingen van ca. ΔFEd= 8,0 kN =<br />
4% toename op. De palen hebben voldoende capaciteit om deze extra belastingen op te<br />
kunnen nemen. Om deze reden is een berekening met een hoge verticale veerstijfheid<br />
niet toegevoegd.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 26 - 9 januari 2013
De palen onder de landhoofden hebben naast een verticale veerstijfheid ook een<br />
horizontale bedding. Voor de horizontale beddingen geldt dat de palen in elkaars<br />
invloedsgebied staan. Om deze reden dienen de voorste palen een capaciteit van 95%<br />
van een enkele paal te hebben en de achterste paal 76% van een enkele paal. Ter<br />
vereenvoudiging van het model is voor alle palen een capaciteit van 76% van een<br />
enkele paal aangehouden. Onderstaand zijn de horizontale beddingen weergegeven.<br />
NAP -4,25 m – NAP -14,0 0,76*1800= 1350 kN/m 3 ;<br />
NAP -14,0 m – NAP -18,0 0,76*2100= 1600 kN/m 3 ;<br />
NAP -18,0 m – NAP -23,0 0,76*40.000= 30.400 kN/m 3 ;<br />
Tegen het landhoofd is een bedding aangehouden van 1600 kN/m 3 .<br />
6.2.2 Belastingen en belastingcombinaties<br />
In hoofdstuk 5 en bijlage B3 zijn de belastingen en de regels voor de<br />
belastingcombinaties uitgeschreven. In het raamwerkmodel (basismodel) zijn de<br />
volgende belastingen beschouwd:<br />
Eigen gewicht (van de totale constructie);<br />
Permanente belasting (grond of asfalt);<br />
Grondbelasting (tegen het landhoofd, zowel horizontaal als verticaal);<br />
Kruip (door wijziging statisch systeem eigen gewicht dekconstructie);<br />
Krimp en kruip;<br />
Verkeersbelasting, gelijkmatig verdeeld (UDL);<br />
Verkeersbelasting, tandemstelsel (TS) t.p.v. midden dek (M);<br />
Verkeersbelasting, tandemstelsel (TS) t.p.v. landhoofd (V);<br />
Verkeersbelasting, rembelasting;<br />
Temperatuur, gelijkmatige temperatuurcomponent (zowel verlenging als verkorting);<br />
Temperatuur, gradiënt (zowel opwarming als afkoeling);<br />
Windbelasting is niet significant en daarom niet meegenomen.<br />
Het eigen gewicht van het dek zal in het begin statisch bepaald op de landhoofden<br />
rusten. Door tijdsafhankelijke kruip verandert dit naar statisch onbepaald. Om deze<br />
reden is het eigen gewicht zowel statisch bepaald als statisch onbepaald beschouwd.<br />
De toename van de krachten t.g.v. het wijzigen van het statisch systeem, door kruip van<br />
het eigen gewicht van het dek, zijn apart bij de resultaten uit het raamwerkmodel<br />
opgeteld (zie bijlage B4).<br />
Uit het raamwerkmodel volgt dat de krachten ten gevolge van temperatuur en<br />
krimp & kruip zeer klein zijn. Daarnaast geldt voor de temperatuursbelasting ψ0= ψ2=<br />
0,3, waardoor het aandeel temperatuursbelasting in de combinaties nog kleiner wordt.<br />
Om deze reden is temperatuur niet meegenomen in de fundamentele<br />
belastingcombinaties (niet significant). In de frequente belastingcombinaties is de<br />
temperatuursbelasting wel meegenomen, omdat dit een kleine invloed heeft op de<br />
scheurvorming. Krimp en kruip zijn niet meegenomen in de belastingcombinaties in het<br />
raamwerkmodel, maar achteraf en indien krimp en kruip van invloed is, m.b.v. een<br />
Excelsheet opgeteld bij de resultaten uit het raamwerkmodel.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 27 - 9 januari 2013
In de onderstaande tabellen zijn de beschouwde fundamentele (STR) en frequente<br />
(FREQ) belastingcombinaties weergegeven.<br />
Belastingen FC1 FC2 FC3 FC4 FC5 FC6 FC7 FC8 FC9 FC10 FC11 FC12 FC13<br />
EG 1,20 1,10 1,10 1,10 1,10 1,20 1,20 0,90 0,90 0,90 0,90 0,90 0,90<br />
Permanent 1,20 1,10 1,10 1,10 1,10 1,20 1,20 1,10 1,10 1,10 1,10 1,20 1,20<br />
Grondbelasting 1,20 1,10 1,10 1,10 1,10 1,20 1,20 1,10 1,10 1,10 1,10 1,20 1,20<br />
BM1 – UDL - 1,20 1,20 0,96 0,96 0,96 0,96 1,20 1,20 0,96 0,96 0,96 0,96<br />
BM1 – TS (M) - 1,20 - 0,96 - 0,96 - 1,20 - 0,96 - 0,96 -<br />
BM1 – TS (V) - - 1,20 - 0,96 - 0,96 - 1,20 - 0,96 - 0,96<br />
BM1 – remmen - 0,96 0,96 1,20 1,20 0,96 0,96 0,96 0,96 1,20 1,20 0,96 0,96<br />
Belastingen Freq1 Freq 2 Freq 3 Freq4 Freq5 Freq6 Freq7 Freq8 Freq9 Freq10 Freq11 Freq12<br />
EG 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0<br />
Permanent 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0<br />
Grondbelasting 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0<br />
BM1 – UDL 0,8 0,8 0,8 0,8 0,8 0,8 0,8 0,8 0,8 0,8 0,8 0,8<br />
BM1 – TS (M) 0,8 - 0,8 - 0,8 0,8 - - 0,8 0,8 - -<br />
BM1 – TS (V) - 0,8 - 0,8 - - 0,8 0,8 - - 0,8 0,8<br />
BM1 –<br />
remmen<br />
Temperatuur<br />
gelijkmatig<br />
verlenging<br />
Temperatuur<br />
Gradient<br />
Opwarming<br />
Temperatuur<br />
Gradient<br />
Afkoeling<br />
0,8 0,8 - - 0,8 0,8 0,8 0,8 - - - -<br />
- - - - 0,3 0,3 0,3 0,3 0,3 0,3 0,3 0,3<br />
- - - - 0,3 - 0,3 - 0,3 - 0,3 -<br />
- - - - - 0,3 - 0,3 - 0,3 - 0,3<br />
In bijlage B4 is het raamwerkmodel weergegeven. Om te controleren of de belastingen<br />
goed zijn ingevoerd is per belastinggeval een controle uitgevoerd op de totale<br />
reactiekrachten. Hieruit volgt dat alle belastinggevallen een afwijking hebben die kleiner<br />
is dan 3%. Dit ligt binnen de nauwkeurigheid van de ontwerpmethodiek.<br />
6.2.3 Krachtsverdeling haaks op de wegas<br />
Om de krachten in langsrichting van het landhoofd te bepalen is een nieuw model<br />
opgesteld. Hiervoor is een fictieve betondoorsnede van bxh= 1000x650 mm<br />
aangehouden. Als belasting is het eigen gewicht, permanente belasting, grondbelasting<br />
en de verkeersbelastingen UDL en TS aangehouden. De belasting door het<br />
tandemstelsel (TS) wordt over 4,25 m gespreid, dit is bijna gelijk aan de dekbreedte.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 28 - 9 januari 2013
6.2.4 Vleugelwanden<br />
De vleugelwanden zijn relatief groot. Om deze reden zijn de vleugelwanden apart<br />
beschouwd in een Scia-plaatmodel. De berekening van de vleugelwanden is<br />
weergegeven in bijlage B8.<br />
Als permanente belastingen tegen de vleugelwanden is rekening gehouden met<br />
horizontale gronddruk. Hierbij is voor de neutrale gronddruk λn= 1,0 aangehouden i.v.m.<br />
het opspaneffect van de vleugelwanden en eventuele zettingen. De grondwaterstand is<br />
tot aan het maaiveld aangehouden. Vanaf het maaiveld tot het hart van de vloer varieert<br />
de horizontale permanente belasting van 0 – 54 kN/m 2 .<br />
Verder is rekening gehouden met de veranderlijke belastingen door het tandemstelsel.<br />
Hierbij wordt één vleugelwand belast door twee wielen van het tandemstelsel. Voor de<br />
neutrale gronddruk is λn= 0,5 aangehouden. De belasting door het tandemstelsel spreidt<br />
in de grond. Uiteindelijk is een horizontale belasting 30 kN/m 2 tegen<br />
het driehoekig deel van de vleugelwand (A= 4,73 m 2 ) geplaatst, zie onderstaande<br />
afbeelding.<br />
Figuur 6-4: Overzicht in rekening gebrachte oppervlakte t.b.v. horizontale belasting door het<br />
tandemstelsel<br />
Voor de vleugelwanden is in de bijlage B8 de buigwapening en dwarskrachtwapening<br />
bepaald.<br />
6.2.5 Stootplaten<br />
Voor de geometrie van de stootplaten zie paragraaf 3.4.3. De stootplaten zijn bepaald<br />
conform de NBD00750. De wapening in de stootplaten is bepaald conform de<br />
NEN-EN 1992-1-1.<br />
De stootplaten worden opgelegd op een console. Deze console dient verbonden te<br />
worden met de landhoofden. De console is niet uitgewerkt in deze ontwerpnota en dient<br />
in een latere fase te worden uitgewerkt.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 29 - 9 januari 2013
6.3 Optimalisaties brug 4<br />
In bijlage C zijn de optimalisaties voor brug 4 beschouwd. Hierbij is een nieuw<br />
raamwerkmodel opgesteld, met daarbij de werkelijke afmetingen van het landhoofd van<br />
brug 4 (Profiel van Vrije ruimte onder de brug is 600 mm kleiner bij brug 4 dan bij<br />
brug 5).<br />
Uit de beschouwing volgt dat de krachten maar beperkt afnemen (het<br />
steunpuntsmoment maximaal 8%) en sommige krachten zoals het paalkopmoment zelfs<br />
toeneemt als gevolg van minder bedding tegen een kleiner landhoofd. De<br />
paalkopwapening heeft voldoende reservecapaciteit om deze extra belasting op te<br />
kunnen nemen. Geadviseerd wordt om geen optimalisaties t.o.v. het “standaardmodel”<br />
(paragraaf 6.2).<br />
6.4 Optimalisaties brug 22<br />
In bijlage D zijn de optimalisaties voor brug 22 beschouwd. Ook voor brug 22 is een<br />
nieuw raamwerkmodel opgesteld, met daarbij de kortere overspanning t.o.v. brug 4 en 5<br />
(6,0 m tussen de landhoofden i.p.v. 7,5 m).<br />
Uit de beschouwing volgt dat de steunpuntswapening t.b.v. het dek geoptimaliseerd kan<br />
worden. In het standaard model is als steunpuntswapening Ø20-150 + Ø20-300<br />
toegepast. Voor brug 22 kan als steunpuntswapening Ø16-150 + Ø20-300 worden<br />
toegepast.<br />
Verder blijkt dat de paalkopmomenten zijn afgenomen. In het standaard model wordt<br />
12Ø20 toegepast als paalkopwapening. Dit kan echter niet gereduceerd worden naar<br />
12Ø16. Tussenliggende combinaties van Ø20 en Ø16 zijn mogelijk, echter is de<br />
besparing beperkt. Om deze reden wordt geadviseerd om de paalkopwapening niet te<br />
wijzigen t.o.v. brug 4 en 5.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 30 - 9 januari 2013
7 RESULTAAT BEREKENINGEN<br />
7.1 Landhoofden<br />
Algemene eigenschappen:<br />
Betonsterkteklasse C30/37<br />
Dekking 50 mm<br />
Milieuklasse XC4, XF3 en XA2<br />
Wapening landhoofden<br />
De wapening voor de landhoofden is bepaald met behulp van Excel spreadsheets. Voor<br />
de langswapening is uitgegaan van 0,67% van de effectieve betondoorsnede. Voor de<br />
effectieve zone is een breedte van 300 mm aangehouden langs de omtrek van het<br />
landhoofd. Met deze langswapening kunnen ook de krachten uit het langsmodel worden<br />
opgenomen.<br />
In het onderstaand figuur is de wapening voor de landhoofden weergegeven. Hierin is<br />
ook de steunpuntswapening voor het dek weergegeven.<br />
Figuur 7-1: Overzicht wapening landhoofden<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 31 - 9 januari 2013
7.2 Vleugelwanden<br />
De wapening voor de vleugelwanden is bepaald met behulp van Excel spreadsheets. In<br />
het onderstaand figuur is de wapening voor de vleugelwanden weergegeven.<br />
Figuur 7-2: Overzicht wapening vleugelwanden<br />
Voor de vleugelwanden is dwarskrachtwapening benodigd, zowel verticaal als<br />
horizontaal. In het onderstaande figuur is de dwarskrachtwapening weergegeven.<br />
Figuur 7-3: Zijaanzicht dwarskrachtwapening vleugelwanden<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 32 - 9 januari 2013
7.3 Stootplaten<br />
Algemene eigenschappen:<br />
Betonsterkteklasse C30/37<br />
Dekking 40 mm<br />
Afmetingen stootplaten brug 4 en 5: lxbxh= 5000x1000x350 mm<br />
Afmetingen stootplaten brug 22: lxbxh= 3000x1000x250 mm<br />
7.4 Wapeningshoeveelheden<br />
De wapeningshoeveelheid van de landhoofden bedraagt 130 kg/m³.<br />
De wapeningshoeveelheid van de vleugelwanden bedraagt 200 kg/m³.<br />
De wapeningshoeveelheid van de stootplaten L= 5,0 m bedraagt 220 kg/m³.<br />
De wapeningshoeveelheid van de stootplaten L= 3,0 m bedraagt 240 kg/m³.<br />
De (wapenings)hoeveelheden van het dek zijn niet beschouwd.<br />
De wapeningshoeveelheden zijn inclusief 15% knip- en lasverliezen en excl. hulpstaal.<br />
7.5 Paalkopwapening en toetsing draagvermogen<br />
Per landhoofd worden twee rijen van 3 prefab palen vierkant 400 toegepast. De palen<br />
worden schoor 10:1 geplaatst. Het paalpuntniveau bedraagt NAP – 23,0 m.<br />
Betonkwaliteit 45/55 en milieuklasse XC4 en XA3 dient te worden aangehouden. De<br />
betondekking bedraagt 40 mm.<br />
Als paalkopwapening dient 12Ø20te worden toegepast. De palen dienen te worden<br />
gesneld en de paalkopwapening dient minimaal 500 mm te zijn verankerd in het<br />
landhoofd. De totale lengte van de paalkopwapening in de prefab palen bedraagt 3,0 m.<br />
De maximale paalbelasting bedraagt 417 kN/m * 5/3= 695 kN/paal.<br />
Het draagvermogen van deze palen bedraagt 771 kN/paal.<br />
Unity check: 0,90 < 1,0 akkoord.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 33 - 9 januari 2013
8 GEOTECHNIEK<br />
Ten behoeve van de nieuwe <strong>bruggen</strong> te Delfgauw zijn geotechnische berekeningen<br />
uitgevoerd om de fundering te bepalen en om zettingen in te schatten van de toeritten.<br />
Tevens is rekening gehouden met de fasering van de uitvoering in verband met de te<br />
verwachten zettingen. Er zijn drie landbouw<strong>bruggen</strong> beschouwd. Bij brug 4 en 5 wordt<br />
de watergang deels verlegd en dient een deel van de bestaande watergang te worden<br />
aangevuld. Hierdoor ontstaat een grotere aanvulling in het bestaande talud waardoor<br />
grotere zettingen zullen ontstaan. Brug 22 wordt in het “vrije veld” gebouwd. Voor het<br />
ontwerp van de <strong>bruggen</strong> wordt verwezen naar tekening 2641-002 van d.d. 12-12-2012.<br />
In figuur 8-1 is een algemene dwarsdoorsnede weergegeven van brug 5.<br />
Figuur 8-1: Dwarsdoorsnede brug 5<br />
8.1 Grondonderzoek en bodemopbouw<br />
Ten behoeve van het project is een grondonderzoek uitgevoerd dat mede voor de<br />
volgende berekeningen is gebruikt. Het grondonderzoek is uitgevoerd door Mos<br />
Grondmechanica in juni 2012 met referentie R1200730-RH_1. Aanvullend is een<br />
archiefsondering gebruikt, S017B ten behoeve van de fundering voor brug 5. Deze<br />
bevindt zich op de locatie van de te realiseren brug.<br />
Naar aanleiding van het grondonderzoek zijn de volgende algemene uitgangspunten<br />
gehanteerd:<br />
Gebruikte sonderingen:<br />
Brug 4: S2, SW3, zand op NAP -16,0 m resp. NAP -17,5 m;<br />
Brug 5: SW4 en S017B, zand op ca. NAP -18,0 m;<br />
Brug 22: S10 en S11, zand op NAP -18,0 m resp. NAP -18,5 m;<br />
Maatgevend grondprofiel t.b.v. zettingsbepaling is SW3;<br />
De grondwaterstand en tevens waterpeil wordt beheerst op NAP -3,02 m;<br />
Het bestaande maaiveld bevindt zich op ca. NAP -2,2 m;<br />
De waterbodem van de bestaande watergangen bevindt zich op ca. NAP -4,05 m.<br />
Globaal is de bodemopbouw overwegend kleiig met diverse veenlagen. Het niveau van<br />
de vaste zandlaag varieert tussen de NAP -16,0 m en -18,0 m.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 34 - 9 januari 2013
8.2 Uitgangspunten fasering<br />
Om tot een juist ontwerp te komen voor de landbouw<strong>bruggen</strong> in verband met de<br />
geotechnische randvoorwaarden (o.a. restzetting ca. 0,1 m) is een goede fasering<br />
tijdens de uitvoering noodzakelijk. De ondergrond is sterk samendrukbaar en daar dient<br />
rekening mee gehouden te worden tijdens de uitvoering. Er is rekening gehouden met<br />
de volgende uitgangspunten:<br />
De bestaande watergang kan tijdelijk worden gedempt met een duiker (min. Ø600);<br />
Maximale voorbelasttijd 1 jaar;<br />
Toepassen van verticale drains is toegestaan;<br />
Toepassen van licht ophoogmateriaal (bims) is toegestaan.<br />
Met de bovenstaande uitgangspunten rekening houdend is het mogelijk om de zettingen<br />
vooraf aan de werkzaamheden grotendeels te laten optreden door het toepassen van<br />
een voorbelasting bestaande uit zand. Door het toepassen van verticale drains wordt de<br />
consolidatiesnelheid van de bodem verhoogd waarmee het zandpakket t.b.v. de<br />
voorbelasting beperkt kan blijven. Dit is tevens veiliger voor de stabiliteit van het<br />
grondlichaam. De volgende fasering wordt voorzien:<br />
Deels aanbrengen voorbelasting in de bestaande watergang;<br />
Aanbrengen tijdelijke duiker (min. Ø600), deze dient zettingsbestendig te zijn<br />
(bijvoorbeeld Spirosol);<br />
Gefaseerd aanbrengen voorbelasting van zand in lagen van ca. 1,0 m;<br />
Zodra het zandlichaam veilig te betreden is, aanbrengen verticale drainage tot<br />
NAP -9,0 m;<br />
Aanbrengen rest van de voorbelasting;<br />
Voorbelasting laten rusten, ca. 3 tot 8 maanden (afhankelijk van zakbaakmetingen);<br />
Aanbrengen omdamming bouwputten (van gebiedseigen grond) en aanbrengen<br />
(open) bemaling;<br />
Ontgraven bouwputten t.b.v. landhoofden;<br />
Aanbrengen constructieve onderdelen landhoofden (fundering + betonwerk);<br />
Aanvullen met licht ophoogmateriaal (bims);<br />
Afwerken bovenbouw brug.<br />
Het is belangrijk dat de aannemer een bemaling aanbrengt ter plaatse van de<br />
voormalige voorbelastingen. Een open bemaling is voldoende voor deze functie.<br />
Hierdoor wordt het water onttrokken uit de verticale drains waardoor de bodem niet of<br />
slechts beperkt wordt herbelast bij plaatsing van de bims. Bij het aanbrengen van de<br />
bims zullen de zettingen als gevolg van het eventueel herbelasten van de ondergrond<br />
beperkt blijven. Het is hiervoor belangrijk dat de verticale drainage zoveel mogelijk intact<br />
blijft.<br />
8.3 Zettingen<br />
Om de aansluiting op het bestaande maaiveld te realiseren worden de toeritten<br />
aangevuld met bims tot de landhoofden. Om een goede inschatting te maken van de te<br />
verwachten zettingen en om beheersmaatregelen te nemen tegen ongelijkmatige<br />
zettingen zijn berekeningen uitgevoerd. De basis van de berekeningen is gebaseerd op<br />
de zettingsberekeningen die eerder zijn uitgevoerd voor de ophoging van de<br />
bergboezem Zuidpolder. Hiervan is een notitie opgesteld met referentie<br />
9R6945.A21/N0002/902893/MJANS/Nijm van d.d. 5 mei 2011 (bijlage C van de<br />
rapportage Bergboezem Zuidpolder).<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 35 - 9 januari 2013
Uitgangspunten<br />
Bij het bepalen van de zettingen zijn de volgende uitgangspunten gehanteerd:<br />
Parameters volgens notitie 9R6945.A21/N0002/902893/MJANS/Nijm van d.d.<br />
5 mei 2011;<br />
Grondopbouw volgens maatgevende sondering SW3;<br />
Maximale netto ophoging vanaf onderkant bestaand talud bedraagt ca. 3,0 m;<br />
Bestaande watergangbodem op ca. NAP -4,05 m;<br />
Bestaand maaiveld op ca. NAP -2,2 m;<br />
Grondwaterstandstand NAP -3,02 m;<br />
Toepassen van verticale drains:<br />
Driehoeksverband, hart op hart afstand 1,5 m;<br />
Diepte tot NAP -9,0 m;<br />
Oppervlakte ten minste de grootte van de voorbelasting, definitief vast te stellen<br />
tijdens opstellen UO ten behoeve van optimalisatie;<br />
Definitieve aanvulling met licht ophoogmateriaal, bims: 12 kN/m 3 ;<br />
Maximale restzetting 0,1 m;<br />
Berekening met behulp van D-Settlement versie 9.2 build 1.2.<br />
Resultaat<br />
In de onderstaande tabel 1 is een samenvatting van de ophogingen met resulterende<br />
zettingen weergegeven. Daarnaast zijn de benodigde voorbelastingen aangegeven met<br />
de tijden. De volledige berekeningsuitvoer van D-Settlement is terug te vinden in<br />
bijlage E2.<br />
Tabel 8.1: Samenvatting resultaten zettingsberekeningen<br />
Brug Bruto ophoging<br />
Verwachte zetting Hoogte voorbelasting (zand) Tijdsduur voorbelasting<br />
[m]<br />
[m]<br />
[m]<br />
[dagen]<br />
22 2,0 (bims) 1,11 2,5 90<br />
4, 5 3,0 (2,2 bims + 0,8 zand) 1,41 3,85 90<br />
Bij brug 22 wordt enkel het maaiveld belast met een ophoging van ca. 0,6 m. Door de<br />
zetting wordt de werkelijk benodigde ophoging van bims groter dan de netto ophoging.<br />
Als gevolg van de netto ophoging wordt een zetting verwacht van ca. 0,5 m. Deze extra<br />
ophoging dient te worden opgevuld. Er is uitgegaan dat het zand van de voorbelasting<br />
bij brug 22 volledig wordt ontgraven en opgevuld met bims. Dit is noodzakelijk voor het<br />
maken van de bouwput voor de landhoofden. Hierdoor volgt een zetting van ca. 1,11 m<br />
waardoor een totaal pakket van bims nodig is van 2,0 hoogte op het dikste punt van de<br />
toerit waar zettingen kunnen optreden.<br />
Bij brug 4 en 5 komt de grootste zetting op het diepste punt van het talud waardoor het<br />
niet meer praktisch is om het volledige zandpakket te verwijderen. Hierbij is rekening<br />
gehouden dat het zand deels achterblijft in de grond waarop met bims de rest kan<br />
worden aangevuld vanaf de bodem van de werkvloer van het landhoofd. Ook hier geldt<br />
dat de totaal aan te brengen ophoging groter is dan de netto ophoging t.o.v. het<br />
maaiveld.<br />
Tevens wordt vermeld dat nabij brug 5 een rioolpersleiding aanwezig is op ca. 8,5 m<br />
afstand van de toerit. Tijdens het UO dient te worden geanalyseerd of de zettingen<br />
invloed hebben op de rioolleiding. De berekeningen van de notitie van 5 mei 2011 geven<br />
aan dat de horizontale invloed beperkt is (ca. 5,0 m). Bij optimalisatie van het UO kan<br />
worden vastgesteld of dit werkelijk het geval is.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 36 - 9 januari 2013
Tijdens het UO dienen de volgende zaken te worden gemaakt voor optimalisatie:<br />
Schetsen van de voorbelasting, bovenaanzichten;<br />
Monitoringsplan;<br />
Detaillering (met name t.b.v. de rioolpersleiding).<br />
Opgemerkt wordt dat het voorspellen van zettingen altijd enige onnauwkeurigheid met<br />
zich meebrengt. Voor de berekende resultaten wordt daarom een marge gehanteerd<br />
van ca. 30%. Doordat het voorspellen van de zettingen deze onnauwkeurigheid kent,<br />
wordt geadviseerd om de zettingen dagelijks nauwkeurig te monitoren, zodat indien<br />
nodig besloten kan worden de voorbelasting aan te passen aan de werkelijke situatie.<br />
8.4 Fundering<br />
De <strong>bruggen</strong> worden op palen gefundeerd. De benodigde berekeningen hiervoor zijn<br />
uitgevoerd met behulp van D-Foundations versie 8.1 build 2.2. De volgende<br />
uitgangspunten zijn gehanteerd:<br />
Paalfundering, prefabbetonpalen vierkant 400 mm, afmeting noodzakelijk voor<br />
draagkracht en voor opname kopwapening (voorkeur constructeur);<br />
Belastingen zoals opgegeven door de constructeur:<br />
Fc,d (EQU) = 695 kN (UGT);<br />
Frep (SLS) = 612 kN (BGT);<br />
Geen trekbelasting van toepassing;<br />
Berekening op basis van een enkele paal (maatgevend, geen groepswerking);<br />
Een enkele paalberekening en paalpuntadvies voor toepassing op alle drie de<br />
<strong>bruggen</strong>;<br />
ξ3,4 = 1,39;<br />
Berekening volgens NEN 9997-1;2011 (Eurocode 7).<br />
Resultaat<br />
Uit de berekeningen voor de paalfunderingen blijkt dat prefab betonpalen vierkant<br />
400 mm geschikt zijn voor de <strong>bruggen</strong>. In onderstaande tabel 2 is een samenvatting van<br />
de resultaten weergegeven.<br />
Tabel 8.2: Samenvatting resultaat paaldraagkrachtberekening<br />
Paaltype Paalpuntniveau<br />
Netto draagkracht, Rc,d Zakking paalpunt (BGT)<br />
[NAP…m]<br />
[kN]<br />
[mm]<br />
Betonpaal vierkant 400 mm -23,0 771 7<br />
De volledige uitvoer van het berekeningsresultaat is terug te vinden in bijlage E1.<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport - 37 - 9 januari 2013
Bijlage A<br />
Tekeningen<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
G<br />
H<br />
J<br />
K<br />
L<br />
M<br />
N<br />
P<br />
Q<br />
R<br />
1 2 3 4 5 6 7 8 9 10 11 12<br />
1<br />
750<br />
1750<br />
1750<br />
750<br />
MV ca. -2.900<br />
230<br />
700<br />
970<br />
650<br />
grens<br />
bestemmingsplan<br />
Ruyven Zuidpolder<br />
X=88915006<br />
Y=446042675<br />
stootplaten<br />
niet getekend<br />
2400<br />
500<br />
4700<br />
1500<br />
2500<br />
1000<br />
300<br />
700<br />
500<br />
90°<br />
X=88920293<br />
Y=446044191<br />
as nieuwe waterweg<br />
250 2250 2250 250<br />
7900 4700<br />
3000 4500 2500 2400<br />
17300<br />
4700<br />
5000<br />
1:3<br />
100 7700<br />
100<br />
-2.020 -2.010<br />
-2.020<br />
-2.250 -2.250<br />
Rv=50m (6992) Rv=25m (3971)<br />
550<br />
grens<br />
bestemmingsplan<br />
Ruyven Zuidpolder<br />
Bovenaanzicht<br />
schaal 1:100<br />
Aanzicht A-A<br />
schaal 1:50<br />
-4.570<br />
Doorsnede B-B<br />
schaal 1:50<br />
2 3 4 5<br />
450 550<br />
grasbetontegels langs landhoofd<br />
1000mm breed<br />
4x stootplaten<br />
5000x1000x350<br />
as brug<br />
palen niet getekend<br />
400<br />
-4.070<br />
grens<br />
kadaster<br />
-3.020<br />
-4.570 -4.570<br />
-4.570<br />
Beschoeiing tbv onderloopsheid<br />
bevestigen aan landhoofd m.b.v. ankers<br />
(dit n.t.b. door aannemer)<br />
2400 2500 7500<br />
2500<br />
2400<br />
10:1<br />
2500<br />
450 450<br />
28254<br />
-4.070<br />
7700<br />
100 100<br />
100 100<br />
-2.120<br />
Bestaand MV<br />
-2.110<br />
grens<br />
kadaster<br />
-3.020<br />
7501<br />
12501<br />
450<br />
460<br />
palen 400 ppn. -23.0m<br />
460 550<br />
450 550<br />
450<br />
450<br />
550<br />
-2.120<br />
2500<br />
1:3<br />
4700<br />
grens<br />
kadaster<br />
vleugelwanden 400 breed<br />
450 100<br />
Rv=25m (2958) Rv=50m (5532)<br />
grens<br />
kadaster<br />
10:1<br />
250 4500 250<br />
Doorsnede C-C<br />
Doorsnede C-C<br />
schaal 1:50<br />
230<br />
700<br />
970<br />
650<br />
5000<br />
MV ca. -2.700<br />
-2.110<br />
400 4200 400<br />
Slib verwijderen en<br />
grondverbetering toepassen<br />
6 7 8 9 10 11 12<br />
-4.570<br />
13 14 15 16 17 18 19<br />
MV ca. -2.700<br />
350 100<br />
prefab volstortliggers h=350mm<br />
met druklaag h=100mm<br />
integraal constructie<br />
oplegvlak 200<br />
EPDM rubber 100x100x10<br />
(tijdelijke oplegstrip)<br />
2450<br />
450<br />
1990<br />
werkvloer 70<br />
10<br />
150<br />
150<br />
700<br />
25<br />
2<br />
598<br />
450 250<br />
650 1850<br />
2500<br />
Detail landhoofd<br />
schaal 1:50<br />
350<br />
onthechtingsmiddel<br />
stalen dook lang 400, ∅25 h.o.h. 500 (2 per plaat) over<br />
een lengte van 190 omwikkelen met densoband<br />
5000<br />
Azobé beschoeiing 25mm dik, lang 1000<br />
met gording 25x70, duurzaamheidsklasse 1<br />
150<br />
8<br />
2<br />
25<br />
150<br />
Detail bevestiging stootplaat<br />
100<br />
350<br />
1000<br />
30<br />
250<br />
stootplaat 5000x1000x350<br />
licht ophoogmateriaal (Bims)<br />
inpakken in geotextiel<br />
162.5<br />
Situatie<br />
schaal 1:5000<br />
Detail bevestiging stootplaat<br />
schaal 1:10<br />
500<br />
lokatie landbouwbrug 5<br />
500<br />
2<br />
250<br />
450 500 598<br />
1798<br />
650<br />
triplex dik 4 met plakfolie dik 0.3<br />
20 21 22 23<br />
A0 zie tekening Definitief Ontwerp<br />
9R6945.I8 / 2641-001<br />
13 14 15 16 17 18 19 20 21 22 23 24<br />
Legenda:<br />
opdrachtgever<br />
project<br />
omschrijving<br />
lokatie landbouwbrug 4<br />
Opmerkingen:<br />
Gewapend beton<br />
Prefab<br />
Licht ophoogmateriaal (Bims)<br />
Grasbetontegels<br />
Werkvloer 70 mm<br />
Contouren watergang<br />
Bestaande watergang<br />
- Peilmaten en coördinaten in m t.o.v. NAP, overige maten in mm.<br />
- Hoeken in graden (360 graden stelsel).<br />
- Maatvoering bestaand in het werk te controleren.<br />
- Hoogte prefab dekconstructie 350mm + druklaag 100mm (exclusief zeeg)<br />
- Verkeersbelasting volgens NEN-EN 1991-2 + C1:2011<br />
- Geen gootconstructie, mantelbuis of trekputten toegepast<br />
- Wapening stootplaten conform <strong>DO</strong>-nota<br />
- Vellingkanten 15x15mm<br />
- Profiel van Vrije Ruimte = bxh = 7,5 x 0,4m.<br />
- Verticale tolerantie op PVR bedraagt 50mm<br />
- Profiel van Vrije Ruimte t.o.v. referentiepeil NAP -3.02m (conform peilbesluit).<br />
- Werkgrenzen uit Voorontwerp 2011.<br />
revisie omschrijving getekend gecontroleerd akkoord datum<br />
Hoogheemraadschap van <strong>Delfland</strong><br />
Alternatief afvoertracé Pijnackerse Vaart<br />
Landbouwbrug 4 nieuwe situatie<br />
formaat schaal fase<br />
bladnr.<br />
van<br />
projectnummer tekeningnummer<br />
24<br />
J<strong>DO</strong> ETJ RNIE 09-01-2013<br />
HASKONING NEDERLAND B.V.<br />
Ruimte & Mobiliteit<br />
TJ<br />
www.royalhaskoning.com<br />
Telefoon<br />
Fax<br />
E-mail<br />
Internet<br />
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
G<br />
H<br />
J<br />
K<br />
L<br />
M<br />
I:\9R6945\Technical_Data\9R6945I8\2. CAD (constructie)\2641-001_04.dwg<br />
Filename :<br />
N<br />
P<br />
Q<br />
R
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
G<br />
H<br />
J<br />
K<br />
L<br />
M<br />
N<br />
P<br />
Q<br />
R<br />
1 2 3 4 5 6 7 8 9 10 11 12<br />
1<br />
360<br />
MV ca. -2.200<br />
990<br />
1150<br />
650<br />
Rioolpersleiding ∅710<br />
750<br />
750 1750 1750<br />
MV ca. -2.200<br />
grens<br />
bestemmingsplan<br />
Ruyven Zuidpolder<br />
grens<br />
bestemmingsplan<br />
Ruyven Zuidpolder<br />
Bovenaanzicht<br />
schaal 1:100<br />
Aanzicht A-A<br />
schaal 1:50<br />
Bestaand MV<br />
X=88092049<br />
Y=445788205<br />
500<br />
stootplaten<br />
niet getekend<br />
Rv=50m (6603) Rv=25m (2650) 550<br />
500<br />
Doorsnede B-B<br />
schaal 1:50<br />
1500<br />
-4.570<br />
500<br />
90°<br />
X=88093456<br />
Y=445782888<br />
2 3 4 5<br />
as nieuwe waterweg<br />
5300<br />
7900 5300<br />
3000 2500<br />
3000 4500 2500 3000<br />
18500<br />
1000<br />
300<br />
700<br />
3000<br />
5000<br />
5300<br />
10:1<br />
10:1<br />
250<br />
2250<br />
2250<br />
250<br />
5000<br />
X=88095247<br />
Y=445776120<br />
1:3<br />
2500<br />
100<br />
-1.520<br />
100<br />
1050 550<br />
100<br />
1050 450<br />
400<br />
palen<br />
niet<br />
getekend<br />
-1.510<br />
1060 450<br />
-4.070<br />
4xstootplaten<br />
5000x1000x350<br />
as brug<br />
grasbetontegels langs landhoofd<br />
1000mm breed<br />
7700<br />
-1.420 -1.410<br />
-1.420<br />
-1.780 -1.780<br />
1060 550<br />
-4.070<br />
-3.020<br />
-4.570 -4.570<br />
Beschoeiing tbv onderloopsheid<br />
bevestigen aan landhoofd m.b.v. ankers<br />
(dit n.t.b. door aannemer)<br />
2500 7500<br />
2500<br />
27306<br />
7700<br />
-3.020<br />
27758<br />
palen 400 ppn. -23.0m<br />
7500<br />
12500<br />
grens<br />
kadaster<br />
grens<br />
kadaster<br />
1050 550<br />
1050 450<br />
100<br />
100<br />
550 Rv=25m (2650)<br />
Rv=50m (6603)<br />
100<br />
-1.520<br />
2500<br />
1:3<br />
10:1 10:1<br />
grens<br />
vleugelwanden 400 breed<br />
5300<br />
grens<br />
kadaster<br />
3000<br />
100<br />
450<br />
Doorsnede C-C<br />
schaal 1:50<br />
kadaster 5000500<br />
6 7 8 9 10 11 12<br />
-4.570<br />
5000<br />
250 4500 250<br />
Doorsnede C-C<br />
Slib verwijderen en<br />
grondverbetering toepassen<br />
-1.513<br />
400 4200 400<br />
360<br />
990<br />
13 14 15 16 17 18 19<br />
MV ca. -2.200<br />
MV ca. -2.200<br />
350 100<br />
prefab volstortliggers h=350mm<br />
met druklaag h=100mm<br />
integraal constructie<br />
oplegvlak 200<br />
EPDM rubber 100x100x10<br />
(tijdelijke oplegstrip)<br />
3050<br />
450<br />
10<br />
2590<br />
werkvloer 70<br />
150<br />
150<br />
700<br />
25<br />
2<br />
698<br />
450 250<br />
650 1850<br />
2500<br />
Detail landhoofd<br />
schaal 1:50<br />
350<br />
onthechtingsmiddel<br />
5000<br />
Azobé beschoeiing 25mm dik, lang 1000<br />
met gording 25x70, duurzaamheidsklasse 1<br />
150<br />
stalen dook lang 400, ∅25 h.o.h. 500 (2 per plaat) over een<br />
lengte van 190 omwikkelen met densoband<br />
25<br />
150<br />
100<br />
1000<br />
Detail bevestiging Detail bevestiging stootplaat stootplaat<br />
schaal 1:10<br />
8<br />
2<br />
350<br />
30<br />
250<br />
stootplaat 5000x1000x350<br />
licht ophoogmateriaal (Bims)<br />
inpakken in geotextiel<br />
162.5<br />
lokatie landbouwbrug 5<br />
Situatie<br />
schaal 1:5000<br />
500<br />
500<br />
2<br />
250<br />
950 500 698<br />
2398<br />
650<br />
triplex dik 4 met plakfolie dik 0.3<br />
20 21 22 23<br />
A0 zie tekening Definitief Ontwerp<br />
9R6945.I8 / 2641-002<br />
13 14 15 16 17 18 19 20 21 22 23 24<br />
Legenda:<br />
Opmerkingen:<br />
opdrachtgever<br />
project<br />
omschrijving<br />
Gewapend beton<br />
Prefab<br />
Licht ophoogmateriaal (BIMS)<br />
Grasbetontegels<br />
Werkvloer 70 mm<br />
Contouren watergang<br />
Bestaande watergang<br />
formaat schaal fase<br />
lokatie landbouwbrug 4<br />
- Peilmaten en coördinaten in m t.o.v. NAP, overige maten in mm.<br />
- Hoeken in graden (360 graden stelsel).<br />
- Maatvoering bestaand in het werk te controleren.<br />
- Hoogte prefab dekconstructie 350mm + druklaag 100mm (exclusief zeeg)<br />
- Verkeersbelasting volgens NEN-EN 1991-2 + C1:2011<br />
- Geen gootconstructie, mantelbuis of trekputten toegepast<br />
- Wapening stootplaten conform <strong>DO</strong>-nota<br />
- Vellingkanten 15x15mm<br />
- Profiel van Vrije Ruimte = bxh = 7,5 x 0,4m.<br />
- Verticale tolerantie op PVR (hoogte) bedraagt 50mm<br />
- Profiel van Vrije Ruimte t.o.v. referentiepeil NAP -3.02m (conform peilbesluit).<br />
- Werkgrenzen uit Voorontwerp 2011.<br />
revisie omschrijving getekend gecontroleerd akkoord datum<br />
Hoogheemraadschap van <strong>Delfland</strong><br />
Alternatief afvoertracé Pijnackerse Vaart<br />
Landbouwbrug 5 nieuwe situatie<br />
bladnr.<br />
van<br />
projectnummer tekeningnummer<br />
24<br />
J<strong>DO</strong> ETJ RNIE 09-01-2013<br />
HASKONING NEDERLAND B.V.<br />
Ruimte & Mobiliteit<br />
.royalhaskoning.com<br />
www.royalhaskoning.com<br />
Telefoon<br />
Fax<br />
E-mail<br />
Internet<br />
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
G<br />
H<br />
J<br />
K<br />
L<br />
M<br />
I:\9R6945\Technical_Data\9R6945I8\2. CAD (constructie)\2641-002_05.dwg<br />
Filename :<br />
N<br />
P<br />
Q<br />
R
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
G<br />
H<br />
J<br />
K<br />
L<br />
MV ca. -2.200<br />
M<br />
N<br />
P<br />
Q<br />
R<br />
1 2 3 4 5 6 7 8 9 10 11 12<br />
1<br />
grasbetontegels langs landhoofd<br />
1000mm breed<br />
500<br />
250<br />
as brug<br />
Rv=50m (6603) Rv=25m (2650) 550<br />
-4.570<br />
palen<br />
niet<br />
getekend<br />
4 stootplaten<br />
3000x1000x250<br />
400<br />
Bovenaanzicht<br />
schaal 1:100<br />
1000<br />
350<br />
700<br />
5300<br />
500 3000<br />
10:1<br />
10:1<br />
3000<br />
1:3<br />
5300<br />
2500<br />
2500<br />
100<br />
-1.520<br />
5000<br />
250 2250 2250 250<br />
X=86520542<br />
Y=444480395<br />
100<br />
1050 550<br />
100<br />
1050 450<br />
3000<br />
6400<br />
as nieuwe waterweg<br />
17000<br />
90°<br />
X=86525834<br />
Y=444481895<br />
3000<br />
500 1500 500<br />
-1.510<br />
1060 450<br />
-4.070<br />
6200<br />
-3.020<br />
25806<br />
6200<br />
-3.020<br />
palen 400 ppn. -23.0m<br />
6000<br />
11000<br />
X=86531125<br />
Y=444483394<br />
5300<br />
2500 3000<br />
Doorsnede B-B<br />
Beschoeiing tbv onderloopsheid<br />
bevestigen aan landhoofd m.b.v. ankers<br />
(dit n.t.b. door aannemer)<br />
26258<br />
epoxy slijtlaag + instrooien met dezelfde kleur<br />
en grootte steenslag als op het bestaande pad,<br />
waar de nieuwe brug op aansluit<br />
1050 450<br />
100<br />
stootplaten<br />
niet getekend<br />
-1.420 -1.410<br />
-1.420<br />
-1.780 -1.780<br />
Aanzicht A-A<br />
schaal 1:50<br />
1060 550<br />
-4.070<br />
Stalen leuning<br />
zwart (poedercoating)<br />
-4.570 -4.570<br />
3000 2500 6000<br />
2500<br />
3000<br />
Doorsnede B-B<br />
schaal 1:50<br />
2 3 4 5<br />
1050 550<br />
100<br />
550 Rv=25m (2650)<br />
Rv=50m (6603)<br />
100<br />
450 250<br />
-1.520<br />
2500<br />
1:3<br />
750<br />
1750<br />
1750<br />
750<br />
3000<br />
10:1<br />
10:1<br />
5300<br />
500<br />
500<br />
-4.570<br />
Leuning op stalen plaat (vormgeving leuning conform<br />
vormgevingsdocument ''Brug Achterdijkse bossen'')<br />
Randligger loopt door over de vleugelwand.<br />
Betonkleur randligger licht grijs conform<br />
vormgevingsdocument ''Brug Achterdijkse bossen''<br />
2<br />
250<br />
1050 500 598<br />
2398<br />
vleugelwanden 400 breed<br />
990 360<br />
1800<br />
450 100<br />
Doorsnede C-C<br />
schaal 1:50<br />
Relief op landhoofden en vleugelwanden<br />
(Madras van Noe)<br />
Betonkleur landhoofden en vleugelwanden donker grijs conform<br />
vormgevingsdocument ''Brug Achterdijkse bossen''<br />
MV ca. -2.200<br />
6 7 8 9 10 11 12<br />
MV ca. -2.200<br />
5000<br />
500 4000 500<br />
-2.110<br />
Doorsnede C-C<br />
13 14 15 16 17 18 19<br />
350 100<br />
400 3700 400<br />
Epoxy slijtlaag + instrooien met dezelfde kleur<br />
en grootte steenslag als op het bestaande pad,<br />
waar de nieuwe brug op aansluit<br />
150<br />
300 1000<br />
prefab volstortliggers h=350mm<br />
met druklaag h=100mm<br />
Relief op landhoofden en vleugelwanden<br />
(Madras van Noe)<br />
integraal constructie<br />
oplegvlak 200<br />
EPDM rubber 100x100x10<br />
(tijdelijke oplegstrip)<br />
3050<br />
450<br />
2590<br />
werkvloer 70<br />
10<br />
150<br />
150<br />
700<br />
25<br />
450 250<br />
Azobé beschoeiing 25mm dik, lang 1000<br />
met gording 25x70, duurzaamheidsklasse 1<br />
650 1850<br />
2500<br />
2<br />
598<br />
250<br />
onthechtingsmiddel<br />
150<br />
3000<br />
stalen dook lang 400, ∅25 h.o.h. 500 (2 per plaat) over een<br />
lengte van 190 omwikkelen met densoband<br />
8<br />
2<br />
1000<br />
25<br />
150<br />
Detail bevestiging stootplaat<br />
500<br />
500<br />
stootplaat 3000x1000x250<br />
Licht ophoogmateriaal (Bims)<br />
inpakken in geotextiel<br />
Detail landhoofd<br />
schaal 1:20<br />
250<br />
100<br />
30<br />
250<br />
162.5<br />
Situatie<br />
schaal 1:5000<br />
2<br />
250<br />
1050 500 598<br />
2398<br />
650<br />
triplex dik 4 met plakfolie dik 0.3<br />
Detail bevestiging stootplaat<br />
schaal 1:10<br />
lokatie landbouwbrug 22<br />
20 21 22 23<br />
A0 zie tekening Definitief Ontwerp<br />
9R6945.I8 / 2641-003<br />
13 14 15 16 17 18 19 20 21 22 23 24<br />
Legenda:<br />
Opmerkingen:<br />
opdrachtgever<br />
project<br />
omschrijving<br />
Gewapend beton<br />
Prefab<br />
Gestabiliseerd zand<br />
Grasbetontegels<br />
Werkvloer 70 mm<br />
Contouren watergang<br />
Bestaande watergang<br />
- Peilmaten en coördinaten in m t.o.v. NAP, overige maten in mm.<br />
- Hoeken in graden (360 graden stelsel).<br />
- Maatvoering bestaand in het werk te controleren.<br />
- Hoogte prefab dekconstructie 350mm + druklaag 100mm (exclusief zeeg)<br />
- Verkeersbelasting volgens NEN-EN 1991-2 + C1:2011<br />
- Geen gootconstructie, mantelbuis of trekputten toegepast<br />
- Wapening stootplaten conform <strong>DO</strong>-nota<br />
- Vellingkanten 15x15mm<br />
- Profiel van Vrije Ruimte = bxh = 7,5 x 0,4m.<br />
- Verticale tolerantie op PVR bedraagt 50mm<br />
- Profiel van Vrije Ruimte t.o.v. referentiepeil NAP -3.02m (conform peilbesluit).<br />
- Werkgrenzen uit Voorontwerp 2011.<br />
revisie omschrijving getekend gecontroleerd akkoord datum<br />
Hoogheemraadschap van <strong>Delfland</strong><br />
Alternatief afvoertracé Pijnackerse Vaart<br />
Landbouwbrug 22 nieuwe situatie<br />
formaat schaal fase<br />
bladnr.<br />
van<br />
projectnummer tekeningnummer<br />
24<br />
J<strong>DO</strong> ETJ RNIE 7-1-2013<br />
HASKONING NEDERLAND B.V.<br />
Ruimte & Mobiliteit<br />
.royalhaskoning.com<br />
www.royalhaskoning.com<br />
Telefoon<br />
Fax<br />
E-mail<br />
Internet<br />
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
G<br />
H<br />
J<br />
K<br />
L<br />
M<br />
I:\9R6945\Technical_Data\9R6945I8\2. CAD (constructie)\2641-003_22.dwg<br />
Filename :<br />
N<br />
P<br />
Q<br />
R
Bijlage B<br />
Ontwerp brug 4, 5 en 22<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
Bijlage B1<br />
Bepaling prefab dekconstructie<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
Bijlage B2<br />
Ontwerp landhoofd<br />
Geometrie + statisch systeem<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
Bijlage B3<br />
Ontwerp landhoofd<br />
Belastingen & belastingcombinaties<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
Bijlage B4<br />
Ontwerp landhoofd<br />
Raamwerkmodel (dwarsrichting)<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
Bijlage B5<br />
Ontwerp landhoofd<br />
Krachtsverdeling haaks op de wegas<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
Bijlage B6<br />
Ontwerp landhoofd<br />
Bepaling wapening<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
Bijlage B7<br />
Ontwerp landhoofd<br />
Bepaling paalkopwapening + toetsing paaldraagvermogen<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
Bijlage B8<br />
Ontwerp landhoofd<br />
Ontwerp vleugelwanden<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
Bijlage C<br />
Beschouwing optimalisaties brug 4<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
Bijlage D<br />
Beschouwing optimalisaties brug 22<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
Bijlage E<br />
Geotechniek<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
Bijlage E1<br />
Paaldraagvermogen<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
Bijlage E2<br />
Zettingsberekeningen<br />
<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />
Definitief rapport 9 januari 2013
Bijlage E – Geotechniek<br />
<strong>DO</strong> brug 4,5 en 22 9R6945.I8/R001_0C/902635/HVT/Nijm<br />
Concept rapport 14 december 2012
Bijlage E1 – Paaldraagvermogen<br />
<strong>DO</strong> brug 4,5 en 22 9R6945.I8/R001_0C/902635/HVT/Nijm<br />
Concept rapport 14 december 2012
Report for D-Foundations 8.1<br />
Design and Verification according to Eurocode 7 of Bearing/Tension Piles and Shallow Foundations<br />
Developed by Deltares<br />
Company: Royal HaskoningDHV<br />
Date of report: 14-12-2012<br />
Time of report: 17:01:08<br />
Date of calculation: 14-12-2012<br />
Time of calculation: 16:17:04<br />
Filename: C:\..\DFoundation\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214<br />
Project identification: Hoogheemraadschap van <strong>Delfland</strong><br />
Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />
D-Foundations Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214
1 Table of Contents<br />
Royal HaskoningDHV D-Foundations 8.1<br />
1 Table of Contents 2<br />
2 Input Data 3<br />
2.1 General Input Data 3<br />
2.2 General Report Data 3<br />
2.3 Application Area Model Bearing Piles 3<br />
2.4 Superstructure 3<br />
2.5 General CPT Data 3<br />
2.5.1 View of CPT's in Foundation Plan 3<br />
2.6 Soil Data 4<br />
2.6.1 Soil Profile SW4 4<br />
2.6.2 Soil Profile S017B 5<br />
2.7 Pile Types 6<br />
2.7.1 Pile type : Rect 380x380 6<br />
2.7.2 Pile type : Rect 400x400 6<br />
2.7.3 Pile type : Rect 450x450 6<br />
2.8 Foundation Plan 7<br />
2.8.1 View of Foundation Plan 7<br />
2.9 Excavation Data 7<br />
2.10 Totalized Loads (design values) 8<br />
2.11 Requirements 8<br />
2.12 Overruled Parameters 8<br />
2.13 Calculation Options 8<br />
2.14 Model Options 8<br />
3 Bearing Piles (EC7-NL): Results of the Option Complete Verification 9<br />
3.1 Errors and Warnings 9<br />
3.2 Remarks 9<br />
3.3 Calculation Parameters 9<br />
3.3.1 Pile Factors 9<br />
3.3.2 Pile type : Rect 400x400 9<br />
3.4 Verification of Limit State EQU 10<br />
3.5 Verification of Limit State GEO 10<br />
3.6 Verification of Serviceability limit state 10<br />
3.7 Additional Information 10<br />
3.7.1 The bearing capacity of shaft and point at Limit state GEO 11<br />
3.7.2 The bearing capacity of shaft and point at the Serviceability Limit State 11<br />
14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 2
2 Input Data<br />
2.1 General Input Data<br />
Model Bearing Piles (EC7-NL)<br />
2.2 General Report Data<br />
Royal HaskoningDHV D-Foundations 8.1<br />
Geotechnical consultant :<br />
Design engineer superstructure :<br />
Principal :<br />
Title 1 : Hoogheemraadschap van <strong>Delfland</strong><br />
Title 2 : Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />
Title 3 : D-Foundations Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214<br />
Number of project : 9R694518<br />
Location of project :<br />
2.3 Application Area Model Bearing Piles<br />
The verifications performed by the model BEARING PILES of D-FOUNDATIONS concern pile foundations on which<br />
axial static or quasi-static loads cause pressures in the piles. The calculations of pile forces and pile displacements<br />
are based on Cone Penetration Tests. Possible rise of (tension-)piles and horizontal displacements of piles and/or<br />
pile groups are not taken into account.<br />
2.4 Superstructure<br />
Rigidity of the superstructure : Non-Rigid<br />
2.5 General CPT Data<br />
Number of CPT's : 2<br />
Timing of CPT's : CPT - Excavation - Install<br />
2.5.1 View of CPT's in Foundation Plan<br />
S017B<br />
SW10 SW7 SW8 SW9 SW6 SW5 SW4 S10 S11 SW3 S4 S5 S6 S9 S7 S8 S2<br />
14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 3<br />
Legend<br />
Rect 400x400 (Edge pile)<br />
Rect 400x400 (Middle pile)<br />
CPT
Royal HaskoningDHV D-Foundations 8.1<br />
Number/Name Pile tip Top of pos. Bottom of neg. X-coor- Y-coor-<br />
CPT level friction zone friction zone dinate dinate<br />
[m R.L.] [m R.L.] [m R.L.] [m] [m]<br />
1: SW4 -23,00 -18,00 -18,00 88102,01 445770,64<br />
2: S017B -23,00 -18,00 -18,00 0,00 0,00<br />
2.6 Soil Data<br />
Number of soil profiles (= number of CPT's) : 2<br />
2.6.1 Soil Profile SW4<br />
Belonging to CPT SW4<br />
Surface level in [m. reference level] : -2,220<br />
Phreatic level in [m. reference level] : -3,020<br />
Pile tip level in [m. reference level] : -23,000<br />
Top of positive skin friction zone in [m. reference level] : -18,000<br />
Bottom of negative skin friction zone in [m. reference level] : -18,000<br />
OCR-value foundation layer : 1,00<br />
Expected groundlevel settlement in [m] : 0,110<br />
Number of layers in profile : 31<br />
5,00<br />
0,00<br />
-5,00<br />
-10,00<br />
-15,00<br />
-20,00<br />
-25,00<br />
-30,00<br />
-35,00<br />
qc [MPa]<br />
5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00<br />
Ground level (-2,22)<br />
-40,00<br />
Depth [m] 0,00 0,10 0,20 0,30 0,40 0,50 0,60<br />
qc [MPa]<br />
Pore water pressure [MPa]<br />
Reduced qc for alpha_s [MPa]<br />
Pore water pressure [MPa]<br />
14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 4<br />
NSFZ<br />
PSFZ<br />
PTL<br />
PL<br />
Profile: SW4<br />
Material Unit weight Unit weight Phi<br />
dry wet<br />
Loam, Clay, Clay, clea.. sl ve s.. s..<br />
Peat, mod..<br />
kN/m3<br />
20,0 17,0<br />
13,0<br />
kN/m3<br />
20,0 17,0<br />
13,0<br />
deg<br />
35,0 22,5 17,5<br />
15,0<br />
Peat, mod.. 13,0 13,0 15,0<br />
Peat, mod..<br />
Clay,<br />
Clay,<br />
clea..<br />
Loam, sl ve s.. s..<br />
Clay, sl s..<br />
Clay, clea..<br />
Clay, clea.. sl s..<br />
Peat, Clay, mod.. clea.. sl s..<br />
Clay, clea..<br />
13,0<br />
17,0<br />
20,0<br />
20,0<br />
17,0 20,0 17,0 20,0 17,0 13,0<br />
17,0<br />
13,0<br />
17,0<br />
20,0<br />
20,0<br />
17,0 20,0 17,0 20,0 17,0 13,0<br />
17,0<br />
15,0<br />
17,5<br />
22,5 35,0<br />
22,5<br />
17,5 22,5 17,5 22,5 17,5 15,0<br />
17,5<br />
Clay, sl s.. 20,0 20,0 22,5<br />
Loam, ve s..<br />
Loam, Sand, ve s..<br />
Clay, sl s..<br />
20,0<br />
19,0 20,0<br />
20,0<br />
20,0<br />
21,0 20,0<br />
20,0<br />
35,0<br />
30,0 35,0<br />
22,5<br />
Clay, clea..<br />
Loam, Sand, Clay, ve sl ve s.. s.. 17,0<br />
20,0 19,0<br />
17,0<br />
20,0 21,0<br />
17,5<br />
22,5 35,0 30,0<br />
Sand, sl s.. 19,0 21,0 32,5<br />
Sand, sl s.. 19,0 21,0 32,5<br />
Sand, sl s.. 19,0 21,0 32,5<br />
PL (Phreatic Level) = -3,02 [m]<br />
EL (Excavation Level) = -4,00 [m]<br />
PTL (Pile Tip Level) = -23,00 [m]<br />
PSFZ = Positive skin friction zone, top = -18,00 [m]<br />
NSFZ = Negative skin friction zone, bottom = -18,00 [m]<br />
Number Top Gamma Gamma;sat Phi Soil Median<br />
layer layer Type (Sand/Gravel)<br />
[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />
1 -2,220 20,00 20,00 35,00 Loam --<br />
2 -2,230 20,00 20,00 35,00 Loam --<br />
3 -2,330 20,00 20,00 35,00 Loam --<br />
4 -2,430 20,00 20,00 22,50 Clay --<br />
5 -2,530 17,00 17,00 17,50 Clay --<br />
6 -2,630 13,00 13,00 15,00 Peat --<br />
7 -3,730 13,00 13,00 15,00 Peat --<br />
8 -4,830 13,00 13,00 15,00 Peat --<br />
9 -6,030 17,00 17,00 17,50 Clay --<br />
10 -6,630 20,00 20,00 22,50 Clay --<br />
11 -7,130 20,00 20,00 35,00 Loam --<br />
12 -7,330 20,00 20,00 22,50 Clay --<br />
EL
Royal HaskoningDHV D-Foundations 8.1<br />
Number Top Gamma Gamma;sat Phi Soil Median<br />
layer layer Type (Sand/Gravel)<br />
[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />
13 -8,430 17,00 17,00 17,50 Clay --<br />
14 -8,930 20,00 20,00 22,50 Clay --<br />
15 -9,030 17,00 17,00 17,50 Clay --<br />
16 -9,530 20,00 20,00 22,50 Clay --<br />
17 -9,830 17,00 17,00 17,50 Clay --<br />
18 -10,030 13,00 13,00 15,00 Peat --<br />
19 -10,130 17,00 17,00 17,50 Clay --<br />
20 -11,330 20,00 20,00 22,50 Clay --<br />
21 -13,330 20,00 20,00 35,00 Loam --<br />
22 -14,430 19,00 21,00 30,00 Sand 0,200<br />
23 -14,630 20,00 20,00 35,00 Loam --<br />
24 -14,830 20,00 20,00 22,50 Clay --<br />
25 -16,030 17,00 17,00 17,50 Clay --<br />
26 -17,430 20,00 20,00 22,50 Clay --<br />
27 -17,930 20,00 20,00 35,00 Loam --<br />
28 -18,030 19,00 21,00 30,00 Sand 0,200<br />
29 -18,130 19,00 21,00 32,50 Sand 0,200<br />
30 -30,130 19,00 21,00 32,50 Sand 0,200<br />
31 -30,230 19,00 21,00 32,50 Sand 0,200<br />
2.6.2 Soil Profile S017B<br />
Belonging to CPT S017B<br />
Surface level in [m. reference level] : -2,460<br />
Phreatic level in [m. reference level] : -3,020<br />
Pile tip level in [m. reference level] : -23,000<br />
Top of positive skin friction zone in [m. reference level] : -18,000<br />
Bottom of negative skin friction zone in [m. reference level] : -18,000<br />
OCR-value foundation layer : 1,00<br />
Expected groundlevel settlement in [m] : 0,110<br />
Number of layers in profile : 25<br />
5,00<br />
0,00<br />
-5,00<br />
-10,00<br />
-15,00<br />
-20,00<br />
-25,00<br />
-30,00<br />
-35,00<br />
-40,00<br />
Depth [m]<br />
qc [MPa]<br />
5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00<br />
qc [MPa]<br />
Reduced qc for alpha_s [MPa]<br />
Ground level (-2,46)<br />
14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 5<br />
NSFZ<br />
PSFZ<br />
PTL<br />
PL<br />
Profile: S017B<br />
Material Unit weight Unit weight Phi<br />
dry wet<br />
Peat, mod..<br />
Peat, mod..<br />
Peat, mod..<br />
kN/m3<br />
13,0<br />
13,0<br />
kN/m3<br />
13,0<br />
13,0<br />
deg<br />
15,0 15,0<br />
15,0<br />
Clay, clea.. 17,0 17,0 17,5<br />
Clay, sl s.. 20,0 20,0 22,5<br />
Clay, clea.. 17,0 17,0 17,5<br />
Clay,<br />
Clay,<br />
clea..<br />
sl s.. 20,0<br />
17,0<br />
20,0<br />
17,0<br />
22,5<br />
17,5<br />
Clay, sl s.. 20,0 20,0 22,5<br />
Loam, Clay, sl ve s.. s..<br />
Loam, ve s..<br />
Clay, sl s..<br />
Peat,<br />
Clay,<br />
mod..<br />
clea..<br />
Clay, clea..<br />
Loam, Sand, Clay, ve sl ve s.. s.. Sand, Sand, ve sl s.. s..<br />
20,0<br />
20,0<br />
20,0 17,0<br />
13,0<br />
17,0<br />
20,0 19,0<br />
20,0<br />
20,0<br />
20,0 17,0<br />
13,0<br />
17,0<br />
20,0 21,0<br />
35,0 22,5<br />
35,0<br />
22,5 17,5<br />
15,0<br />
17,5<br />
22,5 35,0 30,0 32,5 30,0<br />
Sand, sl s.. 19,0 21,0 32,5<br />
Sand, sl s.. 19,0 21,0 32,5<br />
PL (Phreatic Level) = -3,02 [m]<br />
EL (Excavation Level) = -4,00 [m]<br />
PTL (Pile Tip Level) = -23,00 [m]<br />
PSFZ = Positive skin friction zone, top = -18,00 [m]<br />
NSFZ = Negative skin friction zone, bottom = -18,00 [m]<br />
EL
Royal HaskoningDHV D-Foundations 8.1<br />
Number Top Gamma Gamma;sat Phi Soil Median<br />
layer layer Type (Sand/Gravel)<br />
[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />
1 -2,460 13,00 13,00 15,00 Peat --<br />
2 -2,550 13,00 13,00 15,00 Peat --<br />
3 -2,650 13,00 13,00 15,00 Peat --<br />
4 -3,050 13,00 13,00 15,00 Peat --<br />
5 -3,250 13,00 13,00 15,00 Peat --<br />
6 -4,850 17,00 17,00 17,50 Clay --<br />
7 -6,050 20,00 20,00 22,50 Clay --<br />
8 -9,150 17,00 17,00 17,50 Clay --<br />
9 -10,550 20,00 20,00 22,50 Clay --<br />
10 -11,350 17,00 17,00 17,50 Clay --<br />
11 -11,550 20,00 20,00 22,50 Clay --<br />
12 -13,550 20,00 20,00 35,00 Loam --<br />
13 -14,250 20,00 20,00 22,50 Clay --<br />
14 -14,350 20,00 20,00 35,00 Loam --<br />
15 -15,550 20,00 20,00 22,50 Clay --<br />
16 -16,150 17,00 17,00 17,50 Clay --<br />
17 -16,350 13,00 13,00 15,00 Peat --<br />
18 -17,050 17,00 17,00 17,50 Clay --<br />
19 -17,750 20,00 20,00 22,50 Clay --<br />
20 -18,150 20,00 20,00 35,00 Loam --<br />
21 -18,250 19,00 21,00 30,00 Sand 0,200<br />
22 -18,350 19,00 21,00 32,50 Sand 0,200<br />
23 -18,850 19,00 21,00 30,00 Sand 0,200<br />
24 -19,150 19,00 21,00 32,50 Sand 0,200<br />
25 -27,350 19,00 21,00 32,50 Sand 0,200<br />
2.7 Pile Types<br />
2.7.1 Pile type : Rect 380x380<br />
Pile type : Prefabricated concrete pile<br />
Materialtype for pile : Concrete<br />
Slip layer : None<br />
Pile shape : Rectangular pile<br />
beta (Shape factor) according to figure 7i, NEN-EN 1997-1:2005.<br />
s (factor for the influence of the shape of the crosssection of the pile base) according to NEN-EN 1997-1:2005.<br />
Pile dimensions :<br />
Smallest side pile tip [m] : 0,380<br />
Largest side pile tip [m] : 0,380<br />
2.7.2 Pile type : Rect 400x400<br />
Pile type : Prefabricated concrete pile<br />
Materialtype for pile : Concrete<br />
Slip layer : None<br />
Pile shape : Rectangular pile<br />
beta (Shape factor) according to figure 7i, NEN-EN 1997-1:2005.<br />
s (factor for the influence of the shape of the crosssection of the pile base) according to NEN-EN 1997-1:2005.<br />
Pile dimensions :<br />
Smallest side pile tip [m] : 0,400<br />
Largest side pile tip [m] : 0,400<br />
2.7.3 Pile type : Rect 450x450<br />
Pile type : Prefabricated concrete pile<br />
14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 6
Royal HaskoningDHV D-Foundations 8.1<br />
Materialtype for pile : Concrete<br />
Slip layer : None<br />
Pile shape : Rectangular pile<br />
beta (Shape factor) according to figure 7i, NEN-EN 1997-1:2005.<br />
s (factor for the influence of the shape of the crosssection of the pile base) according to NEN-EN 1997-1:2005.<br />
Pile dimensions :<br />
Smallest side pile tip [m] : 0,450<br />
Largest side pile tip [m] : 0,450<br />
2.8 Foundation Plan<br />
Number of piles : 1<br />
Number of collaborating piles* : 1<br />
* : 0 = not defined, 1 = non rigid superstructure, >1 = rigid superstructure<br />
2.8.1 View of Foundation Plan<br />
1<br />
14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 7<br />
Legend<br />
Rect 400x400 (Edge pile)<br />
Rect 400x400 (Middle pile)<br />
CPT<br />
Pile X-coor- Y-coor- Fc;d Fc;d P0 Pile head<br />
nr/name dinate dinate (EQU/GEO) (SLS) level<br />
[m] [m] [kN] [kN] [kN/m2] [m R.L.]<br />
1: 1 86487,66 444158,98 712,00 647,00 16,00 -0,52<br />
2.9 Excavation Data<br />
Excavation level in [m. reference level] : -4,000<br />
Reduction model : Safe (NEN)
5,00<br />
0,00<br />
-5,00<br />
-10,00<br />
-15,00<br />
-20,00<br />
-25,00<br />
-30,00<br />
-35,00<br />
-40,00<br />
Depth [m]<br />
qc [MPa]<br />
5 10 15 20 25 30 35 40<br />
qc [MPa]<br />
Reduced qc [MPa]<br />
2.10 Totalized Loads (design values)<br />
Royal HaskoningDHV D-Foundations 8.1<br />
Indication for qc-reduction<br />
due to safe reduction method<br />
Ground level (-2,22)<br />
14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 8<br />
PL<br />
Profile: SW4<br />
[kN/m2]<br />
0 100 200 300 400 500 600 700 800<br />
PL (Phreatic Level) = -3,02 [m]<br />
EL (Excavation Level) = -4,00 [m]<br />
= Initial Effective Stress<br />
= Effective Stress<br />
Total load on all piles<br />
For limit state EQU/GEO in [kN] : 712,00<br />
For Serviceability limit state in [kN] : 647,00<br />
2.11 Requirements<br />
Limit state GEO<br />
Maximum allowed settlement in [m] : 0,150<br />
Maximum allowed (relative) rotation : 1 / 100<br />
Serviceability Limit State<br />
Maximum allowed settlement in [m] : 0,150<br />
Maximum allowed (relative) rotation : 1 / 300<br />
2.12 Overruled Parameters<br />
User defined Factor xi3 [-] : 1,39<br />
User defined Factor xi4 [-] : 1,39<br />
2.13 Calculation Options<br />
Suppress pile group (for negative skin friction)<br />
Create intermediate results file<br />
Use reduction for continuous flight auger piles (standard)<br />
Use the influence of excavations (standard).<br />
2.14 Model Options<br />
Selected pile types :<br />
-Rect 400x400<br />
Selected profiles :<br />
-SW4<br />
-S017B<br />
EL
Royal HaskoningDHV D-Foundations 8.1<br />
3 Bearing Piles (EC7-NL): Results of the Option Complete Verification<br />
3.1 Errors and Warnings<br />
Warning : The factor xi3 (NEN-EN 1997 1:2005 NEN 9097-1, annex A) is user defined. is user defined. Evidence to<br />
support this from the NEN deviating value has to be provided.<br />
Warning : The factor xi4 (NEN-EN 1997 1:2005 NEN 9097-1, annex A) is user defined. is user defined. Evidence to<br />
support this from the NEN deviating value has to be provided.<br />
Warning : The depth of the CPT's does not meet the requirements as set by NEN 9097-1 par 3.2.3.<br />
The CPT's do not meet the requirements set by NEN 9097-1<br />
par 3.2.3 because :<br />
- the maximum allowed center to center distance for CPT's is exceeded.<br />
- not all piles are positioned within the prescribed area of the CPT's.<br />
3.2 Remarks<br />
When checking the survey and testing of soil according to NEN 9097-1 art 3.2.3 lid (e), the program uses the<br />
provided CPT test level. It does NOT take into account possible different pile tip levels. When different pile tip levels<br />
are used in this calculation, the user itself must check for possibly required additional survey and testing of soil.<br />
Performing the check on NEN 9097-1 par 3.2.3, the average distance between the different CPT's used for this<br />
check is 25 m.<br />
3.3 Calculation Parameters<br />
3.3.1 Pile Factors<br />
gamma;b (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />
Limit State EQU/GEO) : 1,20<br />
gamma;b (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />
the Serviceability Limit State) : 1,00<br />
gamma;s (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />
Limit State EQU/GEO) : 1,20<br />
gamma;s (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />
the Serviceability Limit State) : 1,00<br />
xi3 (user defined) : 1,39<br />
xi4 (user defined) : 1,39<br />
Even though it is possible, the pilegroup model has not been used to calculate the negative skin friction.<br />
3.3.2 Pile type : Rect 400x400<br />
Pile type : Prefabricated concrete pile<br />
Materialtype for pile : Concrete<br />
Slip layer : None<br />
Pile shape : Rectangular pile<br />
beta (Shape factor: figuur 7i, NEN-EN 1997<br />
1:2005 par. 7.6.2.3(g): NEN 9097-1 : Pile tip) : 1,00<br />
s (NEN-EN 1997 1:2005 par. 7.6.2.3(h), NEN 9097-1 : factor for<br />
the influence of the shape of the crosssection of the pile base) : 1,00<br />
Pile dimensions :<br />
Smallest side pile tip [m] : 0,400<br />
Largest side pile tip [m] : 0,400<br />
14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 9
CPT Alpha_s Alpha_s Alpha_p<br />
Sand/ Clay/Loam<br />
Gravel Peat<br />
SW4 0,0100 0,0250 1,0000<br />
S017B 0,0100 0,0207 1,0000<br />
3.4 Verification of Limit State EQU<br />
Required by NEN-EN 1997-1 section 2.4.7 / 2.4.8: Ed
Pile name: 1<br />
Components of the maximum settlement are :<br />
sneg = 0,000 [m]<br />
sb = 0,007 [m]<br />
sel;d = 0,007 [m]<br />
s2 = 0,000 [m]<br />
Royal HaskoningDHV D-Foundations 8.1<br />
sneg stands for the settlement due to negative skin friction when the expected ground level settlement (egls) is<br />
within the next boundaries : 0.02 < egls
Report for D-Foundations 8.1<br />
Design and Verification according to Eurocode 7 of Bearing/Tension Piles and Shallow Foundations<br />
Developed by Deltares<br />
Company: Royal HaskoningDHV<br />
Date of report: 14-12-2012<br />
Time of report: 17:00:27<br />
Date of calculation: 14-12-2012<br />
Time of calculation: 16:16:08<br />
Filename: C:\..\DFoundation\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214<br />
Project identification: Hoogheemraadschap van <strong>Delfland</strong><br />
Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />
D-Foundations Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214
1 Table of Contents<br />
Royal HaskoningDHV D-Foundations 8.1<br />
1 Table of Contents 2<br />
2 Input Data 3<br />
2.1 General Input Data 3<br />
2.2 General Report Data 3<br />
2.3 Application Area Model Bearing Piles 3<br />
2.4 Superstructure 3<br />
2.5 General CPT Data 3<br />
2.5.1 View of CPT's in Foundation Plan 3<br />
2.6 Soil Data 4<br />
2.6.1 Soil Profile S2 4<br />
2.6.2 Soil Profile SW3 5<br />
2.6.3 Soil Profile S11 6<br />
2.6.4 Soil Profile S10 8<br />
2.7 Pile Types 9<br />
2.7.1 Pile type : Rect 380x380 9<br />
2.7.2 Pile type : Rect 400x400 9<br />
2.7.3 Pile type : Rect 450x450 9<br />
2.8 Foundation Plan 10<br />
2.8.1 View of Foundation Plan 10<br />
2.9 Excavation Data 10<br />
2.10 Totalized Loads (design values) 11<br />
2.11 Requirements 11<br />
2.12 Overruled Parameters 11<br />
2.13 Calculation Options 11<br />
2.14 Model Options 11<br />
3 Bearing Piles (EC7-NL): Results of the Option Complete Verification 12<br />
3.1 Errors and Warnings 12<br />
3.2 Remarks 12<br />
3.3 Calculation Parameters 12<br />
3.3.1 Pile Factors 12<br />
3.3.2 Pile type : Rect 400x400 12<br />
3.4 Verification of Limit State EQU 13<br />
3.5 Verification of Limit State GEO 13<br />
3.6 Verification of Serviceability limit state 13<br />
3.7 Additional Information 13<br />
3.7.1 The bearing capacity of shaft and point at Limit state GEO 14<br />
3.7.2 The bearing capacity of shaft and point at the Serviceability Limit State 14<br />
14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 2
2 Input Data<br />
2.1 General Input Data<br />
Model Bearing Piles (EC7-NL)<br />
2.2 General Report Data<br />
Royal HaskoningDHV D-Foundations 8.1<br />
Geotechnical consultant :<br />
Design engineer superstructure :<br />
Principal :<br />
Title 1 : Hoogheemraadschap van <strong>Delfland</strong><br />
Title 2 : Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />
Title 3 : D-Foundations Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214<br />
Number of project : 9R694518<br />
Location of project :<br />
2.3 Application Area Model Bearing Piles<br />
The verifications performed by the model BEARING PILES of D-FOUNDATIONS concern pile foundations on which<br />
axial static or quasi-static loads cause pressures in the piles. The calculations of pile forces and pile displacements<br />
are based on Cone Penetration Tests. Possible rise of (tension-)piles and horizontal displacements of piles and/or<br />
pile groups are not taken into account.<br />
2.4 Superstructure<br />
Rigidity of the superstructure : Non-Rigid<br />
2.5 General CPT Data<br />
Number of CPT's : 4<br />
Timing of CPT's : CPT - Excavation - Install<br />
2.5.1 View of CPT's in Foundation Plan<br />
S017B<br />
SW10 SW7 SW8 SW9 SW6 SW5 SW4 S10 S11 SW3 S4 S5 S6 S9 S7 S8 S2<br />
14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 3<br />
Legend<br />
Rect 400x400 (Edge pile)<br />
Rect 400x400 (Middle pile)<br />
CPT
Royal HaskoningDHV D-Foundations 8.1<br />
Number/Name Pile tip Top of pos. Bottom of neg. X-coor- Y-coor-<br />
CPT level friction zone friction zone dinate dinate<br />
[m R.L.] [m R.L.] [m R.L.] [m] [m]<br />
1: S2 -23,00 -16,00 -16,00 88931,71 446040,98<br />
2: SW3 -23,00 -17,00 -17,00 88913,58 446036,27<br />
3: S11 -23,00 -18,00 -18,00 86492,66 444467,99<br />
4: S10 -23,00 -18,00 -18,00 86507,43 444472,12<br />
2.6 Soil Data<br />
Number of soil profiles (= number of CPT's) : 4<br />
2.6.1 Soil Profile S2<br />
Belonging to CPT S2<br />
Surface level in [m. reference level] : -2,730<br />
Phreatic level in [m. reference level] : -3,020<br />
Pile tip level in [m. reference level] : -23,000<br />
Top of positive skin friction zone in [m. reference level] : -16,000<br />
Bottom of negative skin friction zone in [m. reference level] : -16,000<br />
OCR-value foundation layer : 1,00<br />
Expected groundlevel settlement in [m] : 0,110<br />
Number of layers in profile : 32<br />
5,00<br />
0,00<br />
-5,00<br />
-10,00<br />
-15,00<br />
-20,00<br />
-25,00<br />
-30,00<br />
-35,00<br />
-40,00<br />
Depth [m]<br />
qc [MPa]<br />
5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00<br />
qc [MPa]<br />
Reduced qc for alpha_s [MPa]<br />
Ground level (-2,73)<br />
14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 4<br />
NSFZ<br />
PSFZ<br />
PTL<br />
PL<br />
Profile: S2<br />
Material Unit weight<br />
dry<br />
Unit weight<br />
wet<br />
Phi<br />
Peat, mod..<br />
kN/m3<br />
13,0<br />
kN/m3<br />
13,0<br />
deg<br />
15,0<br />
Peat, mod.. 13,0 13,0 15,0<br />
Peat, not.. 12,0 12,0 15,0<br />
Peat, Clay, mod.. clea.. 13,0 17,0 13,0 17,0 15,0<br />
Clay, sl s.. 20,0 20,0<br />
17,5<br />
Loam, ve s.. 20,0 20,0<br />
22,5<br />
Clay, sl s.. 20,0 20,0 35,0<br />
Clay, clea.. 17,0 17,0 22,5<br />
Clay, clea.. sl s.. 20,0 17,0 20,0 17,0<br />
17,5 22,5<br />
Clay, sl s.. 20,0 20,0 17,5<br />
Clay, clea.. sl s.. 17,0 20,0 17,0 20,0 22,5 17,5<br />
Peat, Clay, mod.. clea.. 17,0 13,0 17,0 13,0<br />
22,5 17,5<br />
Clay, clea.. 17,0 17,0 15,0 17,5<br />
Clay, sl s.. 20,0 20,0 22,5<br />
Peat, Clay, mod.. clea.. 17,0 13,0 17,0 13,0 17,5<br />
Clay, clea.. 17,0 17,0 15,0<br />
Loam, Clay, sl s.. 20,0 20,0 17,5<br />
Sand, ve s.. 20,0 19,0 20,0 21,0 22,5 35,0 30,0<br />
Sand, sl s.. 19,0 21,0 32,5<br />
Sand, ve s.. 19,0 21,0 30,0<br />
Sand, sl s.. 19,0 21,0 32,5<br />
Loam, Sand, ve s.. 19,0 20,0 21,0 20,0 30,0 35,0<br />
Sand, sl s.. 19,0 21,0 32,5<br />
Sand, sl s.. 19,0 21,0 32,5<br />
Sand, sl s.. 19,0 21,0 32,5<br />
PL (Phreatic Level) = -3,02 [m]<br />
EL (Excavation Level) = -4,00 [m]<br />
PTL (Pile Tip Level) = -23,00 [m]<br />
PSFZ = Positive skin friction zone, top = -16,00 [m]<br />
NSFZ = Negative skin friction zone, bottom = -16,00 [m]<br />
Number Top Gamma Gamma;sat Phi Soil Median<br />
layer layer Type (Sand/Gravel)<br />
[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />
1 -2,730 13,00 13,00 15,00 Peat --<br />
2 -2,830 13,00 13,00 15,00 Peat --<br />
3 -5,030 12,00 12,00 15,00 Peat --<br />
4 -6,530 13,00 13,00 15,00 Peat --<br />
5 -6,630 17,00 17,00 17,50 Clay --<br />
6 -6,930 20,00 20,00 22,50 Clay --<br />
7 -7,630 20,00 20,00 35,00 Loam --<br />
8 -7,930 20,00 20,00 22,50 Clay --<br />
9 -8,430 17,00 17,00 17,50 Clay --<br />
10 -8,730 20,00 20,00 22,50 Clay --<br />
EL
Royal HaskoningDHV D-Foundations 8.1<br />
Number Top Gamma Gamma;sat Phi Soil Median<br />
layer layer Type (Sand/Gravel)<br />
[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />
11 -9,030 17,00 17,00 17,50 Clay --<br />
12 -9,130 20,00 20,00 22,50 Clay --<br />
13 -9,530 17,00 17,00 17,50 Clay --<br />
14 -9,630 20,00 20,00 22,50 Clay --<br />
15 -9,830 17,00 17,00 17,50 Clay --<br />
16 -10,030 13,00 13,00 15,00 Peat --<br />
17 -10,330 17,00 17,00 17,50 Clay --<br />
18 -10,930 20,00 20,00 22,50 Clay --<br />
19 -14,930 17,00 17,00 17,50 Clay --<br />
20 -15,130 13,00 13,00 15,00 Peat --<br />
21 -15,330 17,00 17,00 17,50 Clay --<br />
22 -15,830 20,00 20,00 22,50 Clay --<br />
23 -16,030 20,00 20,00 35,00 Loam --<br />
24 -16,230 19,00 21,00 30,00 Sand 0,200<br />
25 -16,430 19,00 21,00 32,50 Sand 0,200<br />
26 -21,830 19,00 21,00 30,00 Sand 0,200<br />
27 -22,730 19,00 21,00 32,50 Sand 0,200<br />
28 -26,730 19,00 21,00 30,00 Sand 0,200<br />
29 -26,830 20,00 20,00 35,00 Loam --<br />
30 -27,130 19,00 21,00 32,50 Sand 0,200<br />
31 -28,330 19,00 21,00 32,50 Sand 0,200<br />
32 -28,430 19,00 21,00 32,50 Sand 0,200<br />
2.6.2 Soil Profile SW3<br />
Belonging to CPT SW3<br />
Surface level in [m. reference level] : -2,790<br />
Phreatic level in [m. reference level] : -3,020<br />
Pile tip level in [m. reference level] : -23,000<br />
Top of positive skin friction zone in [m. reference level] : -17,000<br />
Bottom of negative skin friction zone in [m. reference level] : -17,000<br />
OCR-value foundation layer : 1,00<br />
Expected groundlevel settlement in [m] : 0,110<br />
Number of layers in profile : 38<br />
5,00<br />
0,00<br />
-5,00<br />
-10,00<br />
-15,00<br />
-20,00<br />
-25,00<br />
-30,00<br />
-35,00<br />
qc [MPa]<br />
5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00<br />
Ground level (-2,79)<br />
-40,00<br />
Depth [m]<br />
0,00 0,10 0,20 0,30 0,40 0,50 0,60<br />
qc [MPa]<br />
Pore water pressure [MPa]<br />
Reduced qc for alpha_s [MPa]<br />
Pore water pressure [MPa]<br />
14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 5<br />
NSFZ<br />
PSFZ<br />
PTL<br />
PL<br />
Profile: SW3<br />
Material Unit weight Unit weight Phi<br />
dry wet<br />
Peat, Clay, mod.. clea..<br />
kN/m3<br />
17,0 17,0 17,0 13,0<br />
kN/m3<br />
17,0 13,0<br />
deg<br />
17,5 15,0<br />
Peat, mod.. 13,0 13,0 15,0<br />
Clay, clea..<br />
Loam, Clay, sl s..<br />
Clay, Clay, clea.. sl ve s.. s..<br />
Clay, sl s..<br />
Clay, clea.. sl s..<br />
Peat,<br />
Clay,<br />
mod..<br />
clea..<br />
Clay, clea..<br />
Clay, clea.. sl s..<br />
Clay, clea.. sl s..<br />
Clay, sl s..<br />
Clay, clea..<br />
Clay, clea.. sl s..<br />
Clay, sl s..<br />
Peat, Clay, clea..<br />
Clay,<br />
mod..<br />
clea..<br />
Loam, Sand,<br />
Clay,<br />
ve<br />
sl ve s..<br />
s.. Sand, sl s..<br />
Sand, ve s..<br />
Sand, sl s..<br />
Sand, ve s..<br />
17,0<br />
20,0 17,0 20,0 17,0 20,0<br />
17,0<br />
13,0<br />
17,0<br />
20,0 17,0 20,0 17,0<br />
20,0<br />
17,0 20,0 17,0<br />
20,0<br />
17,0 13,0<br />
17,0<br />
20,0 19,0<br />
19,0<br />
19,0<br />
19,0<br />
19,0<br />
17,0<br />
20,0 17,0 20,0 17,0 20,0<br />
17,0<br />
13,0<br />
17,0<br />
20,0 17,0 20,0 17,0<br />
20,0<br />
17,0 20,0 17,0<br />
20,0<br />
17,0 13,0<br />
17,0<br />
20,0 21,0<br />
21,0<br />
21,0<br />
21,0<br />
21,0<br />
17,5<br />
22,5 35,0 22,5 17,5 22,5 17,5 22,5<br />
17,5<br />
15,0<br />
17,5<br />
22,5 17,5 22,5 17,5<br />
22,5<br />
17,5 22,5 17,5<br />
22,5<br />
17,5 15,0<br />
17,5<br />
22,5 35,0 30,0<br />
32,5<br />
30,0<br />
32,5<br />
30,0<br />
Sand, sl s..<br />
Sand, sl s..<br />
19,0<br />
19,0<br />
21,0<br />
21,0<br />
32,5<br />
32,5<br />
Sand, sl s.. 19,0 21,0 32,5<br />
PL (Phreatic Level) = -3,02 [m]<br />
EL (Excavation Level) = -4,00 [m]<br />
PTL (Pile Tip Level) = -23,00 [m]<br />
PSFZ = Positive skin friction zone, top = -17,00 [m]<br />
NSFZ = Negative skin friction zone, bottom = -17,00 [m]<br />
EL
Royal HaskoningDHV D-Foundations 8.1<br />
Number Top Gamma Gamma;sat Phi Soil Median<br />
layer layer Type (Sand/Gravel)<br />
[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />
1 -2,790 17,00 17,00 17,50 Clay --<br />
2 -2,800 17,00 17,00 17,50 Clay --<br />
3 -2,900 17,00 17,00 17,50 Clay --<br />
4 -3,000 13,00 13,00 15,00 Peat --<br />
5 -3,300 13,00 13,00 15,00 Peat --<br />
6 -6,600 17,00 17,00 17,50 Clay --<br />
7 -7,000 20,00 20,00 22,50 Clay --<br />
8 -7,600 20,00 20,00 35,00 Loam --<br />
9 -7,900 20,00 20,00 22,50 Clay --<br />
10 -8,000 17,00 17,00 17,50 Clay --<br />
11 -8,200 20,00 20,00 22,50 Clay --<br />
12 -8,500 17,00 17,00 17,50 Clay --<br />
13 -8,800 20,00 20,00 22,50 Clay --<br />
14 -9,100 17,00 17,00 17,50 Clay --<br />
15 -9,700 13,00 13,00 15,00 Peat --<br />
16 -10,200 17,00 17,00 17,50 Clay --<br />
17 -10,900 20,00 20,00 22,50 Clay --<br />
18 -11,200 17,00 17,00 17,50 Clay --<br />
19 -11,500 20,00 20,00 22,50 Clay --<br />
20 -11,900 17,00 17,00 17,50 Clay --<br />
21 -12,200 20,00 20,00 22,50 Clay --<br />
22 -13,700 17,00 17,00 17,50 Clay --<br />
23 -14,200 20,00 20,00 22,50 Clay --<br />
24 -14,500 17,00 17,00 17,50 Clay --<br />
25 -14,600 20,00 20,00 22,50 Clay --<br />
26 -15,700 17,00 17,00 17,50 Clay --<br />
27 -15,900 13,00 13,00 15,00 Peat --<br />
28 -16,000 17,00 17,00 17,50 Clay --<br />
29 -16,900 20,00 20,00 22,50 Clay --<br />
30 -17,100 20,00 20,00 35,00 Loam --<br />
31 -17,300 19,00 21,00 30,00 Sand 0,200<br />
32 -17,600 19,00 21,00 32,50 Sand 0,200<br />
33 -18,500 19,00 21,00 30,00 Sand 0,200<br />
34 -18,800 19,00 21,00 32,50 Sand 0,200<br />
35 -19,800 19,00 21,00 30,00 Sand 0,200<br />
36 -20,000 19,00 21,00 32,50 Sand 0,200<br />
37 -22,100 19,00 21,00 32,50 Sand 0,200<br />
38 -22,200 19,00 21,00 32,50 Sand 0,200<br />
2.6.3 Soil Profile S11<br />
Belonging to CPT S11<br />
Surface level in [m. reference level] : -2,270<br />
Phreatic level in [m. reference level] : -3,020<br />
Pile tip level in [m. reference level] : -23,000<br />
Top of positive skin friction zone in [m. reference level] : -18,000<br />
Bottom of negative skin friction zone in [m. reference level] : -18,000<br />
OCR-value foundation layer : 1,00<br />
Expected groundlevel settlement in [m] : 0,110<br />
Number of layers in profile : 34<br />
14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 6
5,00<br />
0,00<br />
-5,00<br />
-10,00<br />
-15,00<br />
-20,00<br />
-25,00<br />
-30,00<br />
-35,00<br />
-40,00<br />
Depth [m]<br />
qc [MPa]<br />
5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00<br />
qc [MPa]<br />
Reduced qc for alpha_s [MPa]<br />
Royal HaskoningDHV D-Foundations 8.1<br />
Ground level (-2,27)<br />
14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 7<br />
NSFZ<br />
PSFZ<br />
PTL<br />
PL<br />
Profile: S11<br />
Material Unit weight Unit weight Phi<br />
dry wet<br />
Clay,<br />
clea.. sl s..<br />
Peat,<br />
Clay, clea..<br />
Peat,<br />
mod..<br />
mod..<br />
Peat, mod..<br />
kN/m3<br />
17,0 20,0 17,0<br />
13,0<br />
13,0<br />
13,0<br />
kN/m3<br />
17,0 20,0 17,0<br />
13,0<br />
13,0<br />
13,0<br />
deg<br />
17,5 22,5 17,5<br />
15,0<br />
15,0<br />
15,0<br />
Clay, clea.. 17,0 17,0 17,5<br />
Loam, Clay, sl ve s..<br />
Clay, sl s.. s..<br />
Clay, clea..<br />
Clay, sl s..<br />
20,0<br />
17,0<br />
20,0<br />
20,0<br />
17,0<br />
20,0<br />
22,5 35,0 22,5<br />
17,5<br />
22,5<br />
Loam, ve s.. 20,0 20,0 35,0<br />
Loam, Sand, Clay, ve sl ve s.. s.. Sand,<br />
Sand, sl s..<br />
Sand, ve sl s.. s..<br />
Loam,<br />
Sand, ve<br />
ve<br />
s..<br />
s..<br />
Clay, sl s..<br />
Clay, clea..<br />
Loam, Clay, sl ve s.. s..<br />
Clay, Clay, clea.. sl s..<br />
Loam, Sand, Clay, ve sl ve s.. s.. 20,0 19,0<br />
19,0<br />
19,0<br />
20,0<br />
20,0<br />
17,0 20,0 17,0 20,0 19,0<br />
20,0 21,0<br />
21,0<br />
21,0<br />
20,0<br />
20,0<br />
17,0 20,0 17,0 20,0 21,0<br />
22,5 35,0 30,0<br />
32,5<br />
30,0 32,5 30,0<br />
35,0<br />
22,5<br />
17,5 22,5 35,0 22,5 17,5 22,5 35,0 30,0<br />
Sand, sl s.. 19,0 21,0 32,5<br />
Sand, sl s.. 19,0 21,0 32,5<br />
PL (Phreatic Level) = -3,02 [m]<br />
EL (Excavation Level) = -4,00 [m]<br />
PTL (Pile Tip Level) = -23,00 [m]<br />
PSFZ = Positive skin friction zone, top = -18,00 [m]<br />
NSFZ = Negative skin friction zone, bottom = -18,00 [m]<br />
Number Top Gamma Gamma;sat Phi Soil Median<br />
layer layer Type (Sand/Gravel)<br />
[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />
1 -2,270 17,00 17,00 17,50 Clay --<br />
2 -2,280 17,00 17,00 17,50 Clay --<br />
3 -2,380 17,00 17,00 17,50 Clay --<br />
4 -2,780 20,00 20,00 22,50 Clay --<br />
5 -2,880 17,00 17,00 17,50 Clay --<br />
6 -3,180 13,00 13,00 15,00 Peat --<br />
7 -3,780 13,00 13,00 15,00 Peat --<br />
8 -4,280 13,00 13,00 15,00 Peat --<br />
9 -4,980 17,00 17,00 17,50 Clay --<br />
10 -7,580 20,00 20,00 22,50 Clay --<br />
11 -7,980 20,00 20,00 35,00 Loam --<br />
12 -8,080 20,00 20,00 22,50 Clay --<br />
13 -8,680 17,00 17,00 17,50 Clay --<br />
14 -9,180 20,00 20,00 22,50 Clay --<br />
15 -10,080 20,00 20,00 35,00 Loam --<br />
16 -11,980 20,00 20,00 22,50 Clay --<br />
17 -12,380 20,00 20,00 35,00 Loam --<br />
18 -12,480 19,00 21,00 30,00 Sand 0,200<br />
19 -12,680 19,00 21,00 32,50 Sand 0,200<br />
20 -13,480 19,00 21,00 30,00 Sand 0,200<br />
21 -13,780 19,00 21,00 32,50 Sand 0,200<br />
22 -14,180 19,00 21,00 30,00 Sand 0,200<br />
23 -14,380 20,00 20,00 35,00 Loam --<br />
24 -15,080 20,00 20,00 22,50 Clay --<br />
25 -16,280 17,00 17,00 17,50 Clay --<br />
26 -16,680 20,00 20,00 22,50 Clay --<br />
27 -16,880 20,00 20,00 35,00 Loam --<br />
28 -17,280 20,00 20,00 22,50 Clay --<br />
29 -17,680 17,00 17,00 17,50 Clay --<br />
30 -18,080 20,00 20,00 22,50 Clay --<br />
31 -18,380 20,00 20,00 35,00 Loam --<br />
32 -18,480 19,00 21,00 30,00 Sand 0,200<br />
33 -18,580 19,00 21,00 32,50 Sand 0,200<br />
34 -30,580 19,00 21,00 32,50 Sand 0,200<br />
EL
2.6.4 Soil Profile S10<br />
Belonging to CPT S10<br />
Surface level in [m. reference level] : -2,200<br />
Phreatic level in [m. reference level] : -3,020<br />
Pile tip level in [m. reference level] : -23,000<br />
Top of positive skin friction zone in [m. reference level] : -18,000<br />
Bottom of negative skin friction zone in [m. reference level] : -18,000<br />
OCR-value foundation layer : 1,00<br />
Expected groundlevel settlement in [m] : 0,110<br />
Number of layers in profile : 43<br />
5,00<br />
0,00<br />
-5,00<br />
-10,00<br />
-15,00<br />
-20,00<br />
-25,00<br />
-30,00<br />
-35,00<br />
-40,00<br />
Depth [m]<br />
qc [MPa]<br />
5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00<br />
qc [MPa]<br />
Reduced qc for alpha_s [MPa]<br />
Royal HaskoningDHV D-Foundations 8.1<br />
Ground level (-2,20)<br />
14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 8<br />
NSFZ<br />
PSFZ<br />
PTL<br />
PL<br />
Profile: S10<br />
Material Unit weight Unit weight Phi<br />
dry wet<br />
Peat, Clay, Clay, mod.. clea.. clea..<br />
Peat, Clay, mod.. clea..<br />
kN/m3<br />
17,0 17,0 13,0 17,0 13,0<br />
kN/m3<br />
17,0 17,0 13,0 17,0 13,0<br />
deg<br />
17,5 17,5 15,0 17,5 15,0<br />
Peat, mod.. 13,0 13,0 15,0<br />
Peat,<br />
mod..<br />
Clay, clea..<br />
Clay, sl s..<br />
Clay, clea..<br />
13,0<br />
17,0<br />
20,0<br />
17,0<br />
13,0<br />
17,0<br />
20,0<br />
17,0<br />
15,0 15,0<br />
17,5<br />
22,5<br />
17,5<br />
Loam,<br />
Clay, sl<br />
ve<br />
s..<br />
Clay, sl s.. s..<br />
Loam, ve s..<br />
Loam, Sand, ve s..<br />
Loam, Sand, ve s..<br />
Loam, Sand, ve s..<br />
Sand, ve s.. Sand, sl s..<br />
Loam, Sand, ve s.. s..<br />
Clay, sl s..<br />
Loam, Clay, clea..<br />
Loam, Sand, Clay, sl s..<br />
Clay, ve sl<br />
ve s.. s.. s..<br />
Loam, Sand,<br />
Clay, clea..<br />
ve sl ve s.. s.. 20,0<br />
20,0<br />
20,0 19,0 20,0 19,0 20,0 19,0 20,0 19,0<br />
19,0<br />
19,0 20,0<br />
20,0<br />
17,0 20,0 19,0 20,0 20,0 17,0 20,0 19,0<br />
20,0<br />
20,0<br />
20,0 21,0 20,0 21,0 20,0 21,0 20,0 21,0<br />
21,0<br />
21,0 20,0<br />
20,0<br />
17,0 20,0 21,0 20,0 20,0 17,0 20,0 21,0<br />
22,5<br />
35,0 22,5<br />
35,0 30,0 35,0 30,0 35,0 30,0 35,0 30,0<br />
32,5<br />
30,0 35,0<br />
22,5<br />
17,5 22,5 35,0 30,0 35,0 22,5 17,5 22,5 35,0 30,0<br />
Sand, sl s.. 19,0 21,0 32,5<br />
Sand, ve s.. 19,0 21,0 30,0<br />
Sand, sl s.. 19,0 21,0 32,5<br />
Sand, sl s.. 19,0 21,0 32,5<br />
Sand, sl s.. 19,0 21,0 32,5<br />
PL (Phreatic Level) = -3,02 [m]<br />
EL (Excavation Level) = -4,00 [m]<br />
PTL (Pile Tip Level) = -23,00 [m]<br />
PSFZ = Positive skin friction zone, top = -18,00 [m]<br />
NSFZ = Negative skin friction zone, bottom = -18,00 [m]<br />
Number Top Gamma Gamma;sat Phi Soil Median<br />
layer layer Type (Sand/Gravel)<br />
[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />
1 -2,200 17,00 17,00 17,50 Clay --<br />
2 -2,210 17,00 17,00 17,50 Clay --<br />
3 -2,310 17,00 17,00 17,50 Clay --<br />
4 -2,410 13,00 13,00 15,00 Peat --<br />
5 -2,710 17,00 17,00 17,50 Clay --<br />
6 -3,110 13,00 13,00 15,00 Peat --<br />
7 -3,310 13,00 13,00 15,00 Peat --<br />
8 -5,710 13,00 13,00 15,00 Peat --<br />
9 -5,810 13,00 13,00 15,00 Peat --<br />
10 -5,910 13,00 13,00 15,00 Peat --<br />
11 -6,510 17,00 17,00 17,50 Clay --<br />
12 -7,710 20,00 20,00 22,50 Clay --<br />
13 -8,010 17,00 17,00 17,50 Clay --<br />
14 -9,610 20,00 20,00 22,50 Clay --<br />
15 -10,210 20,00 20,00 35,00 Loam --<br />
16 -10,510 20,00 20,00 22,50 Clay --<br />
17 -10,810 20,00 20,00 35,00 Loam --<br />
18 -11,410 19,00 21,00 30,00 Sand 0,200<br />
19 -11,510 20,00 20,00 35,00 Loam --<br />
20 -11,910 19,00 21,00 30,00 Sand 0,200<br />
21 -12,110 20,00 20,00 35,00 Loam --<br />
22 -12,510 19,00 21,00 30,00 Sand 0,200<br />
EL
Royal HaskoningDHV D-Foundations 8.1<br />
Number Top Gamma Gamma;sat Phi Soil Median<br />
layer layer Type (Sand/Gravel)<br />
[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />
23 -12,610 20,00 20,00 35,00 Loam --<br />
24 -12,810 19,00 21,00 30,00 Sand 0,200<br />
25 -13,010 19,00 21,00 32,50 Sand 0,200<br />
26 -14,010 19,00 21,00 30,00 Sand 0,200<br />
27 -14,210 20,00 20,00 35,00 Loam --<br />
28 -14,810 20,00 20,00 22,50 Clay --<br />
29 -16,110 17,00 17,00 17,50 Clay --<br />
30 -16,610 20,00 20,00 22,50 Clay --<br />
31 -16,710 20,00 20,00 35,00 Loam --<br />
32 -16,810 19,00 21,00 30,00 Sand 0,200<br />
33 -17,110 20,00 20,00 35,00 Loam --<br />
34 -17,210 20,00 20,00 22,50 Clay --<br />
35 -17,410 17,00 17,00 17,50 Clay --<br />
36 -17,810 20,00 20,00 22,50 Clay --<br />
37 -18,010 20,00 20,00 35,00 Loam --<br />
38 -18,110 19,00 21,00 30,00 Sand 0,200<br />
39 -18,210 19,00 21,00 32,50 Sand 0,200<br />
40 -27,810 19,00 21,00 30,00 Sand 0,200<br />
41 -28,110 19,00 21,00 32,50 Sand 0,200<br />
42 -30,210 19,00 21,00 32,50 Sand 0,200<br />
43 -30,310 19,00 21,00 32,50 Sand 0,200<br />
2.7 Pile Types<br />
2.7.1 Pile type : Rect 380x380<br />
Pile type : Prefabricated concrete pile<br />
Materialtype for pile : Concrete<br />
Slip layer : None<br />
Pile shape : Rectangular pile<br />
beta (Shape factor) according to figure 7i, NEN-EN 1997-1:2005.<br />
s (factor for the influence of the shape of the crosssection of the pile base) according to NEN-EN 1997-1:2005.<br />
Pile dimensions :<br />
Smallest side pile tip [m] : 0,380<br />
Largest side pile tip [m] : 0,380<br />
2.7.2 Pile type : Rect 400x400<br />
Pile type : Prefabricated concrete pile<br />
Materialtype for pile : Concrete<br />
Slip layer : None<br />
Pile shape : Rectangular pile<br />
beta (Shape factor) according to figure 7i, NEN-EN 1997-1:2005.<br />
s (factor for the influence of the shape of the crosssection of the pile base) according to NEN-EN 1997-1:2005.<br />
Pile dimensions :<br />
Smallest side pile tip [m] : 0,400<br />
Largest side pile tip [m] : 0,400<br />
2.7.3 Pile type : Rect 450x450<br />
Pile type : Prefabricated concrete pile<br />
Materialtype for pile : Concrete<br />
Slip layer : None<br />
Pile shape : Rectangular pile<br />
beta (Shape factor) according to figure 7i, NEN-EN 1997-1:2005.<br />
s (factor for the influence of the shape of the crosssection of the pile base) according to NEN-EN 1997-1:2005.<br />
14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 9
Royal HaskoningDHV D-Foundations 8.1<br />
Pile dimensions :<br />
Smallest side pile tip [m] : 0,450<br />
Largest side pile tip [m] : 0,450<br />
2.8 Foundation Plan<br />
Number of piles : 1<br />
Number of collaborating piles* : 1<br />
* : 0 = not defined, 1 = non rigid superstructure, >1 = rigid superstructure<br />
2.8.1 View of Foundation Plan<br />
1<br />
14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 10<br />
Legend<br />
Rect 400x400 (Edge pile)<br />
Rect 400x400 (Middle pile)<br />
CPT<br />
Pile X-coor- Y-coor- Fc;d Fc;d P0 Pile head<br />
nr/name dinate dinate (EQU/GEO) (SLS) level<br />
[m] [m] [kN] [kN] [kN/m2] [m R.L.]<br />
1: 1 86487,66 444158,98 712,00 647,00 7,00 -0,52<br />
2.9 Excavation Data<br />
Excavation level in [m. reference level] : -4,000<br />
Reduction model : Safe (NEN)
5,00<br />
0,00<br />
-5,00<br />
-10,00<br />
-15,00<br />
-20,00<br />
-25,00<br />
-30,00<br />
-35,00<br />
-40,00<br />
Depth [m]<br />
qc [MPa]<br />
5 10 15 20 25 30 35 40<br />
qc [MPa]<br />
Reduced qc [MPa]<br />
2.10 Totalized Loads (design values)<br />
Royal HaskoningDHV D-Foundations 8.1<br />
Indication for qc-reduction<br />
due to safe reduction method<br />
Ground level (-2,73)<br />
14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 11<br />
PL<br />
Profile: S2<br />
[kN/m2]<br />
0 100 200 300 400 500 600 700 800<br />
PL (Phreatic Level) = -3,02 [m]<br />
EL (Excavation Level) = -4,00 [m]<br />
= Initial Effective Stress<br />
= Effective Stress<br />
Total load on all piles<br />
For limit state EQU/GEO in [kN] : 712,00<br />
For Serviceability limit state in [kN] : 647,00<br />
2.11 Requirements<br />
Limit state GEO<br />
Maximum allowed settlement in [m] : 0,150<br />
Maximum allowed (relative) rotation : 1 / 100<br />
Serviceability Limit State<br />
Maximum allowed settlement in [m] : 0,150<br />
Maximum allowed (relative) rotation : 1 / 300<br />
2.12 Overruled Parameters<br />
User defined Factor xi3 [-] : 1,39<br />
User defined Factor xi4 [-] : 1,39<br />
2.13 Calculation Options<br />
Suppress pile group (for negative skin friction)<br />
Create intermediate results file<br />
Use reduction for continuous flight auger piles (standard)<br />
Use the influence of excavations (standard).<br />
2.14 Model Options<br />
Selected pile types :<br />
-Rect 400x400<br />
Selected profiles :<br />
-S2<br />
-SW3<br />
-S11<br />
EL
-S10<br />
Royal HaskoningDHV D-Foundations 8.1<br />
3 Bearing Piles (EC7-NL): Results of the Option Complete Verification<br />
3.1 Errors and Warnings<br />
Warning : The factor xi3 (NEN-EN 1997 1:2005 NEN 9097-1, annex A) is user defined. is user defined. Evidence to<br />
support this from the NEN deviating value has to be provided.<br />
Warning : The factor xi4 (NEN-EN 1997 1:2005 NEN 9097-1, annex A) is user defined. is user defined. Evidence to<br />
support this from the NEN deviating value has to be provided.<br />
The CPT's do not meet the requirements set by NEN 9097-1<br />
par 3.2.3 because :<br />
- the maximum allowed center to center distance for CPT's is exceeded.<br />
- not all piles are positioned within the prescribed area of the CPT's.<br />
3.2 Remarks<br />
When checking the survey and testing of soil according to NEN 9097-1 art 3.2.3 lid (e), the program uses the<br />
provided CPT test level. It does NOT take into account possible different pile tip levels. When different pile tip levels<br />
are used in this calculation, the user itself must check for possibly required additional survey and testing of soil.<br />
Performing the check on NEN 9097-1 par 3.2.3, the average distance between the different CPT's used for this<br />
check is 20 m.<br />
3.3 Calculation Parameters<br />
3.3.1 Pile Factors<br />
gamma;b (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />
Limit State EQU/GEO) : 1,20<br />
gamma;b (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />
the Serviceability Limit State) : 1,00<br />
gamma;s (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />
Limit State EQU/GEO) : 1,20<br />
gamma;s (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />
the Serviceability Limit State) : 1,00<br />
xi3 (user defined) : 1,39<br />
xi4 (user defined) : 1,39<br />
Even though it is possible, the pilegroup model has not been used to calculate the negative skin friction.<br />
3.3.2 Pile type : Rect 400x400<br />
Pile type : Prefabricated concrete pile<br />
Materialtype for pile : Concrete<br />
Slip layer : None<br />
Pile shape : Rectangular pile<br />
beta (Shape factor: figuur 7i, NEN-EN 1997<br />
1:2005 par. 7.6.2.3(g): NEN 9097-1 : Pile tip) : 1,00<br />
s (NEN-EN 1997 1:2005 par. 7.6.2.3(h), NEN 9097-1 : factor for<br />
the influence of the shape of the crosssection of the pile base) : 1,00<br />
Pile dimensions :<br />
Smallest side pile tip [m] : 0,400<br />
Largest side pile tip [m] : 0,400<br />
CPT Alpha_s Alpha_s Alpha_p<br />
Sand/ Clay/Loam<br />
Gravel Peat<br />
S2 0,0100 0,0242 1,0000<br />
14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 12
CPT Alpha_s Alpha_s Alpha_p<br />
Sand/ Clay/Loam<br />
Gravel Peat<br />
SW3 0,0100 0,0233 1,0000<br />
S11 0,0100 0,0210 1,0000<br />
S10 0,0100 0,0242 1,0000<br />
3.4 Verification of Limit State EQU<br />
Required by NEN-EN 1997-1 section 2.4.7 / 2.4.8: Ed
Pile name: 1<br />
Components of the maximum settlement are :<br />
sneg = 0,000 [m]<br />
sb = 0,007 [m]<br />
sel;d = 0,007 [m]<br />
s2 = 0,000 [m]<br />
Royal HaskoningDHV D-Foundations 8.1<br />
sneg stands for the settlement due to negative skin friction when the expected ground level settlement (egls) is<br />
within the next boundaries : 0.02 < egls
Bijlage E2 – Zettingsberekeningen<br />
<strong>DO</strong> brug 4,5 en 22 9R6945.I8/R001_0C/902635/HVT/Nijm<br />
Concept rapport 14 december 2012
Zetting tgv bims (2,0 m; 0,6 m netto t.o.v. mv)<br />
Annex<br />
A4<br />
Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />
form.<br />
Hoogheemraadschap van <strong>Delfland</strong><br />
9R694518<br />
ctr.<br />
Barbarossastraat 35<br />
6522 DK Nijmegen<br />
Phone +31 (0)24 328 42 84<br />
Fax +31 (0)24 323 93 46<br />
14-12-2012<br />
SVVE<br />
date drw.<br />
D-Settlement 9.2 : Bruggen - Zetting landhoofden 60cm - 20121214.sli<br />
Input View<br />
5 6 7 8<br />
8<br />
7<br />
6<br />
5<br />
Bims<br />
Layers<br />
8. Veen, Holland, naast<br />
7. Veen, Holland, naast<br />
6. Klei, DK, naast<br />
5. Klei, DK, naast<br />
4. Klei, DK, naast<br />
3. Klei, DK, naast<br />
2. Veen, Basis<br />
1. Zand, algemeen
Voorbelasting tbv 60cm netto ophoging<br />
Annex<br />
A4<br />
Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />
form.<br />
Hoogheemraadschap van <strong>Delfland</strong><br />
9R694518<br />
ctr.<br />
Barbarossastraat 35<br />
6522 DK Nijmegen<br />
Phone +31 (0)24 328 42 84<br />
Fax +31 (0)24 323 93 46<br />
14-12-2012<br />
SVVE<br />
date drw.<br />
D-Settlement 9.2 : Bruggen - Zetting landhoofden 60cm-voorb - 20121214.sli<br />
Input View<br />
2 3 4 5 6 7 8<br />
Voorbelasting (2)<br />
8<br />
7<br />
6<br />
5<br />
4<br />
3<br />
2<br />
Layers<br />
8. Veen, Holland, naast<br />
7. Veen, Holland, naast<br />
6. Klei, DK, naast<br />
5. Klei, DK, naast<br />
4. Klei, DK, naast<br />
3. Klei, DK, naast<br />
2. Veen, Basis<br />
1. Zand, algemeen
Zetting tgv bims (2,0 m; 0,6 m netto t.o.v. mv)<br />
Annex<br />
A4<br />
Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />
form.<br />
Hoogheemraadschap van <strong>Delfland</strong><br />
9R694518<br />
ctr.<br />
Barbarossastraat 35<br />
6522 DK Nijmegen<br />
Phone +31 (0)24 328 42 84<br />
Fax +31 (0)24 323 93 46<br />
14-12-2012<br />
SVVE<br />
date drw.<br />
D-Settlement 9.2 : Bruggen - Zetting landhoofden 60cm - 20121214.sli<br />
Effective stress [kPa]<br />
Settlement [m]<br />
20,132460<br />
20,132455<br />
20,132450<br />
20,132445<br />
0,000000<br />
0,200000<br />
0,400000<br />
0,600000<br />
0,800000<br />
1,000000<br />
Vertical 5 (X = 0,000 m; Z = 0,000 m)<br />
Method = NEN - Koppejan with Darcy (Natural strain)<br />
Time-History<br />
1 10 100 1000 10000<br />
Time [days]<br />
1 10 100 1000 10000<br />
Depth = 2,200 (-) [m]<br />
Settlement after 10000 days = 1,108 [m]
Voorbelasting tbv 60cm netto ophoging<br />
Annex<br />
A4<br />
Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />
form.<br />
Hoogheemraadschap van <strong>Delfland</strong><br />
9R694518<br />
ctr.<br />
Barbarossastraat 35<br />
6522 DK Nijmegen<br />
Phone +31 (0)24 328 42 84<br />
Fax +31 (0)24 323 93 46<br />
14-12-2012<br />
SVVE<br />
date drw.<br />
D-Settlement 9.2 : Bruggen - Zetting landhoofden 60cm-voorb - 20121214.sli<br />
Effective stress [kPa]<br />
Settlement [m]<br />
35,0<br />
30,0<br />
25,0<br />
20,0<br />
0,0<br />
0,5<br />
1,0<br />
1,5<br />
2,0<br />
Vertical 5 (X = 0,000 m; Z = 0,000 m)<br />
Method = NEN - Koppejan with Darcy (Natural strain)<br />
Time-History<br />
1 10 100 1000 10000<br />
Time [days]<br />
1 10 100 1000 10000<br />
Depth = 2,200 (-) [m]<br />
Settlement after 10000 days = 2,120 [m]
Company: Royal HaskoningDHV<br />
Date of report: 14-12-2012<br />
Time of report: 17:03:52<br />
Date of calculation: 14-12-2012<br />
Time of calculation: 15:56:31<br />
Report for D-Settlement 9.2<br />
Settlement Calculations<br />
Developed by Deltares<br />
Filename: C:\..\Definitief\Bruggen - Zetting landhoofden 60cm-voorb - 20121214<br />
Project identification: Hoogheemraadschap van <strong>Delfland</strong><br />
Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />
Voorbelasting tbv 60cm netto ophoging
1 Table of Contents<br />
Royal HaskoningDHV D-Settlement 9.2<br />
1 Table of Contents 2<br />
2 Echo of the Input 3<br />
2.1 Layer Boundaries 3<br />
2.2 PL Lines 3<br />
2.3 General Data 3<br />
2.4 Soil Profiles 3<br />
2.5 Soil Properties 4<br />
2.6 Non-Uniform Loads 4<br />
2.7 Verticals 5<br />
2.8 Vertical Drain 5<br />
3 Results per Vertical 6<br />
3.1 Results for Vertical 1 (X = -26,00 m; Z = 0,00 m) 6<br />
3.2 Results for Vertical 2 (X = -21,00 m; Z = 0,00 m) 6<br />
3.3 Results for Vertical 3 (X = -16,00 m; Z = 0,00 m) 7<br />
3.4 Results for Vertical 4 (X = -15,00 m; Z = 0,00 m) 8<br />
3.5 Results for Vertical 5 (X = 0,00 m; Z = 0,00 m) 9<br />
3.6 Results for Vertical 6 (X = 1,88 m; Z = 0,00 m) 10<br />
3.7 Results for Vertical 7 (X = 3,69 m; Z = 0,00 m) 10<br />
3.8 Results for Vertical 8 (X = 7,71 m; Z = 0,00 m) 11<br />
3.9 Results for Vertical 9 (X = 26,00 m; Z = 0,00 m) 12<br />
4 Settlements 14<br />
4.1 Settlements 14<br />
4.2 Residual Times 14<br />
5 Warnings and errors 17<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 2
2 Echo of the Input<br />
2.1 Layer Boundaries<br />
Boundary number Co-ordinates [m]<br />
8 - X - -35,000 35,000<br />
8 - Y - -2,200 -2,200<br />
7 - X - -35,000 35,000<br />
7 - Y - -4,050 -4,050<br />
6 - X - -35,000 35,000<br />
6 - Y - -6,500 -6,500<br />
5 - X - -35,000 35,000<br />
5 - Y - -9,000 -9,000<br />
4 - X - -35,000 35,000<br />
4 - Y - -13,000 -13,000<br />
3 - X - -35,000 35,000<br />
3 - Y - -14,200 -14,200<br />
2 - X - -35,000 35,000<br />
2 - Y - -15,500 -15,500<br />
1 - X - -35,000 35,000<br />
1 - Y - -17,000 -17,000<br />
0 - X - -35,000 35,000<br />
0 - Y - -20,000 -20,000<br />
2.2 PL Lines<br />
PL line number Co-ordinates [m]<br />
1 - X - -35,000 35,000<br />
1 - Y - -3,020 -3,020<br />
2.3 General Data<br />
Royal HaskoningDHV D-Settlement 9.2<br />
Soil model: Koppejan<br />
Consolidation model: Darcy<br />
Strain model: Natural<br />
Groundwater level: Initial determined by PL-line number 1<br />
Unit weight of water: 9,81 [kN/m³]<br />
Stress distribution<br />
- Soil: Buisman<br />
- Loads: Simulate<br />
End of consolidation: 10000,00 [days]<br />
No maintain profile<br />
Pc (initial): Variable parallel to the initial effective stress<br />
Pc (per step): Automatic increased to the final effective stresses<br />
Creep rate reference time: 1,000 [days]<br />
No imaginary surface<br />
With submerging<br />
(only for non uniform loads)<br />
- Iteration stop criterium : 0,10 [m]<br />
Load column width<br />
- Non-Uniform Loads : 1,00 [m]<br />
- Trapezoidal Loads : 1,00 [m]<br />
2.4 Soil Profiles<br />
Layer Material name PL-line PL-line<br />
number top bottom<br />
8 Veen, Holland, naast 1 1<br />
7 Veen, Holland, naast 1 1<br />
6 Klei, DK, naast 1 1<br />
5 Klei, DK, naast 1 1<br />
4 Klei, DK, naast 1 1<br />
3 Klei, DK, naast 1 1<br />
2 Veen, Basis 1 1<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 3
Layer Material name PL-line PL-line<br />
number top bottom<br />
1 Zand, algemeen 1 1<br />
2.5 Soil Properties<br />
Layer Drained Unit weight<br />
number Unsaturated Saturated<br />
[kN/m³] [kN/m³]<br />
8 No 10,60 10,60<br />
7 No 10,60 10,60<br />
6 No 14,80 14,80<br />
5 No 14,80 14,80<br />
4 No 14,80 14,80<br />
3 No 14,80 14,80<br />
2 No 11,00 11,00<br />
1 Yes 18,00 20,00<br />
Royal HaskoningDHV D-Settlement 9.2<br />
Layer Storage Vert. consolid. Ratio Ch/Cv Vertical Ratio hor/vert Permeability Initial vertical<br />
number type coefficient Cv permeability permeability strain mod. permeability<br />
[m²/s] [-] [m/s] [-] [m/s] [m/s]<br />
8 Vert. cons. 4,27E-07 2,000 - - - -<br />
7 Vert. cons. 4,27E-07 2,000 - - - -<br />
6 Vert. cons. 2,80E-07 1,000 - - - -<br />
5 Vert. cons. 2,80E-07 1,000 - - - -<br />
4 Vert. cons. 2,80E-07 1,000 - - - -<br />
3 Vert. cons. 2,80E-07 1,000 - - - -<br />
2 Vert. cons. 4,27E-07 2,000 - - - -<br />
1 Const. perm. - - 5,787E-07 3,000 - -<br />
Layer Precons. POP OCR<br />
number pressure<br />
[kN/m²] [kN/m²] [-]<br />
8 - 5,00 -<br />
7 - 5,00 -<br />
6 - - 1,10<br />
5 - - 1,10<br />
4 - - 1,10<br />
3 - - 1,10<br />
2 - - 1,10<br />
1 - - 1,10<br />
Layer Primary compr. coeff. Secular compr. coef. Swell constants<br />
number Cp [-] Cp' [-] Cs [-] Cs' [-] Ap [-] As [-]<br />
8 2,50E+01 6,25E+00 1,00E+02 2,50E+01 2,50E+01 2,50E+01<br />
7 2,50E+01 6,25E+00 1,00E+02 2,50E+01 2,50E+01 2,50E+01<br />
6 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />
5 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />
4 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />
3 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />
2 2,50E+01 7,50E+00 1,00E+02 2,50E+01 2,50E+01 2,50E+01<br />
1 1,00E+09 1,50E+03 1,00E+09 1,00E+09 1,00E+09 1,00E+09<br />
2.6 Non-Uniform Loads<br />
Load Time Unit weight<br />
number Unsaturated Saturated<br />
[days] [kN/m³] [kN/m³]<br />
1 0 18,00 20,00<br />
2 30 18,00 20,00<br />
Load number Co-ordinates [m]<br />
1 - X - -6,00 -5,00 5,00 6,00<br />
1 - Y - -2,20 -0,70 -0,70 -2,20<br />
2 - X - -5,00 -4,00 4,00 5,00<br />
2 - Y - -0,70 0,30 0,30 -0,70<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 4
2.7 Verticals<br />
Royal HaskoningDHV D-Settlement 9.2<br />
Vertical number X co-ordinates [m]<br />
1 - 5 -26,000 -21,000 -16,000 -15,000 0,000<br />
6 - 9 1,881 3,687 7,708 26,000<br />
Calculation of cross section at Z = 0,000 m<br />
Discretisation = 100<br />
2.8 Vertical Drain<br />
Drain type Strip<br />
Horizontal range "From" [m] -10,000<br />
Horizontal range "To" [m] 10,000<br />
Bottom position [m] -9,000<br />
Center to center distance [m] 1,500<br />
Width [m] 0,100<br />
Thickness [m] 0,003<br />
Grid Triangular<br />
Enforced dewatering Off<br />
Start of drainage [days] 0,000<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 5
3 Results per Vertical<br />
3.1 Results for Vertical 1 (X = -26,00 m; Z = 0,00 m)<br />
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-2,200 0,001 -2,200 0,001 0,003<br />
-2,300 1,060 -2,300 1,060 0,003<br />
-2,400 2,120 -2,400 2,120 0,003<br />
-2,500 3,180 -2,500 3,180 0,003<br />
-2,600 4,240 -2,600 4,240 0,003<br />
-2,700 5,300 -2,700 5,300 0,003<br />
-2,800 6,360 -2,800 6,360 0,003<br />
-2,900 7,420 -2,900 7,420 0,003<br />
-3,000 8,480 -3,000 8,480 0,003<br />
-3,020 8,692 -3,020 8,692 0,003<br />
-3,100 8,756 -3,020 8,756 0,003<br />
-3,125 8,775 -3,020 8,775 0,003<br />
-3,200 8,835 -3,020 8,835 0,003<br />
-4,050 9,508 -3,020 9,508 0,003<br />
-4,050 9,508 -3,020 9,508 0,003<br />
-4,675 10,003 -3,020 10,003 0,003<br />
-5,275 10,481 -3,020 10,481 0,003<br />
-5,900 10,979 -3,020 10,979 0,003<br />
-6,500 11,460 -3,020 11,460 0,003<br />
-6,500 11,460 -3,020 11,460 0,003<br />
-7,150 14,714 -3,020 14,714 0,003<br />
-7,750 17,721 -3,020 17,721 0,003<br />
-8,400 20,981 -3,020 20,981 0,003<br />
-9,000 23,995 -3,020 23,995 0,003<br />
-9,000 23,995 -3,020 23,995 0,003<br />
-10,000 29,026 -3,020 29,026 0,003<br />
-11,000 34,069 -3,020 34,069 0,002<br />
-12,000 39,124 -3,020 39,124 0,002<br />
-13,000 44,191 -3,020 44,191 0,002<br />
-13,000 44,191 -3,020 44,191 0,002<br />
-13,600 47,236 -3,020 47,236 0,002<br />
-14,200 50,285 -3,020 50,285 0,002<br />
-14,200 50,285 -3,020 50,285 0,002<br />
-14,850 53,592 -3,020 53,592 0,002<br />
-15,500 56,903 -3,020 56,903 0,001<br />
-15,500 56,903 -3,020 56,903 0,001<br />
-16,250 57,878 -3,020 57,878 0,001<br />
-17,000 58,856 -3,020 58,856 0,000<br />
-17,000 58,856 -3,020 58,856 0,000<br />
-17,800 67,103 -3,020 67,103 0,000<br />
-18,500 74,322 -3,020 74,322 0,000<br />
-19,200 81,542 -3,020 81,542 0,000<br />
-20,000 89,795 -3,020 89,795 0,000<br />
3.2 Results for Vertical 2 (X = -21,00 m; Z = 0,00 m)<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-2,200 0,001 -2,200 0,001 0,007<br />
-2,300 1,060 -2,300 1,060 0,007<br />
-2,400 2,120 -2,400 2,120 0,007<br />
-2,500 3,180 -2,500 3,180 0,007<br />
-2,600 4,241 -2,600 4,241 0,007<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 6
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-2,700 5,301 -2,700 5,301 0,007<br />
-2,800 6,361 -2,800 6,361 0,007<br />
-2,900 7,421 -2,900 7,421 0,007<br />
-3,000 8,481 -3,000 8,481 0,007<br />
-3,020 8,693 -3,020 8,693 0,007<br />
-3,100 8,757 -3,020 8,757 0,007<br />
-3,125 8,776 -3,020 8,776 0,007<br />
-3,200 8,836 -3,020 8,836 0,007<br />
-4,050 9,512 -3,020 9,512 0,007<br />
-4,050 9,512 -3,020 9,512 0,007<br />
-4,675 10,012 -3,020 10,012 0,007<br />
-5,275 10,495 -3,020 10,495 0,007<br />
-5,900 11,004 -3,020 11,004 0,007<br />
-6,500 11,498 -3,020 11,498 0,007<br />
-6,500 11,498 -3,020 11,498 0,007<br />
-7,150 14,771 -3,020 14,771 0,007<br />
-7,750 17,800 -3,020 17,800 0,007<br />
-8,400 21,090 -3,020 21,090 0,006<br />
-9,000 24,136 -3,020 24,136 0,006<br />
-9,000 24,136 -3,020 24,136 0,006<br />
-10,000 29,231 -3,020 29,231 0,006<br />
-11,000 34,348 -3,020 34,348 0,006<br />
-12,000 39,486 -3,020 39,486 0,005<br />
-13,000 44,641 -3,020 44,641 0,005<br />
-13,000 44,641 -3,020 44,641 0,005<br />
-13,600 47,741 -3,020 47,741 0,004<br />
-14,200 50,844 -3,020 50,844 0,004<br />
-14,200 50,844 -3,020 50,844 0,004<br />
-14,850 54,211 -3,020 54,211 0,003<br />
-15,500 57,579 -3,020 57,579 0,003<br />
-15,500 57,579 -3,020 57,579 0,003<br />
-16,250 58,619 -3,020 58,619 0,001<br />
-17,000 59,659 -3,020 59,659 0,000<br />
-17,000 59,659 -3,020 59,659 0,000<br />
-17,800 67,967 -3,020 67,967 0,000<br />
-18,500 75,236 -3,020 75,236 0,000<br />
-19,200 82,501 -3,020 82,501 0,000<br />
-20,000 90,801 -3,020 90,801 0,000<br />
3.3 Results for Vertical 3 (X = -16,00 m; Z = 0,00 m)<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-2,200 0,002 -2,200 0,002 0,018<br />
-2,300 1,061 -2,300 1,061 0,018<br />
-2,400 2,122 -2,400 2,122 0,018<br />
-2,500 3,182 -2,500 3,182 0,018<br />
-2,600 4,242 -2,600 4,242 0,019<br />
-2,700 5,303 -2,700 5,303 0,019<br />
-2,800 6,364 -2,800 6,364 0,019<br />
-2,900 7,424 -2,900 7,424 0,019<br />
-3,000 8,485 -3,000 8,485 0,019<br />
-3,020 8,698 -3,020 8,698 0,019<br />
-3,100 8,762 -3,020 8,762 0,019<br />
-3,125 8,782 -3,020 8,782 0,019<br />
-3,200 8,842 -3,020 8,842 0,019<br />
-4,050 9,532 -3,020 9,532 0,019<br />
-4,050 9,532 -3,020 9,532 0,019<br />
-4,675 10,052 -3,020 10,052 0,019<br />
-5,275 10,567 -3,020 10,567 0,019<br />
-5,900 11,121 -3,020 11,121 0,019<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 7
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-6,500 11,672 -3,020 11,672 0,018<br />
-6,500 11,672 -3,020 11,672 0,018<br />
-7,150 15,023 -3,020 15,023 0,018<br />
-7,750 18,136 -3,020 18,136 0,017<br />
-8,400 21,531 -3,020 21,531 0,016<br />
-9,000 24,683 -3,020 24,683 0,016<br />
-9,000 24,683 -3,020 24,683 0,016<br />
-10,000 29,968 -3,020 29,968 0,015<br />
-11,000 35,282 -3,020 35,282 0,013<br />
-12,000 40,613 -3,020 40,613 0,012<br />
-13,000 45,949 -3,020 45,949 0,010<br />
-13,000 45,949 -3,020 45,949 0,010<br />
-13,600 49,148 -3,020 49,148 0,010<br />
-14,200 52,344 -3,020 52,344 0,009<br />
-14,200 52,344 -3,020 52,344 0,009<br />
-14,850 55,800 -3,020 55,800 0,007<br />
-15,500 59,248 -3,020 59,248 0,006<br />
-15,500 59,248 -3,020 59,248 0,006<br />
-16,250 60,366 -3,020 60,366 0,003<br />
-17,000 61,471 -3,020 61,471 0,000<br />
-17,000 61,471 -3,020 61,471 0,000<br />
-17,800 69,834 -3,020 69,834 0,000<br />
-18,500 77,138 -3,020 77,138 0,000<br />
-19,200 84,429 -3,020 84,429 0,000<br />
-20,000 92,747 -3,020 92,747 0,000<br />
3.4 Results for Vertical 4 (X = -15,00 m; Z = 0,00 m)<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-2,200 0,002 -2,200 0,002 0,023<br />
-2,300 1,062 -2,300 1,062 0,023<br />
-2,400 2,122 -2,400 2,122 0,023<br />
-2,500 3,183 -2,500 3,183 0,023<br />
-2,600 4,244 -2,600 4,244 0,023<br />
-2,700 5,304 -2,700 5,304 0,023<br />
-2,800 6,365 -2,800 6,365 0,023<br />
-2,900 7,426 -2,900 7,426 0,023<br />
-3,000 8,488 -3,000 8,488 0,023<br />
-3,020 8,700 -3,020 8,700 0,023<br />
-3,100 8,764 -3,020 8,764 0,023<br />
-3,125 8,785 -3,020 8,785 0,023<br />
-3,200 8,845 -3,020 8,845 0,023<br />
-4,050 9,543 -3,020 9,543 0,024<br />
-4,050 9,543 -3,020 9,543 0,024<br />
-4,675 10,075 -3,020 10,075 0,024<br />
-5,275 10,606 -3,020 10,606 0,024<br />
-5,900 11,183 -3,020 11,183 0,023<br />
-6,500 11,763 -3,020 11,763 0,022<br />
-6,500 11,763 -3,020 11,763 0,022<br />
-7,150 15,149 -3,020 15,149 0,022<br />
-7,750 18,300 -3,020 18,300 0,021<br />
-8,400 21,739 -3,020 21,739 0,020<br />
-9,000 24,932 -3,020 24,932 0,019<br />
-9,000 24,932 -3,020 24,932 0,019<br />
-10,000 30,286 -3,020 30,286 0,018<br />
-11,000 35,664 -3,020 35,664 0,016<br />
-12,000 41,050 -3,020 41,050 0,014<br />
-13,000 46,431 -3,020 46,431 0,012<br />
-13,000 46,431 -3,020 46,431 0,012<br />
-13,600 49,652 -3,020 49,652 0,011<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 8
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-14,200 52,866 -3,020 52,866 0,010<br />
-14,200 52,866 -3,020 52,866 0,010<br />
-14,850 56,337 -3,020 56,337 0,009<br />
-15,500 59,797 -3,020 59,797 0,007<br />
-15,500 59,797 -3,020 59,797 0,007<br />
-16,250 60,924 -3,020 60,924 0,004<br />
-17,000 62,033 -3,020 62,033 0,000<br />
-17,000 62,033 -3,020 62,033 0,000<br />
-17,800 70,396 -3,020 70,396 0,000<br />
-18,500 77,698 -3,020 77,698 0,000<br />
-19,200 84,984 -3,020 84,984 0,000<br />
-20,000 93,293 -3,020 93,293 0,000<br />
3.5 Results for Vertical 5 (X = 0,00 m; Z = 0,00 m)<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-2,200 34,880 -2,200 34,880 2,120<br />
-2,300 35,927 -2,300 35,927 2,065<br />
-2,400 36,973 -2,400 36,973 2,017<br />
-2,500 38,016 -2,500 38,016 1,972<br />
-2,600 39,058 -2,600 39,058 1,930<br />
-2,700 40,097 -2,700 40,097 1,891<br />
-2,800 41,134 -2,800 41,134 1,853<br />
-2,900 42,169 -2,900 42,169 1,817<br />
-3,000 43,200 -3,000 43,200 1,783<br />
-3,020 43,406 -3,020 43,406 1,776<br />
-3,100 43,444 -3,020 43,444 1,749<br />
-3,125 43,455 -3,020 43,455 1,741<br />
-3,200 43,487 -3,020 43,487 1,716<br />
-4,050 43,668 -3,020 43,668 1,440<br />
-4,050 43,668 -3,020 43,668 1,440<br />
-4,675 43,566 -3,020 43,566 1,243<br />
-5,275 43,297 -3,020 43,297 1,059<br />
-5,900 42,872 -3,020 42,872 0,873<br />
-6,500 42,364 -3,020 42,364 0,701<br />
-6,500 42,364 -3,020 42,364 0,701<br />
-7,150 44,475 -3,020 44,475 0,608<br />
-7,750 46,394 -3,020 46,394 0,535<br />
-8,400 48,469 -3,020 48,469 0,465<br />
-9,000 50,402 -3,020 50,402 0,409<br />
-9,000 50,402 -3,020 50,402 0,409<br />
-10,000 53,692 -3,020 53,692 0,330<br />
-11,000 57,096 -3,020 57,097 0,264<br />
-12,000 60,629 -3,020 60,629 0,210<br />
-13,000 64,289 -3,020 64,289 0,165<br />
-13,000 64,289 -3,020 64,289 0,165<br />
-13,600 66,544 -3,020 66,544 0,142<br />
-14,200 68,841 -3,020 68,841 0,120<br />
-14,200 68,841 -3,020 68,841 0,120<br />
-14,850 71,374 -3,020 71,374 0,100<br />
-15,500 73,950 -3,020 73,950 0,081<br />
-15,500 73,950 -3,020 73,950 0,081<br />
-16,250 74,124 -3,020 74,124 0,039<br />
-17,000 74,347 -3,020 74,347 0,000<br />
-17,000 74,347 -3,020 74,347 0,000<br />
-17,800 81,835 -3,020 81,835 0,000<br />
-18,500 88,426 -3,020 88,426 0,000<br />
-19,200 95,051 -3,020 95,051 0,000<br />
-20,000 102,659 -3,020 102,659 0,000<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 9
3.6 Results for Vertical 6 (X = 1,88 m; Z = 0,00 m)<br />
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-2,200 34,874 -2,200 34,874 2,067<br />
-2,300 35,874 -2,300 35,874 2,012<br />
-2,400 36,869 -2,400 36,869 1,964<br />
-2,500 37,859 -2,500 37,859 1,919<br />
-2,600 38,843 -2,600 38,843 1,878<br />
-2,700 39,822 -2,700 39,822 1,838<br />
-2,800 40,796 -2,800 40,796 1,801<br />
-2,900 41,766 -2,900 41,766 1,765<br />
-3,000 42,732 -3,000 42,732 1,731<br />
-3,020 42,925 -3,020 42,925 1,724<br />
-3,100 42,909 -3,020 42,909 1,698<br />
-3,125 42,904 -3,020 42,904 1,689<br />
-3,200 42,886 -3,020 42,886 1,665<br />
-4,050 42,544 -3,020 42,544 1,392<br />
-4,050 42,544 -3,020 42,544 1,392<br />
-4,675 42,149 -3,020 42,149 1,199<br />
-5,275 41,685 -3,020 41,685 1,020<br />
-5,900 41,144 -3,020 41,144 0,840<br />
-6,500 40,596 -3,020 40,596 0,673<br />
-6,500 40,596 -3,020 40,596 0,673<br />
-7,150 42,727 -3,020 42,727 0,584<br />
-7,750 44,705 -3,020 44,705 0,513<br />
-8,400 46,874 -3,020 46,874 0,446<br />
-9,000 48,909 -3,020 48,909 0,392<br />
-9,000 48,909 -3,020 48,909 0,392<br />
-10,000 52,380 -3,020 52,380 0,317<br />
-11,000 55,961 -3,020 55,961 0,254<br />
-12,000 59,654 -3,020 59,654 0,202<br />
-13,000 63,455 -3,020 63,455 0,159<br />
-13,000 63,455 -3,020 63,455 0,159<br />
-13,600 65,784 -3,020 65,784 0,136<br />
-14,200 68,149 -3,020 68,149 0,116<br />
-14,200 68,149 -3,020 68,149 0,116<br />
-14,850 70,748 -3,020 70,748 0,096<br />
-15,500 73,383 -3,020 73,383 0,078<br />
-15,500 73,383 -3,020 73,383 0,078<br />
-16,250 73,617 -3,020 73,617 0,038<br />
-17,000 73,893 -3,020 73,893 0,000<br />
-17,000 73,893 -3,020 73,893 0,000<br />
-17,800 81,430 -3,020 81,430 0,000<br />
-18,500 88,059 -3,020 88,059 0,000<br />
-19,200 94,718 -3,020 94,718 0,000<br />
-20,000 102,360 -3,020 102,360 0,000<br />
3.7 Results for Vertical 7 (X = 3,69 m; Z = 0,00 m)<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-2,200 32,701 -2,200 32,701 1,889<br />
-2,300 33,543 -2,300 33,543 1,836<br />
-2,400 34,392 -2,400 34,392 1,789<br />
-2,500 35,252 -2,500 35,252 1,746<br />
-2,600 36,115 -2,600 36,115 1,705<br />
-2,700 36,973 -2,700 36,973 1,667<br />
-2,800 37,824 -2,800 37,824 1,631<br />
-2,900 38,668 -2,900 38,668 1,597<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 10
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-3,000 39,507 -3,000 39,507 1,564<br />
-3,020 39,675 -3,020 39,675 1,558<br />
-3,100 39,558 -3,020 39,558 1,533<br />
-3,125 39,522 -3,020 39,522 1,525<br />
-3,200 39,411 -3,020 39,411 1,502<br />
-4,050 38,177 -3,020 38,177 1,247<br />
-4,050 38,177 -3,020 38,177 1,247<br />
-4,675 37,373 -3,020 37,373 1,070<br />
-5,275 36,719 -3,020 36,719 0,908<br />
-5,900 36,162 -3,020 36,162 0,747<br />
-6,500 35,730 -3,020 35,730 0,598<br />
-6,500 35,730 -3,020 35,730 0,598<br />
-7,150 38,085 -3,020 38,085 0,518<br />
-7,750 40,325 -3,020 40,325 0,455<br />
-8,400 42,809 -3,020 42,809 0,396<br />
-9,000 45,142 -3,020 45,142 0,349<br />
-9,000 45,142 -3,020 45,142 0,349<br />
-10,000 49,100 -3,020 49,100 0,282<br />
-11,000 53,127 -3,020 53,127 0,227<br />
-12,000 57,215 -3,020 57,215 0,181<br />
-13,000 61,358 -3,020 61,358 0,143<br />
-13,000 61,358 -3,020 61,358 0,143<br />
-13,600 63,869 -3,020 63,869 0,123<br />
-14,200 66,398 -3,020 66,398 0,104<br />
-14,200 66,398 -3,020 66,398 0,104<br />
-14,850 69,158 -3,020 69,158 0,087<br />
-15,500 71,937 -3,020 71,937 0,071<br />
-15,500 71,937 -3,020 71,937 0,071<br />
-16,250 72,319 -3,020 72,319 0,034<br />
-17,000 72,725 -3,020 72,725 0,000<br />
-17,000 72,725 -3,020 72,725 0,000<br />
-17,800 80,385 -3,020 80,385 0,000<br />
-18,500 87,109 -3,020 87,109 0,000<br />
-19,200 93,851 -3,020 93,851 0,000<br />
-20,000 101,578 -3,020 101,578 0,000<br />
3.8 Results for Vertical 8 (X = 7,71 m; Z = 0,00 m)<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-2,200 0,146 -2,200 0,146 0,401<br />
-2,300 1,243 -2,300 1,243 0,398<br />
-2,400 2,347 -2,400 2,347 0,397<br />
-2,500 3,457 -2,500 3,457 0,397<br />
-2,600 4,577 -2,600 4,577 0,396<br />
-2,700 5,706 -2,700 5,706 0,395<br />
-2,800 6,846 -2,800 6,846 0,395<br />
-2,900 7,999 -2,900 7,999 0,394<br />
-3,000 9,164 -3,000 9,164 0,394<br />
-3,020 9,398 -3,020 9,398 0,394<br />
-3,100 9,557 -3,020 9,557 0,393<br />
-3,125 9,609 -3,020 9,609 0,393<br />
-3,200 9,768 -3,020 9,768 0,392<br />
-4,050 11,949 -3,020 11,949 0,381<br />
-4,050 11,949 -3,020 11,949 0,381<br />
-4,675 13,722 -3,020 13,722 0,368<br />
-5,275 15,358 -3,020 15,358 0,351<br />
-5,900 16,926 -3,020 16,926 0,327<br />
-6,500 18,290 -3,020 18,290 0,294<br />
-6,500 18,290 -3,020 18,290 0,294<br />
-7,150 22,348 -3,020 22,348 0,262<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 11
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-7,750 25,972 -3,020 25,972 0,236<br />
-8,400 29,783 -3,020 29,783 0,210<br />
-9,000 33,207 -3,020 33,207 0,189<br />
-9,000 33,207 -3,020 33,207 0,189<br />
-10,000 38,748 -3,020 38,748 0,157<br />
-11,000 44,118 -3,020 44,118 0,129<br />
-12,000 49,352 -3,020 49,352 0,105<br />
-13,000 54,478 -3,020 54,478 0,084<br />
-13,000 54,478 -3,020 54,478 0,084<br />
-13,600 57,511 -3,020 57,511 0,073<br />
-14,200 60,517 -3,020 60,517 0,063<br />
-14,200 60,517 -3,020 60,517 0,063<br />
-14,850 63,748 -3,020 63,748 0,053<br />
-15,500 66,956 -3,020 66,956 0,043<br />
-15,500 66,956 -3,020 66,956 0,043<br />
-16,250 67,784 -3,020 67,784 0,021<br />
-17,000 68,590 -3,020 68,590 0,000<br />
-17,000 68,590 -3,020 68,590 0,000<br />
-17,800 76,631 -3,020 76,631 0,000<br />
-18,500 83,655 -3,020 83,655 0,000<br />
-19,200 90,669 -3,020 90,669 0,000<br />
-20,000 98,676 -3,020 98,676 0,000<br />
3.9 Results for Vertical 9 (X = 26,00 m; Z = 0,00 m)<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-2,200 0,001 -2,200 0,001 0,003<br />
-2,300 1,060 -2,300 1,060 0,003<br />
-2,400 2,120 -2,400 2,120 0,003<br />
-2,500 3,180 -2,500 3,180 0,003<br />
-2,600 4,240 -2,600 4,240 0,003<br />
-2,700 5,300 -2,700 5,300 0,003<br />
-2,800 6,360 -2,800 6,360 0,003<br />
-2,900 7,420 -2,900 7,420 0,003<br />
-3,000 8,480 -3,000 8,480 0,003<br />
-3,020 8,692 -3,020 8,692 0,003<br />
-3,100 8,756 -3,020 8,756 0,003<br />
-3,125 8,775 -3,020 8,775 0,003<br />
-3,200 8,835 -3,020 8,835 0,003<br />
-4,050 9,508 -3,020 9,508 0,003<br />
-4,050 9,508 -3,020 9,508 0,003<br />
-4,675 10,003 -3,020 10,003 0,003<br />
-5,275 10,480 -3,020 10,481 0,003<br />
-5,900 10,979 -3,020 10,979 0,003<br />
-6,500 11,460 -3,020 11,460 0,003<br />
-6,500 11,460 -3,020 11,460 0,003<br />
-7,150 14,714 -3,020 14,714 0,003<br />
-7,750 17,720 -3,020 17,720 0,003<br />
-8,400 20,981 -3,020 20,981 0,003<br />
-9,000 23,994 -3,020 23,994 0,003<br />
-9,000 23,994 -3,020 23,994 0,003<br />
-10,000 29,025 -3,020 29,025 0,003<br />
-11,000 34,068 -3,020 34,068 0,002<br />
-12,000 39,122 -3,020 39,122 0,002<br />
-13,000 44,188 -3,020 44,188 0,002<br />
-13,000 44,188 -3,020 44,188 0,002<br />
-13,600 47,232 -3,020 47,232 0,002<br />
-14,200 50,281 -3,020 50,281 0,002<br />
-14,200 50,281 -3,020 50,281 0,002<br />
-14,850 53,588 -3,020 53,588 0,002<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 12
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-15,500 56,898 -3,020 56,898 0,001<br />
-15,500 56,898 -3,020 56,898 0,001<br />
-16,250 57,872 -3,020 57,872 0,001<br />
-17,000 58,849 -3,020 58,849 0,000<br />
-17,000 58,849 -3,020 58,849 0,000<br />
-17,800 67,096 -3,020 67,096 0,000<br />
-18,500 74,314 -3,020 74,314 0,000<br />
-19,200 81,533 -3,020 81,533 0,000<br />
-20,000 89,786 -3,020 89,786 0,000<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 13
4 Settlements<br />
4.1 Settlements<br />
Vertical X co-ordinate Surface level Settlement<br />
number [m] [m] [m]<br />
1 -26,00 -2,20 0,003<br />
2 -21,00 -2,20 0,007<br />
3 -16,00 -2,20 0,018<br />
4 -15,00 -2,20 0,023<br />
5 0,00 -2,20 2,120<br />
6 1,88 -2,20 2,067<br />
7 3,69 -2,20 1,889<br />
8 7,71 -2,20 0,401<br />
9 26,00 -2,20 0,003<br />
4.2 Residual Times<br />
Royal HaskoningDHV D-Settlement 9.2<br />
Vertical Time Settlement Part of final Residual<br />
number settlement settlements<br />
[days] [m] [%] [m]<br />
1 14 0,000 8,360 0,003<br />
30 0,000 11,795 0,002<br />
60 0,001 26,103 0,002<br />
90 0,001 31,471 0,002<br />
120 0,001 34,990 0,002<br />
150 0,001 37,753 0,002<br />
180 0,001 40,083 0,002<br />
210 0,001 42,190 0,002<br />
240 0,001 44,202 0,002<br />
270 0,001 46,151 0,001<br />
300 0,001 48,061 0,001<br />
330 0,001 49,958 0,001<br />
365 0,001 52,076 0,001<br />
2 14 0,001 7,566 0,006<br />
30 0,001 10,691 0,006<br />
60 0,002 23,293 0,005<br />
90 0,002 28,268 0,005<br />
120 0,002 31,704 0,005<br />
150 0,002 34,520 0,004<br />
180 0,002 36,984 0,004<br />
210 0,003 39,270 0,004<br />
240 0,003 41,478 0,004<br />
270 0,003 43,634 0,004<br />
300 0,003 45,718 0,004<br />
330 0,003 47,778 0,003<br />
365 0,003 50,056 0,003<br />
3 14 0,001 6,067 0,017<br />
30 0,002 8,551 0,017<br />
60 0,003 18,438 0,015<br />
90 0,004 22,858 0,014<br />
120 0,005 26,321 0,014<br />
150 0,005 29,410 0,013<br />
180 0,006 32,282 0,013<br />
210 0,006 35,009 0,012<br />
240 0,007 37,627 0,012<br />
270 0,007 40,147 0,011<br />
300 0,008 42,524 0,011<br />
330 0,008 44,851 0,010<br />
365 0,009 47,401 0,010<br />
4 14 0,001 5,633 0,022<br />
30 0,002 7,930 0,021<br />
60 0,004 17,171 0,019<br />
90 0,005 21,532 0,018<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 14
Royal HaskoningDHV D-Settlement 9.2<br />
Vertical Time Settlement Part of final Residual<br />
number settlement settlements<br />
[days] [m] [%] [m]<br />
120 0,006 25,093 0,017<br />
150 0,007 28,336 0,017<br />
180 0,007 31,366 0,016<br />
210 0,008 34,223 0,015<br />
240 0,009 36,952 0,015<br />
270 0,009 39,570 0,014<br />
300 0,010 42,030 0,013<br />
330 0,010 44,436 0,013<br />
365 0,011 47,065 0,012<br />
5 14 0,536 25,304 1,583<br />
30 0,722 34,065 1,398<br />
60 1,224 57,735 0,896<br />
90 1,367 64,476 0,753<br />
120 1,440 67,949 0,679<br />
150 1,492 70,389 0,628<br />
180 1,533 72,341 0,586<br />
210 1,569 74,018 0,551<br />
240 1,600 75,495 0,519<br />
270 1,628 76,798 0,492<br />
300 1,651 77,905 0,468<br />
330 1,673 78,943 0,446<br />
365 1,695 79,984 0,424<br />
6 14 0,528 25,559 1,538<br />
30 0,711 34,409 1,356<br />
60 1,198 57,972 0,869<br />
90 1,336 64,659 0,730<br />
120 1,407 68,101 0,659<br />
150 1,457 70,513 0,609<br />
180 1,497 72,440 0,570<br />
210 1,532 74,105 0,535<br />
240 1,562 75,576 0,505<br />
270 1,589 76,874 0,478<br />
300 1,612 77,976 0,455<br />
330 1,633 79,010 0,434<br />
365 1,654 80,047 0,412<br />
7 14 0,510 27,001 1,379<br />
30 0,686 36,333 1,203<br />
60 1,106 58,551 0,783<br />
90 1,228 64,968 0,662<br />
120 1,291 68,303 0,599<br />
150 1,335 70,636 0,555<br />
180 1,370 72,503 0,520<br />
210 1,401 74,151 0,488<br />
240 1,429 75,616 0,461<br />
270 1,453 76,911 0,436<br />
300 1,474 78,011 0,415<br />
330 1,494 79,044 0,396<br />
365 1,513 80,079 0,376<br />
8 14 0,039 9,718 0,362<br />
30 0,065 16,113 0,336<br />
60 0,154 38,450 0,247<br />
90 0,187 46,607 0,214<br />
120 0,204 51,048 0,196<br />
150 0,218 54,517 0,182<br />
180 0,230 57,316 0,171<br />
210 0,240 59,976 0,160<br />
240 0,251 62,614 0,150<br />
270 0,261 65,244 0,139<br />
300 0,270 67,488 0,130<br />
330 0,279 69,597 0,122<br />
365 0,287 71,693 0,113<br />
9 14 0,000 8,289 0,003<br />
30 0,000 11,692 0,002<br />
60 0,001 26,075 0,002<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 15
Royal HaskoningDHV D-Settlement 9.2<br />
Vertical Time Settlement Part of final Residual<br />
number settlement settlements<br />
[days] [m] [%] [m]<br />
90 0,001 31,455 0,002<br />
120 0,001 34,981 0,002<br />
150 0,001 37,747 0,002<br />
180 0,001 40,080 0,002<br />
210 0,001 42,189 0,002<br />
240 0,001 44,202 0,002<br />
270 0,001 46,153 0,001<br />
300 0,001 48,063 0,001<br />
330 0,001 49,960 0,001<br />
365 0,001 52,078 0,001<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 16
5 Warnings and errors<br />
List of non-fatal warnings and errors generated during calculation.<br />
Royal HaskoningDHV D-Settlement 9.2<br />
1 Model Koppejan is not ideal for unloading (e.g. load removal, temporary dewatering, gradual<br />
submerging). If As is much larger than Cs', unloading will yield almost no effect on creep. Switch to the<br />
NEN-Bjerrum or abc Isotache model for improved predictions.<br />
End of Report<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 17
Bepaling zettingen tpv talud<br />
Annex<br />
A4<br />
Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />
form.<br />
Hoogheemraadschap van <strong>Delfland</strong><br />
9R694518<br />
ctr.<br />
Barbarossastraat 35<br />
6522 DK Nijmegen<br />
Phone +31 (0)24 328 42 84<br />
Fax +31 (0)24 323 93 46<br />
14-12-2012<br />
SVVE<br />
date drw.<br />
D-Settlement 9.2 : Bruggen - Zetting landhoofden talud bepaling - 20121214.sli<br />
Input View<br />
5 6 7 8<br />
7<br />
6<br />
5<br />
4<br />
Zand<br />
8<br />
Layers<br />
8. Veen, Holland, naast<br />
7. Veen, Holland, naast<br />
6. Klei, DK, naast<br />
5. Klei, DK, naast<br />
4. Klei, DK, naast<br />
3. Klei, DK, naast<br />
2. Veen, Basis<br />
1. Zand, algemeen
Voorbelasting tbv ophoging<br />
Annex<br />
A4<br />
Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />
form.<br />
Hoogheemraadschap van <strong>Delfland</strong><br />
9R694518<br />
ctr.<br />
Barbarossastraat 35<br />
6522 DK Nijmegen<br />
Phone +31 (0)24 328 42 84<br />
Fax +31 (0)24 323 93 46<br />
14-12-2012<br />
SVVE<br />
date drw.<br />
D-Settlement 9.2 : Bruggen - Zetting landhoofden talud voorb - 20121214.sli<br />
2 3 4 5 6 7<br />
7<br />
6<br />
5<br />
4<br />
3<br />
2<br />
Input View<br />
Voorbelasting (2)<br />
8<br />
Layers<br />
8. Veen, Holland, naast<br />
7. Veen, Holland, naast<br />
6. Klei, DK, naast<br />
5. Klei, DK, naast<br />
4. Klei, DK, naast<br />
3. Klei, DK, naast<br />
2. Veen, Basis<br />
1. Zand, algemeen
Bepaling zettingen tpv talud<br />
Annex<br />
A4<br />
Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />
form.<br />
Hoogheemraadschap van <strong>Delfland</strong><br />
9R694518<br />
ctr.<br />
Barbarossastraat 35<br />
6522 DK Nijmegen<br />
Phone +31 (0)24 328 42 84<br />
Fax +31 (0)24 323 93 46<br />
14-12-2012<br />
SVVE<br />
date drw.<br />
D-Settlement 9.2 : Bruggen - Zetting landhoofden talud bepaling - 20121214.sli<br />
Effective stress [kPa]<br />
Settlement [m]<br />
16,753565<br />
16,753560<br />
16,753555<br />
16,753550<br />
0,000000<br />
0,200000<br />
0,400000<br />
0,600000<br />
0,800000<br />
1,000000<br />
1,200000<br />
1,400000<br />
Vertical 5 (X = 0,000 m; Z = 0,000 m)<br />
Method = NEN - Koppejan with Darcy (Natural strain)<br />
Time-History<br />
1 10 100 1000 10000<br />
Time [days]<br />
1 10 100 1000 10000<br />
Depth = 4,050 (-) [m]<br />
Settlement after 10000 days = 1,411 [m]
Voorbelasting tbv ophoging<br />
Annex<br />
A4<br />
Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />
form.<br />
Hoogheemraadschap van <strong>Delfland</strong><br />
9R694518<br />
ctr.<br />
Barbarossastraat 35<br />
6522 DK Nijmegen<br />
Phone +31 (0)24 328 42 84<br />
Fax +31 (0)24 323 93 46<br />
14-12-2012<br />
SVVE<br />
date drw.<br />
D-Settlement 9.2 : Bruggen - Zetting landhoofden talud voorb - 20121214.sli<br />
Effective stress [kPa]<br />
Settlement [m]<br />
40,0<br />
38,0<br />
36,0<br />
34,0<br />
32,0<br />
30,0<br />
28,0<br />
0,0<br />
0,5<br />
1,0<br />
1,5<br />
2,0<br />
2,5<br />
Vertical 5 (X = 0,000 m; Z = 0,000 m)<br />
Method = NEN - Koppejan with Darcy (Natural strain)<br />
Time-History<br />
1 10 100 1000 10000<br />
Time [days]<br />
1 10 100 1000 10000<br />
Depth = 4,050 (-) [m]<br />
Settlement after 10000 days = 2,464 [m]
Company: Royal HaskoningDHV<br />
Date of report: 14-12-2012<br />
Time of report: 17:10:13<br />
Date of calculation: 14-12-2012<br />
Time of calculation: 15:48:06<br />
Report for D-Settlement 9.2<br />
Settlement Calculations<br />
Developed by Deltares<br />
Filename: C:\..\Definitief\Bruggen - Zetting landhoofden talud voorb - 20121214<br />
Project identification: Hoogheemraadschap van <strong>Delfland</strong><br />
Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />
Voorbelasting tbv ophoging
1 Table of Contents<br />
Royal HaskoningDHV D-Settlement 9.2<br />
1 Table of Contents 2<br />
2 Echo of the Input 3<br />
2.1 Layer Boundaries 3<br />
2.2 PL Lines 3<br />
2.3 General Data 3<br />
2.4 Soil Profiles 3<br />
2.5 Soil Properties 4<br />
2.6 Non-Uniform Loads 4<br />
2.7 Verticals 5<br />
2.8 Vertical Drain 5<br />
3 Results per Vertical 6<br />
3.1 Results for Vertical 1 (X = -26,00 m; Z = 0,00 m) 6<br />
3.2 Results for Vertical 2 (X = -21,00 m; Z = 0,00 m) 6<br />
3.3 Results for Vertical 3 (X = -16,00 m; Z = 0,00 m) 7<br />
3.4 Results for Vertical 4 (X = -15,00 m; Z = 0,00 m) 8<br />
3.5 Results for Vertical 5 (X = 0,00 m; Z = 0,00 m) 8<br />
3.6 Results for Vertical 6 (X = 1,63 m; Z = 0,00 m) 9<br />
3.7 Results for Vertical 7 (X = 3,71 m; Z = 0,00 m) 10<br />
3.8 Results for Vertical 8 (X = 21,00 m; Z = 0,00 m) 11<br />
3.9 Results for Vertical 9 (X = 26,00 m; Z = 0,00 m) 12<br />
4 Settlements 13<br />
4.1 Settlements 13<br />
4.2 Residual Times 13<br />
5 Warnings and errors 16<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 2
2 Echo of the Input<br />
2.1 Layer Boundaries<br />
Boundary number Co-ordinates [m]<br />
8 - X - -35,000 0,000 3,700 35,000<br />
8 - Y - -4,050 -4,050 -2,200 -2,200<br />
7 - X - -35,000 0,000 35,000<br />
7 - Y - -4,050 -4,050 -4,050<br />
6 - X - -35,000 35,000<br />
6 - Y - -6,500 -6,500<br />
5 - X - -35,000 35,000<br />
5 - Y - -9,000 -9,000<br />
4 - X - -35,000 35,000<br />
4 - Y - -13,000 -13,000<br />
3 - X - -35,000 35,000<br />
3 - Y - -14,200 -14,200<br />
2 - X - -35,000 35,000<br />
2 - Y - -15,500 -15,500<br />
1 - X - -35,000 35,000<br />
1 - Y - -17,000 -17,000<br />
0 - X - -35,000 35,000<br />
0 - Y - -20,000 -20,000<br />
2.2 PL Lines<br />
PL line number Co-ordinates [m]<br />
1 - X - -35,000 35,000<br />
1 - Y - -3,020 -3,020<br />
2.3 General Data<br />
Royal HaskoningDHV D-Settlement 9.2<br />
Soil model: Koppejan<br />
Consolidation model: Darcy<br />
Strain model: Natural<br />
Groundwater level: Initial determined by PL-line number 1<br />
Unit weight of water: 9,81 [kN/m³]<br />
Stress distribution<br />
- Soil: Buisman<br />
- Loads: Simulate<br />
End of consolidation: 10000,00 [days]<br />
No maintain profile<br />
Pc (initial): Variable parallel to the initial effective stress<br />
Pc (per step): Automatic increased to the final effective stresses<br />
Creep rate reference time: 1,000 [days]<br />
No imaginary surface<br />
With submerging<br />
(only for non uniform loads)<br />
- Iteration stop criterium : 0,10 [m]<br />
Load column width<br />
- Non-Uniform Loads : 1,00 [m]<br />
- Trapezoidal Loads : 1,00 [m]<br />
2.4 Soil Profiles<br />
Layer Material name PL-line PL-line<br />
number top bottom<br />
8 Veen, Holland, naast 1 1<br />
7 Veen, Holland, naast 1 1<br />
6 Klei, DK, naast 1 1<br />
5 Klei, DK, naast 1 1<br />
4 Klei, DK, naast 1 1<br />
3 Klei, DK, naast 1 1<br />
2 Veen, Basis 1 1<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 3
Layer Material name PL-line PL-line<br />
number top bottom<br />
1 Zand, algemeen 1 1<br />
2.5 Soil Properties<br />
Layer Drained Unit weight<br />
number Unsaturated Saturated<br />
[kN/m³] [kN/m³]<br />
8 No 10,60 10,60<br />
7 No 10,60 10,60<br />
6 No 14,80 14,80<br />
5 No 14,80 14,80<br />
4 No 14,80 14,80<br />
3 No 14,80 14,80<br />
2 No 11,00 11,00<br />
1 Yes 18,00 20,00<br />
Royal HaskoningDHV D-Settlement 9.2<br />
Layer Storage Vert. consolid. Ratio Ch/Cv Vertical Ratio hor/vert Permeability Initial vertical<br />
number type coefficient Cv permeability permeability strain mod. permeability<br />
[m²/s] [-] [m/s] [-] [m/s] [m/s]<br />
8 Vert. cons. 4,27E-07 2,000 - - - -<br />
7 Vert. cons. 4,27E-07 2,000 - - - -<br />
6 Vert. cons. 2,80E-07 1,000 - - - -<br />
5 Vert. cons. 2,80E-07 1,000 - - - -<br />
4 Vert. cons. 2,80E-07 1,000 - - - -<br />
3 Vert. cons. 2,80E-07 1,000 - - - -<br />
2 Vert. cons. 4,27E-07 2,000 - - - -<br />
1 Const. perm. - - 5,787E-07 3,000 - -<br />
Layer Precons. POP OCR<br />
number pressure<br />
[kN/m²] [kN/m²] [-]<br />
8 - 5,00 -<br />
7 - 5,00 -<br />
6 - - 1,10<br />
5 - - 1,10<br />
4 - - 1,10<br />
3 - - 1,10<br />
2 - - 1,10<br />
1 - - 1,10<br />
Layer Primary compr. coeff. Secular compr. coef. Swell constants<br />
number Cp [-] Cp' [-] Cs [-] Cs' [-] Ap [-] As [-]<br />
8 2,50E+01 6,25E+00 1,00E+02 2,50E+01 2,50E+01 2,50E+01<br />
7 2,50E+01 6,25E+00 1,00E+02 2,50E+01 2,50E+01 2,50E+01<br />
6 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />
5 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />
4 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />
3 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />
2 2,50E+01 7,50E+00 1,00E+02 2,50E+01 2,50E+01 2,50E+01<br />
1 1,00E+09 1,50E+03 1,00E+09 1,00E+09 1,00E+09 1,00E+09<br />
2.6 Non-Uniform Loads<br />
Load Time Unit weight<br />
number Unsaturated Saturated<br />
[days] [kN/m³] [kN/m³]<br />
1 0 18,00 20,00<br />
2 14 18,00 20,00<br />
Load number Co-ordinates [m]<br />
1 - X - -7,00 -4,00 10,00 11,00<br />
1 - Y - -4,05 -1,20 -1,20 -2,20<br />
2 - X - -4,26 -3,00 9,00 10,00<br />
2 - Y - -1,45 -0,20 -0,20 -1,20<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 4
2.7 Verticals<br />
Royal HaskoningDHV D-Settlement 9.2<br />
Vertical number X co-ordinates [m]<br />
1 - 5 -26,000 -21,000 -16,000 -15,000 0,000<br />
6 - 9 1,627 3,714 21,000 26,000<br />
Calculation of cross section at Z = 0,000 m<br />
Discretisation = 100<br />
2.8 Vertical Drain<br />
Drain type Strip<br />
Horizontal range "From" [m] -10,000<br />
Horizontal range "To" [m] 10,000<br />
Bottom position [m] -9,000<br />
Center to center distance [m] 1,500<br />
Width [m] 0,100<br />
Thickness [m] 0,003<br />
Grid Triangular<br />
Enforced dewatering Off<br />
Start of drainage [days] 0,000<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 5
3 Results per Vertical<br />
3.1 Results for Vertical 1 (X = -26,00 m; Z = 0,00 m)<br />
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-4,050 0,002 -3,020 0,002 0,004<br />
-4,150 0,080 -3,020 0,080 0,004<br />
-4,250 0,159 -3,020 0,159 0,004<br />
-4,350 0,238 -3,020 0,238 0,004<br />
-4,450 0,317 -3,020 0,317 0,004<br />
-4,550 0,396 -3,020 0,396 0,004<br />
-4,650 0,476 -3,020 0,476 0,004<br />
-4,750 0,555 -3,020 0,555 0,004<br />
-4,850 0,634 -3,020 0,634 0,004<br />
-4,950 0,713 -3,020 0,713 0,004<br />
-5,050 0,793 -3,020 0,793 0,004<br />
-5,275 0,971 -3,020 0,971 0,004<br />
-5,900 1,468 -3,020 1,468 0,004<br />
-6,500 1,946 -3,020 1,946 0,003<br />
-6,500 1,946 -3,020 1,946 0,003<br />
-7,150 5,196 -3,020 5,196 0,003<br />
-7,750 8,199 -3,020 8,199 0,003<br />
-8,400 11,455 -3,020 11,455 0,003<br />
-9,000 14,464 -3,020 14,464 0,003<br />
-9,000 14,464 -3,020 14,464 0,003<br />
-10,000 19,489 -3,020 19,489 0,003<br />
-11,000 24,526 -3,020 24,526 0,003<br />
-12,000 29,576 -3,020 29,576 0,003<br />
-13,000 34,641 -3,020 34,641 0,002<br />
-13,000 34,641 -3,020 34,641 0,002<br />
-13,600 37,687 -3,020 37,687 0,002<br />
-14,200 40,737 -3,020 40,737 0,002<br />
-14,200 40,737 -3,020 40,737 0,002<br />
-14,850 44,048 -3,020 44,048 0,002<br />
-15,500 47,364 -3,020 47,364 0,002<br />
-15,500 47,364 -3,020 47,364 0,002<br />
-16,250 48,347 -3,020 48,347 0,001<br />
-17,000 49,336 -3,020 49,336 0,000<br />
-17,000 49,336 -3,020 49,336 0,000<br />
-17,800 57,597 -3,020 57,597 0,000<br />
-18,500 64,829 -3,020 64,829 0,000<br />
-19,200 72,065 -3,020 72,065 0,000<br />
-20,000 80,339 -3,020 80,339 0,000<br />
3.2 Results for Vertical 2 (X = -21,00 m; Z = 0,00 m)<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-4,050 0,003 -3,020 0,003 0,010<br />
-4,150 0,081 -3,020 0,081 0,010<br />
-4,250 0,161 -3,020 0,161 0,010<br />
-4,350 0,240 -3,020 0,240 0,010<br />
-4,450 0,319 -3,020 0,319 0,010<br />
-4,550 0,399 -3,020 0,399 0,010<br />
-4,650 0,478 -3,020 0,478 0,009<br />
-4,750 0,558 -3,020 0,558 0,009<br />
-4,850 0,638 -3,020 0,638 0,009<br />
-4,950 0,717 -3,020 0,717 0,009<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 6
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-5,050 0,797 -3,020 0,797 0,009<br />
-5,275 0,977 -3,020 0,977 0,009<br />
-5,900 1,479 -3,020 1,479 0,009<br />
-6,500 1,965 -3,020 1,965 0,008<br />
-6,500 1,965 -3,020 1,965 0,008<br />
-7,150 5,227 -3,020 5,227 0,008<br />
-7,750 8,245 -3,020 8,245 0,008<br />
-8,400 11,524 -3,020 11,524 0,007<br />
-9,000 14,559 -3,020 14,559 0,007<br />
-9,000 14,559 -3,020 14,559 0,007<br />
-10,000 19,638 -3,020 19,638 0,007<br />
-11,000 24,745 -3,020 24,745 0,006<br />
-12,000 29,879 -3,020 29,879 0,006<br />
-13,000 35,039 -3,020 35,039 0,005<br />
-13,000 35,039 -3,020 35,039 0,005<br />
-13,600 38,146 -3,020 38,146 0,005<br />
-14,200 41,261 -3,020 41,261 0,004<br />
-14,200 41,261 -3,020 41,261 0,004<br />
-14,850 44,642 -3,020 44,642 0,004<br />
-15,500 48,029 -3,020 48,029 0,003<br />
-15,500 48,029 -3,020 48,029 0,003<br />
-16,250 49,094 -3,020 49,094 0,002<br />
-17,000 50,163 -3,020 50,163 0,000<br />
-17,000 50,163 -3,020 50,163 0,000<br />
-17,800 58,506 -3,020 58,506 0,000<br />
-18,500 65,808 -3,020 65,808 0,000<br />
-19,200 73,109 -3,020 73,109 0,000<br />
-20,000 81,452 -3,020 81,452 0,000<br />
3.3 Results for Vertical 3 (X = -16,00 m; Z = 0,00 m)<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-4,050 0,009 -3,020 0,009 0,031<br />
-4,150 0,088 -3,020 0,088 0,029<br />
-4,250 0,169 -3,020 0,169 0,029<br />
-4,350 0,249 -3,020 0,249 0,028<br />
-4,450 0,330 -3,020 0,330 0,028<br />
-4,550 0,411 -3,020 0,411 0,028<br />
-4,650 0,492 -3,020 0,492 0,027<br />
-4,750 0,573 -3,020 0,573 0,027<br />
-4,850 0,655 -3,020 0,655 0,027<br />
-4,950 0,736 -3,020 0,736 0,027<br />
-5,050 0,818 -3,020 0,818 0,027<br />
-5,275 1,004 -3,020 1,004 0,026<br />
-5,900 1,529 -3,020 1,529 0,024<br />
-6,500 2,048 -3,020 2,048 0,022<br />
-6,500 2,048 -3,020 2,048 0,022<br />
-7,150 5,362 -3,020 5,362 0,021<br />
-7,750 8,443 -3,020 8,443 0,020<br />
-8,400 11,808 -3,020 11,808 0,020<br />
-9,000 14,939 -3,020 14,939 0,019<br />
-9,000 14,939 -3,020 14,939 0,019<br />
-10,000 20,208 -3,020 20,208 0,018<br />
-11,000 25,532 -3,020 25,532 0,016<br />
-12,000 30,897 -3,020 30,897 0,015<br />
-13,000 36,289 -3,020 36,289 0,013<br />
-13,000 36,289 -3,020 36,289 0,013<br />
-13,600 39,531 -3,020 39,531 0,012<br />
-14,200 42,774 -3,020 42,774 0,010<br />
-14,200 42,774 -3,020 42,774 0,010<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 7
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-14,850 46,286 -3,020 46,286 0,009<br />
-15,500 49,795 -3,020 49,795 0,008<br />
-15,500 49,795 -3,020 49,795 0,008<br />
-16,250 50,985 -3,020 50,985 0,004<br />
-17,000 52,164 -3,020 52,164 0,000<br />
-17,000 52,164 -3,020 52,164 0,000<br />
-17,800 60,608 -3,020 60,608 0,000<br />
-18,500 67,982 -3,020 67,982 0,000<br />
-19,200 75,342 -3,020 75,342 0,000<br />
-20,000 83,737 -3,020 83,737 0,000<br />
3.4 Results for Vertical 4 (X = -15,00 m; Z = 0,00 m)<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-4,050 0,012 -3,020 0,012 0,039<br />
-4,150 0,092 -3,020 0,092 0,037<br />
-4,250 0,173 -3,020 0,173 0,037<br />
-4,350 0,254 -3,020 0,254 0,036<br />
-4,450 0,335 -3,020 0,335 0,036<br />
-4,550 0,417 -3,020 0,417 0,035<br />
-4,650 0,499 -3,020 0,499 0,035<br />
-4,750 0,581 -3,020 0,581 0,035<br />
-4,850 0,663 -3,020 0,663 0,034<br />
-4,950 0,746 -3,020 0,746 0,034<br />
-5,050 0,830 -3,020 0,830 0,034<br />
-5,275 1,018 -3,020 1,018 0,033<br />
-5,900 1,555 -3,020 1,555 0,031<br />
-6,500 2,091 -3,020 2,091 0,027<br />
-6,500 2,091 -3,020 2,091 0,027<br />
-7,150 5,431 -3,020 5,431 0,026<br />
-7,750 8,543 -3,020 8,543 0,025<br />
-8,400 11,948 -3,020 11,948 0,024<br />
-9,000 15,122 -3,020 15,122 0,023<br />
-9,000 15,122 -3,020 15,122 0,023<br />
-10,000 20,469 -3,020 20,469 0,022<br />
-11,000 25,874 -3,020 25,874 0,020<br />
-12,000 31,318 -3,020 31,318 0,018<br />
-13,000 36,779 -3,020 36,779 0,015<br />
-13,000 36,779 -3,020 36,779 0,015<br />
-13,600 40,058 -3,020 40,058 0,014<br />
-14,200 43,333 -3,020 43,333 0,013<br />
-14,200 43,333 -3,020 43,333 0,013<br />
-14,850 46,875 -3,020 46,875 0,011<br />
-15,500 50,409 -3,020 50,409 0,009<br />
-15,500 50,409 -3,020 50,409 0,009<br />
-16,250 51,621 -3,020 51,621 0,005<br />
-17,000 52,817 -3,020 52,817 0,000<br />
-17,000 52,817 -3,020 52,817 0,000<br />
-17,800 61,271 -3,020 61,271 0,000<br />
-18,500 68,651 -3,020 68,651 0,000<br />
-19,200 76,012 -3,020 76,012 0,000<br />
-20,000 84,405 -3,020 84,405 0,000<br />
3.5 Results for Vertical 5 (X = 0,00 m; Z = 0,00 m)<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 8
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-4,050 40,275 -3,020 40,275 2,464<br />
-4,150 40,330 -3,020 40,330 2,399<br />
-4,250 40,379 -3,020 40,379 2,337<br />
-4,350 40,415 -3,020 40,415 2,277<br />
-4,450 40,433 -3,020 40,433 2,218<br />
-4,550 40,431 -3,020 40,431 2,160<br />
-4,650 40,409 -3,020 40,409 2,103<br />
-4,750 40,369 -3,020 40,369 2,047<br />
-4,850 40,312 -3,020 40,312 1,991<br />
-4,950 40,243 -3,020 40,243 1,936<br />
-5,050 40,163 -3,020 40,163 1,882<br />
-5,275 39,953 -3,020 39,953 1,762<br />
-5,900 39,269 -3,020 39,269 1,445<br />
-6,500 38,588 -3,020 38,588 1,154<br />
-6,500 38,588 -3,020 38,588 1,154<br />
-7,150 40,602 -3,020 40,602 0,977<br />
-7,750 42,491 -3,020 42,491 0,849<br />
-8,400 44,573 -3,020 44,573 0,735<br />
-9,000 46,527 -3,020 46,527 0,645<br />
-9,000 46,527 -3,020 46,527 0,645<br />
-10,000 49,853 -3,020 49,854 0,520<br />
-11,000 53,270 -3,020 53,270 0,419<br />
-12,000 56,780 -3,020 56,781 0,335<br />
-13,000 60,386 -3,020 60,386 0,265<br />
-13,000 60,386 -3,020 60,386 0,265<br />
-13,600 62,595 -3,020 62,595 0,228<br />
-14,200 64,837 -3,020 64,837 0,194<br />
-14,200 64,837 -3,020 64,837 0,194<br />
-14,850 67,302 -3,020 67,302 0,161<br />
-15,500 69,804 -3,020 69,804 0,131<br />
-15,500 69,804 -3,020 69,804 0,131<br />
-16,250 69,884 -3,020 69,884 0,064<br />
-17,000 70,010 -3,020 70,010 0,000<br />
-17,000 70,010 -3,020 70,010 0,000<br />
-17,800 77,389 -3,020 77,389 0,000<br />
-18,500 83,884 -3,020 83,884 0,000<br />
-19,200 90,411 -3,020 90,411 0,000<br />
-20,000 97,907 -3,020 97,907 0,000<br />
3.6 Results for Vertical 6 (X = 1,63 m; Z = 0,00 m)<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-3,237 32,324 -3,020 32,324 2,712<br />
-3,337 32,750 -3,020 32,750 2,649<br />
-3,437 33,119 -3,020 33,119 2,590<br />
-3,537 33,348 -3,020 33,348 2,533<br />
-3,637 33,189 -3,020 33,189 2,477<br />
-3,643 33,217 -3,020 33,217 2,473<br />
-3,737 33,577 -3,020 33,577 2,421<br />
-3,837 33,787 -3,020 33,787 2,367<br />
-3,937 33,800 -3,020 33,800 2,313<br />
-4,037 33,779 -3,020 33,779 2,260<br />
-4,050 33,776 -3,020 33,776 2,253<br />
-4,050 33,776 -3,020 33,776 2,253<br />
-4,137 33,763 -3,020 33,763 2,208<br />
-4,237 33,773 -3,020 33,773 2,156<br />
-4,775 34,160 -3,020 34,160 1,889<br />
-5,275 34,546 -3,020 34,546 1,650<br />
-5,900 34,903 -3,020 34,903 1,363<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 9
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-6,500 35,128 -3,020 35,128 1,096<br />
-6,500 35,128 -3,020 35,128 1,096<br />
-7,150 37,975 -3,020 37,975 0,935<br />
-7,750 40,501 -3,020 40,501 0,817<br />
-8,400 43,147 -3,020 43,148 0,710<br />
-9,000 45,525 -3,020 45,526 0,626<br />
-9,000 45,525 -3,020 45,526 0,626<br />
-10,000 49,394 -3,020 49,394 0,508<br />
-11,000 53,196 -3,020 53,196 0,410<br />
-12,000 56,978 -3,020 56,978 0,329<br />
-13,000 60,772 -3,020 60,773 0,261<br />
-13,000 60,772 -3,020 60,773 0,261<br />
-13,600 63,065 -3,020 63,065 0,225<br />
-14,200 65,373 -3,020 65,374 0,192<br />
-14,200 65,373 -3,020 65,374 0,192<br />
-14,850 67,895 -3,020 67,895 0,159<br />
-15,500 70,440 -3,020 70,441 0,130<br />
-15,500 70,440 -3,020 70,441 0,130<br />
-16,250 70,558 -3,020 70,558 0,063<br />
-17,000 70,710 -3,020 70,710 0,000<br />
-17,000 70,710 -3,020 70,710 0,000<br />
-17,800 78,110 -3,020 78,110 0,000<br />
-18,500 84,616 -3,020 84,616 0,000<br />
-19,200 91,151 -3,020 91,151 0,000<br />
-20,000 98,653 -3,020 98,653 0,000<br />
3.7 Results for Vertical 7 (X = 3,71 m; Z = 0,00 m)<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-2,200 25,807 -2,200 25,807 2,012<br />
-2,300 26,165 -2,300 26,165 1,963<br />
-2,400 25,874 -2,400 25,874 1,920<br />
-2,500 26,037 -2,500 26,037 1,882<br />
-2,600 27,893 -2,600 27,893 1,848<br />
-2,700 30,348 -2,700 30,348 1,814<br />
-2,800 32,084 -2,800 32,084 1,782<br />
-2,900 33,614 -2,900 33,614 1,751<br />
-3,000 34,999 -3,000 34,999 1,722<br />
-3,020 35,251 -3,020 35,251 1,716<br />
-3,100 35,441 -3,020 35,441 1,693<br />
-3,125 35,491 -3,020 35,491 1,686<br />
-3,200 35,623 -3,020 35,623 1,664<br />
-4,050 36,541 -3,020 36,541 1,423<br />
-4,050 36,541 -3,020 36,541 1,423<br />
-4,675 37,273 -3,020 37,273 1,250<br />
-5,275 37,976 -3,020 37,976 1,085<br />
-5,900 38,661 -3,020 38,661 0,916<br />
-6,500 39,241 -3,020 39,241 0,756<br />
-6,500 39,241 -3,020 39,241 0,756<br />
-7,150 42,491 -3,020 42,491 0,668<br />
-7,750 45,387 -3,020 45,387 0,597<br />
-8,400 48,415 -3,020 48,415 0,529<br />
-9,000 51,122 -3,020 51,122 0,472<br />
-9,000 51,122 -3,020 51,122 0,472<br />
-10,000 55,482 -3,020 55,482 0,390<br />
-11,000 59,706 -3,020 59,706 0,319<br />
-12,000 63,845 -3,020 63,845 0,259<br />
-13,000 67,941 -3,020 67,941 0,207<br />
-13,000 67,941 -3,020 67,941 0,207<br />
-13,600 70,391 -3,020 70,391 0,179<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 10
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-14,200 72,841 -3,020 72,841 0,153<br />
-14,200 72,841 -3,020 72,841 0,153<br />
-14,850 75,500 -3,020 75,500 0,128<br />
-15,500 78,168 -3,020 78,168 0,104<br />
-15,500 78,168 -3,020 78,168 0,104<br />
-16,250 78,410 -3,020 78,410 0,051<br />
-17,000 78,671 -3,020 78,671 0,000<br />
-17,000 78,672 -3,020 78,672 0,000<br />
-17,800 86,173 -3,020 86,173 0,000<br />
-18,500 92,757 -3,020 92,757 0,000<br />
-19,200 99,360 -3,020 99,360 0,000<br />
-20,000 106,932 -3,020 106,932 0,000<br />
3.8 Results for Vertical 8 (X = 21,00 m; Z = 0,00 m)<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-2,200 0,001 -2,200 0,001 0,014<br />
-2,300 1,060 -2,300 1,060 0,014<br />
-2,400 2,120 -2,400 2,120 0,014<br />
-2,500 3,181 -2,500 3,181 0,014<br />
-2,600 4,241 -2,600 4,241 0,014<br />
-2,700 5,301 -2,700 5,301 0,014<br />
-2,800 6,361 -2,800 6,361 0,014<br />
-2,900 7,421 -2,900 7,421 0,015<br />
-3,000 8,482 -3,000 8,482 0,015<br />
-3,020 8,694 -3,020 8,694 0,015<br />
-3,100 8,758 -3,020 8,758 0,015<br />
-3,125 8,777 -3,020 8,777 0,015<br />
-3,200 8,837 -3,020 8,837 0,015<br />
-4,050 9,518 -3,020 9,518 0,015<br />
-4,050 9,518 -3,020 9,518 0,015<br />
-4,675 10,028 -3,020 10,028 0,015<br />
-5,275 10,528 -3,020 10,528 0,015<br />
-5,900 11,062 -3,020 11,062 0,015<br />
-6,500 11,591 -3,020 11,591 0,015<br />
-6,500 11,591 -3,020 11,591 0,015<br />
-7,150 14,912 -3,020 14,912 0,015<br />
-7,750 17,996 -3,020 17,996 0,014<br />
-8,400 21,356 -3,020 21,356 0,014<br />
-9,000 24,475 -3,020 24,475 0,013<br />
-9,000 24,475 -3,020 24,475 0,013<br />
-10,000 29,707 -3,020 29,707 0,012<br />
-11,000 34,973 -3,020 34,973 0,011<br />
-12,000 40,265 -3,020 40,265 0,010<br />
-13,000 45,572 -3,020 45,572 0,009<br />
-13,000 45,573 -3,020 45,573 0,009<br />
-13,600 48,761 -3,020 48,761 0,008<br />
-14,200 51,951 -3,020 51,951 0,007<br />
-14,200 51,951 -3,020 51,951 0,007<br />
-14,850 55,407 -3,020 55,407 0,007<br />
-15,500 58,860 -3,020 58,860 0,006<br />
-15,500 58,860 -3,020 58,860 0,006<br />
-16,250 59,991 -3,020 59,991 0,003<br />
-17,000 61,115 -3,020 61,115 0,000<br />
-17,000 61,115 -3,020 61,115 0,000<br />
-17,800 69,506 -3,020 69,506 0,000<br />
-18,500 76,840 -3,020 76,840 0,000<br />
-19,200 84,165 -3,020 84,165 0,000<br />
-20,000 92,527 -3,020 92,527 0,000<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 11
3.9 Results for Vertical 9 (X = 26,00 m; Z = 0,00 m)<br />
Royal HaskoningDHV D-Settlement 9.2<br />
Depth Effective Hydraulic Loading Settlement<br />
Stress head<br />
[m] [kPa] [m] [kPa] [m]<br />
-2,200 0,001 -2,200 0,001 0,005<br />
-2,300 1,060 -2,300 1,060 0,005<br />
-2,400 2,120 -2,400 2,120 0,005<br />
-2,500 3,180 -2,500 3,180 0,005<br />
-2,600 4,240 -2,600 4,240 0,005<br />
-2,700 5,300 -2,700 5,300 0,005<br />
-2,800 6,360 -2,800 6,360 0,005<br />
-2,900 7,420 -2,900 7,420 0,005<br />
-3,000 8,480 -3,000 8,480 0,005<br />
-3,020 8,692 -3,020 8,692 0,005<br />
-3,100 8,756 -3,020 8,756 0,005<br />
-3,125 8,775 -3,020 8,775 0,005<br />
-3,200 8,835 -3,020 8,835 0,005<br />
-4,050 9,509 -3,020 9,509 0,005<br />
-4,050 9,509 -3,020 9,509 0,005<br />
-4,675 10,006 -3,020 10,006 0,006<br />
-5,275 10,486 -3,020 10,486 0,006<br />
-5,900 10,990 -3,020 10,990 0,006<br />
-6,500 11,478 -3,020 11,478 0,006<br />
-6,500 11,478 -3,020 11,478 0,006<br />
-7,150 14,743 -3,020 14,743 0,006<br />
-7,750 17,763 -3,020 17,763 0,006<br />
-8,400 21,043 -3,020 21,043 0,005<br />
-9,000 24,077 -3,020 24,077 0,005<br />
-9,000 24,077 -3,020 24,077 0,005<br />
-10,000 29,152 -3,020 29,152 0,005<br />
-11,000 34,249 -3,020 34,249 0,005<br />
-12,000 39,366 -3,020 39,366 0,004<br />
-13,000 44,503 -3,020 44,503 0,004<br />
-13,000 44,503 -3,020 44,503 0,004<br />
-13,600 47,593 -3,020 47,593 0,004<br />
-14,200 50,689 -3,020 50,689 0,003<br />
-14,200 50,689 -3,020 50,689 0,003<br />
-14,850 54,048 -3,020 54,048 0,003<br />
-15,500 57,411 -3,020 57,411 0,002<br />
-15,500 57,411 -3,020 57,411 0,002<br />
-16,250 58,447 -3,020 58,447 0,001<br />
-17,000 59,487 -3,020 59,487 0,000<br />
-17,000 59,487 -3,020 59,487 0,000<br />
-17,800 67,799 -3,020 67,799 0,000<br />
-18,500 75,074 -3,020 75,074 0,000<br />
-19,200 82,348 -3,020 82,348 0,000<br />
-20,000 90,662 -3,020 90,662 0,000<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 12
4 Settlements<br />
4.1 Settlements<br />
Vertical X co-ordinate Surface level Settlement<br />
number [m] [m] [m]<br />
1 -26,00 -4,05 0,004<br />
2 -21,00 -4,05 0,010<br />
3 -16,00 -4,05 0,031<br />
4 -15,00 -4,05 0,039<br />
5 0,00 -4,05 2,464<br />
6 1,63 -3,24 2,712<br />
7 3,71 -2,20 2,012<br />
8 21,00 -2,20 0,014<br />
9 26,00 -2,20 0,005<br />
4.2 Residual Times<br />
Royal HaskoningDHV D-Settlement 9.2<br />
Vertical Time Settlement Part of final Residual<br />
number settlement settlements<br />
[days] [m] [%] [m]<br />
1 7 0,000 5,249 0,004<br />
14 0,000 7,134 0,004<br />
30 0,001 19,108 0,003<br />
60 0,001 27,918 0,003<br />
90 0,001 33,714 0,003<br />
120 0,002 38,092 0,003<br />
150 0,002 41,736 0,002<br />
180 0,002 44,940 0,002<br />
210 0,002 47,873 0,002<br />
240 0,002 50,496 0,002<br />
270 0,002 53,035 0,002<br />
300 0,002 55,370 0,002<br />
330 0,002 57,670 0,002<br />
365 0,003 60,046 0,002<br />
2 7 0,000 4,764 0,010<br />
14 0,001 6,407 0,010<br />
30 0,002 17,939 0,008<br />
60 0,003 26,555 0,008<br />
90 0,003 32,419 0,007<br />
120 0,004 36,939 0,007<br />
150 0,004 40,742 0,006<br />
180 0,005 44,099 0,006<br />
210 0,005 47,177 0,005<br />
240 0,005 49,921 0,005<br />
270 0,005 52,572 0,005<br />
300 0,006 54,993 0,005<br />
330 0,006 57,375 0,004<br />
365 0,006 59,818 0,004<br />
3 7 0,001 3,745 0,030<br />
14 0,001 4,839 0,029<br />
30 0,005 16,087 0,026<br />
60 0,008 24,636 0,023<br />
90 0,009 30,811 0,021<br />
120 0,011 35,706 0,020<br />
150 0,012 39,869 0,019<br />
180 0,013 43,547 0,017<br />
210 0,014 46,905 0,016<br />
240 0,015 49,856 0,015<br />
270 0,016 52,692 0,015<br />
300 0,017 55,243 0,014<br />
330 0,018 57,746 0,013<br />
365 0,019 60,261 0,012<br />
4 7 0,001 3,443 0,038<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 13
Royal HaskoningDHV D-Settlement 9.2<br />
Vertical Time Settlement Part of final Residual<br />
number settlement settlements<br />
[days] [m] [%] [m]<br />
14 0,002 4,370 0,038<br />
30 0,006 15,667 0,033<br />
60 0,010 24,310 0,030<br />
90 0,012 30,639 0,027<br />
120 0,014 35,678 0,025<br />
150 0,016 39,962 0,024<br />
180 0,017 43,739 0,022<br />
210 0,019 47,179 0,021<br />
240 0,020 50,182 0,020<br />
270 0,021 53,061 0,019<br />
300 0,022 55,636 0,018<br />
330 0,023 58,160 0,017<br />
365 0,024 60,679 0,016<br />
5 7 0,704 28,594 1,759<br />
14 0,897 36,412 1,567<br />
30 1,229 49,866 1,235<br />
60 1,457 59,136 1,007<br />
90 1,575 63,922 0,889<br />
120 1,654 67,122 0,810<br />
150 1,717 69,702 0,746<br />
180 1,771 71,895 0,692<br />
210 1,817 73,773 0,646<br />
240 1,854 75,273 0,609<br />
270 1,889 76,677 0,575<br />
300 1,918 77,848 0,546<br />
330 1,946 78,987 0,518<br />
365 1,972 80,046 0,492<br />
6 7 0,717 26,429 1,995<br />
14 0,945 34,856 1,767<br />
30 1,377 50,791 1,335<br />
60 1,647 60,727 1,065<br />
90 1,777 65,506 0,935<br />
120 1,861 68,609 0,851<br />
150 1,927 71,061 0,785<br />
180 1,983 73,111 0,729<br />
210 2,030 74,859 0,682<br />
240 2,068 76,252 0,644<br />
270 2,103 77,557 0,609<br />
300 2,133 78,644 0,579<br />
330 2,162 79,701 0,551<br />
365 2,188 80,686 0,524<br />
7 7 0,215 10,693 1,797<br />
14 0,383 19,060 1,629<br />
30 0,915 45,459 1,097<br />
60 1,171 58,190 0,841<br />
90 1,276 63,394 0,737<br />
120 1,338 66,503 0,674<br />
150 1,388 68,971 0,624<br />
180 1,430 71,073 0,582<br />
210 1,467 72,894 0,545<br />
240 1,496 74,362 0,516<br />
270 1,524 75,740 0,488<br />
300 1,547 76,898 0,465<br />
330 1,570 78,026 0,442<br />
365 1,591 79,081 0,421<br />
8 7 0,001 4,417 0,014<br />
14 0,001 6,238 0,014<br />
30 0,002 15,528 0,012<br />
60 0,003 22,070 0,011<br />
90 0,004 26,051 0,011<br />
120 0,004 29,133 0,010<br />
150 0,005 31,840 0,010<br />
180 0,005 34,361 0,009<br />
210 0,005 36,788 0,009<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 14
Royal HaskoningDHV D-Settlement 9.2<br />
Vertical Time Settlement Part of final Residual<br />
number settlement settlements<br />
[days] [m] [%] [m]<br />
240 0,006 39,136 0,009<br />
270 0,006 41,448 0,008<br />
300 0,006 43,670 0,008<br />
330 0,007 45,870 0,008<br />
365 0,007 48,252 0,007<br />
9 7 0,000 5,319 0,005<br />
14 0,000 7,532 0,005<br />
30 0,001 19,228 0,004<br />
60 0,001 27,221 0,004<br />
90 0,002 31,663 0,004<br />
120 0,002 34,772 0,003<br />
150 0,002 37,299 0,003<br />
180 0,002 39,530 0,003<br />
210 0,002 41,608 0,003<br />
240 0,002 43,578 0,003<br />
270 0,002 45,537 0,003<br />
300 0,003 47,469 0,003<br />
330 0,003 49,389 0,003<br />
365 0,003 51,522 0,003<br />
14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 15
5 Warnings and errors<br />
List of non-fatal warnings and errors generated during calculation.<br />
Royal HaskoningDHV D-Settlement 9.2<br />
1 Model Koppejan is not ideal for unloading (e.g. load removal, temporary dewatering, gradual<br />
submerging). If As is much larger than Cs', unloading will yield almost no effect on creep. Switch to the<br />
NEN-Bjerrum or abc Isotache model for improved predictions.<br />
End of Report<br />