Hoogheemraadschap <strong>Delfland</strong><br />

9 januari 2013<br />

Definitief rapport<br />

9R6945.I8<br />

Definitief Ontwerp - <strong>bruggen</strong><br />

Brug 4, 5 en 22


Documenttitel Definitief Ontwerp - <strong>bruggen</strong><br />

Brug 4, 5 en 22<br />

Verkorte documenttitel <strong>DO</strong> brug 4, 5 en 22<br />

Status Definitief rapport<br />

Datum 9 januari 2013<br />

Projectnaam Alternatief Afvoertracé Pijnackerse Vaart<br />

Projectnummer 9R6945.I8<br />

Opdrachtgever Hoogheemraadschap <strong>Delfland</strong><br />

Referentie 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Auteur(s) ing. E.T.J.M. Janssen MSEng/ Ing. S. van Velp<br />

Collegiale toets ir. M.M. Somhorst/ Ing. T. Linthof<br />

Datum/paraaf 9 januari 2013 i.o.<br />

Vrijgegeven door ing. H.T. Nieuwhof<br />

Datum/paraaf 9 januari 2013<br />

HASKONINGDHV NEDERLAND B.V.<br />

RIVERS, DELTAS &COASTS<br />

Barbarossastraat 35<br />

Postbus 151<br />

6500 AD Nijmegen<br />

(024) 328 42 84 Telefoon<br />

info@nijmegen.royalhaskoning.com E-mail<br />

www.royalhaskoningdhv.com Internet<br />

Almere 56515154 KvK<br />

A company of Royal HaskoningDHV


INHOUDSOPGAVE<br />

1 INLEIDING 1<br />

1.1 Projectomschrijving 1<br />

1.2 Doel en reikwijdte document 2<br />

1.3 Leeswijzer 2<br />

2 RANDVOORWAARDEN EN UITGANGSPUNTEN 3<br />

2.1 Ontwerpbasis 3<br />

2.1.1 Programma van Eisen (voorontwerp) 3<br />

2.1.2 Wijzigingen t.o.v. het Programma van Eisen 3<br />

2.2 Bijbehorende documenten 3<br />

2.3 Ontwerplevensduur en betrouwbaarheid 4<br />

2.4 Globlale bouwfasering fasering 4<br />

2.5 Overige uitvoeringstechnische aspecten 4<br />

2.6 Vormgeving 5<br />

3 GEOMETRIE 6<br />

3.1 Brug 4 6<br />

3.1.1 Definitief lengteprofiel 6<br />

3.1.2 Dwarsdoorsnede 6<br />

3.2 Brug 5 7<br />

3.2.1 Definitief lengteprofiel 7<br />

3.2.2 Dwarsdoorsnede 7<br />

3.3 Brug 22 8<br />

3.3.1 Definitief lengteprofiel 8<br />

3.3.2 Dwarsdoorsnede 8<br />

3.4 Opbouw dekconstructie 9<br />

3.4.1 Wegverharding 9<br />

3.4.2 Afwerking en meubilair 10<br />

3.4.3 Stootplaten 10<br />

3.4.4 Zeeg 10<br />

3.5 Landhoofden 11<br />

4 MATERIAALGEGEVENS 12<br />

4.1 Beton 12<br />

4.1.1 Materiaaleigenschappen 12<br />

4.1.2 Partiële materiaalfactoren 12<br />

4.1.3 Toegepaste betonkwaliteiten 12<br />

4.1.4 Afwerking betonoppervlaktes 13<br />

4.1.5 Milieuklasse 13<br />

4.1.6 Cement 13<br />

4.1.7 Dekking 14<br />

4.2 Betonstaal 15<br />

4.2.1 Materiaaleigenschappen 15<br />

4.2.2 Partiële materiaalfactoren 15<br />

5 BELASTINGEN EN BELASTINGCOMBINATIES 16<br />

5.1 Permanente belastingen 16<br />

5.1.1 Eigen gewicht liggers en druklaag 16<br />

<strong>DO</strong> brug 4, 5 en 22 - i - 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013<br />

Blz.


5.1.2 Rustende belasting 16<br />

5.1.3 Eigen gewicht afwerking 16<br />

5.1.4 Grondbelasting 16<br />

5.1.5 Krimp en kruip 16<br />

5.1.6 Zettingen 17<br />

5.2 Veranderlijke belastingen 17<br />

5.2.1 Belastingen op brugleuningen 17<br />

5.2.2 Verkeersbelasting 17<br />

5.2.3 Belasting door remmen of aanzetten 19<br />

5.2.4 Mobiele belasting nabij landhoofden en grondkerende<br />

constructies 20<br />

5.2.5 Sneeuw 20<br />

5.2.6 Windbelasting 20<br />

5.2.7 Temperatuur 20<br />

5.3 Buitengewone belastingen 21<br />

5.3.1 Aanrijdingsbelastingen op stootranden 21<br />

5.4 Belastingcombinaties 21<br />

5.4.1 Grenstoestanden 21<br />

5.4.2 Belastingcombinaties uiterste grenstoestanden 22<br />

5.4.3 Belastingcombinaties bruikbaarheidsgrenstoestanden 22<br />

5.4.4 Belastingcombinaties en –factoren voor geotechnische controles 23<br />

6 AANPAK BEREKENINGEN 24<br />

6.1 Ontwerp dekconstructie 24<br />

6.2 Standaard model: ontwerp landhoofden op palen 24<br />

6.2.1 Geometrie en statisch systeem 24<br />

6.2.2 Belastingen en belastingcombinaties 27<br />

6.2.3 Krachtsverdeling haaks op de wegas 28<br />

6.2.4 Vleugelwanden 29<br />

6.2.5 Stootplaten 29<br />

6.3 Optimalisaties brug 4 30<br />

6.4 Optimalisaties brug 22 30<br />

7 RESULTAAT BEREKENINGEN 31<br />

7.1 Landhoofden 31<br />

7.2 Vleugelwanden 32<br />

7.3 Stootplaten 33<br />

7.4 Wapeningshoeveelheden 33<br />

7.5 Paalkopwapening en toetsing draagvermogen 33<br />

8 GEOTECHNIEK 34<br />

8.1 Grondonderzoek en bodemopbouw 34<br />

8.2 Uitgangspunten fasering 35<br />

8.3 Zettingen 35<br />

8.4 Fundering 37<br />

<strong>DO</strong> brug 4, 5 en 22 - ii - 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


BIJLAGEN<br />

A Tekeningen<br />

B Ontwerp brug 4, 5 en 22<br />

B1 Bepaling prefab dekconstructie<br />

B2 Ontwerp landhoofd – geometrie + statisch systeem<br />

B3 Ontwerp landhoofd – belastingen en belastingcombinaties<br />

B4 Ontwerp landhoofd – raamwerkmodel (dwarsrichting)<br />

B5 Ontwerp landhoofd – krachtsverdeling haaks op de wegas<br />

B6 Ontwerp landhoofd – bepaling wapening<br />

B7 Ontwerp landhoofd – bepaling paalkopwapening<br />

B8 Ontwerp landhoofd – ontwerp vleugelwanden<br />

C Beschouwing optimalisaties brug 4<br />

D Beschouwing optimalisaties brug 22<br />

E Geotechniek<br />

E1 Paaldraagvermogen<br />

E2 Zettingsberekeningen<br />

<strong>DO</strong> brug 4, 5 en 22 - iii - 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


1 INLEIDING<br />

1.1 Projectomschrijving<br />

De Oude Polder van Pijnacker, de Nieuwe of Drooggemaakte Polder en de Noordpolder<br />

van Delfgauw wateren af op de boezemwatergang Pijnackerse Vaart. Als gevolg van<br />

ruimtelijke ontwikkelingen zal de maatgevende afvoer vanuit deze polders in de<br />

toekomst toenemen. Deze ruimtelijke ontwikkelingen houden onder andere in de aanleg<br />

van de Vinex-locaties Tuindershof en Keijzershof. De Pijnackerse Vaart is een bekend<br />

hydraulisch knelpunt in het boezemsysteem van <strong>Delfland</strong> en een vergroting van de<br />

afvoer zal tot extra opstuwing en overlast leiden. Om deze reden is door het<br />

Hoogheemraadschap van <strong>Delfland</strong> een project opgestart voor de realisatie van een<br />

bypass. Het project heet ‘Alternatief Afvoertracé Pijnackerse Vaart’.<br />

Het Alternatief Afvoertracé is in overleg met belanghebbenden verder uitgewerkt tot een<br />

definitief ontwerp van de watergangen. In de onderstaande afbeelding is het definitief<br />

ontwerp van het Alternatief Afvoertracé weergegeven.<br />

Figuur 1.1: Overzicht Alternatief afvoertracé + locatie brug 4, 5 en 22<br />

Ten gevolge van het ontwerp van de watergangen zullen een aantal kunstwerken in het<br />

huidige traject aangepast of vervangen moeten worden.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 1 - 9 januari 2013


1.2 Doel en reikwijdte document<br />

Het doel van dit document is het vastleggen van het Definitief Ontwerp van de <strong>bruggen</strong><br />

4,5 en 22 om daarmee aan te tonen dat het ontwerp voldoet aan het document<br />

“Programma van Eisen <strong>bruggen</strong> <strong>Delfland</strong>” en de van toepassing zijnde normen en<br />

richtlijnen.<br />

Met het Definitief Ontwerp worden de dimensies van de constructieonderdelen en de<br />

materialen (wapening) zodanig vastgelegd dat een duidelijk beeld ontstaat van de<br />

gehele constructie. Het ontwerp geeft een volledig en duidelijk beeld van de omvang,<br />

materiaal en kwaliteit. Hieruit kunnen de realisatiekosten en realisatietijd bepaald<br />

worden.<br />

De uitgangspunten voor deze ontwerpnota zijn vastgelegd in het document “Programma<br />

van Eisen <strong>bruggen</strong> <strong>Delfland</strong>”. Hierin zijn de algemene uitgangspunten vastgelegd voor<br />

het definitief ontwerp van de drie <strong>bruggen</strong>.<br />

Deze ontwerpnota bevat alleen de constructie beoordeling van de landhoofden en de<br />

steunpuntswapening t.b.v. het dek. Het dek, op de steunpuntswapening na, wordt<br />

uitgewerkt door de prefab leverancier. De prefab palen worden uitgewerkt door de<br />

prefab leverancier. Het funderingsadvies van de drie <strong>bruggen</strong> is ook toegevoegd aan dit<br />

document.<br />

1.3 Leeswijzer<br />

Naast de beschrijving en de constructieve onderbouwing van het Definitief Ontwerp in<br />

voorliggende ontwerpnota is het Definitief Ontwerp tekentechnisch vastgelegd op<br />

bijbehorende <strong>DO</strong>-tekening(en). Deze <strong>DO</strong>-tekening(en) maken onlosmakelijk onderdeel<br />

uit van voorliggende ontwerpnota en worden samen met deze ontwerpnota ingediend.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 2 - 9 januari 2013


2 RANDVOORWAARDEN EN UITGANGSPUNTEN<br />

Voor de algemene eisen, de randvoorwaarden en de uitgangspunten wordt verwezen<br />

naar het “Programma van Eisen”.<br />

In dit hoofdstuk worden de randvoorwaarden, uitgangspunten en referenties<br />

samengevat die specifiek voor de constructieve berekening van dit kunstwerk van<br />

toepassing zijn.<br />

2.1 Ontwerpbasis<br />

In onderstaande paragrafen is de ontwerpbasis voorafgaand aan het <strong>DO</strong> vastgelegd.<br />

2.1.1 Programma van Eisen (voorontwerp)<br />

In de voorgaande fase is door Royal HaskoningDHV een Programma van Eisen<br />

opgesteld. Dit Programma van Eisen is in document [D1] vastgesteld en dient als<br />

ontwerpbasis voor het Definitief Ontwerp.<br />

2.1.2 Wijzigingen t.o.v. het Programma van Eisen<br />

De breedte van de randliggers voor brug 22 zijn gewijzigd t.o.v. het Programma van<br />

Eisen. In het Programma van Eisen is een breedte van 250 mm aangehouden voor de<br />

randliggers. Dit is in het definitief ontwerp gewijzigd naar 500 mm.<br />

Verder zijn er geen wijzigingen t.o.v. het Programma van Eisen te benoemen.<br />

2.2 Bijbehorende documenten<br />

Voor het opstellen van de <strong>DO</strong> berekeningen is een Programma van Eisen geschreven<br />

[D1] waarin uitgangspunten zijn opgenomen die van toepassing zijn voor de drie<br />

<strong>bruggen</strong>. Dit Programma van Eisen maakt onlosmakelijk deel uit van deze ontwerpnota.<br />

Bijbehorende <strong>DO</strong>-documenten:<br />

[D1] Programma van Eisen <strong>bruggen</strong> <strong>Delfland</strong> – definitief versie 1.0 d.d. 26-11-2012<br />

Referentie: 9R6945.I8/R0006/ETJ/MJANS/Nijm.;<br />

Bijbehorende <strong>DO</strong>-tekeningen:<br />

[T1] 2641-001 Landbouwbrug 4 nieuwe situatie;<br />

[T2] 2641-002 Landbouwbrug 5 nieuwe situatie;<br />

[T3] 2641-003 Landbouwbrug 22 nieuwe situatie.<br />

Normen en richtlijnen<br />

Voor de gebruikte normen en richtlijnen wordt verwezen naar de bovengenoemde<br />

Programma van Eisen. De drie <strong>bruggen</strong> zijn uitgewerkt op basis van de Eurocode.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 3 - 9 januari 2013


2.3 Ontwerplevensduur en betrouwbaarheid<br />

In de onderstaande tabel is de levensduur en gevolgklasse conform [D1] weergegeven.<br />

Tabel 2.1: Overzicht levensduureisen per onderdeel<br />

Titel Levensduur Betrouwbaarheidsklasse<br />

Hoofddraagconstructie 100 jaar RC1<br />

Leuning (brug 22) 25 jaar RC1<br />

2.4 Globlale bouwfasering fasering<br />

Voor de bouwvolgorde wordt de volgende aanname gedaan:<br />

Aanbrengen duiker min. Ø600 t.b.v. ophoging voorbelasten ondergrond;<br />

Aanbrengen ophoging t.b.v. voorbelastingen ondergrond;<br />

Ontgraven t.b.v. aanbrengen landhoofden;<br />

Realisatie bouwkuipen t.b.v. bouw landhoofden;<br />

Aanbrengen prefab palen;<br />

Snellen paalkoppen;<br />

Aanbrengen werkvloer;<br />

Realisatie van landhoofdbalken;<br />

Realisatie vleugelwanden;<br />

Liggers leggen, van binnen naar buiten;<br />

Aanbrengen druklaag;<br />

Aanvullen grond;<br />

Afbouw kunstwerken.<br />

Het voorbelastingen en zettingen hebben invloed op de krachtswerking in de<br />

constructies. Om deze reden is in paragraaf 8.2 een meer uitgebreide bouwfasering<br />

beschreven.<br />

2.5 Overige uitvoeringstechnische aspecten<br />

De zeeg van de prefab liggers dient voor het plaatsen te worden ingemeten. Prefab<br />

liggers zo veel mogelijk sorteren zodat onderlinge zeegverschillen worden<br />

geminimaliseerd.<br />

De ankers van de leuningen dienen in de randliggers te worden aangebracht. De<br />

voorkeur betreft de ankers van te voren in te storten i.v.m. risico doorboren<br />

voorspanning. De afstand van hart anker tot rand betonnen constructie dient minimaal<br />

100 mm te bedragen.<br />

Vellingkanten 15x15 mm (uitwendige hoeken).<br />

In verband met duurzaamheid van de betonconstructie is het niet toegestaan om<br />

hulpstaven binnen de te hanteren dekking te plaatsen.<br />

T.b.v. in het werk gestorte landhoofden wordt een werkvloer van 70 mm aangebracht.<br />

Op locaties waar op het ontgravingsniveau geen zandpakket aanwezig is, rekening<br />

houden met een grondverbetering (zand) van 0,3 m.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 4 - 9 januari 2013


2.6 Vormgeving<br />

Voor brug 22 is het vormgevingsdocument “Brug Ackerdijkse bossen” opgesteld. Hierin<br />

zijn extra eisen gesteld aan het uiterlijk van het dek, landhoofden, randliggers en<br />

leuning.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 5 - 9 januari 2013


3 GEOMETRIE<br />

3.1 Brug 4<br />

In dit hoofdstuk wordt een beschrijving gegeven van de constructieve opbouw van<br />

brug 4,5 en 22 en zijn de ontwerpkeuzes vastgelegd.<br />

3.1.1 Definitief lengteprofiel<br />

Voor de toeritten is een maximaal hellingspercentage van 12% aangehouden met<br />

topbogen met een straal van 25 m en dalbogen met een straal van 50 m.<br />

Voor het profiel van vrije ruimte in verticale richting onder de brug is uitgegaan van<br />

0,4 m (geen doorvaarthoogte) + 0,050 m uitvoeringstolerantie. De overspanning<br />

bedraagt 7,5 m tussen de landhoofden.<br />

Figuur 3.1: Overzicht lengteprofiel + dwarsdoorsnede watergang t.p.v. brug 4<br />

3.1.2 Dwarsdoorsnede<br />

In de onderstaande figuur een dwarsdoorsnede van het brugdek van brug 4<br />

weergegeven. Brug 4 heeft een breedte van 4,5 m tussen de schampkanten.<br />

Figuur 3.2: Dwarsdoorsnede brugdek, brug 4<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 6 - 9 januari 2013


3.2 Brug 5<br />

3.2.1 Definitief lengteprofiel<br />

Voor de toeritten is een maximaal hellingspercentage van 12% aangehouden met<br />

topbogen met een straal van 25 m en dalbogen met een straal van 50 m.<br />

Voor het profiel van vrije ruimte in verticale richting onder de brug is uitgegaan van<br />

1,0 m (doorvaarthoogte) + 0,050 m uitvoeringstolerantie. De overspanning bedraagt<br />

7,5 m tussen de landhoofden.<br />

Figuur 3.3: Overzicht lengteprofiel + dwarsdoorsnede watergang t.p.v. brug 5<br />

3.2.2 Dwarsdoorsnede<br />

In het onderstaande figuur is een dwarsdoorsnede van het brugdek van brug 5<br />

weergegeven. Brug 5 heeft een breedte van 4,5 m tussen de schampkanten.<br />

Figuur 3.4: Dwarsdoorsnede brugdek, brug 5<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 7 - 9 januari 2013


3.3 Brug 22<br />

3.3.1 Definitief lengteprofiel<br />

Voor de toeritten is een maximaal hellingspercentage van 12% aangehouden met<br />

topbogen met een straal van 25 m en dalbogen met een straal van 50 m.<br />

Voor het profiel van vrije ruimte in verticale richting onder de brug is uitgegaan van<br />

1,0 m (doorvaarthoogte) + 0,050 m uitvoeringstolerantie. De overspanning bedraagt<br />

6,0 m tussen de landhoofden.<br />

Figuur 3.5: Overzicht lengteprofiel + dwarsdoorsnede watergang t.p.v. brug 22<br />

3.3.2 Dwarsdoorsnede<br />

In de onderstaande figuur een dwarsdoorsnede van het brugdek van brug 22<br />

weergegeven. Brug 22 heeft een breedte van 4,0 m tussen de schampkanten.<br />

Figuur 3.6: Dwarsdoorsnede brugdek, brug 22<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 8 - 9 januari 2013


3.4 Opbouw dekconstructie<br />

De dekconstructie bestaat, voor alle drie de <strong>bruggen</strong>, uit geprefabriceerde volstortliggers<br />

die integraal verbonden worden aan de landhoofden. Om oneffenheden uit te<br />

vlakken worden de prefab liggers tijdelijk opgelegd op een EPDM oplegstrip.<br />

De drie <strong>bruggen</strong> hebben de volgende overspanningen tussen de landhoofden:<br />

Brug 4: 7,5 m;<br />

Brug 5: 7,5 m;<br />

Brug 22: 6,0 m.<br />

Er is uitgegaan van prefab liggers met een hoogte van 350 mm. De prefab liggers<br />

krijgen een druklaag met een dikte van 100 mm i.v.m. de steunpuntswapening. De totale<br />

constructieve hoogte bedraagt 450 mm.<br />

De kruisingshoek bedraagt 90 graden.<br />

Brug 22<br />

Voor brug 22 is het principe van de vorm van de randliggers weergegeven in figuur 3.3.<br />

Figuur 3.7: Vormgeving randliggers, conform het vormgevingsdocument “Brug Ackerdijkse bossen”<br />

De randligger van brug 22 loopt door over de vleugelwanden en wordt uitgevoerd<br />

zonder dilataties. De randligger krijgt een licht grijze betonkleur. De afmetingen van de<br />

randligger wijkt af van het vormgevingsdocument “Brug Ackerdijkse bossen”. De breedte<br />

van de randliggers bedraagt 500 mm i.p.v. 250 mm. Verder is voor de hoogte van de<br />

“neus” van de randligger 300 mm aangehouden i.p.v. 200 mm in verband met de<br />

bevestiging van de leuning aan de randligger, zie ook tekening [T3].<br />

3.4.1 Wegverharding<br />

Op brug 4 en 5 wordt geen wegverharding toegepast, het dek wordt “kaal” opgeleverd<br />

zonder verdere afwerking.<br />

Op brug 22 wordt een epoxy slijtlaag toegepast met instrooien met dezelfde kleur en<br />

grootte steenslag als op het bestaande pad, waar de nieuwe brug op aansluit.<br />

Er wordt geen verkanting toegepast.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 9 - 9 januari 2013


Afwatering van regenwater op het brugdek geschiet in de richting van de landhoofden.<br />

Het dek krijgt een zeeg, zie paragraaf 3.4.4.<br />

3.4.2 Afwerking en meubilair<br />

De <strong>bruggen</strong> 4 en 5 krijgen een schampkant met de afmetingen bxh = 250x100 mm.<br />

Voor brug 22 bedraagt de afmetingen van de schampkant bxh= 500x100 mm.<br />

Alleen op brug 22 dient een leuning te worden toegepast, conform het<br />

vormgevingsdocument “Brug Ackerdijkse bossen”, zie onderstaande afbeelding en<br />

Figuur 3.7.<br />

Figuur 3.8: Leuning, conform het vormgevingsdocument “Brug Ackerdijkse bossen”<br />

De leuning is niet berekend in deze ontwerpnota. De aannemer dient de berekening en<br />

detaillering van de leuning ter controle voor te leggen aan de opdrachtgever en<br />

landschapsarchitect.<br />

Op brug 4 en 5 komt geen leuning.<br />

Er worden geen verlichtingsarmaturen op de <strong>bruggen</strong> aangebracht.<br />

3.4.3 Stootplaten<br />

3.4.4 Zeeg<br />

Ter plaatse van de landhoofden zullen stootplaten worden toegepast. Het landhoofd van<br />

brug 4 en 5 komt ter plaatse van de bestaande watergang. In verband met restzettingen<br />

worden voor brug 4 en 5 stootplaten met de afmetingen (L x B x H) 5.000 x 1.000 x<br />

350 mm toegepast.<br />

Brug 22 wordt in het vrije veld gebouwd, hier zullen de restzettingen kleiner zijn. Voor<br />

brug 22 kunnen stootplaten met de afmetingen (L x B x H) 3.000 x 1.000 x 250 mm<br />

worden toegepast.<br />

Het dek heeft in rusttoestand een positieve zeeg van:<br />

w rust<br />

L<br />

<br />

<br />

1000<br />

0,<br />

40<br />

w<br />

var<br />

<br />

8000<br />

1000<br />

<br />

0,<br />

40<br />

w<br />

var<br />

8 <br />

0,<br />

40<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 10 - 9 januari 2013<br />

w<br />

var


3.5 Landhoofden<br />

De landhoofden zijn laaggelegen. De landhoofden worden gefundeerd op prefab palen<br />

vk 400. Aan de landhoofden komen vleugelwanden met een lengte van 3,0 m, die de<br />

grond van de toeritten keren. De vleugelwanden lopen evenwijdig aan de brug.<br />

Figuur 3.9: Doorsnede landhoofd<br />

In het vormgevingsdocument “Brug Ackerdijkse bossen” zijn eisen gesteld aan de<br />

vormgeving van de landhoofden. Zo dient de oppervlakte van de landhoofden en<br />

vleugelwanden van beton met een donker grijze kleur te zijn. Daarnaast krijgt de<br />

oppervlakte van de landhoofden en vleugelwanden een reliëf type Madras van Noe (een<br />

verticaalpatroon van stengels), zie onderstaande afbeelding.<br />

Figuur 3.10: Reliëf landhoofden, Madras van Noe<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 11 - 9 januari 2013


4 MATERIAALGEGEVENS<br />

4.1 Beton<br />

4.1.1 Materiaaleigenschappen<br />

De materiaaleigenschappen van beton zijn samengevat in de onderstaande tabel. In<br />

deze tabel zijn tevens de rekenwaarden van de grootheden aangegeven.<br />

Tabel 4.1: Eigenschappen beton<br />

Sterkteklasse fck<br />

fcd<br />

[N/mm 2 ] [N/mm 2 ] [N/mm 2 ] [N/mm 2 ] [N/mm 2 ]<br />

C12/15 12 8,0 0,73 1,57 27000<br />

C30/37 30 20,0 1,33 2,90 33000<br />

C45/55 45 30,0 1,77 3,80 36000<br />

C55/67 55 36,7 2,00 4,20 38000<br />

Thermische uitzettingscoëfficiënt voor beton bedraagt α = 1,0 x 10-5 K -1 .<br />

4.1.2 Partiële materiaalfactoren<br />

De te hanteren materiaalfactoren voor het bepalen van de rekenwaarde van de<br />

materiaalgrootheden zijn in onderstaande tabel vermeld.<br />

Tabel 4.2: Partiele materiaalfactoren beton<br />

Grootheid Symbool m<br />

Druksterkte fcd = fck/m fcd 1,5<br />

Treksterkte fctd = fctk,0,05 / m fctd 1,5<br />

4.1.3 Toegepaste betonkwaliteiten<br />

In de onderstaande tabel zijn de betonkwaliteiten voor de verschillende<br />

constructieonderdelen weergegeven.<br />

Tabel 4.3: Betonkwaliteiten<br />

Onderdeel Betonkwaliteit toepassing<br />

Betonaanvulling, werkvloer C12/15 in situ, ongewapend beton<br />

Landhoofden C30/37 in situ, gewapend beton<br />

Stootplaten C35/45 Prefab beton<br />

Prefab liggers C55/67 Prefab beton<br />

Druklaag dekconstructie C30/37 in situ, gewapend beton<br />

Prefab palen C45/55 Prefab beton<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 12 - 9 januari 2013<br />

fctd<br />

fctm<br />

[-]<br />

Ecm


4.1.4 Afwerking betonoppervlaktes<br />

In het zicht komende vlakken<br />

In afwijking op het “Handboek Civiele kunstwerken”, wordt voor de landbouw<strong>bruggen</strong> 4<br />

en 5 de eis gesteld dat het betonoppervlak dient te voldoen aan beoordelingsklasse A<br />

conform CUR aanbeveling nr. 100 i.p.v. beoordelingsklasse B1 conform [D.8].<br />

Voor brug 22 dient het betonoppervlak wel te voldoen aan beoordelingsklasse B1<br />

conform CUR aanbeveling nr. 100. Deze eis is van toepassing op betonvlakken in het<br />

zicht. Met betrekking tot de scheurwijdte dient voldaan te worden aan een scheurwijdteeis<br />

van wmax= 0,1 mm. De wapening wordt hier niet op gedimensioneerd, maar<br />

betonoppervlakken in het zicht die niet voldoen aan genoemde scheurwijdte-eis dienen<br />

nabehandeld te worden.<br />

Antigraffiti coating<br />

In afwijking op het “Handboek Civiele kunstwerken”, wordt voor de landbouw<strong>bruggen</strong> 4<br />

en 5 geen anti-graffiti coating toegepast.<br />

Voor brug 22 dient conform het “Handboek Civiele kunstwerken” wel een anti-graffiti<br />

coating te worden aangebracht. Alle in het zicht zijnde beton hiermee afwerken i.v.m.<br />

kleurverschil.<br />

Vellingkanten<br />

Voor brug 4, 5 en 22 dienen vellingkanten van 15 x15 mm te worden toegepast.<br />

4.1.5 Milieuklasse<br />

4.1.6 Cement<br />

Onderstaand zijn de van toepassing zijnde milieuklassen per constructieonderdeel<br />

weergegeven.<br />

Brugdek, schampkant en stootplaten: XC4 en XF3.<br />

Landhoofd: XC4, XF3 en XA2.<br />

Prefab palen: XC4, XA3.<br />

(XA milieuklasse heeft geen invloed op de betondekking en maximale scheurwijdte,<br />

alleen op de betonsamenstelling. De XA-milieuklasse zegt iets over de natuurlijke<br />

zuurtegraad van de stoffen in de bodem en het grondwater. Dit is plaatsafhankelijk en<br />

alleen aan te tonen met behulp van een milieukundig onderzoek.<br />

Gezien de aanwezigheid van veenlagen, wordt uitgegaan van XA3 voor de palen en<br />

XA2 voor het landhoofd.)<br />

De volgende cementsoorten en cementklassen mogen worden toegepast:<br />

In situ beton: Hoogovencement CEM III (>50% gegranuleerde hoogovenslak);<br />

Zie ook CUR 89, art 5.3.<br />

Prefab beton: Hoogovencement CEM III (>50% gegranuleerde hoogovenslak) of<br />

Portlandvliegascement CEM II/B-V (>25% poederkoolvliegas)<br />

Zie ook CUR 89, art 5.3.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 13 - 9 januari 2013


4.1.7 Dekking<br />

Tevens wordt de cementklasse aangehouden conform het volgende overzicht:<br />

In-situ beton: CEM III 42,5 N. (>50% gegranuleerde hoogovenslak)<br />

Prefab beton: CEM III 52,5 N; (>50% gegranuleerde hoogovenslak)<br />

CEM III 52,5 R; (>50% gegranuleerde hoogovenslak)<br />

CEM II/B-V 52,5 N; (>25% poederkoolvliegas)<br />

CEM II/B-V 52,5 R. (>25% poederkoolvliegas)<br />

De minimum dekking cnom is bepaald conform NEN-EN 1992-1-1 art. 4.4.1. De dekking<br />

is apart bepaald t.b.v. de steunpuntswapening voor het dek, de landhoofden en voor de<br />

prefab palen.<br />

Bepaling nominale dekking t.b.v. de steunpuntswapening van het dek en de<br />

landhoofden<br />

Uitgangspunten:<br />

Beginwaarde constructieklasse S4 (+4 klassen)<br />

Ontwerplevensduur 100 jaar (+2 klassen)<br />

Betonsterkteklasse C30/37 (+0 klasse)<br />

Plaatgeometrie (indien de kleinste hoofdafmeting > 1,0 m) (-1 klasse)<br />

Totaal constructieklasse +5 klassen (S5)<br />

Toepassen constructieklasse S5 met een cmin;dur= 35 mm<br />

De betondekking is als volgt opgebouwd:<br />

cnom cmin<br />

c<br />

dev<br />

c ; c c<br />

c<br />

c<br />

; 10mm<br />

cmin max min, b min, dur dur,<br />

y dur,<br />

st dur,<br />

add<br />

cmin,b= staafdiameter of –bundel øk<br />

∆cdur,y= 0 mm (NB art. 4.4.1.2 (6))<br />

∆cdur,st= 0 mm (NB art. 4.4.1.2 (7))<br />

∆cdur,add= 0 mm (NB art. 4.4.1.2 (8))<br />

cmin= 35 mm<br />

neem cmin,b = 25 mm<br />

cdev= 5 mm (NEN-EN 1992-1-1/NB art. 4.4.1.3).<br />

cnom= 35 + 5= 40 mm<br />

Beton gestort tegen een voorbereide ondergrond (incl. schraalbeton) dient de nominale<br />

dekking tenminste k1= cmin,dur + 10 mm= 35 te bedragen. cnom= 40 mm. (1992-1-1<br />

art. 4.4.1.3(4).<br />

** Standaard wordt voor de landhoofden overal een dekking van ctoegepast= 50 mm<br />

toegepast. **<br />

Voor de scheurvormingstoets mogen de scheurwijdtes zijn berekend met de<br />

reductiefactor kx= ctoegepast / cnom ≤ 2 conform NEN-EN 1992-1-1/NB art 7.3.1.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 14 - 9 januari 2013


Bepaling nominale dekking prefab palen<br />

Uitgangspunten:<br />

Beginwaarde constructieklasse S4 (+4 klassen)<br />

Milieuklasse XC4: (+0 klasse)<br />

Betonsterkteklasse ≥C40/50 (-1 klasse)<br />

Geen plaatgeometrie (+0 klasse)<br />

Ontwerplevensduur 100 jaar (+2 klassen)<br />

Totaal constructieklasse +5 klassen (S5)<br />

Toepassen constructieklasse S5 met een cmin;dur= 35 mm<br />

De betondekking is als volgt opgebouwd:<br />

cnom cmin<br />

c<br />

dev<br />

c ; c c<br />

c<br />

c<br />

; 10mm<br />

cmin max min, b min, dur dur,<br />

y dur,<br />

st dur,<br />

add<br />

cmin,b= staafdiameter of –bundel øk<br />

∆cdur,y= 0 mm (NB art. 4.4.1.2 (6))<br />

∆cdur,st= 0 mm (NB art. 4.4.1.2 (7))<br />

∆cdur,add= 0 mm (NB art. 4.4.1.2 (8))<br />

cmin= 35 mm<br />

neem cmin,b = 20 mm<br />

cdev= 5 mm (NEN-EN 1992-1-1/NB art. 4.4.1.3).<br />

cnom= 35 + 5= 40 mm<br />

** De toegepaste dekking (ctoegepast) voor de prefab palen bedraagt 40 mm. **<br />

4.2 Betonstaal<br />

4.2.1 Materiaaleigenschappen<br />

De materiaaleigenschappen van het betonstaal volgens NEN 6008:2008 zijn<br />

samengevat in de onderstaande tabel. In deze tabel zijn tevens de rekenwaarden van<br />

de grootheden aangegeven.<br />

Tabel 4.4: Eigenschappen betonstaal.<br />

Staalsoort fy,k<br />

fy,d<br />

Es<br />

εu,k<br />

[N/mm2] [N/mm2] [N/mm2] [%]<br />

Staven en gerichte draden B 500 B 500 435 200.000 5,00<br />

Gepuntlaste wapeningsnetten B 500 B 500 435 200.000 5,00<br />

4.2.2 Partiële materiaalfactoren<br />

De te hanteren materiaalfactoren voor het bepalen van de rekenwaarde van de<br />

materiaalgrootheden zijn in onderstaande tabel vermeld.<br />

Tabel 4.5: Partiële materiaalfactor betonstaal<br />

Grootheid Symbool m<br />

[-]<br />

Trek- en druksterkte fs 1,15<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 15 - 9 januari 2013


5 BELASTINGEN EN BELASTINGCOMBINATIES<br />

5.1 Permanente belastingen<br />

5.1.1 Eigen gewicht liggers en druklaag<br />

In deze fase is uitgegaan van dekconstructie bestaande uit prefab volstortliggers met<br />

hoogte van 350 mm en een druklaag met een hoogte van 100 mm. De totale<br />

constructiehoogte bedraagt 450 mm.<br />

Het eigen gewicht van de liggers en druklaag bedraagt: 0,45 * 25= 11,25 kN/m 2 .<br />

De dekconstructie wordt momentvast verbonden aan de landhoofden, waardoor een<br />

integraalconstructie ontstaat.<br />

5.1.2 Rustende belasting<br />

Op brug 4 en 5 komt geen afwerkingslaag (geen asfalt of slijtlaag). Op brug 22 komt wel<br />

een slijtlaag.<br />

In verband met toekomstvastheid en omdat het niet uit te sluiten is dat in de loop der tijd<br />

toch wat grond op het dek blijft liggen, is uitgegaan van een rustende belasting door<br />

asfalt of grond met een dikte van 50 mm. Dit resulteert in een rustende belasting van<br />

0,05 * 23= 1,2 kN/m 2 .<br />

5.1.3 Eigen gewicht afwerking<br />

Voor de afwerking zijn de volgende belastingen in rekening gebracht:<br />

Leuning (incl. stalen randplaat): 1,00 kN/m 1 (aanname)<br />

Betonnen schampkant: 5,50 kN/m 1 (1,1 m 1 x 0,20 m 1 x 25,0 kN/m 3 )<br />

5.1.4 Grondbelasting<br />

Op de landhoofden werkt een permanente belasting door gronddrukken. Het gewicht<br />

van de grond (uitgangspunt is zand) bedraagt bij benadering 18 kN/m 3 droog en<br />

20 kN/m 3 nat. De omrekening naar een horizontale belasting gebeurt met het toepassen<br />

van de neutrale gronddrukcoëfficiënt (n = 1,0). Hierbij is rekening gehouden oplopende<br />

gronddruk als gevolg van fluctuerende temperaturen (zie ROK 1.0 pag. 195).<br />

De grondbelasting tegen het landhoofd is uitgewerkt in bijlage B3.<br />

De horizontale grondbelasting betreft een driehoeksbelasting van 4,5 – 55 kN/m 2 .<br />

De verticale grondbelasting bedraagt: 43,2 kN/m 2 .<br />

5.1.5 Krimp en kruip<br />

Aangenomen is, op basis van ervaringsgetallen, dat de krimp- en kruipbelasting een<br />

vervorming van het dek (voor volstortiggers) geeft van maximaal 0,50 mm/m dek.<br />

Uitgaande van een overspanning van (7,5 + 2*0,65/2= 8,15 m bedraagt de verkorting<br />

2,2 mm per zijde van het dek. Deze belasting is in het TS-model ingevoegd als een<br />

temperatuursbelasting. Bij een temperatuur van -50°C treedt een verkorting op van<br />

2,2 mm per zijde van het dek.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 16 - 9 januari 2013


5.1.6 Zettingen<br />

De prefab liggers worden verbonden aan de landhoofden (integraalconstructie). Het<br />

statisch systeem van het eigen gewicht van het dek is in het begin statisch bepaald. In<br />

de loop van de tijd zal dit statisch systeem (alleen eigen gewicht dek) als gevolg van<br />

kruip veranderen naar statisch onbepaald. In de berekeningen is met beide situaties<br />

rekening gehouden.<br />

Een integraalconstructie is gevoelig voor verschilzettingen tussen de landhoofden. De<br />

palen worden in de vaste zandlaag geplaatst. De verschilzettingen tussen de<br />

landhoofden zijn hierdoor verwaarloosbaar klein. Daarnaast is de invloed van mogelijke<br />

verschilzettingen tussen de twee landhoofden beschouwd (niet toegevoegd aan dit<br />

document). De effecten op de krachtsverdeling zijn beperkt. Om deze reden is het<br />

belastingsgeval zettingen niet meegenomen in de raamwerkberekening.<br />

5.2 Veranderlijke belastingen<br />

5.2.1 Belastingen op brugleuningen<br />

Alleen op brug 22 wordt een leuning aangebracht. Conform NEN-EN 1991-2 art. 4.8,<br />

volgen de waarden van de krachten die op het brugdek worden overgedragen door<br />

leuningen uit:<br />

Een lijnbelasting van 3 kN/m (zone a), die zowel een keer horizontaal als verticaal<br />

moet zijn beschouwd, als variabele belasting op de bovenzijde van de leuning;<br />

Er wordt geen rekening gehouden met een stootbelasting (buitengewone<br />

belastingen).<br />

5.2.2 Verkeersbelasting<br />

Voor de belastingen door wegverkeer worden de belastingen volgens de<br />

NEN-EN 1991-2 aangehouden.<br />

Rijstrookindeling<br />

Conform de NEN-EN 1991-2 art. 4.2 dient de brug te worden ingedeeld in theoretische<br />

rijstroken, met elke rijstrook een breedte van 3,0 m. De <strong>bruggen</strong> zijn maximaal 4,5 m<br />

breed. Om deze reden wordt één theoretische rijstrook aangehouden en een reststrook<br />

van 1,5 m.<br />

Belastingsmodel 1 (BM1)<br />

Dit belastingmodel is bedoeld voor de toetsing van globale en lokale belastingeffecten.<br />

Het bestaat uit twee deelsystemen:<br />

a) Tandemstelsel (TS): twee geconcentreerde aslasten, elk met een karakteristieke<br />

waarde van QQk;<br />

b) Gelijkmatig verdeelde belasting (UDL): qqk.<br />

In overleg met de opdrachtgever is voor de <strong>bruggen</strong> een intensiteit van<br />


In onderstaande tabel zijn de in rekening te brengen belastingen per rijstrook volgens<br />

BM1 samengevat.<br />

Rijbanen met minder dan 3 theoretische rijstroken:<br />

Tabel 5.1: Belastingen volgens BM1 m.b.t. rijbanen met minder dan 3 theoretische rijstroken<br />

Belastingssysteem met Gelijkmatig verdeelde belasting per oppervlakte<br />

tandemstelsel (TS)<br />

(UDL)<br />

Qi;k; belasting per as (kN) qi;k (kN/m 2 ) qr;k (kN/m 2 )<br />

Rijstrook i=1 αQ;1 * 300= 273 αq;1 * 9,0= 8,2 -<br />

Reststrook 0 - αq;r * 2,5= 1,75<br />

In de volgende figuur is het belastingsmodel BM1 grafisch weergegeven.<br />

Figuur 5.1: Belastingsmodel BM1<br />

Belastingsmodel 2 (BM2)<br />

Dit belastingmodel dient afzonderlijk te worden beschouwd en is alleen bedoeld voor de<br />

toetsing van lokale belastingeffecten. Het model bestaat uit een enkele aslast die op<br />

iedere willekeurige positie op de rijweg moet zijn toegepast. De grootte van de aslast is<br />

(QQa;k) met Q = Q;1 = 1 en Qa;k = 400 kN.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 18 - 9 januari 2013


Figuur 5.2 Belastingsmodel BM2<br />

Belastingsmodel 3 (BM3)<br />

Dit belastingsmodel mag alleen zijn toegepast indien dit in de projectspecificatie is<br />

voorgeschreven, dit is echter niet het geval. Om deze reden is belastingsmodel 3 niet<br />

van toepassing.<br />

Belastingsmodel 4 (BM4)<br />

Voor belastingsmodel 4 (mensenmenigte) dient een gelijkmatig verdeelde belasting<br />

gelijk aan 5 kN/m 2 in rekening te worden gebracht. Hierin is een vergrotingsfactor voor<br />

dynamische effecten bij inbegrepen.<br />

De belasting door mensenmenigte is echter niet maatgevend t.o.v. het<br />

belastingsmodel 1 (BM1).<br />

5.2.3 Belasting door remmen of aanzetten<br />

De rembelasting is beschreven in NEN-EN 1991-2 art. 4.4.1. De remkracht is afhankelijk<br />

van de totale lengte van de brug en wordt berekend met de onderstaande formule:<br />

Fl;b;k = 0,6 * αQ;1 * (2 Q1;k) + 0,10 * αq;1 * q1;k * wth;1 * L ≤ 800kN<br />

Fl;b;k= 0,6*2*300*0,91 + 0,10*9,0*3,0*(7,5+2*0,65+2*3,0)*0,91= 364 kN.<br />

Rembelasting t.b.v. TS-model (per m 2 ):<br />

Pl;b;k= 364 / ((7,5+2*0,65+2*3,0) * 5,0)= 5,0 kN/m 2 .<br />

De remkracht grijpt aan in de lengte-as van de meest maatgevende rijstrook en mag in<br />

de lengterichting als gelijkmatig verdeeld in rekening zijn gebracht.<br />

Conform NEN-EN 1991-2 art 4.9.2 dient voor het ontwerp en de berekening van de<br />

frontmuren van een landhoofd een remkracht in lengterichting in rekening te zijn<br />

gebracht, met een karakteristieke waarde gelijk aan 0,6Q;1Q1;k, die gelijktijdig aangrijpt<br />

met de aslast Q;1Q1;k van belastingmodel 1 en met de gronddruk van de aanvulling. Van<br />

de aanvulling behoort te zijn aangenomen dat deze niet gelijktijdig wordt belast.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 19 - 9 januari 2013


5.2.4 Mobiele belasting nabij landhoofden en grondkerende constructies<br />

5.2.5 Sneeuw<br />

Conform NEN-EN 1991-2 art. 4.9 dient er bij het ontwerp van landhoofden en<br />

vleugelwanden rekening te worden gehouden met mobiele belasting t.g.v. BM1, zie ook<br />

paragraaf 6.2.4.<br />

Sneeuwbelasting is voor de <strong>bruggen</strong> niet maatgevend en wordt derhalve niet verder<br />

gespecificeerd.<br />

5.2.6 Windbelasting<br />

Windbelasting is voor de <strong>bruggen</strong> niet maatgevend en wordt derhalve niet verder<br />

gespecificeerd.<br />

5.2.7 Temperatuur<br />

De temperatuurbelasting is bepaald conform NEN-EN 1991-1-5. Hierbij is gerekend met<br />

de volgende temperatuurcomponenten:<br />

gelijkmatige temperatuurcomponent;<br />

verticale niet-lineaire temperatuurverschilcomponent.<br />

Gelijkmatige temperatuurcomponent<br />

De gelijkmatige temperatuurcomponent is afhankelijk van de minimale en maximale<br />

luchttemperatuur (Tabel 5.2 van NEN-EN 1991-1-5):<br />

Minimum luchttemperatuur in de schaduw (Tmin) = -27,8°C<br />

Maximum luchttemperatuur in de schaduw (Tmax) = 31,2°C<br />

Hieruit volgen, conform figuur NB.1 – 6.1 uit de Nationale Bijlage, voor een betonnen<br />

brugdek (type 3) de volgende gelijkmatige temperatuurcomponenten:<br />

Minimale gelijkmatige temperatuurcomponent Te,min = -20°C<br />

Maximale gelijkmatige temperatuurcomponent Te,max = 33,2°C<br />

Volgens NEN-EN 1991-1-5 bijlage A dient uitgegaan te worden van een<br />

aanvangstemperatuur T0 van 10°C.<br />

Het maximum bereik van de gelijkmatige temperatuurcomponenten van de brug bij een<br />

verkorting (∆TN;con) en een verlenging (∆TN;exp) is:<br />

∆TN;con = T0 - Te,min = 29,8°C + 23,2°C = +52,9°C i.v.m. integraalconstructie dienen<br />

opwarming en afkoeling te worden gesuperponeerd (opspaneffect).<br />

∆TN;exp = Te,max - T0 = 23,2°C<br />

Het totale bereik van de gelijkmatige temperatuurcomponent van de brug is:<br />

∆TN;con = Te,max - Te,min= 52,9°C.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 20 - 9 januari 2013


Verticale temperatuurcomponent (temperatuurgradiënt)<br />

De verticale temperatuurcompoment is bepaald volgens benadering 2 conform<br />

NEN-EN 1991-1-5+C1:2011/NB:2011 art. 6.1.4.2. Onderstaand is de verticale<br />

temperatuurcomponent weergegeven:<br />

5.3 Buitengewone belastingen<br />

5.3.1 Aanrijdingsbelastingen op stootranden<br />

Er is rekening gehouden met een aanrijdbelasting tegen de vleugelwanden of<br />

schampkanten van 100 kN, die aangrijpt op een hoogte van 0,05 m onder de bovenrand<br />

van de stootrand.<br />

5.4 Belastingcombinaties<br />

In deze paragraaf worden de basis uitgangspunten voor het maken van<br />

belastingcombinaties uitgelegd.<br />

5.4.1 Grenstoestanden<br />

Er moet onderscheid zijn gemaakt tussen uiterste grenstoestanden en<br />

bruikbaarheidsgrenstoestanden.<br />

Uiterste grenstoestanden<br />

Bij de toetsing dient uitgegaan te worden van de volgende grenstoestanden:<br />

STR Intern bezwijken of buitensporige vervorming van de constructie of constructieve<br />

elementen. Hierbij moet de volgende toets worden uitgevoerd: Ed ≤ Rd;<br />

GEO Bezwijken of buitensporige vervorming van de grond, waarbij de sterktes van<br />

grond bepalend zijn voor de te leveren weerstand.<br />

Bruikbaarheidsgrenstoestanden<br />

Deze grenstoestanden hebben betrekking op het functioneren van de constructie onder<br />

normaal gebruik, het comfort van mensen en het uiterlijk van de bouwwerken.<br />

De toetsing behoort te zijn gebaseerd op maatstaven die betrekking hebben op:<br />

a. Vervormingen;<br />

b. Trillingen;<br />

c. Schade die waarschijnlijk nadelig uitwerkt op uiterlijk, duurzaamheid of het<br />

functioneren van de constructie.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 21 - 9 januari 2013


5.4.2 Belastingcombinaties uiterste grenstoestanden<br />

Blijvende of tijdelijke ontwerpsituaties (fundamentele combinaties)<br />

Voor STR en GEO grenstoestanden geldt als combinatie de minst gunstige van de twee<br />

volgende combinaties:<br />

(6.10a)<br />

<br />

<br />

Ed E<br />

G,<br />

j Gk<br />

, j P P Q,<br />

1 <br />

0,<br />

1 Qk<br />

, 1 <br />

Q,<br />

i <br />

0,<br />

i Qk<br />

, i <br />

j1<br />

i1<br />

<br />

(6.10b)<br />

<br />

<br />

Ed E<br />

j <br />

G,<br />

j Gk<br />

, j P P Q,<br />

1 Qk<br />

, 1 <br />

Q,<br />

i <br />

0,<br />

i Qk<br />

, i <br />

j1<br />

i1<br />

<br />

Belastingsfactor voor permanente belastingen;<br />

G, j<br />

j<br />

Reductiefactor voor ongunstige blijvende belastingen G. ξ = 0,80<br />

volgens NEN-EN 1990:2011 NB12;<br />

Gk,j<br />

Belastingsgeval van de som van de representatieve waarden van de<br />

permanente belastingen;<br />

Q, i<br />

Belastingsfactor voor veranderlijke belastingen;<br />

Qk;1<br />

Belastingsgeval voor een representatieve waarden van de<br />

overheersende veranderlijke belasting (ranggetal 1);<br />

Qk;i<br />

Belastingsgeval voor een representatieve waarden van de andere<br />

veranderlijke belasting met ranggetal i;<br />

Combinatiefactor voor de veranderlijke belastingen.<br />

ψi<br />

Buitengewone ontwerpsituaties<br />

Voor de buitengewone ontwerpsituatie geldt als combinatie:<br />

<br />

<br />

(6.11) Ed E<br />

Gk<br />

, j P Ad<br />

<br />

1,<br />

1 Qk<br />

, 1 <br />

2,<br />

i Qk<br />

, i <br />

j1<br />

i1<br />

<br />

Ad Is de representatieve waarde van de buitengewone belasting.<br />

5.4.3 Belastingcombinaties bruikbaarheidsgrenstoestanden<br />

Karakteristieke combinatie<br />

De karakteristieke combinatie wordt normaliter gebruikt voor onomkeerbare<br />

grenstoestanden. Hiervoor geldt de volgende combinatie:<br />

<br />

<br />

(6.14) Ed E<br />

Gk<br />

, j P Qk<br />

, 1 <br />

0,<br />

i Qk<br />

, i <br />

j1<br />

i1<br />

<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 22 - 9 januari 2013


Frequente combinatie<br />

De frequente combinatie wordt normaliter gebruikt voor omkeerbare grenstoestanden,<br />

zoals trillingen en vervormingen. Daarnaast wordt de frequente combinatie ook gebruikt<br />

voor de toetsing van scheurvorming voor gewapende en voorgespannen elementen met<br />

voorspanning met en zonder aanhechting (NEN-EN 1992-1-1/NB tabel 7.1N) en voor de<br />

controle van vermoeiing van de niet-wisselende belastingen (NEN-EN 1992-1-1<br />

art 6.83).<br />

Hiervoor geldt de volgende combinatie:<br />

<br />

n<br />

(6.15) Ed<br />

E<br />

Gk<br />

, j P <br />

1,<br />

1 Qk<br />

, 1 <br />

2<br />

j1<br />

i1<br />

Quasi-blijvende combinatie<br />

De quasi-blijvende combinatie wordt normaliter gebruikt voor de langetermijneffecten en<br />

voor het uiterlijk van de constructie, bijvoorbeeld vervorming door blijvende belasting<br />

(bepaling zeeg), krimp en kruip NEN-EN 1992-1-1 art. 2.3.2.2(3) en scheurvorming in de<br />

uitvoeringsfase (NEN-EN 1992-2 art. (104)). Hiervoor geldt de volgende combinatie:<br />

n<br />

<br />

<br />

(6.16) Ed<br />

EGk<br />

, j P <br />

2,<br />

i Qk<br />

, i <br />

<br />

i1<br />

<br />

In het overzicht van de belastingcombinaties in bijlage C zijn de belastings- en<br />

combinatiefactoren verwerkt.<br />

5.4.4 Belastingcombinaties en –factoren voor geotechnische controles<br />

Volgens de NEN 9997-1 art. 2.4.7.3.4.1 moet voor alle geotechnische berekeningen<br />

ontwerpbenadering 3 zijn toegepast.<br />

Volgens NEN 9997-1 bijlage A.3.1 geldt dat voor een geotechnische belasting op een<br />

geotechnische constructie zijnde een fundering, de partiële factoren volgens tabel A.3<br />

kolom A1 moeten zijn toegepast. Dit komt overeen met de partiële factoren conform<br />

tabel NB.13 en NB.14 van NEN-EN 1990.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 23 - 9 januari 2013<br />

, i<br />

Q<br />

k , i


6 AANPAK BEREKENINGEN<br />

In dit hoofdstuk is een beschrijving gegeven van de wijze waarop de berekeningen zijn<br />

uitgevoerd en welke uitgangspunten daarbij zijn aangehouden.<br />

6.1 Ontwerp dekconstructie<br />

De brugdekken worden momentvast verbonden aan de landhoofden<br />

(integraalconstructie). Hierdoor zijn geen oplegblokken benodigd.<br />

Het constructief ontwerp van het dek ligt bij de leverancier van de prefab liggers. Wel is<br />

in deze ontwerpnota de steunpuntswapening bepaald. Ook de lengte van de<br />

steunpuntswapening is bepaald, rekening houdend met de verankering en de lengte<br />

voor de overlappingslassen. Voor de steunpuntswapening is uitgegaan van een<br />

dekconstructie met een constructieve hoogte van 450 mm (prefab liggers h= 350 mm +<br />

een druklaag van 100 mm).<br />

Voor het ontwerp van het dek en de landhoofden is één model gemaakt. Voor een<br />

verdere omschrijving van het ontwerp zie paragraaf 6.2.<br />

6.2 Standaard model: ontwerp landhoofden op palen<br />

Brug 4, 5 en 22 zijn niet geheel identiek aan elkaar. De overspanningen van brug 4 en 5<br />

zijn gelijk, namelijk 7,5 m tussen de landhoofden. De overspanning van brug 22 is<br />

kleiner, namelijk 6,0 m tussen de landhoofden. Daarnaast heeft brug 4 een kleiner<br />

Profiel van Vrije ruimte tussen de brug en de waterlijn dan brug 5 en 22. Toch is voor de<br />

drie <strong>bruggen</strong> 4, 5 en 22 één berekening gemaakt. Vervolgens is nog wel gekeken of<br />

voor brug 22 en brug 4 optimalisaties mogelijk zijn.<br />

In de volgende paragrafen is eerst de volledige berekening van de landhoofden voor<br />

brug 4, 5 en 22 beschreven. Daarna volgt een beschrijving van welke optimalisaties zijn<br />

beschouwd.<br />

De berekening van het landhoofd is weergegeven in bijlage B2 t/m B8.<br />

6.2.1 Geometrie en statisch systeem<br />

Voor brug 4, 5 en 22 is dus één standaard berekening gemaakt. In de onderstaande<br />

figuren is de geometrie van de landhoofden weergegeven.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 24 - 9 januari 2013


Figuur 6-1: Geometrie landhoofd inclusief vleugelwanden t.b.v. standaard berekening<br />

Figuur 6-2: Bovenaanzicht landhoofd t.b.v. standaard berekening<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 25 - 9 januari 2013


Het dek is momentvast verbonden aan de landhoofden. Om deze reden is een model<br />

gemaakt van de totale constructie (twee landhoofden en het dek). Onderstaand is het<br />

statisch systeem weergegeven.<br />

Figuur 6-3: Statisch systeem landhoofden + dek t.b.v. standaard berekening<br />

Voor het dek is een gescheurde E-modules aangehouden van Egem= 9465 N/mm 2 . Dit<br />

levert maximale steunpuntsmomenten in het dek op (niet het maximale veldmoment). In<br />

principe zal alleen de druklaag t.p.v. de steunpuntswapening scheuren, de<br />

voorgespannen prefab liggers zijn ongescheurd. Om deze reden is dit een conservatief<br />

uitgangspunt.<br />

Het betreft een model per stekkende meter. Om deze reden is een fictieve breedte voor<br />

de palen ingevoerd. Het landhoofd is 5,0 m breed en heeft 2 rijen van 3 palen. De<br />

fictieve paalbreedte bedraagt: 3 / 5 * 400= 240 mm.<br />

De palen zijn schoor 10:1 geplaatst omdat dit gunstig is voor eventuele paalzettingen.<br />

Voor de palen is als verticale veerstijfheid is Kv,laag= 25.000 kN/m op het paalpuntniveau<br />

aangehouden. Dit levert de maximale paalkopmomenten. Een hoge verticale<br />

veerstijfheid (Kv,hoog) levert iets hogere verticale paalbelastingen van ca. ΔFEd= 8,0 kN =<br />

4% toename op. De palen hebben voldoende capaciteit om deze extra belastingen op te<br />

kunnen nemen. Om deze reden is een berekening met een hoge verticale veerstijfheid<br />

niet toegevoegd.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 26 - 9 januari 2013


De palen onder de landhoofden hebben naast een verticale veerstijfheid ook een<br />

horizontale bedding. Voor de horizontale beddingen geldt dat de palen in elkaars<br />

invloedsgebied staan. Om deze reden dienen de voorste palen een capaciteit van 95%<br />

van een enkele paal te hebben en de achterste paal 76% van een enkele paal. Ter<br />

vereenvoudiging van het model is voor alle palen een capaciteit van 76% van een<br />

enkele paal aangehouden. Onderstaand zijn de horizontale beddingen weergegeven.<br />

NAP -4,25 m – NAP -14,0 0,76*1800= 1350 kN/m 3 ;<br />

NAP -14,0 m – NAP -18,0 0,76*2100= 1600 kN/m 3 ;<br />

NAP -18,0 m – NAP -23,0 0,76*40.000= 30.400 kN/m 3 ;<br />

Tegen het landhoofd is een bedding aangehouden van 1600 kN/m 3 .<br />

6.2.2 Belastingen en belastingcombinaties<br />

In hoofdstuk 5 en bijlage B3 zijn de belastingen en de regels voor de<br />

belastingcombinaties uitgeschreven. In het raamwerkmodel (basismodel) zijn de<br />

volgende belastingen beschouwd:<br />

Eigen gewicht (van de totale constructie);<br />

Permanente belasting (grond of asfalt);<br />

Grondbelasting (tegen het landhoofd, zowel horizontaal als verticaal);<br />

Kruip (door wijziging statisch systeem eigen gewicht dekconstructie);<br />

Krimp en kruip;<br />

Verkeersbelasting, gelijkmatig verdeeld (UDL);<br />

Verkeersbelasting, tandemstelsel (TS) t.p.v. midden dek (M);<br />

Verkeersbelasting, tandemstelsel (TS) t.p.v. landhoofd (V);<br />

Verkeersbelasting, rembelasting;<br />

Temperatuur, gelijkmatige temperatuurcomponent (zowel verlenging als verkorting);<br />

Temperatuur, gradiënt (zowel opwarming als afkoeling);<br />

Windbelasting is niet significant en daarom niet meegenomen.<br />

Het eigen gewicht van het dek zal in het begin statisch bepaald op de landhoofden<br />

rusten. Door tijdsafhankelijke kruip verandert dit naar statisch onbepaald. Om deze<br />

reden is het eigen gewicht zowel statisch bepaald als statisch onbepaald beschouwd.<br />

De toename van de krachten t.g.v. het wijzigen van het statisch systeem, door kruip van<br />

het eigen gewicht van het dek, zijn apart bij de resultaten uit het raamwerkmodel<br />

opgeteld (zie bijlage B4).<br />

Uit het raamwerkmodel volgt dat de krachten ten gevolge van temperatuur en<br />

krimp & kruip zeer klein zijn. Daarnaast geldt voor de temperatuursbelasting ψ0= ψ2=<br />

0,3, waardoor het aandeel temperatuursbelasting in de combinaties nog kleiner wordt.<br />

Om deze reden is temperatuur niet meegenomen in de fundamentele<br />

belastingcombinaties (niet significant). In de frequente belastingcombinaties is de<br />

temperatuursbelasting wel meegenomen, omdat dit een kleine invloed heeft op de<br />

scheurvorming. Krimp en kruip zijn niet meegenomen in de belastingcombinaties in het<br />

raamwerkmodel, maar achteraf en indien krimp en kruip van invloed is, m.b.v. een<br />

Excelsheet opgeteld bij de resultaten uit het raamwerkmodel.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 27 - 9 januari 2013


In de onderstaande tabellen zijn de beschouwde fundamentele (STR) en frequente<br />

(FREQ) belastingcombinaties weergegeven.<br />

Belastingen FC1 FC2 FC3 FC4 FC5 FC6 FC7 FC8 FC9 FC10 FC11 FC12 FC13<br />

EG 1,20 1,10 1,10 1,10 1,10 1,20 1,20 0,90 0,90 0,90 0,90 0,90 0,90<br />

Permanent 1,20 1,10 1,10 1,10 1,10 1,20 1,20 1,10 1,10 1,10 1,10 1,20 1,20<br />

Grondbelasting 1,20 1,10 1,10 1,10 1,10 1,20 1,20 1,10 1,10 1,10 1,10 1,20 1,20<br />

BM1 – UDL - 1,20 1,20 0,96 0,96 0,96 0,96 1,20 1,20 0,96 0,96 0,96 0,96<br />

BM1 – TS (M) - 1,20 - 0,96 - 0,96 - 1,20 - 0,96 - 0,96 -<br />

BM1 – TS (V) - - 1,20 - 0,96 - 0,96 - 1,20 - 0,96 - 0,96<br />

BM1 – remmen - 0,96 0,96 1,20 1,20 0,96 0,96 0,96 0,96 1,20 1,20 0,96 0,96<br />

Belastingen Freq1 Freq 2 Freq 3 Freq4 Freq5 Freq6 Freq7 Freq8 Freq9 Freq10 Freq11 Freq12<br />

EG 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0<br />

Permanent 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0<br />

Grondbelasting 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0 1,0<br />

BM1 – UDL 0,8 0,8 0,8 0,8 0,8 0,8 0,8 0,8 0,8 0,8 0,8 0,8<br />

BM1 – TS (M) 0,8 - 0,8 - 0,8 0,8 - - 0,8 0,8 - -<br />

BM1 – TS (V) - 0,8 - 0,8 - - 0,8 0,8 - - 0,8 0,8<br />

BM1 –<br />

remmen<br />

Temperatuur<br />

gelijkmatig<br />

verlenging<br />

Temperatuur<br />

Gradient<br />

Opwarming<br />

Temperatuur<br />

Gradient<br />

Afkoeling<br />

0,8 0,8 - - 0,8 0,8 0,8 0,8 - - - -<br />

- - - - 0,3 0,3 0,3 0,3 0,3 0,3 0,3 0,3<br />

- - - - 0,3 - 0,3 - 0,3 - 0,3 -<br />

- - - - - 0,3 - 0,3 - 0,3 - 0,3<br />

In bijlage B4 is het raamwerkmodel weergegeven. Om te controleren of de belastingen<br />

goed zijn ingevoerd is per belastinggeval een controle uitgevoerd op de totale<br />

reactiekrachten. Hieruit volgt dat alle belastinggevallen een afwijking hebben die kleiner<br />

is dan 3%. Dit ligt binnen de nauwkeurigheid van de ontwerpmethodiek.<br />

6.2.3 Krachtsverdeling haaks op de wegas<br />

Om de krachten in langsrichting van het landhoofd te bepalen is een nieuw model<br />

opgesteld. Hiervoor is een fictieve betondoorsnede van bxh= 1000x650 mm<br />

aangehouden. Als belasting is het eigen gewicht, permanente belasting, grondbelasting<br />

en de verkeersbelastingen UDL en TS aangehouden. De belasting door het<br />

tandemstelsel (TS) wordt over 4,25 m gespreid, dit is bijna gelijk aan de dekbreedte.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 28 - 9 januari 2013


6.2.4 Vleugelwanden<br />

De vleugelwanden zijn relatief groot. Om deze reden zijn de vleugelwanden apart<br />

beschouwd in een Scia-plaatmodel. De berekening van de vleugelwanden is<br />

weergegeven in bijlage B8.<br />

Als permanente belastingen tegen de vleugelwanden is rekening gehouden met<br />

horizontale gronddruk. Hierbij is voor de neutrale gronddruk λn= 1,0 aangehouden i.v.m.<br />

het opspaneffect van de vleugelwanden en eventuele zettingen. De grondwaterstand is<br />

tot aan het maaiveld aangehouden. Vanaf het maaiveld tot het hart van de vloer varieert<br />

de horizontale permanente belasting van 0 – 54 kN/m 2 .<br />

Verder is rekening gehouden met de veranderlijke belastingen door het tandemstelsel.<br />

Hierbij wordt één vleugelwand belast door twee wielen van het tandemstelsel. Voor de<br />

neutrale gronddruk is λn= 0,5 aangehouden. De belasting door het tandemstelsel spreidt<br />

in de grond. Uiteindelijk is een horizontale belasting 30 kN/m 2 tegen<br />

het driehoekig deel van de vleugelwand (A= 4,73 m 2 ) geplaatst, zie onderstaande<br />

afbeelding.<br />

Figuur 6-4: Overzicht in rekening gebrachte oppervlakte t.b.v. horizontale belasting door het<br />

tandemstelsel<br />

Voor de vleugelwanden is in de bijlage B8 de buigwapening en dwarskrachtwapening<br />

bepaald.<br />

6.2.5 Stootplaten<br />

Voor de geometrie van de stootplaten zie paragraaf 3.4.3. De stootplaten zijn bepaald<br />

conform de NBD00750. De wapening in de stootplaten is bepaald conform de<br />

NEN-EN 1992-1-1.<br />

De stootplaten worden opgelegd op een console. Deze console dient verbonden te<br />

worden met de landhoofden. De console is niet uitgewerkt in deze ontwerpnota en dient<br />

in een latere fase te worden uitgewerkt.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 29 - 9 januari 2013


6.3 Optimalisaties brug 4<br />

In bijlage C zijn de optimalisaties voor brug 4 beschouwd. Hierbij is een nieuw<br />

raamwerkmodel opgesteld, met daarbij de werkelijke afmetingen van het landhoofd van<br />

brug 4 (Profiel van Vrije ruimte onder de brug is 600 mm kleiner bij brug 4 dan bij<br />

brug 5).<br />

Uit de beschouwing volgt dat de krachten maar beperkt afnemen (het<br />

steunpuntsmoment maximaal 8%) en sommige krachten zoals het paalkopmoment zelfs<br />

toeneemt als gevolg van minder bedding tegen een kleiner landhoofd. De<br />

paalkopwapening heeft voldoende reservecapaciteit om deze extra belasting op te<br />

kunnen nemen. Geadviseerd wordt om geen optimalisaties t.o.v. het “standaardmodel”<br />

(paragraaf 6.2).<br />

6.4 Optimalisaties brug 22<br />

In bijlage D zijn de optimalisaties voor brug 22 beschouwd. Ook voor brug 22 is een<br />

nieuw raamwerkmodel opgesteld, met daarbij de kortere overspanning t.o.v. brug 4 en 5<br />

(6,0 m tussen de landhoofden i.p.v. 7,5 m).<br />

Uit de beschouwing volgt dat de steunpuntswapening t.b.v. het dek geoptimaliseerd kan<br />

worden. In het standaard model is als steunpuntswapening Ø20-150 + Ø20-300<br />

toegepast. Voor brug 22 kan als steunpuntswapening Ø16-150 + Ø20-300 worden<br />

toegepast.<br />

Verder blijkt dat de paalkopmomenten zijn afgenomen. In het standaard model wordt<br />

12Ø20 toegepast als paalkopwapening. Dit kan echter niet gereduceerd worden naar<br />

12Ø16. Tussenliggende combinaties van Ø20 en Ø16 zijn mogelijk, echter is de<br />

besparing beperkt. Om deze reden wordt geadviseerd om de paalkopwapening niet te<br />

wijzigen t.o.v. brug 4 en 5.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 30 - 9 januari 2013


7 RESULTAAT BEREKENINGEN<br />

7.1 Landhoofden<br />

Algemene eigenschappen:<br />

Betonsterkteklasse C30/37<br />

Dekking 50 mm<br />

Milieuklasse XC4, XF3 en XA2<br />

Wapening landhoofden<br />

De wapening voor de landhoofden is bepaald met behulp van Excel spreadsheets. Voor<br />

de langswapening is uitgegaan van 0,67% van de effectieve betondoorsnede. Voor de<br />

effectieve zone is een breedte van 300 mm aangehouden langs de omtrek van het<br />

landhoofd. Met deze langswapening kunnen ook de krachten uit het langsmodel worden<br />

opgenomen.<br />

In het onderstaand figuur is de wapening voor de landhoofden weergegeven. Hierin is<br />

ook de steunpuntswapening voor het dek weergegeven.<br />

Figuur 7-1: Overzicht wapening landhoofden<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 31 - 9 januari 2013


7.2 Vleugelwanden<br />

De wapening voor de vleugelwanden is bepaald met behulp van Excel spreadsheets. In<br />

het onderstaand figuur is de wapening voor de vleugelwanden weergegeven.<br />

Figuur 7-2: Overzicht wapening vleugelwanden<br />

Voor de vleugelwanden is dwarskrachtwapening benodigd, zowel verticaal als<br />

horizontaal. In het onderstaande figuur is de dwarskrachtwapening weergegeven.<br />

Figuur 7-3: Zijaanzicht dwarskrachtwapening vleugelwanden<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 32 - 9 januari 2013


7.3 Stootplaten<br />

Algemene eigenschappen:<br />

Betonsterkteklasse C30/37<br />

Dekking 40 mm<br />

Afmetingen stootplaten brug 4 en 5: lxbxh= 5000x1000x350 mm<br />

Afmetingen stootplaten brug 22: lxbxh= 3000x1000x250 mm<br />

7.4 Wapeningshoeveelheden<br />

De wapeningshoeveelheid van de landhoofden bedraagt 130 kg/m³.<br />

De wapeningshoeveelheid van de vleugelwanden bedraagt 200 kg/m³.<br />

De wapeningshoeveelheid van de stootplaten L= 5,0 m bedraagt 220 kg/m³.<br />

De wapeningshoeveelheid van de stootplaten L= 3,0 m bedraagt 240 kg/m³.<br />

De (wapenings)hoeveelheden van het dek zijn niet beschouwd.<br />

De wapeningshoeveelheden zijn inclusief 15% knip- en lasverliezen en excl. hulpstaal.<br />

7.5 Paalkopwapening en toetsing draagvermogen<br />

Per landhoofd worden twee rijen van 3 prefab palen vierkant 400 toegepast. De palen<br />

worden schoor 10:1 geplaatst. Het paalpuntniveau bedraagt NAP – 23,0 m.<br />

Betonkwaliteit 45/55 en milieuklasse XC4 en XA3 dient te worden aangehouden. De<br />

betondekking bedraagt 40 mm.<br />

Als paalkopwapening dient 12Ø20te worden toegepast. De palen dienen te worden<br />

gesneld en de paalkopwapening dient minimaal 500 mm te zijn verankerd in het<br />

landhoofd. De totale lengte van de paalkopwapening in de prefab palen bedraagt 3,0 m.<br />

De maximale paalbelasting bedraagt 417 kN/m * 5/3= 695 kN/paal.<br />

Het draagvermogen van deze palen bedraagt 771 kN/paal.<br />

Unity check: 0,90 < 1,0 akkoord.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 33 - 9 januari 2013


8 GEOTECHNIEK<br />

Ten behoeve van de nieuwe <strong>bruggen</strong> te Delfgauw zijn geotechnische berekeningen<br />

uitgevoerd om de fundering te bepalen en om zettingen in te schatten van de toeritten.<br />

Tevens is rekening gehouden met de fasering van de uitvoering in verband met de te<br />

verwachten zettingen. Er zijn drie landbouw<strong>bruggen</strong> beschouwd. Bij brug 4 en 5 wordt<br />

de watergang deels verlegd en dient een deel van de bestaande watergang te worden<br />

aangevuld. Hierdoor ontstaat een grotere aanvulling in het bestaande talud waardoor<br />

grotere zettingen zullen ontstaan. Brug 22 wordt in het “vrije veld” gebouwd. Voor het<br />

ontwerp van de <strong>bruggen</strong> wordt verwezen naar tekening 2641-002 van d.d. 12-12-2012.<br />

In figuur 8-1 is een algemene dwarsdoorsnede weergegeven van brug 5.<br />

Figuur 8-1: Dwarsdoorsnede brug 5<br />

8.1 Grondonderzoek en bodemopbouw<br />

Ten behoeve van het project is een grondonderzoek uitgevoerd dat mede voor de<br />

volgende berekeningen is gebruikt. Het grondonderzoek is uitgevoerd door Mos<br />

Grondmechanica in juni 2012 met referentie R1200730-RH_1. Aanvullend is een<br />

archiefsondering gebruikt, S017B ten behoeve van de fundering voor brug 5. Deze<br />

bevindt zich op de locatie van de te realiseren brug.<br />

Naar aanleiding van het grondonderzoek zijn de volgende algemene uitgangspunten<br />

gehanteerd:<br />

Gebruikte sonderingen:<br />

Brug 4: S2, SW3, zand op NAP -16,0 m resp. NAP -17,5 m;<br />

Brug 5: SW4 en S017B, zand op ca. NAP -18,0 m;<br />

Brug 22: S10 en S11, zand op NAP -18,0 m resp. NAP -18,5 m;<br />

Maatgevend grondprofiel t.b.v. zettingsbepaling is SW3;<br />

De grondwaterstand en tevens waterpeil wordt beheerst op NAP -3,02 m;<br />

Het bestaande maaiveld bevindt zich op ca. NAP -2,2 m;<br />

De waterbodem van de bestaande watergangen bevindt zich op ca. NAP -4,05 m.<br />

Globaal is de bodemopbouw overwegend kleiig met diverse veenlagen. Het niveau van<br />

de vaste zandlaag varieert tussen de NAP -16,0 m en -18,0 m.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 34 - 9 januari 2013


8.2 Uitgangspunten fasering<br />

Om tot een juist ontwerp te komen voor de landbouw<strong>bruggen</strong> in verband met de<br />

geotechnische randvoorwaarden (o.a. restzetting ca. 0,1 m) is een goede fasering<br />

tijdens de uitvoering noodzakelijk. De ondergrond is sterk samendrukbaar en daar dient<br />

rekening mee gehouden te worden tijdens de uitvoering. Er is rekening gehouden met<br />

de volgende uitgangspunten:<br />

De bestaande watergang kan tijdelijk worden gedempt met een duiker (min. Ø600);<br />

Maximale voorbelasttijd 1 jaar;<br />

Toepassen van verticale drains is toegestaan;<br />

Toepassen van licht ophoogmateriaal (bims) is toegestaan.<br />

Met de bovenstaande uitgangspunten rekening houdend is het mogelijk om de zettingen<br />

vooraf aan de werkzaamheden grotendeels te laten optreden door het toepassen van<br />

een voorbelasting bestaande uit zand. Door het toepassen van verticale drains wordt de<br />

consolidatiesnelheid van de bodem verhoogd waarmee het zandpakket t.b.v. de<br />

voorbelasting beperkt kan blijven. Dit is tevens veiliger voor de stabiliteit van het<br />

grondlichaam. De volgende fasering wordt voorzien:<br />

Deels aanbrengen voorbelasting in de bestaande watergang;<br />

Aanbrengen tijdelijke duiker (min. Ø600), deze dient zettingsbestendig te zijn<br />

(bijvoorbeeld Spirosol);<br />

Gefaseerd aanbrengen voorbelasting van zand in lagen van ca. 1,0 m;<br />

Zodra het zandlichaam veilig te betreden is, aanbrengen verticale drainage tot<br />

NAP -9,0 m;<br />

Aanbrengen rest van de voorbelasting;<br />

Voorbelasting laten rusten, ca. 3 tot 8 maanden (afhankelijk van zakbaakmetingen);<br />

Aanbrengen omdamming bouwputten (van gebiedseigen grond) en aanbrengen<br />

(open) bemaling;<br />

Ontgraven bouwputten t.b.v. landhoofden;<br />

Aanbrengen constructieve onderdelen landhoofden (fundering + betonwerk);<br />

Aanvullen met licht ophoogmateriaal (bims);<br />

Afwerken bovenbouw brug.<br />

Het is belangrijk dat de aannemer een bemaling aanbrengt ter plaatse van de<br />

voormalige voorbelastingen. Een open bemaling is voldoende voor deze functie.<br />

Hierdoor wordt het water onttrokken uit de verticale drains waardoor de bodem niet of<br />

slechts beperkt wordt herbelast bij plaatsing van de bims. Bij het aanbrengen van de<br />

bims zullen de zettingen als gevolg van het eventueel herbelasten van de ondergrond<br />

beperkt blijven. Het is hiervoor belangrijk dat de verticale drainage zoveel mogelijk intact<br />

blijft.<br />

8.3 Zettingen<br />

Om de aansluiting op het bestaande maaiveld te realiseren worden de toeritten<br />

aangevuld met bims tot de landhoofden. Om een goede inschatting te maken van de te<br />

verwachten zettingen en om beheersmaatregelen te nemen tegen ongelijkmatige<br />

zettingen zijn berekeningen uitgevoerd. De basis van de berekeningen is gebaseerd op<br />

de zettingsberekeningen die eerder zijn uitgevoerd voor de ophoging van de<br />

bergboezem Zuidpolder. Hiervan is een notitie opgesteld met referentie<br />

9R6945.A21/N0002/902893/MJANS/Nijm van d.d. 5 mei 2011 (bijlage C van de<br />

rapportage Bergboezem Zuidpolder).<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 35 - 9 januari 2013


Uitgangspunten<br />

Bij het bepalen van de zettingen zijn de volgende uitgangspunten gehanteerd:<br />

Parameters volgens notitie 9R6945.A21/N0002/902893/MJANS/Nijm van d.d.<br />

5 mei 2011;<br />

Grondopbouw volgens maatgevende sondering SW3;<br />

Maximale netto ophoging vanaf onderkant bestaand talud bedraagt ca. 3,0 m;<br />

Bestaande watergangbodem op ca. NAP -4,05 m;<br />

Bestaand maaiveld op ca. NAP -2,2 m;<br />

Grondwaterstandstand NAP -3,02 m;<br />

Toepassen van verticale drains:<br />

Driehoeksverband, hart op hart afstand 1,5 m;<br />

Diepte tot NAP -9,0 m;<br />

Oppervlakte ten minste de grootte van de voorbelasting, definitief vast te stellen<br />

tijdens opstellen UO ten behoeve van optimalisatie;<br />

Definitieve aanvulling met licht ophoogmateriaal, bims: 12 kN/m 3 ;<br />

Maximale restzetting 0,1 m;<br />

Berekening met behulp van D-Settlement versie 9.2 build 1.2.<br />

Resultaat<br />

In de onderstaande tabel 1 is een samenvatting van de ophogingen met resulterende<br />

zettingen weergegeven. Daarnaast zijn de benodigde voorbelastingen aangegeven met<br />

de tijden. De volledige berekeningsuitvoer van D-Settlement is terug te vinden in<br />

bijlage E2.<br />

Tabel 8.1: Samenvatting resultaten zettingsberekeningen<br />

Brug Bruto ophoging<br />

Verwachte zetting Hoogte voorbelasting (zand) Tijdsduur voorbelasting<br />

[m]<br />

[m]<br />

[m]<br />

[dagen]<br />

22 2,0 (bims) 1,11 2,5 90<br />

4, 5 3,0 (2,2 bims + 0,8 zand) 1,41 3,85 90<br />

Bij brug 22 wordt enkel het maaiveld belast met een ophoging van ca. 0,6 m. Door de<br />

zetting wordt de werkelijk benodigde ophoging van bims groter dan de netto ophoging.<br />

Als gevolg van de netto ophoging wordt een zetting verwacht van ca. 0,5 m. Deze extra<br />

ophoging dient te worden opgevuld. Er is uitgegaan dat het zand van de voorbelasting<br />

bij brug 22 volledig wordt ontgraven en opgevuld met bims. Dit is noodzakelijk voor het<br />

maken van de bouwput voor de landhoofden. Hierdoor volgt een zetting van ca. 1,11 m<br />

waardoor een totaal pakket van bims nodig is van 2,0 hoogte op het dikste punt van de<br />

toerit waar zettingen kunnen optreden.<br />

Bij brug 4 en 5 komt de grootste zetting op het diepste punt van het talud waardoor het<br />

niet meer praktisch is om het volledige zandpakket te verwijderen. Hierbij is rekening<br />

gehouden dat het zand deels achterblijft in de grond waarop met bims de rest kan<br />

worden aangevuld vanaf de bodem van de werkvloer van het landhoofd. Ook hier geldt<br />

dat de totaal aan te brengen ophoging groter is dan de netto ophoging t.o.v. het<br />

maaiveld.<br />

Tevens wordt vermeld dat nabij brug 5 een rioolpersleiding aanwezig is op ca. 8,5 m<br />

afstand van de toerit. Tijdens het UO dient te worden geanalyseerd of de zettingen<br />

invloed hebben op de rioolleiding. De berekeningen van de notitie van 5 mei 2011 geven<br />

aan dat de horizontale invloed beperkt is (ca. 5,0 m). Bij optimalisatie van het UO kan<br />

worden vastgesteld of dit werkelijk het geval is.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 36 - 9 januari 2013


Tijdens het UO dienen de volgende zaken te worden gemaakt voor optimalisatie:<br />

Schetsen van de voorbelasting, bovenaanzichten;<br />

Monitoringsplan;<br />

Detaillering (met name t.b.v. de rioolpersleiding).<br />

Opgemerkt wordt dat het voorspellen van zettingen altijd enige onnauwkeurigheid met<br />

zich meebrengt. Voor de berekende resultaten wordt daarom een marge gehanteerd<br />

van ca. 30%. Doordat het voorspellen van de zettingen deze onnauwkeurigheid kent,<br />

wordt geadviseerd om de zettingen dagelijks nauwkeurig te monitoren, zodat indien<br />

nodig besloten kan worden de voorbelasting aan te passen aan de werkelijke situatie.<br />

8.4 Fundering<br />

De <strong>bruggen</strong> worden op palen gefundeerd. De benodigde berekeningen hiervoor zijn<br />

uitgevoerd met behulp van D-Foundations versie 8.1 build 2.2. De volgende<br />

uitgangspunten zijn gehanteerd:<br />

Paalfundering, prefabbetonpalen vierkant 400 mm, afmeting noodzakelijk voor<br />

draagkracht en voor opname kopwapening (voorkeur constructeur);<br />

Belastingen zoals opgegeven door de constructeur:<br />

Fc,d (EQU) = 695 kN (UGT);<br />

Frep (SLS) = 612 kN (BGT);<br />

Geen trekbelasting van toepassing;<br />

Berekening op basis van een enkele paal (maatgevend, geen groepswerking);<br />

Een enkele paalberekening en paalpuntadvies voor toepassing op alle drie de<br />

<strong>bruggen</strong>;<br />

ξ3,4 = 1,39;<br />

Berekening volgens NEN 9997-1;2011 (Eurocode 7).<br />

Resultaat<br />

Uit de berekeningen voor de paalfunderingen blijkt dat prefab betonpalen vierkant<br />

400 mm geschikt zijn voor de <strong>bruggen</strong>. In onderstaande tabel 2 is een samenvatting van<br />

de resultaten weergegeven.<br />

Tabel 8.2: Samenvatting resultaat paaldraagkrachtberekening<br />

Paaltype Paalpuntniveau<br />

Netto draagkracht, Rc,d Zakking paalpunt (BGT)<br />

[NAP…m]<br />

[kN]<br />

[mm]<br />

Betonpaal vierkant 400 mm -23,0 771 7<br />

De volledige uitvoer van het berekeningsresultaat is terug te vinden in bijlage E1.<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport - 37 - 9 januari 2013


Bijlage A<br />

Tekeningen<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


A<br />

B<br />

C<br />

D<br />

E<br />

F<br />

G<br />

H<br />

J<br />

K<br />

L<br />

M<br />

N<br />

P<br />

Q<br />

R<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

1<br />

750<br />

1750<br />

1750<br />

750<br />

MV ca. -2.900<br />

230<br />

700<br />

970<br />

650<br />

grens<br />

bestemmingsplan<br />

Ruyven Zuidpolder<br />

X=88915006<br />

Y=446042675<br />

stootplaten<br />

niet getekend<br />

2400<br />

500<br />

4700<br />

1500<br />

2500<br />

1000<br />

300<br />

700<br />

500<br />

90°<br />

X=88920293<br />

Y=446044191<br />

as nieuwe waterweg<br />

250 2250 2250 250<br />

7900 4700<br />

3000 4500 2500 2400<br />

17300<br />

4700<br />

5000<br />

1:3<br />

100 7700<br />

100<br />

-2.020 -2.010<br />

-2.020<br />

-2.250 -2.250<br />

Rv=50m (6992) Rv=25m (3971)<br />

550<br />

grens<br />

bestemmingsplan<br />

Ruyven Zuidpolder<br />

Bovenaanzicht<br />

schaal 1:100<br />

Aanzicht A-A<br />

schaal 1:50<br />

-4.570<br />

Doorsnede B-B<br />

schaal 1:50<br />

2 3 4 5<br />

450 550<br />

grasbetontegels langs landhoofd<br />

1000mm breed<br />

4x stootplaten<br />

5000x1000x350<br />

as brug<br />

palen niet getekend<br />

400<br />

-4.070<br />

grens<br />

kadaster<br />

-3.020<br />

-4.570 -4.570<br />

-4.570<br />

Beschoeiing tbv onderloopsheid<br />

bevestigen aan landhoofd m.b.v. ankers<br />

(dit n.t.b. door aannemer)<br />

2400 2500 7500<br />

2500<br />

2400<br />

10:1<br />

2500<br />

450 450<br />

28254<br />

-4.070<br />

7700<br />

100 100<br />

100 100<br />

-2.120<br />

Bestaand MV<br />

-2.110<br />

grens<br />

kadaster<br />

-3.020<br />

7501<br />

12501<br />

450<br />

460<br />

palen 400 ppn. -23.0m<br />

460 550<br />

450 550<br />

450<br />

450<br />

550<br />

-2.120<br />

2500<br />

1:3<br />

4700<br />

grens<br />

kadaster<br />

vleugelwanden 400 breed<br />

450 100<br />

Rv=25m (2958) Rv=50m (5532)<br />

grens<br />

kadaster<br />

10:1<br />

250 4500 250<br />

Doorsnede C-C<br />

Doorsnede C-C<br />

schaal 1:50<br />

230<br />

700<br />

970<br />

650<br />

5000<br />

MV ca. -2.700<br />

-2.110<br />

400 4200 400<br />

Slib verwijderen en<br />

grondverbetering toepassen<br />

6 7 8 9 10 11 12<br />

-4.570<br />

13 14 15 16 17 18 19<br />

MV ca. -2.700<br />

350 100<br />

prefab volstortliggers h=350mm<br />

met druklaag h=100mm<br />

integraal constructie<br />

oplegvlak 200<br />

EPDM rubber 100x100x10<br />

(tijdelijke oplegstrip)<br />

2450<br />

450<br />

1990<br />

werkvloer 70<br />

10<br />

150<br />

150<br />

700<br />

25<br />

2<br />

598<br />

450 250<br />

650 1850<br />

2500<br />

Detail landhoofd<br />

schaal 1:50<br />

350<br />

onthechtingsmiddel<br />

stalen dook lang 400, ∅25 h.o.h. 500 (2 per plaat) over<br />

een lengte van 190 omwikkelen met densoband<br />

5000<br />

Azobé beschoeiing 25mm dik, lang 1000<br />

met gording 25x70, duurzaamheidsklasse 1<br />

150<br />

8<br />

2<br />

25<br />

150<br />

Detail bevestiging stootplaat<br />

100<br />

350<br />

1000<br />

30<br />

250<br />

stootplaat 5000x1000x350<br />

licht ophoogmateriaal (Bims)<br />

inpakken in geotextiel<br />

162.5<br />

Situatie<br />

schaal 1:5000<br />

Detail bevestiging stootplaat<br />

schaal 1:10<br />

500<br />

lokatie landbouwbrug 5<br />

500<br />

2<br />

250<br />

450 500 598<br />

1798<br />

650<br />

triplex dik 4 met plakfolie dik 0.3<br />

20 21 22 23<br />

A0 zie tekening Definitief Ontwerp<br />

9R6945.I8 / 2641-001<br />

13 14 15 16 17 18 19 20 21 22 23 24<br />

Legenda:<br />

opdrachtgever<br />

project<br />

omschrijving<br />

lokatie landbouwbrug 4<br />

Opmerkingen:<br />

Gewapend beton<br />

Prefab<br />

Licht ophoogmateriaal (Bims)<br />

Grasbetontegels<br />

Werkvloer 70 mm<br />

Contouren watergang<br />

Bestaande watergang<br />

- Peilmaten en coördinaten in m t.o.v. NAP, overige maten in mm.<br />

- Hoeken in graden (360 graden stelsel).<br />

- Maatvoering bestaand in het werk te controleren.<br />

- Hoogte prefab dekconstructie 350mm + druklaag 100mm (exclusief zeeg)<br />

- Verkeersbelasting volgens NEN-EN 1991-2 + C1:2011<br />

- Geen gootconstructie, mantelbuis of trekputten toegepast<br />

- Wapening stootplaten conform <strong>DO</strong>-nota<br />

- Vellingkanten 15x15mm<br />

- Profiel van Vrije Ruimte = bxh = 7,5 x 0,4m.<br />

- Verticale tolerantie op PVR bedraagt 50mm<br />

- Profiel van Vrije Ruimte t.o.v. referentiepeil NAP -3.02m (conform peilbesluit).<br />

- Werkgrenzen uit Voorontwerp 2011.<br />

revisie omschrijving getekend gecontroleerd akkoord datum<br />

Hoogheemraadschap van <strong>Delfland</strong><br />

Alternatief afvoertracé Pijnackerse Vaart<br />

Landbouwbrug 4 nieuwe situatie<br />

formaat schaal fase<br />

bladnr.<br />

van<br />

projectnummer tekeningnummer<br />

24<br />

J<strong>DO</strong> ETJ RNIE 09-01-2013<br />

HASKONING NEDERLAND B.V.<br />

Ruimte & Mobiliteit<br />

TJ<br />

www.royalhaskoning.com<br />

Telefoon<br />

Fax<br />

E-mail<br />

Internet<br />

A<br />

B<br />

C<br />

D<br />

E<br />

F<br />

G<br />

H<br />

J<br />

K<br />

L<br />

M<br />

I:\9R6945\Technical_Data\9R6945I8\2. CAD (constructie)\2641-001_04.dwg<br />

Filename :<br />

N<br />

P<br />

Q<br />

R


A<br />

B<br />

C<br />

D<br />

E<br />

F<br />

G<br />

H<br />

J<br />

K<br />

L<br />

M<br />

N<br />

P<br />

Q<br />

R<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

1<br />

360<br />

MV ca. -2.200<br />

990<br />

1150<br />

650<br />

Rioolpersleiding ∅710<br />

750<br />

750 1750 1750<br />

MV ca. -2.200<br />

grens<br />

bestemmingsplan<br />

Ruyven Zuidpolder<br />

grens<br />

bestemmingsplan<br />

Ruyven Zuidpolder<br />

Bovenaanzicht<br />

schaal 1:100<br />

Aanzicht A-A<br />

schaal 1:50<br />

Bestaand MV<br />

X=88092049<br />

Y=445788205<br />

500<br />

stootplaten<br />

niet getekend<br />

Rv=50m (6603) Rv=25m (2650) 550<br />

500<br />

Doorsnede B-B<br />

schaal 1:50<br />

1500<br />

-4.570<br />

500<br />

90°<br />

X=88093456<br />

Y=445782888<br />

2 3 4 5<br />

as nieuwe waterweg<br />

5300<br />

7900 5300<br />

3000 2500<br />

3000 4500 2500 3000<br />

18500<br />

1000<br />

300<br />

700<br />

3000<br />

5000<br />

5300<br />

10:1<br />

10:1<br />

250<br />

2250<br />

2250<br />

250<br />

5000<br />

X=88095247<br />

Y=445776120<br />

1:3<br />

2500<br />

100<br />

-1.520<br />

100<br />

1050 550<br />

100<br />

1050 450<br />

400<br />

palen<br />

niet<br />

getekend<br />

-1.510<br />

1060 450<br />

-4.070<br />

4xstootplaten<br />

5000x1000x350<br />

as brug<br />

grasbetontegels langs landhoofd<br />

1000mm breed<br />

7700<br />

-1.420 -1.410<br />

-1.420<br />

-1.780 -1.780<br />

1060 550<br />

-4.070<br />

-3.020<br />

-4.570 -4.570<br />

Beschoeiing tbv onderloopsheid<br />

bevestigen aan landhoofd m.b.v. ankers<br />

(dit n.t.b. door aannemer)<br />

2500 7500<br />

2500<br />

27306<br />

7700<br />

-3.020<br />

27758<br />

palen 400 ppn. -23.0m<br />

7500<br />

12500<br />

grens<br />

kadaster<br />

grens<br />

kadaster<br />

1050 550<br />

1050 450<br />

100<br />

100<br />

550 Rv=25m (2650)<br />

Rv=50m (6603)<br />

100<br />

-1.520<br />

2500<br />

1:3<br />

10:1 10:1<br />

grens<br />

vleugelwanden 400 breed<br />

5300<br />

grens<br />

kadaster<br />

3000<br />

100<br />

450<br />

Doorsnede C-C<br />

schaal 1:50<br />

kadaster 5000500<br />

6 7 8 9 10 11 12<br />

-4.570<br />

5000<br />

250 4500 250<br />

Doorsnede C-C<br />

Slib verwijderen en<br />

grondverbetering toepassen<br />

-1.513<br />

400 4200 400<br />

360<br />

990<br />

13 14 15 16 17 18 19<br />

MV ca. -2.200<br />

MV ca. -2.200<br />

350 100<br />

prefab volstortliggers h=350mm<br />

met druklaag h=100mm<br />

integraal constructie<br />

oplegvlak 200<br />

EPDM rubber 100x100x10<br />

(tijdelijke oplegstrip)<br />

3050<br />

450<br />

10<br />

2590<br />

werkvloer 70<br />

150<br />

150<br />

700<br />

25<br />

2<br />

698<br />

450 250<br />

650 1850<br />

2500<br />

Detail landhoofd<br />

schaal 1:50<br />

350<br />

onthechtingsmiddel<br />

5000<br />

Azobé beschoeiing 25mm dik, lang 1000<br />

met gording 25x70, duurzaamheidsklasse 1<br />

150<br />

stalen dook lang 400, ∅25 h.o.h. 500 (2 per plaat) over een<br />

lengte van 190 omwikkelen met densoband<br />

25<br />

150<br />

100<br />

1000<br />

Detail bevestiging Detail bevestiging stootplaat stootplaat<br />

schaal 1:10<br />

8<br />

2<br />

350<br />

30<br />

250<br />

stootplaat 5000x1000x350<br />

licht ophoogmateriaal (Bims)<br />

inpakken in geotextiel<br />

162.5<br />

lokatie landbouwbrug 5<br />

Situatie<br />

schaal 1:5000<br />

500<br />

500<br />

2<br />

250<br />

950 500 698<br />

2398<br />

650<br />

triplex dik 4 met plakfolie dik 0.3<br />

20 21 22 23<br />

A0 zie tekening Definitief Ontwerp<br />

9R6945.I8 / 2641-002<br />

13 14 15 16 17 18 19 20 21 22 23 24<br />

Legenda:<br />

Opmerkingen:<br />

opdrachtgever<br />

project<br />

omschrijving<br />

Gewapend beton<br />

Prefab<br />

Licht ophoogmateriaal (BIMS)<br />

Grasbetontegels<br />

Werkvloer 70 mm<br />

Contouren watergang<br />

Bestaande watergang<br />

formaat schaal fase<br />

lokatie landbouwbrug 4<br />

- Peilmaten en coördinaten in m t.o.v. NAP, overige maten in mm.<br />

- Hoeken in graden (360 graden stelsel).<br />

- Maatvoering bestaand in het werk te controleren.<br />

- Hoogte prefab dekconstructie 350mm + druklaag 100mm (exclusief zeeg)<br />

- Verkeersbelasting volgens NEN-EN 1991-2 + C1:2011<br />

- Geen gootconstructie, mantelbuis of trekputten toegepast<br />

- Wapening stootplaten conform <strong>DO</strong>-nota<br />

- Vellingkanten 15x15mm<br />

- Profiel van Vrije Ruimte = bxh = 7,5 x 0,4m.<br />

- Verticale tolerantie op PVR (hoogte) bedraagt 50mm<br />

- Profiel van Vrije Ruimte t.o.v. referentiepeil NAP -3.02m (conform peilbesluit).<br />

- Werkgrenzen uit Voorontwerp 2011.<br />

revisie omschrijving getekend gecontroleerd akkoord datum<br />

Hoogheemraadschap van <strong>Delfland</strong><br />

Alternatief afvoertracé Pijnackerse Vaart<br />

Landbouwbrug 5 nieuwe situatie<br />

bladnr.<br />

van<br />

projectnummer tekeningnummer<br />

24<br />

J<strong>DO</strong> ETJ RNIE 09-01-2013<br />

HASKONING NEDERLAND B.V.<br />

Ruimte & Mobiliteit<br />

.royalhaskoning.com<br />

www.royalhaskoning.com<br />

Telefoon<br />

Fax<br />

E-mail<br />

Internet<br />

A<br />

B<br />

C<br />

D<br />

E<br />

F<br />

G<br />

H<br />

J<br />

K<br />

L<br />

M<br />

I:\9R6945\Technical_Data\9R6945I8\2. CAD (constructie)\2641-002_05.dwg<br />

Filename :<br />

N<br />

P<br />

Q<br />

R


A<br />

B<br />

C<br />

D<br />

E<br />

F<br />

G<br />

H<br />

J<br />

K<br />

L<br />

MV ca. -2.200<br />

M<br />

N<br />

P<br />

Q<br />

R<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

1<br />

grasbetontegels langs landhoofd<br />

1000mm breed<br />

500<br />

250<br />

as brug<br />

Rv=50m (6603) Rv=25m (2650) 550<br />

-4.570<br />

palen<br />

niet<br />

getekend<br />

4 stootplaten<br />

3000x1000x250<br />

400<br />

Bovenaanzicht<br />

schaal 1:100<br />

1000<br />

350<br />

700<br />

5300<br />

500 3000<br />

10:1<br />

10:1<br />

3000<br />

1:3<br />

5300<br />

2500<br />

2500<br />

100<br />

-1.520<br />

5000<br />

250 2250 2250 250<br />

X=86520542<br />

Y=444480395<br />

100<br />

1050 550<br />

100<br />

1050 450<br />

3000<br />

6400<br />

as nieuwe waterweg<br />

17000<br />

90°<br />

X=86525834<br />

Y=444481895<br />

3000<br />

500 1500 500<br />

-1.510<br />

1060 450<br />

-4.070<br />

6200<br />

-3.020<br />

25806<br />

6200<br />

-3.020<br />

palen 400 ppn. -23.0m<br />

6000<br />

11000<br />

X=86531125<br />

Y=444483394<br />

5300<br />

2500 3000<br />

Doorsnede B-B<br />

Beschoeiing tbv onderloopsheid<br />

bevestigen aan landhoofd m.b.v. ankers<br />

(dit n.t.b. door aannemer)<br />

26258<br />

epoxy slijtlaag + instrooien met dezelfde kleur<br />

en grootte steenslag als op het bestaande pad,<br />

waar de nieuwe brug op aansluit<br />

1050 450<br />

100<br />

stootplaten<br />

niet getekend<br />

-1.420 -1.410<br />

-1.420<br />

-1.780 -1.780<br />

Aanzicht A-A<br />

schaal 1:50<br />

1060 550<br />

-4.070<br />

Stalen leuning<br />

zwart (poedercoating)<br />

-4.570 -4.570<br />

3000 2500 6000<br />

2500<br />

3000<br />

Doorsnede B-B<br />

schaal 1:50<br />

2 3 4 5<br />

1050 550<br />

100<br />

550 Rv=25m (2650)<br />

Rv=50m (6603)<br />

100<br />

450 250<br />

-1.520<br />

2500<br />

1:3<br />

750<br />

1750<br />

1750<br />

750<br />

3000<br />

10:1<br />

10:1<br />

5300<br />

500<br />

500<br />

-4.570<br />

Leuning op stalen plaat (vormgeving leuning conform<br />

vormgevingsdocument ''Brug Achterdijkse bossen'')<br />

Randligger loopt door over de vleugelwand.<br />

Betonkleur randligger licht grijs conform<br />

vormgevingsdocument ''Brug Achterdijkse bossen''<br />

2<br />

250<br />

1050 500 598<br />

2398<br />

vleugelwanden 400 breed<br />

990 360<br />

1800<br />

450 100<br />

Doorsnede C-C<br />

schaal 1:50<br />

Relief op landhoofden en vleugelwanden<br />

(Madras van Noe)<br />

Betonkleur landhoofden en vleugelwanden donker grijs conform<br />

vormgevingsdocument ''Brug Achterdijkse bossen''<br />

MV ca. -2.200<br />

6 7 8 9 10 11 12<br />

MV ca. -2.200<br />

5000<br />

500 4000 500<br />

-2.110<br />

Doorsnede C-C<br />

13 14 15 16 17 18 19<br />

350 100<br />

400 3700 400<br />

Epoxy slijtlaag + instrooien met dezelfde kleur<br />

en grootte steenslag als op het bestaande pad,<br />

waar de nieuwe brug op aansluit<br />

150<br />

300 1000<br />

prefab volstortliggers h=350mm<br />

met druklaag h=100mm<br />

Relief op landhoofden en vleugelwanden<br />

(Madras van Noe)<br />

integraal constructie<br />

oplegvlak 200<br />

EPDM rubber 100x100x10<br />

(tijdelijke oplegstrip)<br />

3050<br />

450<br />

2590<br />

werkvloer 70<br />

10<br />

150<br />

150<br />

700<br />

25<br />

450 250<br />

Azobé beschoeiing 25mm dik, lang 1000<br />

met gording 25x70, duurzaamheidsklasse 1<br />

650 1850<br />

2500<br />

2<br />

598<br />

250<br />

onthechtingsmiddel<br />

150<br />

3000<br />

stalen dook lang 400, ∅25 h.o.h. 500 (2 per plaat) over een<br />

lengte van 190 omwikkelen met densoband<br />

8<br />

2<br />

1000<br />

25<br />

150<br />

Detail bevestiging stootplaat<br />

500<br />

500<br />

stootplaat 3000x1000x250<br />

Licht ophoogmateriaal (Bims)<br />

inpakken in geotextiel<br />

Detail landhoofd<br />

schaal 1:20<br />

250<br />

100<br />

30<br />

250<br />

162.5<br />

Situatie<br />

schaal 1:5000<br />

2<br />

250<br />

1050 500 598<br />

2398<br />

650<br />

triplex dik 4 met plakfolie dik 0.3<br />

Detail bevestiging stootplaat<br />

schaal 1:10<br />

lokatie landbouwbrug 22<br />

20 21 22 23<br />

A0 zie tekening Definitief Ontwerp<br />

9R6945.I8 / 2641-003<br />

13 14 15 16 17 18 19 20 21 22 23 24<br />

Legenda:<br />

Opmerkingen:<br />

opdrachtgever<br />

project<br />

omschrijving<br />

Gewapend beton<br />

Prefab<br />

Gestabiliseerd zand<br />

Grasbetontegels<br />

Werkvloer 70 mm<br />

Contouren watergang<br />

Bestaande watergang<br />

- Peilmaten en coördinaten in m t.o.v. NAP, overige maten in mm.<br />

- Hoeken in graden (360 graden stelsel).<br />

- Maatvoering bestaand in het werk te controleren.<br />

- Hoogte prefab dekconstructie 350mm + druklaag 100mm (exclusief zeeg)<br />

- Verkeersbelasting volgens NEN-EN 1991-2 + C1:2011<br />

- Geen gootconstructie, mantelbuis of trekputten toegepast<br />

- Wapening stootplaten conform <strong>DO</strong>-nota<br />

- Vellingkanten 15x15mm<br />

- Profiel van Vrije Ruimte = bxh = 7,5 x 0,4m.<br />

- Verticale tolerantie op PVR bedraagt 50mm<br />

- Profiel van Vrije Ruimte t.o.v. referentiepeil NAP -3.02m (conform peilbesluit).<br />

- Werkgrenzen uit Voorontwerp 2011.<br />

revisie omschrijving getekend gecontroleerd akkoord datum<br />

Hoogheemraadschap van <strong>Delfland</strong><br />

Alternatief afvoertracé Pijnackerse Vaart<br />

Landbouwbrug 22 nieuwe situatie<br />

formaat schaal fase<br />

bladnr.<br />

van<br />

projectnummer tekeningnummer<br />

24<br />

J<strong>DO</strong> ETJ RNIE 7-1-2013<br />

HASKONING NEDERLAND B.V.<br />

Ruimte & Mobiliteit<br />

.royalhaskoning.com<br />

www.royalhaskoning.com<br />

Telefoon<br />

Fax<br />

E-mail<br />

Internet<br />

A<br />

B<br />

C<br />

D<br />

E<br />

F<br />

G<br />

H<br />

J<br />

K<br />

L<br />

M<br />

I:\9R6945\Technical_Data\9R6945I8\2. CAD (constructie)\2641-003_22.dwg<br />

Filename :<br />

N<br />

P<br />

Q<br />

R


Bijlage B<br />

Ontwerp brug 4, 5 en 22<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


Bijlage B1<br />

Bepaling prefab dekconstructie<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


Bijlage B2<br />

Ontwerp landhoofd<br />

Geometrie + statisch systeem<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


Bijlage B3<br />

Ontwerp landhoofd<br />

Belastingen & belastingcombinaties<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


Bijlage B4<br />

Ontwerp landhoofd<br />

Raamwerkmodel (dwarsrichting)<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


Bijlage B5<br />

Ontwerp landhoofd<br />

Krachtsverdeling haaks op de wegas<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


Bijlage B6<br />

Ontwerp landhoofd<br />

Bepaling wapening<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


Bijlage B7<br />

Ontwerp landhoofd<br />

Bepaling paalkopwapening + toetsing paaldraagvermogen<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


Bijlage B8<br />

Ontwerp landhoofd<br />

Ontwerp vleugelwanden<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


Bijlage C<br />

Beschouwing optimalisaties brug 4<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


Bijlage D<br />

Beschouwing optimalisaties brug 22<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


Bijlage E<br />

Geotechniek<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


Bijlage E1<br />

Paaldraagvermogen<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


Bijlage E2<br />

Zettingsberekeningen<br />

<strong>DO</strong> brug 4, 5 en 22 9R6945.I8/R0009/902635/VVDM/Nijm<br />

Definitief rapport 9 januari 2013


Bijlage E – Geotechniek<br />

<strong>DO</strong> brug 4,5 en 22 9R6945.I8/R001_0C/902635/HVT/Nijm<br />

Concept rapport 14 december 2012


Bijlage E1 – Paaldraagvermogen<br />

<strong>DO</strong> brug 4,5 en 22 9R6945.I8/R001_0C/902635/HVT/Nijm<br />

Concept rapport 14 december 2012


Report for D-Foundations 8.1<br />

Design and Verification according to Eurocode 7 of Bearing/Tension Piles and Shallow Foundations<br />

Developed by Deltares<br />

Company: Royal HaskoningDHV<br />

Date of report: 14-12-2012<br />

Time of report: 17:01:08<br />

Date of calculation: 14-12-2012<br />

Time of calculation: 16:17:04<br />

Filename: C:\..\DFoundation\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214<br />

Project identification: Hoogheemraadschap van <strong>Delfland</strong><br />

Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />

D-Foundations Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214


1 Table of Contents<br />

Royal HaskoningDHV D-Foundations 8.1<br />

1 Table of Contents 2<br />

2 Input Data 3<br />

2.1 General Input Data 3<br />

2.2 General Report Data 3<br />

2.3 Application Area Model Bearing Piles 3<br />

2.4 Superstructure 3<br />

2.5 General CPT Data 3<br />

2.5.1 View of CPT's in Foundation Plan 3<br />

2.6 Soil Data 4<br />

2.6.1 Soil Profile SW4 4<br />

2.6.2 Soil Profile S017B 5<br />

2.7 Pile Types 6<br />

2.7.1 Pile type : Rect 380x380 6<br />

2.7.2 Pile type : Rect 400x400 6<br />

2.7.3 Pile type : Rect 450x450 6<br />

2.8 Foundation Plan 7<br />

2.8.1 View of Foundation Plan 7<br />

2.9 Excavation Data 7<br />

2.10 Totalized Loads (design values) 8<br />

2.11 Requirements 8<br />

2.12 Overruled Parameters 8<br />

2.13 Calculation Options 8<br />

2.14 Model Options 8<br />

3 Bearing Piles (EC7-NL): Results of the Option Complete Verification 9<br />

3.1 Errors and Warnings 9<br />

3.2 Remarks 9<br />

3.3 Calculation Parameters 9<br />

3.3.1 Pile Factors 9<br />

3.3.2 Pile type : Rect 400x400 9<br />

3.4 Verification of Limit State EQU 10<br />

3.5 Verification of Limit State GEO 10<br />

3.6 Verification of Serviceability limit state 10<br />

3.7 Additional Information 10<br />

3.7.1 The bearing capacity of shaft and point at Limit state GEO 11<br />

3.7.2 The bearing capacity of shaft and point at the Serviceability Limit State 11<br />

14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 2


2 Input Data<br />

2.1 General Input Data<br />

Model Bearing Piles (EC7-NL)<br />

2.2 General Report Data<br />

Royal HaskoningDHV D-Foundations 8.1<br />

Geotechnical consultant :<br />

Design engineer superstructure :<br />

Principal :<br />

Title 1 : Hoogheemraadschap van <strong>Delfland</strong><br />

Title 2 : Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />

Title 3 : D-Foundations Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214<br />

Number of project : 9R694518<br />

Location of project :<br />

2.3 Application Area Model Bearing Piles<br />

The verifications performed by the model BEARING PILES of D-FOUNDATIONS concern pile foundations on which<br />

axial static or quasi-static loads cause pressures in the piles. The calculations of pile forces and pile displacements<br />

are based on Cone Penetration Tests. Possible rise of (tension-)piles and horizontal displacements of piles and/or<br />

pile groups are not taken into account.<br />

2.4 Superstructure<br />

Rigidity of the superstructure : Non-Rigid<br />

2.5 General CPT Data<br />

Number of CPT's : 2<br />

Timing of CPT's : CPT - Excavation - Install<br />

2.5.1 View of CPT's in Foundation Plan<br />

S017B<br />

SW10 SW7 SW8 SW9 SW6 SW5 SW4 S10 S11 SW3 S4 S5 S6 S9 S7 S8 S2<br />

14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 3<br />

Legend<br />

Rect 400x400 (Edge pile)<br />

Rect 400x400 (Middle pile)<br />

CPT


Royal HaskoningDHV D-Foundations 8.1<br />

Number/Name Pile tip Top of pos. Bottom of neg. X-coor- Y-coor-<br />

CPT level friction zone friction zone dinate dinate<br />

[m R.L.] [m R.L.] [m R.L.] [m] [m]<br />

1: SW4 -23,00 -18,00 -18,00 88102,01 445770,64<br />

2: S017B -23,00 -18,00 -18,00 0,00 0,00<br />

2.6 Soil Data<br />

Number of soil profiles (= number of CPT's) : 2<br />

2.6.1 Soil Profile SW4<br />

Belonging to CPT SW4<br />

Surface level in [m. reference level] : -2,220<br />

Phreatic level in [m. reference level] : -3,020<br />

Pile tip level in [m. reference level] : -23,000<br />

Top of positive skin friction zone in [m. reference level] : -18,000<br />

Bottom of negative skin friction zone in [m. reference level] : -18,000<br />

OCR-value foundation layer : 1,00<br />

Expected groundlevel settlement in [m] : 0,110<br />

Number of layers in profile : 31<br />

5,00<br />

0,00<br />

-5,00<br />

-10,00<br />

-15,00<br />

-20,00<br />

-25,00<br />

-30,00<br />

-35,00<br />

qc [MPa]<br />

5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00<br />

Ground level (-2,22)<br />

-40,00<br />

Depth [m] 0,00 0,10 0,20 0,30 0,40 0,50 0,60<br />

qc [MPa]<br />

Pore water pressure [MPa]<br />

Reduced qc for alpha_s [MPa]<br />

Pore water pressure [MPa]<br />

14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 4<br />

NSFZ<br />

PSFZ<br />

PTL<br />

PL<br />

Profile: SW4<br />

Material Unit weight Unit weight Phi<br />

dry wet<br />

Loam, Clay, Clay, clea.. sl ve s.. s..<br />

Peat, mod..<br />

kN/m3<br />

20,0 17,0<br />

13,0<br />

kN/m3<br />

20,0 17,0<br />

13,0<br />

deg<br />

35,0 22,5 17,5<br />

15,0<br />

Peat, mod.. 13,0 13,0 15,0<br />

Peat, mod..<br />

Clay,<br />

Clay,<br />

clea..<br />

Loam, sl ve s.. s..<br />

Clay, sl s..<br />

Clay, clea..<br />

Clay, clea.. sl s..<br />

Peat, Clay, mod.. clea.. sl s..<br />

Clay, clea..<br />

13,0<br />

17,0<br />

20,0<br />

20,0<br />

17,0 20,0 17,0 20,0 17,0 13,0<br />

17,0<br />

13,0<br />

17,0<br />

20,0<br />

20,0<br />

17,0 20,0 17,0 20,0 17,0 13,0<br />

17,0<br />

15,0<br />

17,5<br />

22,5 35,0<br />

22,5<br />

17,5 22,5 17,5 22,5 17,5 15,0<br />

17,5<br />

Clay, sl s.. 20,0 20,0 22,5<br />

Loam, ve s..<br />

Loam, Sand, ve s..<br />

Clay, sl s..<br />

20,0<br />

19,0 20,0<br />

20,0<br />

20,0<br />

21,0 20,0<br />

20,0<br />

35,0<br />

30,0 35,0<br />

22,5<br />

Clay, clea..<br />

Loam, Sand, Clay, ve sl ve s.. s.. 17,0<br />

20,0 19,0<br />

17,0<br />

20,0 21,0<br />

17,5<br />

22,5 35,0 30,0<br />

Sand, sl s.. 19,0 21,0 32,5<br />

Sand, sl s.. 19,0 21,0 32,5<br />

Sand, sl s.. 19,0 21,0 32,5<br />

PL (Phreatic Level) = -3,02 [m]<br />

EL (Excavation Level) = -4,00 [m]<br />

PTL (Pile Tip Level) = -23,00 [m]<br />

PSFZ = Positive skin friction zone, top = -18,00 [m]<br />

NSFZ = Negative skin friction zone, bottom = -18,00 [m]<br />

Number Top Gamma Gamma;sat Phi Soil Median<br />

layer layer Type (Sand/Gravel)<br />

[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />

1 -2,220 20,00 20,00 35,00 Loam --<br />

2 -2,230 20,00 20,00 35,00 Loam --<br />

3 -2,330 20,00 20,00 35,00 Loam --<br />

4 -2,430 20,00 20,00 22,50 Clay --<br />

5 -2,530 17,00 17,00 17,50 Clay --<br />

6 -2,630 13,00 13,00 15,00 Peat --<br />

7 -3,730 13,00 13,00 15,00 Peat --<br />

8 -4,830 13,00 13,00 15,00 Peat --<br />

9 -6,030 17,00 17,00 17,50 Clay --<br />

10 -6,630 20,00 20,00 22,50 Clay --<br />

11 -7,130 20,00 20,00 35,00 Loam --<br />

12 -7,330 20,00 20,00 22,50 Clay --<br />

EL


Royal HaskoningDHV D-Foundations 8.1<br />

Number Top Gamma Gamma;sat Phi Soil Median<br />

layer layer Type (Sand/Gravel)<br />

[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />

13 -8,430 17,00 17,00 17,50 Clay --<br />

14 -8,930 20,00 20,00 22,50 Clay --<br />

15 -9,030 17,00 17,00 17,50 Clay --<br />

16 -9,530 20,00 20,00 22,50 Clay --<br />

17 -9,830 17,00 17,00 17,50 Clay --<br />

18 -10,030 13,00 13,00 15,00 Peat --<br />

19 -10,130 17,00 17,00 17,50 Clay --<br />

20 -11,330 20,00 20,00 22,50 Clay --<br />

21 -13,330 20,00 20,00 35,00 Loam --<br />

22 -14,430 19,00 21,00 30,00 Sand 0,200<br />

23 -14,630 20,00 20,00 35,00 Loam --<br />

24 -14,830 20,00 20,00 22,50 Clay --<br />

25 -16,030 17,00 17,00 17,50 Clay --<br />

26 -17,430 20,00 20,00 22,50 Clay --<br />

27 -17,930 20,00 20,00 35,00 Loam --<br />

28 -18,030 19,00 21,00 30,00 Sand 0,200<br />

29 -18,130 19,00 21,00 32,50 Sand 0,200<br />

30 -30,130 19,00 21,00 32,50 Sand 0,200<br />

31 -30,230 19,00 21,00 32,50 Sand 0,200<br />

2.6.2 Soil Profile S017B<br />

Belonging to CPT S017B<br />

Surface level in [m. reference level] : -2,460<br />

Phreatic level in [m. reference level] : -3,020<br />

Pile tip level in [m. reference level] : -23,000<br />

Top of positive skin friction zone in [m. reference level] : -18,000<br />

Bottom of negative skin friction zone in [m. reference level] : -18,000<br />

OCR-value foundation layer : 1,00<br />

Expected groundlevel settlement in [m] : 0,110<br />

Number of layers in profile : 25<br />

5,00<br />

0,00<br />

-5,00<br />

-10,00<br />

-15,00<br />

-20,00<br />

-25,00<br />

-30,00<br />

-35,00<br />

-40,00<br />

Depth [m]<br />

qc [MPa]<br />

5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00<br />

qc [MPa]<br />

Reduced qc for alpha_s [MPa]<br />

Ground level (-2,46)<br />

14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 5<br />

NSFZ<br />

PSFZ<br />

PTL<br />

PL<br />

Profile: S017B<br />

Material Unit weight Unit weight Phi<br />

dry wet<br />

Peat, mod..<br />

Peat, mod..<br />

Peat, mod..<br />

kN/m3<br />

13,0<br />

13,0<br />

kN/m3<br />

13,0<br />

13,0<br />

deg<br />

15,0 15,0<br />

15,0<br />

Clay, clea.. 17,0 17,0 17,5<br />

Clay, sl s.. 20,0 20,0 22,5<br />

Clay, clea.. 17,0 17,0 17,5<br />

Clay,<br />

Clay,<br />

clea..<br />

sl s.. 20,0<br />

17,0<br />

20,0<br />

17,0<br />

22,5<br />

17,5<br />

Clay, sl s.. 20,0 20,0 22,5<br />

Loam, Clay, sl ve s.. s..<br />

Loam, ve s..<br />

Clay, sl s..<br />

Peat,<br />

Clay,<br />

mod..<br />

clea..<br />

Clay, clea..<br />

Loam, Sand, Clay, ve sl ve s.. s.. Sand, Sand, ve sl s.. s..<br />

20,0<br />

20,0<br />

20,0 17,0<br />

13,0<br />

17,0<br />

20,0 19,0<br />

20,0<br />

20,0<br />

20,0 17,0<br />

13,0<br />

17,0<br />

20,0 21,0<br />

35,0 22,5<br />

35,0<br />

22,5 17,5<br />

15,0<br />

17,5<br />

22,5 35,0 30,0 32,5 30,0<br />

Sand, sl s.. 19,0 21,0 32,5<br />

Sand, sl s.. 19,0 21,0 32,5<br />

PL (Phreatic Level) = -3,02 [m]<br />

EL (Excavation Level) = -4,00 [m]<br />

PTL (Pile Tip Level) = -23,00 [m]<br />

PSFZ = Positive skin friction zone, top = -18,00 [m]<br />

NSFZ = Negative skin friction zone, bottom = -18,00 [m]<br />

EL


Royal HaskoningDHV D-Foundations 8.1<br />

Number Top Gamma Gamma;sat Phi Soil Median<br />

layer layer Type (Sand/Gravel)<br />

[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />

1 -2,460 13,00 13,00 15,00 Peat --<br />

2 -2,550 13,00 13,00 15,00 Peat --<br />

3 -2,650 13,00 13,00 15,00 Peat --<br />

4 -3,050 13,00 13,00 15,00 Peat --<br />

5 -3,250 13,00 13,00 15,00 Peat --<br />

6 -4,850 17,00 17,00 17,50 Clay --<br />

7 -6,050 20,00 20,00 22,50 Clay --<br />

8 -9,150 17,00 17,00 17,50 Clay --<br />

9 -10,550 20,00 20,00 22,50 Clay --<br />

10 -11,350 17,00 17,00 17,50 Clay --<br />

11 -11,550 20,00 20,00 22,50 Clay --<br />

12 -13,550 20,00 20,00 35,00 Loam --<br />

13 -14,250 20,00 20,00 22,50 Clay --<br />

14 -14,350 20,00 20,00 35,00 Loam --<br />

15 -15,550 20,00 20,00 22,50 Clay --<br />

16 -16,150 17,00 17,00 17,50 Clay --<br />

17 -16,350 13,00 13,00 15,00 Peat --<br />

18 -17,050 17,00 17,00 17,50 Clay --<br />

19 -17,750 20,00 20,00 22,50 Clay --<br />

20 -18,150 20,00 20,00 35,00 Loam --<br />

21 -18,250 19,00 21,00 30,00 Sand 0,200<br />

22 -18,350 19,00 21,00 32,50 Sand 0,200<br />

23 -18,850 19,00 21,00 30,00 Sand 0,200<br />

24 -19,150 19,00 21,00 32,50 Sand 0,200<br />

25 -27,350 19,00 21,00 32,50 Sand 0,200<br />

2.7 Pile Types<br />

2.7.1 Pile type : Rect 380x380<br />

Pile type : Prefabricated concrete pile<br />

Materialtype for pile : Concrete<br />

Slip layer : None<br />

Pile shape : Rectangular pile<br />

beta (Shape factor) according to figure 7i, NEN-EN 1997-1:2005.<br />

s (factor for the influence of the shape of the crosssection of the pile base) according to NEN-EN 1997-1:2005.<br />

Pile dimensions :<br />

Smallest side pile tip [m] : 0,380<br />

Largest side pile tip [m] : 0,380<br />

2.7.2 Pile type : Rect 400x400<br />

Pile type : Prefabricated concrete pile<br />

Materialtype for pile : Concrete<br />

Slip layer : None<br />

Pile shape : Rectangular pile<br />

beta (Shape factor) according to figure 7i, NEN-EN 1997-1:2005.<br />

s (factor for the influence of the shape of the crosssection of the pile base) according to NEN-EN 1997-1:2005.<br />

Pile dimensions :<br />

Smallest side pile tip [m] : 0,400<br />

Largest side pile tip [m] : 0,400<br />

2.7.3 Pile type : Rect 450x450<br />

Pile type : Prefabricated concrete pile<br />

14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 6


Royal HaskoningDHV D-Foundations 8.1<br />

Materialtype for pile : Concrete<br />

Slip layer : None<br />

Pile shape : Rectangular pile<br />

beta (Shape factor) according to figure 7i, NEN-EN 1997-1:2005.<br />

s (factor for the influence of the shape of the crosssection of the pile base) according to NEN-EN 1997-1:2005.<br />

Pile dimensions :<br />

Smallest side pile tip [m] : 0,450<br />

Largest side pile tip [m] : 0,450<br />

2.8 Foundation Plan<br />

Number of piles : 1<br />

Number of collaborating piles* : 1<br />

* : 0 = not defined, 1 = non rigid superstructure, >1 = rigid superstructure<br />

2.8.1 View of Foundation Plan<br />

1<br />

14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 7<br />

Legend<br />

Rect 400x400 (Edge pile)<br />

Rect 400x400 (Middle pile)<br />

CPT<br />

Pile X-coor- Y-coor- Fc;d Fc;d P0 Pile head<br />

nr/name dinate dinate (EQU/GEO) (SLS) level<br />

[m] [m] [kN] [kN] [kN/m2] [m R.L.]<br />

1: 1 86487,66 444158,98 712,00 647,00 16,00 -0,52<br />

2.9 Excavation Data<br />

Excavation level in [m. reference level] : -4,000<br />

Reduction model : Safe (NEN)


5,00<br />

0,00<br />

-5,00<br />

-10,00<br />

-15,00<br />

-20,00<br />

-25,00<br />

-30,00<br />

-35,00<br />

-40,00<br />

Depth [m]<br />

qc [MPa]<br />

5 10 15 20 25 30 35 40<br />

qc [MPa]<br />

Reduced qc [MPa]<br />

2.10 Totalized Loads (design values)<br />

Royal HaskoningDHV D-Foundations 8.1<br />

Indication for qc-reduction<br />

due to safe reduction method<br />

Ground level (-2,22)<br />

14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 8<br />

PL<br />

Profile: SW4<br />

[kN/m2]<br />

0 100 200 300 400 500 600 700 800<br />

PL (Phreatic Level) = -3,02 [m]<br />

EL (Excavation Level) = -4,00 [m]<br />

= Initial Effective Stress<br />

= Effective Stress<br />

Total load on all piles<br />

For limit state EQU/GEO in [kN] : 712,00<br />

For Serviceability limit state in [kN] : 647,00<br />

2.11 Requirements<br />

Limit state GEO<br />

Maximum allowed settlement in [m] : 0,150<br />

Maximum allowed (relative) rotation : 1 / 100<br />

Serviceability Limit State<br />

Maximum allowed settlement in [m] : 0,150<br />

Maximum allowed (relative) rotation : 1 / 300<br />

2.12 Overruled Parameters<br />

User defined Factor xi3 [-] : 1,39<br />

User defined Factor xi4 [-] : 1,39<br />

2.13 Calculation Options<br />

Suppress pile group (for negative skin friction)<br />

Create intermediate results file<br />

Use reduction for continuous flight auger piles (standard)<br />

Use the influence of excavations (standard).<br />

2.14 Model Options<br />

Selected pile types :<br />

-Rect 400x400<br />

Selected profiles :<br />

-SW4<br />

-S017B<br />

EL


Royal HaskoningDHV D-Foundations 8.1<br />

3 Bearing Piles (EC7-NL): Results of the Option Complete Verification<br />

3.1 Errors and Warnings<br />

Warning : The factor xi3 (NEN-EN 1997 1:2005 NEN 9097-1, annex A) is user defined. is user defined. Evidence to<br />

support this from the NEN deviating value has to be provided.<br />

Warning : The factor xi4 (NEN-EN 1997 1:2005 NEN 9097-1, annex A) is user defined. is user defined. Evidence to<br />

support this from the NEN deviating value has to be provided.<br />

Warning : The depth of the CPT's does not meet the requirements as set by NEN 9097-1 par 3.2.3.<br />

The CPT's do not meet the requirements set by NEN 9097-1<br />

par 3.2.3 because :<br />

- the maximum allowed center to center distance for CPT's is exceeded.<br />

- not all piles are positioned within the prescribed area of the CPT's.<br />

3.2 Remarks<br />

When checking the survey and testing of soil according to NEN 9097-1 art 3.2.3 lid (e), the program uses the<br />

provided CPT test level. It does NOT take into account possible different pile tip levels. When different pile tip levels<br />

are used in this calculation, the user itself must check for possibly required additional survey and testing of soil.<br />

Performing the check on NEN 9097-1 par 3.2.3, the average distance between the different CPT's used for this<br />

check is 25 m.<br />

3.3 Calculation Parameters<br />

3.3.1 Pile Factors<br />

gamma;b (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />

Limit State EQU/GEO) : 1,20<br />

gamma;b (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />

the Serviceability Limit State) : 1,00<br />

gamma;s (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />

Limit State EQU/GEO) : 1,20<br />

gamma;s (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />

the Serviceability Limit State) : 1,00<br />

xi3 (user defined) : 1,39<br />

xi4 (user defined) : 1,39<br />

Even though it is possible, the pilegroup model has not been used to calculate the negative skin friction.<br />

3.3.2 Pile type : Rect 400x400<br />

Pile type : Prefabricated concrete pile<br />

Materialtype for pile : Concrete<br />

Slip layer : None<br />

Pile shape : Rectangular pile<br />

beta (Shape factor: figuur 7i, NEN-EN 1997<br />

1:2005 par. 7.6.2.3(g): NEN 9097-1 : Pile tip) : 1,00<br />

s (NEN-EN 1997 1:2005 par. 7.6.2.3(h), NEN 9097-1 : factor for<br />

the influence of the shape of the crosssection of the pile base) : 1,00<br />

Pile dimensions :<br />

Smallest side pile tip [m] : 0,400<br />

Largest side pile tip [m] : 0,400<br />

14-12-2012 C:\..\Landbouwbrug 5 <strong>Delfland</strong> Definitief - 20121214 Page 9


CPT Alpha_s Alpha_s Alpha_p<br />

Sand/ Clay/Loam<br />

Gravel Peat<br />

SW4 0,0100 0,0250 1,0000<br />

S017B 0,0100 0,0207 1,0000<br />

3.4 Verification of Limit State EQU<br />

Required by NEN-EN 1997-1 section 2.4.7 / 2.4.8: Ed


Pile name: 1<br />

Components of the maximum settlement are :<br />

sneg = 0,000 [m]<br />

sb = 0,007 [m]<br />

sel;d = 0,007 [m]<br />

s2 = 0,000 [m]<br />

Royal HaskoningDHV D-Foundations 8.1<br />

sneg stands for the settlement due to negative skin friction when the expected ground level settlement (egls) is<br />

within the next boundaries : 0.02 < egls


Report for D-Foundations 8.1<br />

Design and Verification according to Eurocode 7 of Bearing/Tension Piles and Shallow Foundations<br />

Developed by Deltares<br />

Company: Royal HaskoningDHV<br />

Date of report: 14-12-2012<br />

Time of report: 17:00:27<br />

Date of calculation: 14-12-2012<br />

Time of calculation: 16:16:08<br />

Filename: C:\..\DFoundation\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214<br />

Project identification: Hoogheemraadschap van <strong>Delfland</strong><br />

Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />

D-Foundations Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214


1 Table of Contents<br />

Royal HaskoningDHV D-Foundations 8.1<br />

1 Table of Contents 2<br />

2 Input Data 3<br />

2.1 General Input Data 3<br />

2.2 General Report Data 3<br />

2.3 Application Area Model Bearing Piles 3<br />

2.4 Superstructure 3<br />

2.5 General CPT Data 3<br />

2.5.1 View of CPT's in Foundation Plan 3<br />

2.6 Soil Data 4<br />

2.6.1 Soil Profile S2 4<br />

2.6.2 Soil Profile SW3 5<br />

2.6.3 Soil Profile S11 6<br />

2.6.4 Soil Profile S10 8<br />

2.7 Pile Types 9<br />

2.7.1 Pile type : Rect 380x380 9<br />

2.7.2 Pile type : Rect 400x400 9<br />

2.7.3 Pile type : Rect 450x450 9<br />

2.8 Foundation Plan 10<br />

2.8.1 View of Foundation Plan 10<br />

2.9 Excavation Data 10<br />

2.10 Totalized Loads (design values) 11<br />

2.11 Requirements 11<br />

2.12 Overruled Parameters 11<br />

2.13 Calculation Options 11<br />

2.14 Model Options 11<br />

3 Bearing Piles (EC7-NL): Results of the Option Complete Verification 12<br />

3.1 Errors and Warnings 12<br />

3.2 Remarks 12<br />

3.3 Calculation Parameters 12<br />

3.3.1 Pile Factors 12<br />

3.3.2 Pile type : Rect 400x400 12<br />

3.4 Verification of Limit State EQU 13<br />

3.5 Verification of Limit State GEO 13<br />

3.6 Verification of Serviceability limit state 13<br />

3.7 Additional Information 13<br />

3.7.1 The bearing capacity of shaft and point at Limit state GEO 14<br />

3.7.2 The bearing capacity of shaft and point at the Serviceability Limit State 14<br />

14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 2


2 Input Data<br />

2.1 General Input Data<br />

Model Bearing Piles (EC7-NL)<br />

2.2 General Report Data<br />

Royal HaskoningDHV D-Foundations 8.1<br />

Geotechnical consultant :<br />

Design engineer superstructure :<br />

Principal :<br />

Title 1 : Hoogheemraadschap van <strong>Delfland</strong><br />

Title 2 : Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />

Title 3 : D-Foundations Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214<br />

Number of project : 9R694518<br />

Location of project :<br />

2.3 Application Area Model Bearing Piles<br />

The verifications performed by the model BEARING PILES of D-FOUNDATIONS concern pile foundations on which<br />

axial static or quasi-static loads cause pressures in the piles. The calculations of pile forces and pile displacements<br />

are based on Cone Penetration Tests. Possible rise of (tension-)piles and horizontal displacements of piles and/or<br />

pile groups are not taken into account.<br />

2.4 Superstructure<br />

Rigidity of the superstructure : Non-Rigid<br />

2.5 General CPT Data<br />

Number of CPT's : 4<br />

Timing of CPT's : CPT - Excavation - Install<br />

2.5.1 View of CPT's in Foundation Plan<br />

S017B<br />

SW10 SW7 SW8 SW9 SW6 SW5 SW4 S10 S11 SW3 S4 S5 S6 S9 S7 S8 S2<br />

14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 3<br />

Legend<br />

Rect 400x400 (Edge pile)<br />

Rect 400x400 (Middle pile)<br />

CPT


Royal HaskoningDHV D-Foundations 8.1<br />

Number/Name Pile tip Top of pos. Bottom of neg. X-coor- Y-coor-<br />

CPT level friction zone friction zone dinate dinate<br />

[m R.L.] [m R.L.] [m R.L.] [m] [m]<br />

1: S2 -23,00 -16,00 -16,00 88931,71 446040,98<br />

2: SW3 -23,00 -17,00 -17,00 88913,58 446036,27<br />

3: S11 -23,00 -18,00 -18,00 86492,66 444467,99<br />

4: S10 -23,00 -18,00 -18,00 86507,43 444472,12<br />

2.6 Soil Data<br />

Number of soil profiles (= number of CPT's) : 4<br />

2.6.1 Soil Profile S2<br />

Belonging to CPT S2<br />

Surface level in [m. reference level] : -2,730<br />

Phreatic level in [m. reference level] : -3,020<br />

Pile tip level in [m. reference level] : -23,000<br />

Top of positive skin friction zone in [m. reference level] : -16,000<br />

Bottom of negative skin friction zone in [m. reference level] : -16,000<br />

OCR-value foundation layer : 1,00<br />

Expected groundlevel settlement in [m] : 0,110<br />

Number of layers in profile : 32<br />

5,00<br />

0,00<br />

-5,00<br />

-10,00<br />

-15,00<br />

-20,00<br />

-25,00<br />

-30,00<br />

-35,00<br />

-40,00<br />

Depth [m]<br />

qc [MPa]<br />

5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00<br />

qc [MPa]<br />

Reduced qc for alpha_s [MPa]<br />

Ground level (-2,73)<br />

14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 4<br />

NSFZ<br />

PSFZ<br />

PTL<br />

PL<br />

Profile: S2<br />

Material Unit weight<br />

dry<br />

Unit weight<br />

wet<br />

Phi<br />

Peat, mod..<br />

kN/m3<br />

13,0<br />

kN/m3<br />

13,0<br />

deg<br />

15,0<br />

Peat, mod.. 13,0 13,0 15,0<br />

Peat, not.. 12,0 12,0 15,0<br />

Peat, Clay, mod.. clea.. 13,0 17,0 13,0 17,0 15,0<br />

Clay, sl s.. 20,0 20,0<br />

17,5<br />

Loam, ve s.. 20,0 20,0<br />

22,5<br />

Clay, sl s.. 20,0 20,0 35,0<br />

Clay, clea.. 17,0 17,0 22,5<br />

Clay, clea.. sl s.. 20,0 17,0 20,0 17,0<br />

17,5 22,5<br />

Clay, sl s.. 20,0 20,0 17,5<br />

Clay, clea.. sl s.. 17,0 20,0 17,0 20,0 22,5 17,5<br />

Peat, Clay, mod.. clea.. 17,0 13,0 17,0 13,0<br />

22,5 17,5<br />

Clay, clea.. 17,0 17,0 15,0 17,5<br />

Clay, sl s.. 20,0 20,0 22,5<br />

Peat, Clay, mod.. clea.. 17,0 13,0 17,0 13,0 17,5<br />

Clay, clea.. 17,0 17,0 15,0<br />

Loam, Clay, sl s.. 20,0 20,0 17,5<br />

Sand, ve s.. 20,0 19,0 20,0 21,0 22,5 35,0 30,0<br />

Sand, sl s.. 19,0 21,0 32,5<br />

Sand, ve s.. 19,0 21,0 30,0<br />

Sand, sl s.. 19,0 21,0 32,5<br />

Loam, Sand, ve s.. 19,0 20,0 21,0 20,0 30,0 35,0<br />

Sand, sl s.. 19,0 21,0 32,5<br />

Sand, sl s.. 19,0 21,0 32,5<br />

Sand, sl s.. 19,0 21,0 32,5<br />

PL (Phreatic Level) = -3,02 [m]<br />

EL (Excavation Level) = -4,00 [m]<br />

PTL (Pile Tip Level) = -23,00 [m]<br />

PSFZ = Positive skin friction zone, top = -16,00 [m]<br />

NSFZ = Negative skin friction zone, bottom = -16,00 [m]<br />

Number Top Gamma Gamma;sat Phi Soil Median<br />

layer layer Type (Sand/Gravel)<br />

[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />

1 -2,730 13,00 13,00 15,00 Peat --<br />

2 -2,830 13,00 13,00 15,00 Peat --<br />

3 -5,030 12,00 12,00 15,00 Peat --<br />

4 -6,530 13,00 13,00 15,00 Peat --<br />

5 -6,630 17,00 17,00 17,50 Clay --<br />

6 -6,930 20,00 20,00 22,50 Clay --<br />

7 -7,630 20,00 20,00 35,00 Loam --<br />

8 -7,930 20,00 20,00 22,50 Clay --<br />

9 -8,430 17,00 17,00 17,50 Clay --<br />

10 -8,730 20,00 20,00 22,50 Clay --<br />

EL


Royal HaskoningDHV D-Foundations 8.1<br />

Number Top Gamma Gamma;sat Phi Soil Median<br />

layer layer Type (Sand/Gravel)<br />

[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />

11 -9,030 17,00 17,00 17,50 Clay --<br />

12 -9,130 20,00 20,00 22,50 Clay --<br />

13 -9,530 17,00 17,00 17,50 Clay --<br />

14 -9,630 20,00 20,00 22,50 Clay --<br />

15 -9,830 17,00 17,00 17,50 Clay --<br />

16 -10,030 13,00 13,00 15,00 Peat --<br />

17 -10,330 17,00 17,00 17,50 Clay --<br />

18 -10,930 20,00 20,00 22,50 Clay --<br />

19 -14,930 17,00 17,00 17,50 Clay --<br />

20 -15,130 13,00 13,00 15,00 Peat --<br />

21 -15,330 17,00 17,00 17,50 Clay --<br />

22 -15,830 20,00 20,00 22,50 Clay --<br />

23 -16,030 20,00 20,00 35,00 Loam --<br />

24 -16,230 19,00 21,00 30,00 Sand 0,200<br />

25 -16,430 19,00 21,00 32,50 Sand 0,200<br />

26 -21,830 19,00 21,00 30,00 Sand 0,200<br />

27 -22,730 19,00 21,00 32,50 Sand 0,200<br />

28 -26,730 19,00 21,00 30,00 Sand 0,200<br />

29 -26,830 20,00 20,00 35,00 Loam --<br />

30 -27,130 19,00 21,00 32,50 Sand 0,200<br />

31 -28,330 19,00 21,00 32,50 Sand 0,200<br />

32 -28,430 19,00 21,00 32,50 Sand 0,200<br />

2.6.2 Soil Profile SW3<br />

Belonging to CPT SW3<br />

Surface level in [m. reference level] : -2,790<br />

Phreatic level in [m. reference level] : -3,020<br />

Pile tip level in [m. reference level] : -23,000<br />

Top of positive skin friction zone in [m. reference level] : -17,000<br />

Bottom of negative skin friction zone in [m. reference level] : -17,000<br />

OCR-value foundation layer : 1,00<br />

Expected groundlevel settlement in [m] : 0,110<br />

Number of layers in profile : 38<br />

5,00<br />

0,00<br />

-5,00<br />

-10,00<br />

-15,00<br />

-20,00<br />

-25,00<br />

-30,00<br />

-35,00<br />

qc [MPa]<br />

5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00<br />

Ground level (-2,79)<br />

-40,00<br />

Depth [m]<br />

0,00 0,10 0,20 0,30 0,40 0,50 0,60<br />

qc [MPa]<br />

Pore water pressure [MPa]<br />

Reduced qc for alpha_s [MPa]<br />

Pore water pressure [MPa]<br />

14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 5<br />

NSFZ<br />

PSFZ<br />

PTL<br />

PL<br />

Profile: SW3<br />

Material Unit weight Unit weight Phi<br />

dry wet<br />

Peat, Clay, mod.. clea..<br />

kN/m3<br />

17,0 17,0 17,0 13,0<br />

kN/m3<br />

17,0 13,0<br />

deg<br />

17,5 15,0<br />

Peat, mod.. 13,0 13,0 15,0<br />

Clay, clea..<br />

Loam, Clay, sl s..<br />

Clay, Clay, clea.. sl ve s.. s..<br />

Clay, sl s..<br />

Clay, clea.. sl s..<br />

Peat,<br />

Clay,<br />

mod..<br />

clea..<br />

Clay, clea..<br />

Clay, clea.. sl s..<br />

Clay, clea.. sl s..<br />

Clay, sl s..<br />

Clay, clea..<br />

Clay, clea.. sl s..<br />

Clay, sl s..<br />

Peat, Clay, clea..<br />

Clay,<br />

mod..<br />

clea..<br />

Loam, Sand,<br />

Clay,<br />

ve<br />

sl ve s..<br />

s.. Sand, sl s..<br />

Sand, ve s..<br />

Sand, sl s..<br />

Sand, ve s..<br />

17,0<br />

20,0 17,0 20,0 17,0 20,0<br />

17,0<br />

13,0<br />

17,0<br />

20,0 17,0 20,0 17,0<br />

20,0<br />

17,0 20,0 17,0<br />

20,0<br />

17,0 13,0<br />

17,0<br />

20,0 19,0<br />

19,0<br />

19,0<br />

19,0<br />

19,0<br />

17,0<br />

20,0 17,0 20,0 17,0 20,0<br />

17,0<br />

13,0<br />

17,0<br />

20,0 17,0 20,0 17,0<br />

20,0<br />

17,0 20,0 17,0<br />

20,0<br />

17,0 13,0<br />

17,0<br />

20,0 21,0<br />

21,0<br />

21,0<br />

21,0<br />

21,0<br />

17,5<br />

22,5 35,0 22,5 17,5 22,5 17,5 22,5<br />

17,5<br />

15,0<br />

17,5<br />

22,5 17,5 22,5 17,5<br />

22,5<br />

17,5 22,5 17,5<br />

22,5<br />

17,5 15,0<br />

17,5<br />

22,5 35,0 30,0<br />

32,5<br />

30,0<br />

32,5<br />

30,0<br />

Sand, sl s..<br />

Sand, sl s..<br />

19,0<br />

19,0<br />

21,0<br />

21,0<br />

32,5<br />

32,5<br />

Sand, sl s.. 19,0 21,0 32,5<br />

PL (Phreatic Level) = -3,02 [m]<br />

EL (Excavation Level) = -4,00 [m]<br />

PTL (Pile Tip Level) = -23,00 [m]<br />

PSFZ = Positive skin friction zone, top = -17,00 [m]<br />

NSFZ = Negative skin friction zone, bottom = -17,00 [m]<br />

EL


Royal HaskoningDHV D-Foundations 8.1<br />

Number Top Gamma Gamma;sat Phi Soil Median<br />

layer layer Type (Sand/Gravel)<br />

[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />

1 -2,790 17,00 17,00 17,50 Clay --<br />

2 -2,800 17,00 17,00 17,50 Clay --<br />

3 -2,900 17,00 17,00 17,50 Clay --<br />

4 -3,000 13,00 13,00 15,00 Peat --<br />

5 -3,300 13,00 13,00 15,00 Peat --<br />

6 -6,600 17,00 17,00 17,50 Clay --<br />

7 -7,000 20,00 20,00 22,50 Clay --<br />

8 -7,600 20,00 20,00 35,00 Loam --<br />

9 -7,900 20,00 20,00 22,50 Clay --<br />

10 -8,000 17,00 17,00 17,50 Clay --<br />

11 -8,200 20,00 20,00 22,50 Clay --<br />

12 -8,500 17,00 17,00 17,50 Clay --<br />

13 -8,800 20,00 20,00 22,50 Clay --<br />

14 -9,100 17,00 17,00 17,50 Clay --<br />

15 -9,700 13,00 13,00 15,00 Peat --<br />

16 -10,200 17,00 17,00 17,50 Clay --<br />

17 -10,900 20,00 20,00 22,50 Clay --<br />

18 -11,200 17,00 17,00 17,50 Clay --<br />

19 -11,500 20,00 20,00 22,50 Clay --<br />

20 -11,900 17,00 17,00 17,50 Clay --<br />

21 -12,200 20,00 20,00 22,50 Clay --<br />

22 -13,700 17,00 17,00 17,50 Clay --<br />

23 -14,200 20,00 20,00 22,50 Clay --<br />

24 -14,500 17,00 17,00 17,50 Clay --<br />

25 -14,600 20,00 20,00 22,50 Clay --<br />

26 -15,700 17,00 17,00 17,50 Clay --<br />

27 -15,900 13,00 13,00 15,00 Peat --<br />

28 -16,000 17,00 17,00 17,50 Clay --<br />

29 -16,900 20,00 20,00 22,50 Clay --<br />

30 -17,100 20,00 20,00 35,00 Loam --<br />

31 -17,300 19,00 21,00 30,00 Sand 0,200<br />

32 -17,600 19,00 21,00 32,50 Sand 0,200<br />

33 -18,500 19,00 21,00 30,00 Sand 0,200<br />

34 -18,800 19,00 21,00 32,50 Sand 0,200<br />

35 -19,800 19,00 21,00 30,00 Sand 0,200<br />

36 -20,000 19,00 21,00 32,50 Sand 0,200<br />

37 -22,100 19,00 21,00 32,50 Sand 0,200<br />

38 -22,200 19,00 21,00 32,50 Sand 0,200<br />

2.6.3 Soil Profile S11<br />

Belonging to CPT S11<br />

Surface level in [m. reference level] : -2,270<br />

Phreatic level in [m. reference level] : -3,020<br />

Pile tip level in [m. reference level] : -23,000<br />

Top of positive skin friction zone in [m. reference level] : -18,000<br />

Bottom of negative skin friction zone in [m. reference level] : -18,000<br />

OCR-value foundation layer : 1,00<br />

Expected groundlevel settlement in [m] : 0,110<br />

Number of layers in profile : 34<br />

14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 6


5,00<br />

0,00<br />

-5,00<br />

-10,00<br />

-15,00<br />

-20,00<br />

-25,00<br />

-30,00<br />

-35,00<br />

-40,00<br />

Depth [m]<br />

qc [MPa]<br />

5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00<br />

qc [MPa]<br />

Reduced qc for alpha_s [MPa]<br />

Royal HaskoningDHV D-Foundations 8.1<br />

Ground level (-2,27)<br />

14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 7<br />

NSFZ<br />

PSFZ<br />

PTL<br />

PL<br />

Profile: S11<br />

Material Unit weight Unit weight Phi<br />

dry wet<br />

Clay,<br />

clea.. sl s..<br />

Peat,<br />

Clay, clea..<br />

Peat,<br />

mod..<br />

mod..<br />

Peat, mod..<br />

kN/m3<br />

17,0 20,0 17,0<br />

13,0<br />

13,0<br />

13,0<br />

kN/m3<br />

17,0 20,0 17,0<br />

13,0<br />

13,0<br />

13,0<br />

deg<br />

17,5 22,5 17,5<br />

15,0<br />

15,0<br />

15,0<br />

Clay, clea.. 17,0 17,0 17,5<br />

Loam, Clay, sl ve s..<br />

Clay, sl s.. s..<br />

Clay, clea..<br />

Clay, sl s..<br />

20,0<br />

17,0<br />

20,0<br />

20,0<br />

17,0<br />

20,0<br />

22,5 35,0 22,5<br />

17,5<br />

22,5<br />

Loam, ve s.. 20,0 20,0 35,0<br />

Loam, Sand, Clay, ve sl ve s.. s.. Sand,<br />

Sand, sl s..<br />

Sand, ve sl s.. s..<br />

Loam,<br />

Sand, ve<br />

ve<br />

s..<br />

s..<br />

Clay, sl s..<br />

Clay, clea..<br />

Loam, Clay, sl ve s.. s..<br />

Clay, Clay, clea.. sl s..<br />

Loam, Sand, Clay, ve sl ve s.. s.. 20,0 19,0<br />

19,0<br />

19,0<br />

20,0<br />

20,0<br />

17,0 20,0 17,0 20,0 19,0<br />

20,0 21,0<br />

21,0<br />

21,0<br />

20,0<br />

20,0<br />

17,0 20,0 17,0 20,0 21,0<br />

22,5 35,0 30,0<br />

32,5<br />

30,0 32,5 30,0<br />

35,0<br />

22,5<br />

17,5 22,5 35,0 22,5 17,5 22,5 35,0 30,0<br />

Sand, sl s.. 19,0 21,0 32,5<br />

Sand, sl s.. 19,0 21,0 32,5<br />

PL (Phreatic Level) = -3,02 [m]<br />

EL (Excavation Level) = -4,00 [m]<br />

PTL (Pile Tip Level) = -23,00 [m]<br />

PSFZ = Positive skin friction zone, top = -18,00 [m]<br />

NSFZ = Negative skin friction zone, bottom = -18,00 [m]<br />

Number Top Gamma Gamma;sat Phi Soil Median<br />

layer layer Type (Sand/Gravel)<br />

[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />

1 -2,270 17,00 17,00 17,50 Clay --<br />

2 -2,280 17,00 17,00 17,50 Clay --<br />

3 -2,380 17,00 17,00 17,50 Clay --<br />

4 -2,780 20,00 20,00 22,50 Clay --<br />

5 -2,880 17,00 17,00 17,50 Clay --<br />

6 -3,180 13,00 13,00 15,00 Peat --<br />

7 -3,780 13,00 13,00 15,00 Peat --<br />

8 -4,280 13,00 13,00 15,00 Peat --<br />

9 -4,980 17,00 17,00 17,50 Clay --<br />

10 -7,580 20,00 20,00 22,50 Clay --<br />

11 -7,980 20,00 20,00 35,00 Loam --<br />

12 -8,080 20,00 20,00 22,50 Clay --<br />

13 -8,680 17,00 17,00 17,50 Clay --<br />

14 -9,180 20,00 20,00 22,50 Clay --<br />

15 -10,080 20,00 20,00 35,00 Loam --<br />

16 -11,980 20,00 20,00 22,50 Clay --<br />

17 -12,380 20,00 20,00 35,00 Loam --<br />

18 -12,480 19,00 21,00 30,00 Sand 0,200<br />

19 -12,680 19,00 21,00 32,50 Sand 0,200<br />

20 -13,480 19,00 21,00 30,00 Sand 0,200<br />

21 -13,780 19,00 21,00 32,50 Sand 0,200<br />

22 -14,180 19,00 21,00 30,00 Sand 0,200<br />

23 -14,380 20,00 20,00 35,00 Loam --<br />

24 -15,080 20,00 20,00 22,50 Clay --<br />

25 -16,280 17,00 17,00 17,50 Clay --<br />

26 -16,680 20,00 20,00 22,50 Clay --<br />

27 -16,880 20,00 20,00 35,00 Loam --<br />

28 -17,280 20,00 20,00 22,50 Clay --<br />

29 -17,680 17,00 17,00 17,50 Clay --<br />

30 -18,080 20,00 20,00 22,50 Clay --<br />

31 -18,380 20,00 20,00 35,00 Loam --<br />

32 -18,480 19,00 21,00 30,00 Sand 0,200<br />

33 -18,580 19,00 21,00 32,50 Sand 0,200<br />

34 -30,580 19,00 21,00 32,50 Sand 0,200<br />

EL


2.6.4 Soil Profile S10<br />

Belonging to CPT S10<br />

Surface level in [m. reference level] : -2,200<br />

Phreatic level in [m. reference level] : -3,020<br />

Pile tip level in [m. reference level] : -23,000<br />

Top of positive skin friction zone in [m. reference level] : -18,000<br />

Bottom of negative skin friction zone in [m. reference level] : -18,000<br />

OCR-value foundation layer : 1,00<br />

Expected groundlevel settlement in [m] : 0,110<br />

Number of layers in profile : 43<br />

5,00<br />

0,00<br />

-5,00<br />

-10,00<br />

-15,00<br />

-20,00<br />

-25,00<br />

-30,00<br />

-35,00<br />

-40,00<br />

Depth [m]<br />

qc [MPa]<br />

5,00 10,00 15,00 20,00 25,00 30,00 35,00 40,00<br />

qc [MPa]<br />

Reduced qc for alpha_s [MPa]<br />

Royal HaskoningDHV D-Foundations 8.1<br />

Ground level (-2,20)<br />

14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 8<br />

NSFZ<br />

PSFZ<br />

PTL<br />

PL<br />

Profile: S10<br />

Material Unit weight Unit weight Phi<br />

dry wet<br />

Peat, Clay, Clay, mod.. clea.. clea..<br />

Peat, Clay, mod.. clea..<br />

kN/m3<br />

17,0 17,0 13,0 17,0 13,0<br />

kN/m3<br />

17,0 17,0 13,0 17,0 13,0<br />

deg<br />

17,5 17,5 15,0 17,5 15,0<br />

Peat, mod.. 13,0 13,0 15,0<br />

Peat,<br />

mod..<br />

Clay, clea..<br />

Clay, sl s..<br />

Clay, clea..<br />

13,0<br />

17,0<br />

20,0<br />

17,0<br />

13,0<br />

17,0<br />

20,0<br />

17,0<br />

15,0 15,0<br />

17,5<br />

22,5<br />

17,5<br />

Loam,<br />

Clay, sl<br />

ve<br />

s..<br />

Clay, sl s.. s..<br />

Loam, ve s..<br />

Loam, Sand, ve s..<br />

Loam, Sand, ve s..<br />

Loam, Sand, ve s..<br />

Sand, ve s.. Sand, sl s..<br />

Loam, Sand, ve s.. s..<br />

Clay, sl s..<br />

Loam, Clay, clea..<br />

Loam, Sand, Clay, sl s..<br />

Clay, ve sl<br />

ve s.. s.. s..<br />

Loam, Sand,<br />

Clay, clea..<br />

ve sl ve s.. s.. 20,0<br />

20,0<br />

20,0 19,0 20,0 19,0 20,0 19,0 20,0 19,0<br />

19,0<br />

19,0 20,0<br />

20,0<br />

17,0 20,0 19,0 20,0 20,0 17,0 20,0 19,0<br />

20,0<br />

20,0<br />

20,0 21,0 20,0 21,0 20,0 21,0 20,0 21,0<br />

21,0<br />

21,0 20,0<br />

20,0<br />

17,0 20,0 21,0 20,0 20,0 17,0 20,0 21,0<br />

22,5<br />

35,0 22,5<br />

35,0 30,0 35,0 30,0 35,0 30,0 35,0 30,0<br />

32,5<br />

30,0 35,0<br />

22,5<br />

17,5 22,5 35,0 30,0 35,0 22,5 17,5 22,5 35,0 30,0<br />

Sand, sl s.. 19,0 21,0 32,5<br />

Sand, ve s.. 19,0 21,0 30,0<br />

Sand, sl s.. 19,0 21,0 32,5<br />

Sand, sl s.. 19,0 21,0 32,5<br />

Sand, sl s.. 19,0 21,0 32,5<br />

PL (Phreatic Level) = -3,02 [m]<br />

EL (Excavation Level) = -4,00 [m]<br />

PTL (Pile Tip Level) = -23,00 [m]<br />

PSFZ = Positive skin friction zone, top = -18,00 [m]<br />

NSFZ = Negative skin friction zone, bottom = -18,00 [m]<br />

Number Top Gamma Gamma;sat Phi Soil Median<br />

layer layer Type (Sand/Gravel)<br />

[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />

1 -2,200 17,00 17,00 17,50 Clay --<br />

2 -2,210 17,00 17,00 17,50 Clay --<br />

3 -2,310 17,00 17,00 17,50 Clay --<br />

4 -2,410 13,00 13,00 15,00 Peat --<br />

5 -2,710 17,00 17,00 17,50 Clay --<br />

6 -3,110 13,00 13,00 15,00 Peat --<br />

7 -3,310 13,00 13,00 15,00 Peat --<br />

8 -5,710 13,00 13,00 15,00 Peat --<br />

9 -5,810 13,00 13,00 15,00 Peat --<br />

10 -5,910 13,00 13,00 15,00 Peat --<br />

11 -6,510 17,00 17,00 17,50 Clay --<br />

12 -7,710 20,00 20,00 22,50 Clay --<br />

13 -8,010 17,00 17,00 17,50 Clay --<br />

14 -9,610 20,00 20,00 22,50 Clay --<br />

15 -10,210 20,00 20,00 35,00 Loam --<br />

16 -10,510 20,00 20,00 22,50 Clay --<br />

17 -10,810 20,00 20,00 35,00 Loam --<br />

18 -11,410 19,00 21,00 30,00 Sand 0,200<br />

19 -11,510 20,00 20,00 35,00 Loam --<br />

20 -11,910 19,00 21,00 30,00 Sand 0,200<br />

21 -12,110 20,00 20,00 35,00 Loam --<br />

22 -12,510 19,00 21,00 30,00 Sand 0,200<br />

EL


Royal HaskoningDHV D-Foundations 8.1<br />

Number Top Gamma Gamma;sat Phi Soil Median<br />

layer layer Type (Sand/Gravel)<br />

[m R.L.] [kN/m3] [kN/m3] [deg] [mm]<br />

23 -12,610 20,00 20,00 35,00 Loam --<br />

24 -12,810 19,00 21,00 30,00 Sand 0,200<br />

25 -13,010 19,00 21,00 32,50 Sand 0,200<br />

26 -14,010 19,00 21,00 30,00 Sand 0,200<br />

27 -14,210 20,00 20,00 35,00 Loam --<br />

28 -14,810 20,00 20,00 22,50 Clay --<br />

29 -16,110 17,00 17,00 17,50 Clay --<br />

30 -16,610 20,00 20,00 22,50 Clay --<br />

31 -16,710 20,00 20,00 35,00 Loam --<br />

32 -16,810 19,00 21,00 30,00 Sand 0,200<br />

33 -17,110 20,00 20,00 35,00 Loam --<br />

34 -17,210 20,00 20,00 22,50 Clay --<br />

35 -17,410 17,00 17,00 17,50 Clay --<br />

36 -17,810 20,00 20,00 22,50 Clay --<br />

37 -18,010 20,00 20,00 35,00 Loam --<br />

38 -18,110 19,00 21,00 30,00 Sand 0,200<br />

39 -18,210 19,00 21,00 32,50 Sand 0,200<br />

40 -27,810 19,00 21,00 30,00 Sand 0,200<br />

41 -28,110 19,00 21,00 32,50 Sand 0,200<br />

42 -30,210 19,00 21,00 32,50 Sand 0,200<br />

43 -30,310 19,00 21,00 32,50 Sand 0,200<br />

2.7 Pile Types<br />

2.7.1 Pile type : Rect 380x380<br />

Pile type : Prefabricated concrete pile<br />

Materialtype for pile : Concrete<br />

Slip layer : None<br />

Pile shape : Rectangular pile<br />

beta (Shape factor) according to figure 7i, NEN-EN 1997-1:2005.<br />

s (factor for the influence of the shape of the crosssection of the pile base) according to NEN-EN 1997-1:2005.<br />

Pile dimensions :<br />

Smallest side pile tip [m] : 0,380<br />

Largest side pile tip [m] : 0,380<br />

2.7.2 Pile type : Rect 400x400<br />

Pile type : Prefabricated concrete pile<br />

Materialtype for pile : Concrete<br />

Slip layer : None<br />

Pile shape : Rectangular pile<br />

beta (Shape factor) according to figure 7i, NEN-EN 1997-1:2005.<br />

s (factor for the influence of the shape of the crosssection of the pile base) according to NEN-EN 1997-1:2005.<br />

Pile dimensions :<br />

Smallest side pile tip [m] : 0,400<br />

Largest side pile tip [m] : 0,400<br />

2.7.3 Pile type : Rect 450x450<br />

Pile type : Prefabricated concrete pile<br />

Materialtype for pile : Concrete<br />

Slip layer : None<br />

Pile shape : Rectangular pile<br />

beta (Shape factor) according to figure 7i, NEN-EN 1997-1:2005.<br />

s (factor for the influence of the shape of the crosssection of the pile base) according to NEN-EN 1997-1:2005.<br />

14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 9


Royal HaskoningDHV D-Foundations 8.1<br />

Pile dimensions :<br />

Smallest side pile tip [m] : 0,450<br />

Largest side pile tip [m] : 0,450<br />

2.8 Foundation Plan<br />

Number of piles : 1<br />

Number of collaborating piles* : 1<br />

* : 0 = not defined, 1 = non rigid superstructure, >1 = rigid superstructure<br />

2.8.1 View of Foundation Plan<br />

1<br />

14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 10<br />

Legend<br />

Rect 400x400 (Edge pile)<br />

Rect 400x400 (Middle pile)<br />

CPT<br />

Pile X-coor- Y-coor- Fc;d Fc;d P0 Pile head<br />

nr/name dinate dinate (EQU/GEO) (SLS) level<br />

[m] [m] [kN] [kN] [kN/m2] [m R.L.]<br />

1: 1 86487,66 444158,98 712,00 647,00 7,00 -0,52<br />

2.9 Excavation Data<br />

Excavation level in [m. reference level] : -4,000<br />

Reduction model : Safe (NEN)


5,00<br />

0,00<br />

-5,00<br />

-10,00<br />

-15,00<br />

-20,00<br />

-25,00<br />

-30,00<br />

-35,00<br />

-40,00<br />

Depth [m]<br />

qc [MPa]<br />

5 10 15 20 25 30 35 40<br />

qc [MPa]<br />

Reduced qc [MPa]<br />

2.10 Totalized Loads (design values)<br />

Royal HaskoningDHV D-Foundations 8.1<br />

Indication for qc-reduction<br />

due to safe reduction method<br />

Ground level (-2,73)<br />

14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 11<br />

PL<br />

Profile: S2<br />

[kN/m2]<br />

0 100 200 300 400 500 600 700 800<br />

PL (Phreatic Level) = -3,02 [m]<br />

EL (Excavation Level) = -4,00 [m]<br />

= Initial Effective Stress<br />

= Effective Stress<br />

Total load on all piles<br />

For limit state EQU/GEO in [kN] : 712,00<br />

For Serviceability limit state in [kN] : 647,00<br />

2.11 Requirements<br />

Limit state GEO<br />

Maximum allowed settlement in [m] : 0,150<br />

Maximum allowed (relative) rotation : 1 / 100<br />

Serviceability Limit State<br />

Maximum allowed settlement in [m] : 0,150<br />

Maximum allowed (relative) rotation : 1 / 300<br />

2.12 Overruled Parameters<br />

User defined Factor xi3 [-] : 1,39<br />

User defined Factor xi4 [-] : 1,39<br />

2.13 Calculation Options<br />

Suppress pile group (for negative skin friction)<br />

Create intermediate results file<br />

Use reduction for continuous flight auger piles (standard)<br />

Use the influence of excavations (standard).<br />

2.14 Model Options<br />

Selected pile types :<br />

-Rect 400x400<br />

Selected profiles :<br />

-S2<br />

-SW3<br />

-S11<br />

EL


-S10<br />

Royal HaskoningDHV D-Foundations 8.1<br />

3 Bearing Piles (EC7-NL): Results of the Option Complete Verification<br />

3.1 Errors and Warnings<br />

Warning : The factor xi3 (NEN-EN 1997 1:2005 NEN 9097-1, annex A) is user defined. is user defined. Evidence to<br />

support this from the NEN deviating value has to be provided.<br />

Warning : The factor xi4 (NEN-EN 1997 1:2005 NEN 9097-1, annex A) is user defined. is user defined. Evidence to<br />

support this from the NEN deviating value has to be provided.<br />

The CPT's do not meet the requirements set by NEN 9097-1<br />

par 3.2.3 because :<br />

- the maximum allowed center to center distance for CPT's is exceeded.<br />

- not all piles are positioned within the prescribed area of the CPT's.<br />

3.2 Remarks<br />

When checking the survey and testing of soil according to NEN 9097-1 art 3.2.3 lid (e), the program uses the<br />

provided CPT test level. It does NOT take into account possible different pile tip levels. When different pile tip levels<br />

are used in this calculation, the user itself must check for possibly required additional survey and testing of soil.<br />

Performing the check on NEN 9097-1 par 3.2.3, the average distance between the different CPT's used for this<br />

check is 20 m.<br />

3.3 Calculation Parameters<br />

3.3.1 Pile Factors<br />

gamma;b (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />

Limit State EQU/GEO) : 1,20<br />

gamma;b (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />

the Serviceability Limit State) : 1,00<br />

gamma;s (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />

Limit State EQU/GEO) : 1,20<br />

gamma;s (NEN-EN 1997-1:2005, annex A.6 A.7 A.8,<br />

the Serviceability Limit State) : 1,00<br />

xi3 (user defined) : 1,39<br />

xi4 (user defined) : 1,39<br />

Even though it is possible, the pilegroup model has not been used to calculate the negative skin friction.<br />

3.3.2 Pile type : Rect 400x400<br />

Pile type : Prefabricated concrete pile<br />

Materialtype for pile : Concrete<br />

Slip layer : None<br />

Pile shape : Rectangular pile<br />

beta (Shape factor: figuur 7i, NEN-EN 1997<br />

1:2005 par. 7.6.2.3(g): NEN 9097-1 : Pile tip) : 1,00<br />

s (NEN-EN 1997 1:2005 par. 7.6.2.3(h), NEN 9097-1 : factor for<br />

the influence of the shape of the crosssection of the pile base) : 1,00<br />

Pile dimensions :<br />

Smallest side pile tip [m] : 0,400<br />

Largest side pile tip [m] : 0,400<br />

CPT Alpha_s Alpha_s Alpha_p<br />

Sand/ Clay/Loam<br />

Gravel Peat<br />

S2 0,0100 0,0242 1,0000<br />

14-12-2012 C:\..\Landbouw<strong>bruggen</strong> <strong>Delfland</strong> Definitief - 20121214 Page 12


CPT Alpha_s Alpha_s Alpha_p<br />

Sand/ Clay/Loam<br />

Gravel Peat<br />

SW3 0,0100 0,0233 1,0000<br />

S11 0,0100 0,0210 1,0000<br />

S10 0,0100 0,0242 1,0000<br />

3.4 Verification of Limit State EQU<br />

Required by NEN-EN 1997-1 section 2.4.7 / 2.4.8: Ed


Pile name: 1<br />

Components of the maximum settlement are :<br />

sneg = 0,000 [m]<br />

sb = 0,007 [m]<br />

sel;d = 0,007 [m]<br />

s2 = 0,000 [m]<br />

Royal HaskoningDHV D-Foundations 8.1<br />

sneg stands for the settlement due to negative skin friction when the expected ground level settlement (egls) is<br />

within the next boundaries : 0.02 < egls


Bijlage E2 – Zettingsberekeningen<br />

<strong>DO</strong> brug 4,5 en 22 9R6945.I8/R001_0C/902635/HVT/Nijm<br />

Concept rapport 14 december 2012


Zetting tgv bims (2,0 m; 0,6 m netto t.o.v. mv)<br />

Annex<br />

A4<br />

Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />

form.<br />

Hoogheemraadschap van <strong>Delfland</strong><br />

9R694518<br />

ctr.<br />

Barbarossastraat 35<br />

6522 DK Nijmegen<br />

Phone +31 (0)24 328 42 84<br />

Fax +31 (0)24 323 93 46<br />

14-12-2012<br />

SVVE<br />

date drw.<br />

D-Settlement 9.2 : Bruggen - Zetting landhoofden 60cm - 20121214.sli<br />

Input View<br />

5 6 7 8<br />

8<br />

7<br />

6<br />

5<br />

Bims<br />

Layers<br />

8. Veen, Holland, naast<br />

7. Veen, Holland, naast<br />

6. Klei, DK, naast<br />

5. Klei, DK, naast<br />

4. Klei, DK, naast<br />

3. Klei, DK, naast<br />

2. Veen, Basis<br />

1. Zand, algemeen


Voorbelasting tbv 60cm netto ophoging<br />

Annex<br />

A4<br />

Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />

form.<br />

Hoogheemraadschap van <strong>Delfland</strong><br />

9R694518<br />

ctr.<br />

Barbarossastraat 35<br />

6522 DK Nijmegen<br />

Phone +31 (0)24 328 42 84<br />

Fax +31 (0)24 323 93 46<br />

14-12-2012<br />

SVVE<br />

date drw.<br />

D-Settlement 9.2 : Bruggen - Zetting landhoofden 60cm-voorb - 20121214.sli<br />

Input View<br />

2 3 4 5 6 7 8<br />

Voorbelasting (2)<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

Layers<br />

8. Veen, Holland, naast<br />

7. Veen, Holland, naast<br />

6. Klei, DK, naast<br />

5. Klei, DK, naast<br />

4. Klei, DK, naast<br />

3. Klei, DK, naast<br />

2. Veen, Basis<br />

1. Zand, algemeen


Zetting tgv bims (2,0 m; 0,6 m netto t.o.v. mv)<br />

Annex<br />

A4<br />

Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />

form.<br />

Hoogheemraadschap van <strong>Delfland</strong><br />

9R694518<br />

ctr.<br />

Barbarossastraat 35<br />

6522 DK Nijmegen<br />

Phone +31 (0)24 328 42 84<br />

Fax +31 (0)24 323 93 46<br />

14-12-2012<br />

SVVE<br />

date drw.<br />

D-Settlement 9.2 : Bruggen - Zetting landhoofden 60cm - 20121214.sli<br />

Effective stress [kPa]<br />

Settlement [m]<br />

20,132460<br />

20,132455<br />

20,132450<br />

20,132445<br />

0,000000<br />

0,200000<br />

0,400000<br />

0,600000<br />

0,800000<br />

1,000000<br />

Vertical 5 (X = 0,000 m; Z = 0,000 m)<br />

Method = NEN - Koppejan with Darcy (Natural strain)<br />

Time-History<br />

1 10 100 1000 10000<br />

Time [days]<br />

1 10 100 1000 10000<br />

Depth = 2,200 (-) [m]<br />

Settlement after 10000 days = 1,108 [m]


Voorbelasting tbv 60cm netto ophoging<br />

Annex<br />

A4<br />

Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />

form.<br />

Hoogheemraadschap van <strong>Delfland</strong><br />

9R694518<br />

ctr.<br />

Barbarossastraat 35<br />

6522 DK Nijmegen<br />

Phone +31 (0)24 328 42 84<br />

Fax +31 (0)24 323 93 46<br />

14-12-2012<br />

SVVE<br />

date drw.<br />

D-Settlement 9.2 : Bruggen - Zetting landhoofden 60cm-voorb - 20121214.sli<br />

Effective stress [kPa]<br />

Settlement [m]<br />

35,0<br />

30,0<br />

25,0<br />

20,0<br />

0,0<br />

0,5<br />

1,0<br />

1,5<br />

2,0<br />

Vertical 5 (X = 0,000 m; Z = 0,000 m)<br />

Method = NEN - Koppejan with Darcy (Natural strain)<br />

Time-History<br />

1 10 100 1000 10000<br />

Time [days]<br />

1 10 100 1000 10000<br />

Depth = 2,200 (-) [m]<br />

Settlement after 10000 days = 2,120 [m]


Company: Royal HaskoningDHV<br />

Date of report: 14-12-2012<br />

Time of report: 17:03:52<br />

Date of calculation: 14-12-2012<br />

Time of calculation: 15:56:31<br />

Report for D-Settlement 9.2<br />

Settlement Calculations<br />

Developed by Deltares<br />

Filename: C:\..\Definitief\Bruggen - Zetting landhoofden 60cm-voorb - 20121214<br />

Project identification: Hoogheemraadschap van <strong>Delfland</strong><br />

Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />

Voorbelasting tbv 60cm netto ophoging


1 Table of Contents<br />

Royal HaskoningDHV D-Settlement 9.2<br />

1 Table of Contents 2<br />

2 Echo of the Input 3<br />

2.1 Layer Boundaries 3<br />

2.2 PL Lines 3<br />

2.3 General Data 3<br />

2.4 Soil Profiles 3<br />

2.5 Soil Properties 4<br />

2.6 Non-Uniform Loads 4<br />

2.7 Verticals 5<br />

2.8 Vertical Drain 5<br />

3 Results per Vertical 6<br />

3.1 Results for Vertical 1 (X = -26,00 m; Z = 0,00 m) 6<br />

3.2 Results for Vertical 2 (X = -21,00 m; Z = 0,00 m) 6<br />

3.3 Results for Vertical 3 (X = -16,00 m; Z = 0,00 m) 7<br />

3.4 Results for Vertical 4 (X = -15,00 m; Z = 0,00 m) 8<br />

3.5 Results for Vertical 5 (X = 0,00 m; Z = 0,00 m) 9<br />

3.6 Results for Vertical 6 (X = 1,88 m; Z = 0,00 m) 10<br />

3.7 Results for Vertical 7 (X = 3,69 m; Z = 0,00 m) 10<br />

3.8 Results for Vertical 8 (X = 7,71 m; Z = 0,00 m) 11<br />

3.9 Results for Vertical 9 (X = 26,00 m; Z = 0,00 m) 12<br />

4 Settlements 14<br />

4.1 Settlements 14<br />

4.2 Residual Times 14<br />

5 Warnings and errors 17<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 2


2 Echo of the Input<br />

2.1 Layer Boundaries<br />

Boundary number Co-ordinates [m]<br />

8 - X - -35,000 35,000<br />

8 - Y - -2,200 -2,200<br />

7 - X - -35,000 35,000<br />

7 - Y - -4,050 -4,050<br />

6 - X - -35,000 35,000<br />

6 - Y - -6,500 -6,500<br />

5 - X - -35,000 35,000<br />

5 - Y - -9,000 -9,000<br />

4 - X - -35,000 35,000<br />

4 - Y - -13,000 -13,000<br />

3 - X - -35,000 35,000<br />

3 - Y - -14,200 -14,200<br />

2 - X - -35,000 35,000<br />

2 - Y - -15,500 -15,500<br />

1 - X - -35,000 35,000<br />

1 - Y - -17,000 -17,000<br />

0 - X - -35,000 35,000<br />

0 - Y - -20,000 -20,000<br />

2.2 PL Lines<br />

PL line number Co-ordinates [m]<br />

1 - X - -35,000 35,000<br />

1 - Y - -3,020 -3,020<br />

2.3 General Data<br />

Royal HaskoningDHV D-Settlement 9.2<br />

Soil model: Koppejan<br />

Consolidation model: Darcy<br />

Strain model: Natural<br />

Groundwater level: Initial determined by PL-line number 1<br />

Unit weight of water: 9,81 [kN/m³]<br />

Stress distribution<br />

- Soil: Buisman<br />

- Loads: Simulate<br />

End of consolidation: 10000,00 [days]<br />

No maintain profile<br />

Pc (initial): Variable parallel to the initial effective stress<br />

Pc (per step): Automatic increased to the final effective stresses<br />

Creep rate reference time: 1,000 [days]<br />

No imaginary surface<br />

With submerging<br />

(only for non uniform loads)<br />

- Iteration stop criterium : 0,10 [m]<br />

Load column width<br />

- Non-Uniform Loads : 1,00 [m]<br />

- Trapezoidal Loads : 1,00 [m]<br />

2.4 Soil Profiles<br />

Layer Material name PL-line PL-line<br />

number top bottom<br />

8 Veen, Holland, naast 1 1<br />

7 Veen, Holland, naast 1 1<br />

6 Klei, DK, naast 1 1<br />

5 Klei, DK, naast 1 1<br />

4 Klei, DK, naast 1 1<br />

3 Klei, DK, naast 1 1<br />

2 Veen, Basis 1 1<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 3


Layer Material name PL-line PL-line<br />

number top bottom<br />

1 Zand, algemeen 1 1<br />

2.5 Soil Properties<br />

Layer Drained Unit weight<br />

number Unsaturated Saturated<br />

[kN/m³] [kN/m³]<br />

8 No 10,60 10,60<br />

7 No 10,60 10,60<br />

6 No 14,80 14,80<br />

5 No 14,80 14,80<br />

4 No 14,80 14,80<br />

3 No 14,80 14,80<br />

2 No 11,00 11,00<br />

1 Yes 18,00 20,00<br />

Royal HaskoningDHV D-Settlement 9.2<br />

Layer Storage Vert. consolid. Ratio Ch/Cv Vertical Ratio hor/vert Permeability Initial vertical<br />

number type coefficient Cv permeability permeability strain mod. permeability<br />

[m²/s] [-] [m/s] [-] [m/s] [m/s]<br />

8 Vert. cons. 4,27E-07 2,000 - - - -<br />

7 Vert. cons. 4,27E-07 2,000 - - - -<br />

6 Vert. cons. 2,80E-07 1,000 - - - -<br />

5 Vert. cons. 2,80E-07 1,000 - - - -<br />

4 Vert. cons. 2,80E-07 1,000 - - - -<br />

3 Vert. cons. 2,80E-07 1,000 - - - -<br />

2 Vert. cons. 4,27E-07 2,000 - - - -<br />

1 Const. perm. - - 5,787E-07 3,000 - -<br />

Layer Precons. POP OCR<br />

number pressure<br />

[kN/m²] [kN/m²] [-]<br />

8 - 5,00 -<br />

7 - 5,00 -<br />

6 - - 1,10<br />

5 - - 1,10<br />

4 - - 1,10<br />

3 - - 1,10<br />

2 - - 1,10<br />

1 - - 1,10<br />

Layer Primary compr. coeff. Secular compr. coef. Swell constants<br />

number Cp [-] Cp' [-] Cs [-] Cs' [-] Ap [-] As [-]<br />

8 2,50E+01 6,25E+00 1,00E+02 2,50E+01 2,50E+01 2,50E+01<br />

7 2,50E+01 6,25E+00 1,00E+02 2,50E+01 2,50E+01 2,50E+01<br />

6 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />

5 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />

4 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />

3 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />

2 2,50E+01 7,50E+00 1,00E+02 2,50E+01 2,50E+01 2,50E+01<br />

1 1,00E+09 1,50E+03 1,00E+09 1,00E+09 1,00E+09 1,00E+09<br />

2.6 Non-Uniform Loads<br />

Load Time Unit weight<br />

number Unsaturated Saturated<br />

[days] [kN/m³] [kN/m³]<br />

1 0 18,00 20,00<br />

2 30 18,00 20,00<br />

Load number Co-ordinates [m]<br />

1 - X - -6,00 -5,00 5,00 6,00<br />

1 - Y - -2,20 -0,70 -0,70 -2,20<br />

2 - X - -5,00 -4,00 4,00 5,00<br />

2 - Y - -0,70 0,30 0,30 -0,70<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 4


2.7 Verticals<br />

Royal HaskoningDHV D-Settlement 9.2<br />

Vertical number X co-ordinates [m]<br />

1 - 5 -26,000 -21,000 -16,000 -15,000 0,000<br />

6 - 9 1,881 3,687 7,708 26,000<br />

Calculation of cross section at Z = 0,000 m<br />

Discretisation = 100<br />

2.8 Vertical Drain<br />

Drain type Strip<br />

Horizontal range "From" [m] -10,000<br />

Horizontal range "To" [m] 10,000<br />

Bottom position [m] -9,000<br />

Center to center distance [m] 1,500<br />

Width [m] 0,100<br />

Thickness [m] 0,003<br />

Grid Triangular<br />

Enforced dewatering Off<br />

Start of drainage [days] 0,000<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 5


3 Results per Vertical<br />

3.1 Results for Vertical 1 (X = -26,00 m; Z = 0,00 m)<br />

Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-2,200 0,001 -2,200 0,001 0,003<br />

-2,300 1,060 -2,300 1,060 0,003<br />

-2,400 2,120 -2,400 2,120 0,003<br />

-2,500 3,180 -2,500 3,180 0,003<br />

-2,600 4,240 -2,600 4,240 0,003<br />

-2,700 5,300 -2,700 5,300 0,003<br />

-2,800 6,360 -2,800 6,360 0,003<br />

-2,900 7,420 -2,900 7,420 0,003<br />

-3,000 8,480 -3,000 8,480 0,003<br />

-3,020 8,692 -3,020 8,692 0,003<br />

-3,100 8,756 -3,020 8,756 0,003<br />

-3,125 8,775 -3,020 8,775 0,003<br />

-3,200 8,835 -3,020 8,835 0,003<br />

-4,050 9,508 -3,020 9,508 0,003<br />

-4,050 9,508 -3,020 9,508 0,003<br />

-4,675 10,003 -3,020 10,003 0,003<br />

-5,275 10,481 -3,020 10,481 0,003<br />

-5,900 10,979 -3,020 10,979 0,003<br />

-6,500 11,460 -3,020 11,460 0,003<br />

-6,500 11,460 -3,020 11,460 0,003<br />

-7,150 14,714 -3,020 14,714 0,003<br />

-7,750 17,721 -3,020 17,721 0,003<br />

-8,400 20,981 -3,020 20,981 0,003<br />

-9,000 23,995 -3,020 23,995 0,003<br />

-9,000 23,995 -3,020 23,995 0,003<br />

-10,000 29,026 -3,020 29,026 0,003<br />

-11,000 34,069 -3,020 34,069 0,002<br />

-12,000 39,124 -3,020 39,124 0,002<br />

-13,000 44,191 -3,020 44,191 0,002<br />

-13,000 44,191 -3,020 44,191 0,002<br />

-13,600 47,236 -3,020 47,236 0,002<br />

-14,200 50,285 -3,020 50,285 0,002<br />

-14,200 50,285 -3,020 50,285 0,002<br />

-14,850 53,592 -3,020 53,592 0,002<br />

-15,500 56,903 -3,020 56,903 0,001<br />

-15,500 56,903 -3,020 56,903 0,001<br />

-16,250 57,878 -3,020 57,878 0,001<br />

-17,000 58,856 -3,020 58,856 0,000<br />

-17,000 58,856 -3,020 58,856 0,000<br />

-17,800 67,103 -3,020 67,103 0,000<br />

-18,500 74,322 -3,020 74,322 0,000<br />

-19,200 81,542 -3,020 81,542 0,000<br />

-20,000 89,795 -3,020 89,795 0,000<br />

3.2 Results for Vertical 2 (X = -21,00 m; Z = 0,00 m)<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-2,200 0,001 -2,200 0,001 0,007<br />

-2,300 1,060 -2,300 1,060 0,007<br />

-2,400 2,120 -2,400 2,120 0,007<br />

-2,500 3,180 -2,500 3,180 0,007<br />

-2,600 4,241 -2,600 4,241 0,007<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 6


Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-2,700 5,301 -2,700 5,301 0,007<br />

-2,800 6,361 -2,800 6,361 0,007<br />

-2,900 7,421 -2,900 7,421 0,007<br />

-3,000 8,481 -3,000 8,481 0,007<br />

-3,020 8,693 -3,020 8,693 0,007<br />

-3,100 8,757 -3,020 8,757 0,007<br />

-3,125 8,776 -3,020 8,776 0,007<br />

-3,200 8,836 -3,020 8,836 0,007<br />

-4,050 9,512 -3,020 9,512 0,007<br />

-4,050 9,512 -3,020 9,512 0,007<br />

-4,675 10,012 -3,020 10,012 0,007<br />

-5,275 10,495 -3,020 10,495 0,007<br />

-5,900 11,004 -3,020 11,004 0,007<br />

-6,500 11,498 -3,020 11,498 0,007<br />

-6,500 11,498 -3,020 11,498 0,007<br />

-7,150 14,771 -3,020 14,771 0,007<br />

-7,750 17,800 -3,020 17,800 0,007<br />

-8,400 21,090 -3,020 21,090 0,006<br />

-9,000 24,136 -3,020 24,136 0,006<br />

-9,000 24,136 -3,020 24,136 0,006<br />

-10,000 29,231 -3,020 29,231 0,006<br />

-11,000 34,348 -3,020 34,348 0,006<br />

-12,000 39,486 -3,020 39,486 0,005<br />

-13,000 44,641 -3,020 44,641 0,005<br />

-13,000 44,641 -3,020 44,641 0,005<br />

-13,600 47,741 -3,020 47,741 0,004<br />

-14,200 50,844 -3,020 50,844 0,004<br />

-14,200 50,844 -3,020 50,844 0,004<br />

-14,850 54,211 -3,020 54,211 0,003<br />

-15,500 57,579 -3,020 57,579 0,003<br />

-15,500 57,579 -3,020 57,579 0,003<br />

-16,250 58,619 -3,020 58,619 0,001<br />

-17,000 59,659 -3,020 59,659 0,000<br />

-17,000 59,659 -3,020 59,659 0,000<br />

-17,800 67,967 -3,020 67,967 0,000<br />

-18,500 75,236 -3,020 75,236 0,000<br />

-19,200 82,501 -3,020 82,501 0,000<br />

-20,000 90,801 -3,020 90,801 0,000<br />

3.3 Results for Vertical 3 (X = -16,00 m; Z = 0,00 m)<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-2,200 0,002 -2,200 0,002 0,018<br />

-2,300 1,061 -2,300 1,061 0,018<br />

-2,400 2,122 -2,400 2,122 0,018<br />

-2,500 3,182 -2,500 3,182 0,018<br />

-2,600 4,242 -2,600 4,242 0,019<br />

-2,700 5,303 -2,700 5,303 0,019<br />

-2,800 6,364 -2,800 6,364 0,019<br />

-2,900 7,424 -2,900 7,424 0,019<br />

-3,000 8,485 -3,000 8,485 0,019<br />

-3,020 8,698 -3,020 8,698 0,019<br />

-3,100 8,762 -3,020 8,762 0,019<br />

-3,125 8,782 -3,020 8,782 0,019<br />

-3,200 8,842 -3,020 8,842 0,019<br />

-4,050 9,532 -3,020 9,532 0,019<br />

-4,050 9,532 -3,020 9,532 0,019<br />

-4,675 10,052 -3,020 10,052 0,019<br />

-5,275 10,567 -3,020 10,567 0,019<br />

-5,900 11,121 -3,020 11,121 0,019<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 7


Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-6,500 11,672 -3,020 11,672 0,018<br />

-6,500 11,672 -3,020 11,672 0,018<br />

-7,150 15,023 -3,020 15,023 0,018<br />

-7,750 18,136 -3,020 18,136 0,017<br />

-8,400 21,531 -3,020 21,531 0,016<br />

-9,000 24,683 -3,020 24,683 0,016<br />

-9,000 24,683 -3,020 24,683 0,016<br />

-10,000 29,968 -3,020 29,968 0,015<br />

-11,000 35,282 -3,020 35,282 0,013<br />

-12,000 40,613 -3,020 40,613 0,012<br />

-13,000 45,949 -3,020 45,949 0,010<br />

-13,000 45,949 -3,020 45,949 0,010<br />

-13,600 49,148 -3,020 49,148 0,010<br />

-14,200 52,344 -3,020 52,344 0,009<br />

-14,200 52,344 -3,020 52,344 0,009<br />

-14,850 55,800 -3,020 55,800 0,007<br />

-15,500 59,248 -3,020 59,248 0,006<br />

-15,500 59,248 -3,020 59,248 0,006<br />

-16,250 60,366 -3,020 60,366 0,003<br />

-17,000 61,471 -3,020 61,471 0,000<br />

-17,000 61,471 -3,020 61,471 0,000<br />

-17,800 69,834 -3,020 69,834 0,000<br />

-18,500 77,138 -3,020 77,138 0,000<br />

-19,200 84,429 -3,020 84,429 0,000<br />

-20,000 92,747 -3,020 92,747 0,000<br />

3.4 Results for Vertical 4 (X = -15,00 m; Z = 0,00 m)<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-2,200 0,002 -2,200 0,002 0,023<br />

-2,300 1,062 -2,300 1,062 0,023<br />

-2,400 2,122 -2,400 2,122 0,023<br />

-2,500 3,183 -2,500 3,183 0,023<br />

-2,600 4,244 -2,600 4,244 0,023<br />

-2,700 5,304 -2,700 5,304 0,023<br />

-2,800 6,365 -2,800 6,365 0,023<br />

-2,900 7,426 -2,900 7,426 0,023<br />

-3,000 8,488 -3,000 8,488 0,023<br />

-3,020 8,700 -3,020 8,700 0,023<br />

-3,100 8,764 -3,020 8,764 0,023<br />

-3,125 8,785 -3,020 8,785 0,023<br />

-3,200 8,845 -3,020 8,845 0,023<br />

-4,050 9,543 -3,020 9,543 0,024<br />

-4,050 9,543 -3,020 9,543 0,024<br />

-4,675 10,075 -3,020 10,075 0,024<br />

-5,275 10,606 -3,020 10,606 0,024<br />

-5,900 11,183 -3,020 11,183 0,023<br />

-6,500 11,763 -3,020 11,763 0,022<br />

-6,500 11,763 -3,020 11,763 0,022<br />

-7,150 15,149 -3,020 15,149 0,022<br />

-7,750 18,300 -3,020 18,300 0,021<br />

-8,400 21,739 -3,020 21,739 0,020<br />

-9,000 24,932 -3,020 24,932 0,019<br />

-9,000 24,932 -3,020 24,932 0,019<br />

-10,000 30,286 -3,020 30,286 0,018<br />

-11,000 35,664 -3,020 35,664 0,016<br />

-12,000 41,050 -3,020 41,050 0,014<br />

-13,000 46,431 -3,020 46,431 0,012<br />

-13,000 46,431 -3,020 46,431 0,012<br />

-13,600 49,652 -3,020 49,652 0,011<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 8


Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-14,200 52,866 -3,020 52,866 0,010<br />

-14,200 52,866 -3,020 52,866 0,010<br />

-14,850 56,337 -3,020 56,337 0,009<br />

-15,500 59,797 -3,020 59,797 0,007<br />

-15,500 59,797 -3,020 59,797 0,007<br />

-16,250 60,924 -3,020 60,924 0,004<br />

-17,000 62,033 -3,020 62,033 0,000<br />

-17,000 62,033 -3,020 62,033 0,000<br />

-17,800 70,396 -3,020 70,396 0,000<br />

-18,500 77,698 -3,020 77,698 0,000<br />

-19,200 84,984 -3,020 84,984 0,000<br />

-20,000 93,293 -3,020 93,293 0,000<br />

3.5 Results for Vertical 5 (X = 0,00 m; Z = 0,00 m)<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-2,200 34,880 -2,200 34,880 2,120<br />

-2,300 35,927 -2,300 35,927 2,065<br />

-2,400 36,973 -2,400 36,973 2,017<br />

-2,500 38,016 -2,500 38,016 1,972<br />

-2,600 39,058 -2,600 39,058 1,930<br />

-2,700 40,097 -2,700 40,097 1,891<br />

-2,800 41,134 -2,800 41,134 1,853<br />

-2,900 42,169 -2,900 42,169 1,817<br />

-3,000 43,200 -3,000 43,200 1,783<br />

-3,020 43,406 -3,020 43,406 1,776<br />

-3,100 43,444 -3,020 43,444 1,749<br />

-3,125 43,455 -3,020 43,455 1,741<br />

-3,200 43,487 -3,020 43,487 1,716<br />

-4,050 43,668 -3,020 43,668 1,440<br />

-4,050 43,668 -3,020 43,668 1,440<br />

-4,675 43,566 -3,020 43,566 1,243<br />

-5,275 43,297 -3,020 43,297 1,059<br />

-5,900 42,872 -3,020 42,872 0,873<br />

-6,500 42,364 -3,020 42,364 0,701<br />

-6,500 42,364 -3,020 42,364 0,701<br />

-7,150 44,475 -3,020 44,475 0,608<br />

-7,750 46,394 -3,020 46,394 0,535<br />

-8,400 48,469 -3,020 48,469 0,465<br />

-9,000 50,402 -3,020 50,402 0,409<br />

-9,000 50,402 -3,020 50,402 0,409<br />

-10,000 53,692 -3,020 53,692 0,330<br />

-11,000 57,096 -3,020 57,097 0,264<br />

-12,000 60,629 -3,020 60,629 0,210<br />

-13,000 64,289 -3,020 64,289 0,165<br />

-13,000 64,289 -3,020 64,289 0,165<br />

-13,600 66,544 -3,020 66,544 0,142<br />

-14,200 68,841 -3,020 68,841 0,120<br />

-14,200 68,841 -3,020 68,841 0,120<br />

-14,850 71,374 -3,020 71,374 0,100<br />

-15,500 73,950 -3,020 73,950 0,081<br />

-15,500 73,950 -3,020 73,950 0,081<br />

-16,250 74,124 -3,020 74,124 0,039<br />

-17,000 74,347 -3,020 74,347 0,000<br />

-17,000 74,347 -3,020 74,347 0,000<br />

-17,800 81,835 -3,020 81,835 0,000<br />

-18,500 88,426 -3,020 88,426 0,000<br />

-19,200 95,051 -3,020 95,051 0,000<br />

-20,000 102,659 -3,020 102,659 0,000<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 9


3.6 Results for Vertical 6 (X = 1,88 m; Z = 0,00 m)<br />

Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-2,200 34,874 -2,200 34,874 2,067<br />

-2,300 35,874 -2,300 35,874 2,012<br />

-2,400 36,869 -2,400 36,869 1,964<br />

-2,500 37,859 -2,500 37,859 1,919<br />

-2,600 38,843 -2,600 38,843 1,878<br />

-2,700 39,822 -2,700 39,822 1,838<br />

-2,800 40,796 -2,800 40,796 1,801<br />

-2,900 41,766 -2,900 41,766 1,765<br />

-3,000 42,732 -3,000 42,732 1,731<br />

-3,020 42,925 -3,020 42,925 1,724<br />

-3,100 42,909 -3,020 42,909 1,698<br />

-3,125 42,904 -3,020 42,904 1,689<br />

-3,200 42,886 -3,020 42,886 1,665<br />

-4,050 42,544 -3,020 42,544 1,392<br />

-4,050 42,544 -3,020 42,544 1,392<br />

-4,675 42,149 -3,020 42,149 1,199<br />

-5,275 41,685 -3,020 41,685 1,020<br />

-5,900 41,144 -3,020 41,144 0,840<br />

-6,500 40,596 -3,020 40,596 0,673<br />

-6,500 40,596 -3,020 40,596 0,673<br />

-7,150 42,727 -3,020 42,727 0,584<br />

-7,750 44,705 -3,020 44,705 0,513<br />

-8,400 46,874 -3,020 46,874 0,446<br />

-9,000 48,909 -3,020 48,909 0,392<br />

-9,000 48,909 -3,020 48,909 0,392<br />

-10,000 52,380 -3,020 52,380 0,317<br />

-11,000 55,961 -3,020 55,961 0,254<br />

-12,000 59,654 -3,020 59,654 0,202<br />

-13,000 63,455 -3,020 63,455 0,159<br />

-13,000 63,455 -3,020 63,455 0,159<br />

-13,600 65,784 -3,020 65,784 0,136<br />

-14,200 68,149 -3,020 68,149 0,116<br />

-14,200 68,149 -3,020 68,149 0,116<br />

-14,850 70,748 -3,020 70,748 0,096<br />

-15,500 73,383 -3,020 73,383 0,078<br />

-15,500 73,383 -3,020 73,383 0,078<br />

-16,250 73,617 -3,020 73,617 0,038<br />

-17,000 73,893 -3,020 73,893 0,000<br />

-17,000 73,893 -3,020 73,893 0,000<br />

-17,800 81,430 -3,020 81,430 0,000<br />

-18,500 88,059 -3,020 88,059 0,000<br />

-19,200 94,718 -3,020 94,718 0,000<br />

-20,000 102,360 -3,020 102,360 0,000<br />

3.7 Results for Vertical 7 (X = 3,69 m; Z = 0,00 m)<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-2,200 32,701 -2,200 32,701 1,889<br />

-2,300 33,543 -2,300 33,543 1,836<br />

-2,400 34,392 -2,400 34,392 1,789<br />

-2,500 35,252 -2,500 35,252 1,746<br />

-2,600 36,115 -2,600 36,115 1,705<br />

-2,700 36,973 -2,700 36,973 1,667<br />

-2,800 37,824 -2,800 37,824 1,631<br />

-2,900 38,668 -2,900 38,668 1,597<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 10


Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-3,000 39,507 -3,000 39,507 1,564<br />

-3,020 39,675 -3,020 39,675 1,558<br />

-3,100 39,558 -3,020 39,558 1,533<br />

-3,125 39,522 -3,020 39,522 1,525<br />

-3,200 39,411 -3,020 39,411 1,502<br />

-4,050 38,177 -3,020 38,177 1,247<br />

-4,050 38,177 -3,020 38,177 1,247<br />

-4,675 37,373 -3,020 37,373 1,070<br />

-5,275 36,719 -3,020 36,719 0,908<br />

-5,900 36,162 -3,020 36,162 0,747<br />

-6,500 35,730 -3,020 35,730 0,598<br />

-6,500 35,730 -3,020 35,730 0,598<br />

-7,150 38,085 -3,020 38,085 0,518<br />

-7,750 40,325 -3,020 40,325 0,455<br />

-8,400 42,809 -3,020 42,809 0,396<br />

-9,000 45,142 -3,020 45,142 0,349<br />

-9,000 45,142 -3,020 45,142 0,349<br />

-10,000 49,100 -3,020 49,100 0,282<br />

-11,000 53,127 -3,020 53,127 0,227<br />

-12,000 57,215 -3,020 57,215 0,181<br />

-13,000 61,358 -3,020 61,358 0,143<br />

-13,000 61,358 -3,020 61,358 0,143<br />

-13,600 63,869 -3,020 63,869 0,123<br />

-14,200 66,398 -3,020 66,398 0,104<br />

-14,200 66,398 -3,020 66,398 0,104<br />

-14,850 69,158 -3,020 69,158 0,087<br />

-15,500 71,937 -3,020 71,937 0,071<br />

-15,500 71,937 -3,020 71,937 0,071<br />

-16,250 72,319 -3,020 72,319 0,034<br />

-17,000 72,725 -3,020 72,725 0,000<br />

-17,000 72,725 -3,020 72,725 0,000<br />

-17,800 80,385 -3,020 80,385 0,000<br />

-18,500 87,109 -3,020 87,109 0,000<br />

-19,200 93,851 -3,020 93,851 0,000<br />

-20,000 101,578 -3,020 101,578 0,000<br />

3.8 Results for Vertical 8 (X = 7,71 m; Z = 0,00 m)<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-2,200 0,146 -2,200 0,146 0,401<br />

-2,300 1,243 -2,300 1,243 0,398<br />

-2,400 2,347 -2,400 2,347 0,397<br />

-2,500 3,457 -2,500 3,457 0,397<br />

-2,600 4,577 -2,600 4,577 0,396<br />

-2,700 5,706 -2,700 5,706 0,395<br />

-2,800 6,846 -2,800 6,846 0,395<br />

-2,900 7,999 -2,900 7,999 0,394<br />

-3,000 9,164 -3,000 9,164 0,394<br />

-3,020 9,398 -3,020 9,398 0,394<br />

-3,100 9,557 -3,020 9,557 0,393<br />

-3,125 9,609 -3,020 9,609 0,393<br />

-3,200 9,768 -3,020 9,768 0,392<br />

-4,050 11,949 -3,020 11,949 0,381<br />

-4,050 11,949 -3,020 11,949 0,381<br />

-4,675 13,722 -3,020 13,722 0,368<br />

-5,275 15,358 -3,020 15,358 0,351<br />

-5,900 16,926 -3,020 16,926 0,327<br />

-6,500 18,290 -3,020 18,290 0,294<br />

-6,500 18,290 -3,020 18,290 0,294<br />

-7,150 22,348 -3,020 22,348 0,262<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 11


Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-7,750 25,972 -3,020 25,972 0,236<br />

-8,400 29,783 -3,020 29,783 0,210<br />

-9,000 33,207 -3,020 33,207 0,189<br />

-9,000 33,207 -3,020 33,207 0,189<br />

-10,000 38,748 -3,020 38,748 0,157<br />

-11,000 44,118 -3,020 44,118 0,129<br />

-12,000 49,352 -3,020 49,352 0,105<br />

-13,000 54,478 -3,020 54,478 0,084<br />

-13,000 54,478 -3,020 54,478 0,084<br />

-13,600 57,511 -3,020 57,511 0,073<br />

-14,200 60,517 -3,020 60,517 0,063<br />

-14,200 60,517 -3,020 60,517 0,063<br />

-14,850 63,748 -3,020 63,748 0,053<br />

-15,500 66,956 -3,020 66,956 0,043<br />

-15,500 66,956 -3,020 66,956 0,043<br />

-16,250 67,784 -3,020 67,784 0,021<br />

-17,000 68,590 -3,020 68,590 0,000<br />

-17,000 68,590 -3,020 68,590 0,000<br />

-17,800 76,631 -3,020 76,631 0,000<br />

-18,500 83,655 -3,020 83,655 0,000<br />

-19,200 90,669 -3,020 90,669 0,000<br />

-20,000 98,676 -3,020 98,676 0,000<br />

3.9 Results for Vertical 9 (X = 26,00 m; Z = 0,00 m)<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-2,200 0,001 -2,200 0,001 0,003<br />

-2,300 1,060 -2,300 1,060 0,003<br />

-2,400 2,120 -2,400 2,120 0,003<br />

-2,500 3,180 -2,500 3,180 0,003<br />

-2,600 4,240 -2,600 4,240 0,003<br />

-2,700 5,300 -2,700 5,300 0,003<br />

-2,800 6,360 -2,800 6,360 0,003<br />

-2,900 7,420 -2,900 7,420 0,003<br />

-3,000 8,480 -3,000 8,480 0,003<br />

-3,020 8,692 -3,020 8,692 0,003<br />

-3,100 8,756 -3,020 8,756 0,003<br />

-3,125 8,775 -3,020 8,775 0,003<br />

-3,200 8,835 -3,020 8,835 0,003<br />

-4,050 9,508 -3,020 9,508 0,003<br />

-4,050 9,508 -3,020 9,508 0,003<br />

-4,675 10,003 -3,020 10,003 0,003<br />

-5,275 10,480 -3,020 10,481 0,003<br />

-5,900 10,979 -3,020 10,979 0,003<br />

-6,500 11,460 -3,020 11,460 0,003<br />

-6,500 11,460 -3,020 11,460 0,003<br />

-7,150 14,714 -3,020 14,714 0,003<br />

-7,750 17,720 -3,020 17,720 0,003<br />

-8,400 20,981 -3,020 20,981 0,003<br />

-9,000 23,994 -3,020 23,994 0,003<br />

-9,000 23,994 -3,020 23,994 0,003<br />

-10,000 29,025 -3,020 29,025 0,003<br />

-11,000 34,068 -3,020 34,068 0,002<br />

-12,000 39,122 -3,020 39,122 0,002<br />

-13,000 44,188 -3,020 44,188 0,002<br />

-13,000 44,188 -3,020 44,188 0,002<br />

-13,600 47,232 -3,020 47,232 0,002<br />

-14,200 50,281 -3,020 50,281 0,002<br />

-14,200 50,281 -3,020 50,281 0,002<br />

-14,850 53,588 -3,020 53,588 0,002<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 12


Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-15,500 56,898 -3,020 56,898 0,001<br />

-15,500 56,898 -3,020 56,898 0,001<br />

-16,250 57,872 -3,020 57,872 0,001<br />

-17,000 58,849 -3,020 58,849 0,000<br />

-17,000 58,849 -3,020 58,849 0,000<br />

-17,800 67,096 -3,020 67,096 0,000<br />

-18,500 74,314 -3,020 74,314 0,000<br />

-19,200 81,533 -3,020 81,533 0,000<br />

-20,000 89,786 -3,020 89,786 0,000<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 13


4 Settlements<br />

4.1 Settlements<br />

Vertical X co-ordinate Surface level Settlement<br />

number [m] [m] [m]<br />

1 -26,00 -2,20 0,003<br />

2 -21,00 -2,20 0,007<br />

3 -16,00 -2,20 0,018<br />

4 -15,00 -2,20 0,023<br />

5 0,00 -2,20 2,120<br />

6 1,88 -2,20 2,067<br />

7 3,69 -2,20 1,889<br />

8 7,71 -2,20 0,401<br />

9 26,00 -2,20 0,003<br />

4.2 Residual Times<br />

Royal HaskoningDHV D-Settlement 9.2<br />

Vertical Time Settlement Part of final Residual<br />

number settlement settlements<br />

[days] [m] [%] [m]<br />

1 14 0,000 8,360 0,003<br />

30 0,000 11,795 0,002<br />

60 0,001 26,103 0,002<br />

90 0,001 31,471 0,002<br />

120 0,001 34,990 0,002<br />

150 0,001 37,753 0,002<br />

180 0,001 40,083 0,002<br />

210 0,001 42,190 0,002<br />

240 0,001 44,202 0,002<br />

270 0,001 46,151 0,001<br />

300 0,001 48,061 0,001<br />

330 0,001 49,958 0,001<br />

365 0,001 52,076 0,001<br />

2 14 0,001 7,566 0,006<br />

30 0,001 10,691 0,006<br />

60 0,002 23,293 0,005<br />

90 0,002 28,268 0,005<br />

120 0,002 31,704 0,005<br />

150 0,002 34,520 0,004<br />

180 0,002 36,984 0,004<br />

210 0,003 39,270 0,004<br />

240 0,003 41,478 0,004<br />

270 0,003 43,634 0,004<br />

300 0,003 45,718 0,004<br />

330 0,003 47,778 0,003<br />

365 0,003 50,056 0,003<br />

3 14 0,001 6,067 0,017<br />

30 0,002 8,551 0,017<br />

60 0,003 18,438 0,015<br />

90 0,004 22,858 0,014<br />

120 0,005 26,321 0,014<br />

150 0,005 29,410 0,013<br />

180 0,006 32,282 0,013<br />

210 0,006 35,009 0,012<br />

240 0,007 37,627 0,012<br />

270 0,007 40,147 0,011<br />

300 0,008 42,524 0,011<br />

330 0,008 44,851 0,010<br />

365 0,009 47,401 0,010<br />

4 14 0,001 5,633 0,022<br />

30 0,002 7,930 0,021<br />

60 0,004 17,171 0,019<br />

90 0,005 21,532 0,018<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 14


Royal HaskoningDHV D-Settlement 9.2<br />

Vertical Time Settlement Part of final Residual<br />

number settlement settlements<br />

[days] [m] [%] [m]<br />

120 0,006 25,093 0,017<br />

150 0,007 28,336 0,017<br />

180 0,007 31,366 0,016<br />

210 0,008 34,223 0,015<br />

240 0,009 36,952 0,015<br />

270 0,009 39,570 0,014<br />

300 0,010 42,030 0,013<br />

330 0,010 44,436 0,013<br />

365 0,011 47,065 0,012<br />

5 14 0,536 25,304 1,583<br />

30 0,722 34,065 1,398<br />

60 1,224 57,735 0,896<br />

90 1,367 64,476 0,753<br />

120 1,440 67,949 0,679<br />

150 1,492 70,389 0,628<br />

180 1,533 72,341 0,586<br />

210 1,569 74,018 0,551<br />

240 1,600 75,495 0,519<br />

270 1,628 76,798 0,492<br />

300 1,651 77,905 0,468<br />

330 1,673 78,943 0,446<br />

365 1,695 79,984 0,424<br />

6 14 0,528 25,559 1,538<br />

30 0,711 34,409 1,356<br />

60 1,198 57,972 0,869<br />

90 1,336 64,659 0,730<br />

120 1,407 68,101 0,659<br />

150 1,457 70,513 0,609<br />

180 1,497 72,440 0,570<br />

210 1,532 74,105 0,535<br />

240 1,562 75,576 0,505<br />

270 1,589 76,874 0,478<br />

300 1,612 77,976 0,455<br />

330 1,633 79,010 0,434<br />

365 1,654 80,047 0,412<br />

7 14 0,510 27,001 1,379<br />

30 0,686 36,333 1,203<br />

60 1,106 58,551 0,783<br />

90 1,228 64,968 0,662<br />

120 1,291 68,303 0,599<br />

150 1,335 70,636 0,555<br />

180 1,370 72,503 0,520<br />

210 1,401 74,151 0,488<br />

240 1,429 75,616 0,461<br />

270 1,453 76,911 0,436<br />

300 1,474 78,011 0,415<br />

330 1,494 79,044 0,396<br />

365 1,513 80,079 0,376<br />

8 14 0,039 9,718 0,362<br />

30 0,065 16,113 0,336<br />

60 0,154 38,450 0,247<br />

90 0,187 46,607 0,214<br />

120 0,204 51,048 0,196<br />

150 0,218 54,517 0,182<br />

180 0,230 57,316 0,171<br />

210 0,240 59,976 0,160<br />

240 0,251 62,614 0,150<br />

270 0,261 65,244 0,139<br />

300 0,270 67,488 0,130<br />

330 0,279 69,597 0,122<br />

365 0,287 71,693 0,113<br />

9 14 0,000 8,289 0,003<br />

30 0,000 11,692 0,002<br />

60 0,001 26,075 0,002<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 15


Royal HaskoningDHV D-Settlement 9.2<br />

Vertical Time Settlement Part of final Residual<br />

number settlement settlements<br />

[days] [m] [%] [m]<br />

90 0,001 31,455 0,002<br />

120 0,001 34,981 0,002<br />

150 0,001 37,747 0,002<br />

180 0,001 40,080 0,002<br />

210 0,001 42,189 0,002<br />

240 0,001 44,202 0,002<br />

270 0,001 46,153 0,001<br />

300 0,001 48,063 0,001<br />

330 0,001 49,960 0,001<br />

365 0,001 52,078 0,001<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 16


5 Warnings and errors<br />

List of non-fatal warnings and errors generated during calculation.<br />

Royal HaskoningDHV D-Settlement 9.2<br />

1 Model Koppejan is not ideal for unloading (e.g. load removal, temporary dewatering, gradual<br />

submerging). If As is much larger than Cs', unloading will yield almost no effect on creep. Switch to the<br />

NEN-Bjerrum or abc Isotache model for improved predictions.<br />

End of Report<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden 60cm-voorb - 20121214 Page 17


Bepaling zettingen tpv talud<br />

Annex<br />

A4<br />

Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />

form.<br />

Hoogheemraadschap van <strong>Delfland</strong><br />

9R694518<br />

ctr.<br />

Barbarossastraat 35<br />

6522 DK Nijmegen<br />

Phone +31 (0)24 328 42 84<br />

Fax +31 (0)24 323 93 46<br />

14-12-2012<br />

SVVE<br />

date drw.<br />

D-Settlement 9.2 : Bruggen - Zetting landhoofden talud bepaling - 20121214.sli<br />

Input View<br />

5 6 7 8<br />

7<br />

6<br />

5<br />

4<br />

Zand<br />

8<br />

Layers<br />

8. Veen, Holland, naast<br />

7. Veen, Holland, naast<br />

6. Klei, DK, naast<br />

5. Klei, DK, naast<br />

4. Klei, DK, naast<br />

3. Klei, DK, naast<br />

2. Veen, Basis<br />

1. Zand, algemeen


Voorbelasting tbv ophoging<br />

Annex<br />

A4<br />

Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />

form.<br />

Hoogheemraadschap van <strong>Delfland</strong><br />

9R694518<br />

ctr.<br />

Barbarossastraat 35<br />

6522 DK Nijmegen<br />

Phone +31 (0)24 328 42 84<br />

Fax +31 (0)24 323 93 46<br />

14-12-2012<br />

SVVE<br />

date drw.<br />

D-Settlement 9.2 : Bruggen - Zetting landhoofden talud voorb - 20121214.sli<br />

2 3 4 5 6 7<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

Input View<br />

Voorbelasting (2)<br />

8<br />

Layers<br />

8. Veen, Holland, naast<br />

7. Veen, Holland, naast<br />

6. Klei, DK, naast<br />

5. Klei, DK, naast<br />

4. Klei, DK, naast<br />

3. Klei, DK, naast<br />

2. Veen, Basis<br />

1. Zand, algemeen


Bepaling zettingen tpv talud<br />

Annex<br />

A4<br />

Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />

form.<br />

Hoogheemraadschap van <strong>Delfland</strong><br />

9R694518<br />

ctr.<br />

Barbarossastraat 35<br />

6522 DK Nijmegen<br />

Phone +31 (0)24 328 42 84<br />

Fax +31 (0)24 323 93 46<br />

14-12-2012<br />

SVVE<br />

date drw.<br />

D-Settlement 9.2 : Bruggen - Zetting landhoofden talud bepaling - 20121214.sli<br />

Effective stress [kPa]<br />

Settlement [m]<br />

16,753565<br />

16,753560<br />

16,753555<br />

16,753550<br />

0,000000<br />

0,200000<br />

0,400000<br />

0,600000<br />

0,800000<br />

1,000000<br />

1,200000<br />

1,400000<br />

Vertical 5 (X = 0,000 m; Z = 0,000 m)<br />

Method = NEN - Koppejan with Darcy (Natural strain)<br />

Time-History<br />

1 10 100 1000 10000<br />

Time [days]<br />

1 10 100 1000 10000<br />

Depth = 4,050 (-) [m]<br />

Settlement after 10000 days = 1,411 [m]


Voorbelasting tbv ophoging<br />

Annex<br />

A4<br />

Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />

form.<br />

Hoogheemraadschap van <strong>Delfland</strong><br />

9R694518<br />

ctr.<br />

Barbarossastraat 35<br />

6522 DK Nijmegen<br />

Phone +31 (0)24 328 42 84<br />

Fax +31 (0)24 323 93 46<br />

14-12-2012<br />

SVVE<br />

date drw.<br />

D-Settlement 9.2 : Bruggen - Zetting landhoofden talud voorb - 20121214.sli<br />

Effective stress [kPa]<br />

Settlement [m]<br />

40,0<br />

38,0<br />

36,0<br />

34,0<br />

32,0<br />

30,0<br />

28,0<br />

0,0<br />

0,5<br />

1,0<br />

1,5<br />

2,0<br />

2,5<br />

Vertical 5 (X = 0,000 m; Z = 0,000 m)<br />

Method = NEN - Koppejan with Darcy (Natural strain)<br />

Time-History<br />

1 10 100 1000 10000<br />

Time [days]<br />

1 10 100 1000 10000<br />

Depth = 4,050 (-) [m]<br />

Settlement after 10000 days = 2,464 [m]


Company: Royal HaskoningDHV<br />

Date of report: 14-12-2012<br />

Time of report: 17:10:13<br />

Date of calculation: 14-12-2012<br />

Time of calculation: 15:48:06<br />

Report for D-Settlement 9.2<br />

Settlement Calculations<br />

Developed by Deltares<br />

Filename: C:\..\Definitief\Bruggen - Zetting landhoofden talud voorb - 20121214<br />

Project identification: Hoogheemraadschap van <strong>Delfland</strong><br />

Landbouw<strong>bruggen</strong> Pijnackerse Vaart<br />

Voorbelasting tbv ophoging


1 Table of Contents<br />

Royal HaskoningDHV D-Settlement 9.2<br />

1 Table of Contents 2<br />

2 Echo of the Input 3<br />

2.1 Layer Boundaries 3<br />

2.2 PL Lines 3<br />

2.3 General Data 3<br />

2.4 Soil Profiles 3<br />

2.5 Soil Properties 4<br />

2.6 Non-Uniform Loads 4<br />

2.7 Verticals 5<br />

2.8 Vertical Drain 5<br />

3 Results per Vertical 6<br />

3.1 Results for Vertical 1 (X = -26,00 m; Z = 0,00 m) 6<br />

3.2 Results for Vertical 2 (X = -21,00 m; Z = 0,00 m) 6<br />

3.3 Results for Vertical 3 (X = -16,00 m; Z = 0,00 m) 7<br />

3.4 Results for Vertical 4 (X = -15,00 m; Z = 0,00 m) 8<br />

3.5 Results for Vertical 5 (X = 0,00 m; Z = 0,00 m) 8<br />

3.6 Results for Vertical 6 (X = 1,63 m; Z = 0,00 m) 9<br />

3.7 Results for Vertical 7 (X = 3,71 m; Z = 0,00 m) 10<br />

3.8 Results for Vertical 8 (X = 21,00 m; Z = 0,00 m) 11<br />

3.9 Results for Vertical 9 (X = 26,00 m; Z = 0,00 m) 12<br />

4 Settlements 13<br />

4.1 Settlements 13<br />

4.2 Residual Times 13<br />

5 Warnings and errors 16<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 2


2 Echo of the Input<br />

2.1 Layer Boundaries<br />

Boundary number Co-ordinates [m]<br />

8 - X - -35,000 0,000 3,700 35,000<br />

8 - Y - -4,050 -4,050 -2,200 -2,200<br />

7 - X - -35,000 0,000 35,000<br />

7 - Y - -4,050 -4,050 -4,050<br />

6 - X - -35,000 35,000<br />

6 - Y - -6,500 -6,500<br />

5 - X - -35,000 35,000<br />

5 - Y - -9,000 -9,000<br />

4 - X - -35,000 35,000<br />

4 - Y - -13,000 -13,000<br />

3 - X - -35,000 35,000<br />

3 - Y - -14,200 -14,200<br />

2 - X - -35,000 35,000<br />

2 - Y - -15,500 -15,500<br />

1 - X - -35,000 35,000<br />

1 - Y - -17,000 -17,000<br />

0 - X - -35,000 35,000<br />

0 - Y - -20,000 -20,000<br />

2.2 PL Lines<br />

PL line number Co-ordinates [m]<br />

1 - X - -35,000 35,000<br />

1 - Y - -3,020 -3,020<br />

2.3 General Data<br />

Royal HaskoningDHV D-Settlement 9.2<br />

Soil model: Koppejan<br />

Consolidation model: Darcy<br />

Strain model: Natural<br />

Groundwater level: Initial determined by PL-line number 1<br />

Unit weight of water: 9,81 [kN/m³]<br />

Stress distribution<br />

- Soil: Buisman<br />

- Loads: Simulate<br />

End of consolidation: 10000,00 [days]<br />

No maintain profile<br />

Pc (initial): Variable parallel to the initial effective stress<br />

Pc (per step): Automatic increased to the final effective stresses<br />

Creep rate reference time: 1,000 [days]<br />

No imaginary surface<br />

With submerging<br />

(only for non uniform loads)<br />

- Iteration stop criterium : 0,10 [m]<br />

Load column width<br />

- Non-Uniform Loads : 1,00 [m]<br />

- Trapezoidal Loads : 1,00 [m]<br />

2.4 Soil Profiles<br />

Layer Material name PL-line PL-line<br />

number top bottom<br />

8 Veen, Holland, naast 1 1<br />

7 Veen, Holland, naast 1 1<br />

6 Klei, DK, naast 1 1<br />

5 Klei, DK, naast 1 1<br />

4 Klei, DK, naast 1 1<br />

3 Klei, DK, naast 1 1<br />

2 Veen, Basis 1 1<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 3


Layer Material name PL-line PL-line<br />

number top bottom<br />

1 Zand, algemeen 1 1<br />

2.5 Soil Properties<br />

Layer Drained Unit weight<br />

number Unsaturated Saturated<br />

[kN/m³] [kN/m³]<br />

8 No 10,60 10,60<br />

7 No 10,60 10,60<br />

6 No 14,80 14,80<br />

5 No 14,80 14,80<br />

4 No 14,80 14,80<br />

3 No 14,80 14,80<br />

2 No 11,00 11,00<br />

1 Yes 18,00 20,00<br />

Royal HaskoningDHV D-Settlement 9.2<br />

Layer Storage Vert. consolid. Ratio Ch/Cv Vertical Ratio hor/vert Permeability Initial vertical<br />

number type coefficient Cv permeability permeability strain mod. permeability<br />

[m²/s] [-] [m/s] [-] [m/s] [m/s]<br />

8 Vert. cons. 4,27E-07 2,000 - - - -<br />

7 Vert. cons. 4,27E-07 2,000 - - - -<br />

6 Vert. cons. 2,80E-07 1,000 - - - -<br />

5 Vert. cons. 2,80E-07 1,000 - - - -<br />

4 Vert. cons. 2,80E-07 1,000 - - - -<br />

3 Vert. cons. 2,80E-07 1,000 - - - -<br />

2 Vert. cons. 4,27E-07 2,000 - - - -<br />

1 Const. perm. - - 5,787E-07 3,000 - -<br />

Layer Precons. POP OCR<br />

number pressure<br />

[kN/m²] [kN/m²] [-]<br />

8 - 5,00 -<br />

7 - 5,00 -<br />

6 - - 1,10<br />

5 - - 1,10<br />

4 - - 1,10<br />

3 - - 1,10<br />

2 - - 1,10<br />

1 - - 1,10<br />

Layer Primary compr. coeff. Secular compr. coef. Swell constants<br />

number Cp [-] Cp' [-] Cs [-] Cs' [-] Ap [-] As [-]<br />

8 2,50E+01 6,25E+00 1,00E+02 2,50E+01 2,50E+01 2,50E+01<br />

7 2,50E+01 6,25E+00 1,00E+02 2,50E+01 2,50E+01 2,50E+01<br />

6 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />

5 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />

4 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />

3 4,00E+01 1,00E+01 4,40E+02 1,10E+02 4,00E+01 1,10E+02<br />

2 2,50E+01 7,50E+00 1,00E+02 2,50E+01 2,50E+01 2,50E+01<br />

1 1,00E+09 1,50E+03 1,00E+09 1,00E+09 1,00E+09 1,00E+09<br />

2.6 Non-Uniform Loads<br />

Load Time Unit weight<br />

number Unsaturated Saturated<br />

[days] [kN/m³] [kN/m³]<br />

1 0 18,00 20,00<br />

2 14 18,00 20,00<br />

Load number Co-ordinates [m]<br />

1 - X - -7,00 -4,00 10,00 11,00<br />

1 - Y - -4,05 -1,20 -1,20 -2,20<br />

2 - X - -4,26 -3,00 9,00 10,00<br />

2 - Y - -1,45 -0,20 -0,20 -1,20<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 4


2.7 Verticals<br />

Royal HaskoningDHV D-Settlement 9.2<br />

Vertical number X co-ordinates [m]<br />

1 - 5 -26,000 -21,000 -16,000 -15,000 0,000<br />

6 - 9 1,627 3,714 21,000 26,000<br />

Calculation of cross section at Z = 0,000 m<br />

Discretisation = 100<br />

2.8 Vertical Drain<br />

Drain type Strip<br />

Horizontal range "From" [m] -10,000<br />

Horizontal range "To" [m] 10,000<br />

Bottom position [m] -9,000<br />

Center to center distance [m] 1,500<br />

Width [m] 0,100<br />

Thickness [m] 0,003<br />

Grid Triangular<br />

Enforced dewatering Off<br />

Start of drainage [days] 0,000<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 5


3 Results per Vertical<br />

3.1 Results for Vertical 1 (X = -26,00 m; Z = 0,00 m)<br />

Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-4,050 0,002 -3,020 0,002 0,004<br />

-4,150 0,080 -3,020 0,080 0,004<br />

-4,250 0,159 -3,020 0,159 0,004<br />

-4,350 0,238 -3,020 0,238 0,004<br />

-4,450 0,317 -3,020 0,317 0,004<br />

-4,550 0,396 -3,020 0,396 0,004<br />

-4,650 0,476 -3,020 0,476 0,004<br />

-4,750 0,555 -3,020 0,555 0,004<br />

-4,850 0,634 -3,020 0,634 0,004<br />

-4,950 0,713 -3,020 0,713 0,004<br />

-5,050 0,793 -3,020 0,793 0,004<br />

-5,275 0,971 -3,020 0,971 0,004<br />

-5,900 1,468 -3,020 1,468 0,004<br />

-6,500 1,946 -3,020 1,946 0,003<br />

-6,500 1,946 -3,020 1,946 0,003<br />

-7,150 5,196 -3,020 5,196 0,003<br />

-7,750 8,199 -3,020 8,199 0,003<br />

-8,400 11,455 -3,020 11,455 0,003<br />

-9,000 14,464 -3,020 14,464 0,003<br />

-9,000 14,464 -3,020 14,464 0,003<br />

-10,000 19,489 -3,020 19,489 0,003<br />

-11,000 24,526 -3,020 24,526 0,003<br />

-12,000 29,576 -3,020 29,576 0,003<br />

-13,000 34,641 -3,020 34,641 0,002<br />

-13,000 34,641 -3,020 34,641 0,002<br />

-13,600 37,687 -3,020 37,687 0,002<br />

-14,200 40,737 -3,020 40,737 0,002<br />

-14,200 40,737 -3,020 40,737 0,002<br />

-14,850 44,048 -3,020 44,048 0,002<br />

-15,500 47,364 -3,020 47,364 0,002<br />

-15,500 47,364 -3,020 47,364 0,002<br />

-16,250 48,347 -3,020 48,347 0,001<br />

-17,000 49,336 -3,020 49,336 0,000<br />

-17,000 49,336 -3,020 49,336 0,000<br />

-17,800 57,597 -3,020 57,597 0,000<br />

-18,500 64,829 -3,020 64,829 0,000<br />

-19,200 72,065 -3,020 72,065 0,000<br />

-20,000 80,339 -3,020 80,339 0,000<br />

3.2 Results for Vertical 2 (X = -21,00 m; Z = 0,00 m)<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-4,050 0,003 -3,020 0,003 0,010<br />

-4,150 0,081 -3,020 0,081 0,010<br />

-4,250 0,161 -3,020 0,161 0,010<br />

-4,350 0,240 -3,020 0,240 0,010<br />

-4,450 0,319 -3,020 0,319 0,010<br />

-4,550 0,399 -3,020 0,399 0,010<br />

-4,650 0,478 -3,020 0,478 0,009<br />

-4,750 0,558 -3,020 0,558 0,009<br />

-4,850 0,638 -3,020 0,638 0,009<br />

-4,950 0,717 -3,020 0,717 0,009<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 6


Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-5,050 0,797 -3,020 0,797 0,009<br />

-5,275 0,977 -3,020 0,977 0,009<br />

-5,900 1,479 -3,020 1,479 0,009<br />

-6,500 1,965 -3,020 1,965 0,008<br />

-6,500 1,965 -3,020 1,965 0,008<br />

-7,150 5,227 -3,020 5,227 0,008<br />

-7,750 8,245 -3,020 8,245 0,008<br />

-8,400 11,524 -3,020 11,524 0,007<br />

-9,000 14,559 -3,020 14,559 0,007<br />

-9,000 14,559 -3,020 14,559 0,007<br />

-10,000 19,638 -3,020 19,638 0,007<br />

-11,000 24,745 -3,020 24,745 0,006<br />

-12,000 29,879 -3,020 29,879 0,006<br />

-13,000 35,039 -3,020 35,039 0,005<br />

-13,000 35,039 -3,020 35,039 0,005<br />

-13,600 38,146 -3,020 38,146 0,005<br />

-14,200 41,261 -3,020 41,261 0,004<br />

-14,200 41,261 -3,020 41,261 0,004<br />

-14,850 44,642 -3,020 44,642 0,004<br />

-15,500 48,029 -3,020 48,029 0,003<br />

-15,500 48,029 -3,020 48,029 0,003<br />

-16,250 49,094 -3,020 49,094 0,002<br />

-17,000 50,163 -3,020 50,163 0,000<br />

-17,000 50,163 -3,020 50,163 0,000<br />

-17,800 58,506 -3,020 58,506 0,000<br />

-18,500 65,808 -3,020 65,808 0,000<br />

-19,200 73,109 -3,020 73,109 0,000<br />

-20,000 81,452 -3,020 81,452 0,000<br />

3.3 Results for Vertical 3 (X = -16,00 m; Z = 0,00 m)<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-4,050 0,009 -3,020 0,009 0,031<br />

-4,150 0,088 -3,020 0,088 0,029<br />

-4,250 0,169 -3,020 0,169 0,029<br />

-4,350 0,249 -3,020 0,249 0,028<br />

-4,450 0,330 -3,020 0,330 0,028<br />

-4,550 0,411 -3,020 0,411 0,028<br />

-4,650 0,492 -3,020 0,492 0,027<br />

-4,750 0,573 -3,020 0,573 0,027<br />

-4,850 0,655 -3,020 0,655 0,027<br />

-4,950 0,736 -3,020 0,736 0,027<br />

-5,050 0,818 -3,020 0,818 0,027<br />

-5,275 1,004 -3,020 1,004 0,026<br />

-5,900 1,529 -3,020 1,529 0,024<br />

-6,500 2,048 -3,020 2,048 0,022<br />

-6,500 2,048 -3,020 2,048 0,022<br />

-7,150 5,362 -3,020 5,362 0,021<br />

-7,750 8,443 -3,020 8,443 0,020<br />

-8,400 11,808 -3,020 11,808 0,020<br />

-9,000 14,939 -3,020 14,939 0,019<br />

-9,000 14,939 -3,020 14,939 0,019<br />

-10,000 20,208 -3,020 20,208 0,018<br />

-11,000 25,532 -3,020 25,532 0,016<br />

-12,000 30,897 -3,020 30,897 0,015<br />

-13,000 36,289 -3,020 36,289 0,013<br />

-13,000 36,289 -3,020 36,289 0,013<br />

-13,600 39,531 -3,020 39,531 0,012<br />

-14,200 42,774 -3,020 42,774 0,010<br />

-14,200 42,774 -3,020 42,774 0,010<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 7


Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-14,850 46,286 -3,020 46,286 0,009<br />

-15,500 49,795 -3,020 49,795 0,008<br />

-15,500 49,795 -3,020 49,795 0,008<br />

-16,250 50,985 -3,020 50,985 0,004<br />

-17,000 52,164 -3,020 52,164 0,000<br />

-17,000 52,164 -3,020 52,164 0,000<br />

-17,800 60,608 -3,020 60,608 0,000<br />

-18,500 67,982 -3,020 67,982 0,000<br />

-19,200 75,342 -3,020 75,342 0,000<br />

-20,000 83,737 -3,020 83,737 0,000<br />

3.4 Results for Vertical 4 (X = -15,00 m; Z = 0,00 m)<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-4,050 0,012 -3,020 0,012 0,039<br />

-4,150 0,092 -3,020 0,092 0,037<br />

-4,250 0,173 -3,020 0,173 0,037<br />

-4,350 0,254 -3,020 0,254 0,036<br />

-4,450 0,335 -3,020 0,335 0,036<br />

-4,550 0,417 -3,020 0,417 0,035<br />

-4,650 0,499 -3,020 0,499 0,035<br />

-4,750 0,581 -3,020 0,581 0,035<br />

-4,850 0,663 -3,020 0,663 0,034<br />

-4,950 0,746 -3,020 0,746 0,034<br />

-5,050 0,830 -3,020 0,830 0,034<br />

-5,275 1,018 -3,020 1,018 0,033<br />

-5,900 1,555 -3,020 1,555 0,031<br />

-6,500 2,091 -3,020 2,091 0,027<br />

-6,500 2,091 -3,020 2,091 0,027<br />

-7,150 5,431 -3,020 5,431 0,026<br />

-7,750 8,543 -3,020 8,543 0,025<br />

-8,400 11,948 -3,020 11,948 0,024<br />

-9,000 15,122 -3,020 15,122 0,023<br />

-9,000 15,122 -3,020 15,122 0,023<br />

-10,000 20,469 -3,020 20,469 0,022<br />

-11,000 25,874 -3,020 25,874 0,020<br />

-12,000 31,318 -3,020 31,318 0,018<br />

-13,000 36,779 -3,020 36,779 0,015<br />

-13,000 36,779 -3,020 36,779 0,015<br />

-13,600 40,058 -3,020 40,058 0,014<br />

-14,200 43,333 -3,020 43,333 0,013<br />

-14,200 43,333 -3,020 43,333 0,013<br />

-14,850 46,875 -3,020 46,875 0,011<br />

-15,500 50,409 -3,020 50,409 0,009<br />

-15,500 50,409 -3,020 50,409 0,009<br />

-16,250 51,621 -3,020 51,621 0,005<br />

-17,000 52,817 -3,020 52,817 0,000<br />

-17,000 52,817 -3,020 52,817 0,000<br />

-17,800 61,271 -3,020 61,271 0,000<br />

-18,500 68,651 -3,020 68,651 0,000<br />

-19,200 76,012 -3,020 76,012 0,000<br />

-20,000 84,405 -3,020 84,405 0,000<br />

3.5 Results for Vertical 5 (X = 0,00 m; Z = 0,00 m)<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 8


Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-4,050 40,275 -3,020 40,275 2,464<br />

-4,150 40,330 -3,020 40,330 2,399<br />

-4,250 40,379 -3,020 40,379 2,337<br />

-4,350 40,415 -3,020 40,415 2,277<br />

-4,450 40,433 -3,020 40,433 2,218<br />

-4,550 40,431 -3,020 40,431 2,160<br />

-4,650 40,409 -3,020 40,409 2,103<br />

-4,750 40,369 -3,020 40,369 2,047<br />

-4,850 40,312 -3,020 40,312 1,991<br />

-4,950 40,243 -3,020 40,243 1,936<br />

-5,050 40,163 -3,020 40,163 1,882<br />

-5,275 39,953 -3,020 39,953 1,762<br />

-5,900 39,269 -3,020 39,269 1,445<br />

-6,500 38,588 -3,020 38,588 1,154<br />

-6,500 38,588 -3,020 38,588 1,154<br />

-7,150 40,602 -3,020 40,602 0,977<br />

-7,750 42,491 -3,020 42,491 0,849<br />

-8,400 44,573 -3,020 44,573 0,735<br />

-9,000 46,527 -3,020 46,527 0,645<br />

-9,000 46,527 -3,020 46,527 0,645<br />

-10,000 49,853 -3,020 49,854 0,520<br />

-11,000 53,270 -3,020 53,270 0,419<br />

-12,000 56,780 -3,020 56,781 0,335<br />

-13,000 60,386 -3,020 60,386 0,265<br />

-13,000 60,386 -3,020 60,386 0,265<br />

-13,600 62,595 -3,020 62,595 0,228<br />

-14,200 64,837 -3,020 64,837 0,194<br />

-14,200 64,837 -3,020 64,837 0,194<br />

-14,850 67,302 -3,020 67,302 0,161<br />

-15,500 69,804 -3,020 69,804 0,131<br />

-15,500 69,804 -3,020 69,804 0,131<br />

-16,250 69,884 -3,020 69,884 0,064<br />

-17,000 70,010 -3,020 70,010 0,000<br />

-17,000 70,010 -3,020 70,010 0,000<br />

-17,800 77,389 -3,020 77,389 0,000<br />

-18,500 83,884 -3,020 83,884 0,000<br />

-19,200 90,411 -3,020 90,411 0,000<br />

-20,000 97,907 -3,020 97,907 0,000<br />

3.6 Results for Vertical 6 (X = 1,63 m; Z = 0,00 m)<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-3,237 32,324 -3,020 32,324 2,712<br />

-3,337 32,750 -3,020 32,750 2,649<br />

-3,437 33,119 -3,020 33,119 2,590<br />

-3,537 33,348 -3,020 33,348 2,533<br />

-3,637 33,189 -3,020 33,189 2,477<br />

-3,643 33,217 -3,020 33,217 2,473<br />

-3,737 33,577 -3,020 33,577 2,421<br />

-3,837 33,787 -3,020 33,787 2,367<br />

-3,937 33,800 -3,020 33,800 2,313<br />

-4,037 33,779 -3,020 33,779 2,260<br />

-4,050 33,776 -3,020 33,776 2,253<br />

-4,050 33,776 -3,020 33,776 2,253<br />

-4,137 33,763 -3,020 33,763 2,208<br />

-4,237 33,773 -3,020 33,773 2,156<br />

-4,775 34,160 -3,020 34,160 1,889<br />

-5,275 34,546 -3,020 34,546 1,650<br />

-5,900 34,903 -3,020 34,903 1,363<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 9


Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-6,500 35,128 -3,020 35,128 1,096<br />

-6,500 35,128 -3,020 35,128 1,096<br />

-7,150 37,975 -3,020 37,975 0,935<br />

-7,750 40,501 -3,020 40,501 0,817<br />

-8,400 43,147 -3,020 43,148 0,710<br />

-9,000 45,525 -3,020 45,526 0,626<br />

-9,000 45,525 -3,020 45,526 0,626<br />

-10,000 49,394 -3,020 49,394 0,508<br />

-11,000 53,196 -3,020 53,196 0,410<br />

-12,000 56,978 -3,020 56,978 0,329<br />

-13,000 60,772 -3,020 60,773 0,261<br />

-13,000 60,772 -3,020 60,773 0,261<br />

-13,600 63,065 -3,020 63,065 0,225<br />

-14,200 65,373 -3,020 65,374 0,192<br />

-14,200 65,373 -3,020 65,374 0,192<br />

-14,850 67,895 -3,020 67,895 0,159<br />

-15,500 70,440 -3,020 70,441 0,130<br />

-15,500 70,440 -3,020 70,441 0,130<br />

-16,250 70,558 -3,020 70,558 0,063<br />

-17,000 70,710 -3,020 70,710 0,000<br />

-17,000 70,710 -3,020 70,710 0,000<br />

-17,800 78,110 -3,020 78,110 0,000<br />

-18,500 84,616 -3,020 84,616 0,000<br />

-19,200 91,151 -3,020 91,151 0,000<br />

-20,000 98,653 -3,020 98,653 0,000<br />

3.7 Results for Vertical 7 (X = 3,71 m; Z = 0,00 m)<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-2,200 25,807 -2,200 25,807 2,012<br />

-2,300 26,165 -2,300 26,165 1,963<br />

-2,400 25,874 -2,400 25,874 1,920<br />

-2,500 26,037 -2,500 26,037 1,882<br />

-2,600 27,893 -2,600 27,893 1,848<br />

-2,700 30,348 -2,700 30,348 1,814<br />

-2,800 32,084 -2,800 32,084 1,782<br />

-2,900 33,614 -2,900 33,614 1,751<br />

-3,000 34,999 -3,000 34,999 1,722<br />

-3,020 35,251 -3,020 35,251 1,716<br />

-3,100 35,441 -3,020 35,441 1,693<br />

-3,125 35,491 -3,020 35,491 1,686<br />

-3,200 35,623 -3,020 35,623 1,664<br />

-4,050 36,541 -3,020 36,541 1,423<br />

-4,050 36,541 -3,020 36,541 1,423<br />

-4,675 37,273 -3,020 37,273 1,250<br />

-5,275 37,976 -3,020 37,976 1,085<br />

-5,900 38,661 -3,020 38,661 0,916<br />

-6,500 39,241 -3,020 39,241 0,756<br />

-6,500 39,241 -3,020 39,241 0,756<br />

-7,150 42,491 -3,020 42,491 0,668<br />

-7,750 45,387 -3,020 45,387 0,597<br />

-8,400 48,415 -3,020 48,415 0,529<br />

-9,000 51,122 -3,020 51,122 0,472<br />

-9,000 51,122 -3,020 51,122 0,472<br />

-10,000 55,482 -3,020 55,482 0,390<br />

-11,000 59,706 -3,020 59,706 0,319<br />

-12,000 63,845 -3,020 63,845 0,259<br />

-13,000 67,941 -3,020 67,941 0,207<br />

-13,000 67,941 -3,020 67,941 0,207<br />

-13,600 70,391 -3,020 70,391 0,179<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 10


Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-14,200 72,841 -3,020 72,841 0,153<br />

-14,200 72,841 -3,020 72,841 0,153<br />

-14,850 75,500 -3,020 75,500 0,128<br />

-15,500 78,168 -3,020 78,168 0,104<br />

-15,500 78,168 -3,020 78,168 0,104<br />

-16,250 78,410 -3,020 78,410 0,051<br />

-17,000 78,671 -3,020 78,671 0,000<br />

-17,000 78,672 -3,020 78,672 0,000<br />

-17,800 86,173 -3,020 86,173 0,000<br />

-18,500 92,757 -3,020 92,757 0,000<br />

-19,200 99,360 -3,020 99,360 0,000<br />

-20,000 106,932 -3,020 106,932 0,000<br />

3.8 Results for Vertical 8 (X = 21,00 m; Z = 0,00 m)<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-2,200 0,001 -2,200 0,001 0,014<br />

-2,300 1,060 -2,300 1,060 0,014<br />

-2,400 2,120 -2,400 2,120 0,014<br />

-2,500 3,181 -2,500 3,181 0,014<br />

-2,600 4,241 -2,600 4,241 0,014<br />

-2,700 5,301 -2,700 5,301 0,014<br />

-2,800 6,361 -2,800 6,361 0,014<br />

-2,900 7,421 -2,900 7,421 0,015<br />

-3,000 8,482 -3,000 8,482 0,015<br />

-3,020 8,694 -3,020 8,694 0,015<br />

-3,100 8,758 -3,020 8,758 0,015<br />

-3,125 8,777 -3,020 8,777 0,015<br />

-3,200 8,837 -3,020 8,837 0,015<br />

-4,050 9,518 -3,020 9,518 0,015<br />

-4,050 9,518 -3,020 9,518 0,015<br />

-4,675 10,028 -3,020 10,028 0,015<br />

-5,275 10,528 -3,020 10,528 0,015<br />

-5,900 11,062 -3,020 11,062 0,015<br />

-6,500 11,591 -3,020 11,591 0,015<br />

-6,500 11,591 -3,020 11,591 0,015<br />

-7,150 14,912 -3,020 14,912 0,015<br />

-7,750 17,996 -3,020 17,996 0,014<br />

-8,400 21,356 -3,020 21,356 0,014<br />

-9,000 24,475 -3,020 24,475 0,013<br />

-9,000 24,475 -3,020 24,475 0,013<br />

-10,000 29,707 -3,020 29,707 0,012<br />

-11,000 34,973 -3,020 34,973 0,011<br />

-12,000 40,265 -3,020 40,265 0,010<br />

-13,000 45,572 -3,020 45,572 0,009<br />

-13,000 45,573 -3,020 45,573 0,009<br />

-13,600 48,761 -3,020 48,761 0,008<br />

-14,200 51,951 -3,020 51,951 0,007<br />

-14,200 51,951 -3,020 51,951 0,007<br />

-14,850 55,407 -3,020 55,407 0,007<br />

-15,500 58,860 -3,020 58,860 0,006<br />

-15,500 58,860 -3,020 58,860 0,006<br />

-16,250 59,991 -3,020 59,991 0,003<br />

-17,000 61,115 -3,020 61,115 0,000<br />

-17,000 61,115 -3,020 61,115 0,000<br />

-17,800 69,506 -3,020 69,506 0,000<br />

-18,500 76,840 -3,020 76,840 0,000<br />

-19,200 84,165 -3,020 84,165 0,000<br />

-20,000 92,527 -3,020 92,527 0,000<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 11


3.9 Results for Vertical 9 (X = 26,00 m; Z = 0,00 m)<br />

Royal HaskoningDHV D-Settlement 9.2<br />

Depth Effective Hydraulic Loading Settlement<br />

Stress head<br />

[m] [kPa] [m] [kPa] [m]<br />

-2,200 0,001 -2,200 0,001 0,005<br />

-2,300 1,060 -2,300 1,060 0,005<br />

-2,400 2,120 -2,400 2,120 0,005<br />

-2,500 3,180 -2,500 3,180 0,005<br />

-2,600 4,240 -2,600 4,240 0,005<br />

-2,700 5,300 -2,700 5,300 0,005<br />

-2,800 6,360 -2,800 6,360 0,005<br />

-2,900 7,420 -2,900 7,420 0,005<br />

-3,000 8,480 -3,000 8,480 0,005<br />

-3,020 8,692 -3,020 8,692 0,005<br />

-3,100 8,756 -3,020 8,756 0,005<br />

-3,125 8,775 -3,020 8,775 0,005<br />

-3,200 8,835 -3,020 8,835 0,005<br />

-4,050 9,509 -3,020 9,509 0,005<br />

-4,050 9,509 -3,020 9,509 0,005<br />

-4,675 10,006 -3,020 10,006 0,006<br />

-5,275 10,486 -3,020 10,486 0,006<br />

-5,900 10,990 -3,020 10,990 0,006<br />

-6,500 11,478 -3,020 11,478 0,006<br />

-6,500 11,478 -3,020 11,478 0,006<br />

-7,150 14,743 -3,020 14,743 0,006<br />

-7,750 17,763 -3,020 17,763 0,006<br />

-8,400 21,043 -3,020 21,043 0,005<br />

-9,000 24,077 -3,020 24,077 0,005<br />

-9,000 24,077 -3,020 24,077 0,005<br />

-10,000 29,152 -3,020 29,152 0,005<br />

-11,000 34,249 -3,020 34,249 0,005<br />

-12,000 39,366 -3,020 39,366 0,004<br />

-13,000 44,503 -3,020 44,503 0,004<br />

-13,000 44,503 -3,020 44,503 0,004<br />

-13,600 47,593 -3,020 47,593 0,004<br />

-14,200 50,689 -3,020 50,689 0,003<br />

-14,200 50,689 -3,020 50,689 0,003<br />

-14,850 54,048 -3,020 54,048 0,003<br />

-15,500 57,411 -3,020 57,411 0,002<br />

-15,500 57,411 -3,020 57,411 0,002<br />

-16,250 58,447 -3,020 58,447 0,001<br />

-17,000 59,487 -3,020 59,487 0,000<br />

-17,000 59,487 -3,020 59,487 0,000<br />

-17,800 67,799 -3,020 67,799 0,000<br />

-18,500 75,074 -3,020 75,074 0,000<br />

-19,200 82,348 -3,020 82,348 0,000<br />

-20,000 90,662 -3,020 90,662 0,000<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 12


4 Settlements<br />

4.1 Settlements<br />

Vertical X co-ordinate Surface level Settlement<br />

number [m] [m] [m]<br />

1 -26,00 -4,05 0,004<br />

2 -21,00 -4,05 0,010<br />

3 -16,00 -4,05 0,031<br />

4 -15,00 -4,05 0,039<br />

5 0,00 -4,05 2,464<br />

6 1,63 -3,24 2,712<br />

7 3,71 -2,20 2,012<br />

8 21,00 -2,20 0,014<br />

9 26,00 -2,20 0,005<br />

4.2 Residual Times<br />

Royal HaskoningDHV D-Settlement 9.2<br />

Vertical Time Settlement Part of final Residual<br />

number settlement settlements<br />

[days] [m] [%] [m]<br />

1 7 0,000 5,249 0,004<br />

14 0,000 7,134 0,004<br />

30 0,001 19,108 0,003<br />

60 0,001 27,918 0,003<br />

90 0,001 33,714 0,003<br />

120 0,002 38,092 0,003<br />

150 0,002 41,736 0,002<br />

180 0,002 44,940 0,002<br />

210 0,002 47,873 0,002<br />

240 0,002 50,496 0,002<br />

270 0,002 53,035 0,002<br />

300 0,002 55,370 0,002<br />

330 0,002 57,670 0,002<br />

365 0,003 60,046 0,002<br />

2 7 0,000 4,764 0,010<br />

14 0,001 6,407 0,010<br />

30 0,002 17,939 0,008<br />

60 0,003 26,555 0,008<br />

90 0,003 32,419 0,007<br />

120 0,004 36,939 0,007<br />

150 0,004 40,742 0,006<br />

180 0,005 44,099 0,006<br />

210 0,005 47,177 0,005<br />

240 0,005 49,921 0,005<br />

270 0,005 52,572 0,005<br />

300 0,006 54,993 0,005<br />

330 0,006 57,375 0,004<br />

365 0,006 59,818 0,004<br />

3 7 0,001 3,745 0,030<br />

14 0,001 4,839 0,029<br />

30 0,005 16,087 0,026<br />

60 0,008 24,636 0,023<br />

90 0,009 30,811 0,021<br />

120 0,011 35,706 0,020<br />

150 0,012 39,869 0,019<br />

180 0,013 43,547 0,017<br />

210 0,014 46,905 0,016<br />

240 0,015 49,856 0,015<br />

270 0,016 52,692 0,015<br />

300 0,017 55,243 0,014<br />

330 0,018 57,746 0,013<br />

365 0,019 60,261 0,012<br />

4 7 0,001 3,443 0,038<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 13


Royal HaskoningDHV D-Settlement 9.2<br />

Vertical Time Settlement Part of final Residual<br />

number settlement settlements<br />

[days] [m] [%] [m]<br />

14 0,002 4,370 0,038<br />

30 0,006 15,667 0,033<br />

60 0,010 24,310 0,030<br />

90 0,012 30,639 0,027<br />

120 0,014 35,678 0,025<br />

150 0,016 39,962 0,024<br />

180 0,017 43,739 0,022<br />

210 0,019 47,179 0,021<br />

240 0,020 50,182 0,020<br />

270 0,021 53,061 0,019<br />

300 0,022 55,636 0,018<br />

330 0,023 58,160 0,017<br />

365 0,024 60,679 0,016<br />

5 7 0,704 28,594 1,759<br />

14 0,897 36,412 1,567<br />

30 1,229 49,866 1,235<br />

60 1,457 59,136 1,007<br />

90 1,575 63,922 0,889<br />

120 1,654 67,122 0,810<br />

150 1,717 69,702 0,746<br />

180 1,771 71,895 0,692<br />

210 1,817 73,773 0,646<br />

240 1,854 75,273 0,609<br />

270 1,889 76,677 0,575<br />

300 1,918 77,848 0,546<br />

330 1,946 78,987 0,518<br />

365 1,972 80,046 0,492<br />

6 7 0,717 26,429 1,995<br />

14 0,945 34,856 1,767<br />

30 1,377 50,791 1,335<br />

60 1,647 60,727 1,065<br />

90 1,777 65,506 0,935<br />

120 1,861 68,609 0,851<br />

150 1,927 71,061 0,785<br />

180 1,983 73,111 0,729<br />

210 2,030 74,859 0,682<br />

240 2,068 76,252 0,644<br />

270 2,103 77,557 0,609<br />

300 2,133 78,644 0,579<br />

330 2,162 79,701 0,551<br />

365 2,188 80,686 0,524<br />

7 7 0,215 10,693 1,797<br />

14 0,383 19,060 1,629<br />

30 0,915 45,459 1,097<br />

60 1,171 58,190 0,841<br />

90 1,276 63,394 0,737<br />

120 1,338 66,503 0,674<br />

150 1,388 68,971 0,624<br />

180 1,430 71,073 0,582<br />

210 1,467 72,894 0,545<br />

240 1,496 74,362 0,516<br />

270 1,524 75,740 0,488<br />

300 1,547 76,898 0,465<br />

330 1,570 78,026 0,442<br />

365 1,591 79,081 0,421<br />

8 7 0,001 4,417 0,014<br />

14 0,001 6,238 0,014<br />

30 0,002 15,528 0,012<br />

60 0,003 22,070 0,011<br />

90 0,004 26,051 0,011<br />

120 0,004 29,133 0,010<br />

150 0,005 31,840 0,010<br />

180 0,005 34,361 0,009<br />

210 0,005 36,788 0,009<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 14


Royal HaskoningDHV D-Settlement 9.2<br />

Vertical Time Settlement Part of final Residual<br />

number settlement settlements<br />

[days] [m] [%] [m]<br />

240 0,006 39,136 0,009<br />

270 0,006 41,448 0,008<br />

300 0,006 43,670 0,008<br />

330 0,007 45,870 0,008<br />

365 0,007 48,252 0,007<br />

9 7 0,000 5,319 0,005<br />

14 0,000 7,532 0,005<br />

30 0,001 19,228 0,004<br />

60 0,001 27,221 0,004<br />

90 0,002 31,663 0,004<br />

120 0,002 34,772 0,003<br />

150 0,002 37,299 0,003<br />

180 0,002 39,530 0,003<br />

210 0,002 41,608 0,003<br />

240 0,002 43,578 0,003<br />

270 0,002 45,537 0,003<br />

300 0,003 47,469 0,003<br />

330 0,003 49,389 0,003<br />

365 0,003 51,522 0,003<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 15


5 Warnings and errors<br />

List of non-fatal warnings and errors generated during calculation.<br />

Royal HaskoningDHV D-Settlement 9.2<br />

1 Model Koppejan is not ideal for unloading (e.g. load removal, temporary dewatering, gradual<br />

submerging). If As is much larger than Cs', unloading will yield almost no effect on creep. Switch to the<br />

NEN-Bjerrum or abc Isotache model for improved predictions.<br />

End of Report<br />

14-12-2012 C:\..\Bruggen - Zetting landhoofden talud voorb - 20121214 Page 16