(Fls. 16/27 do Contrato de Concessão n o 001/95)<br />

ANEXO I<br />

<strong>CONTRATO</strong> <strong>DE</strong> <strong>CONCESSÃO</strong> DA ESCELSA<br />

TARIFA CONVENCIONAL<br />

SUBGRUPO <strong>DE</strong>MANDA<br />

(R$/kW)<br />

CONSUMO<br />

(R$/MWh)<br />

QUADRO A<br />

A2 (88 A 138 kV) 9,16 23,04<br />

A3 (69 kV) 9,87 24,83<br />

A3a (30 kV a 44 kV) 3,42 50,12<br />

A4 (2,3 kV a 25 kV) 3,55 51,96<br />

AS (Subterrâneo) 5,24 54,38<br />

B1 - RESI<strong>DE</strong>NCIAL: - -<br />

Consumo mensal até 30 kWh - 21,35<br />

Consumo mensal de 31 a 100 kWh - 50,85<br />

Consumo mensal de 101 a 200 kWh - 86,30<br />

Consumo mensal acima de 200 kWh - 112,89<br />

B2-RURAL - 59,10<br />

B2-COOPERATIVA <strong>DE</strong> ELETRIFICAÇÃO RURAL - 41,76<br />

B2-SERVIÇO PÚBLICO <strong>DE</strong> IRRIGAÇÃO - 54,35<br />

B3-<strong>DE</strong>MAIS CLASSES - 94,29<br />

B4-ILUMINAÇÃO PÚBLICA: - -<br />

B4a - Rede de Distribuição - 48,58<br />

B4b - Bulbo da Lâmpada - 53,32<br />

B4c - Nível de IP acima do Padrão - 78,99<br />

QUADRO B<br />

TARIFA HORO-SAZONAL AZUL<br />

SEGMENTO HORÁRIO <strong>DE</strong>MANDA (R$/kW)<br />

SUBGRUPO PONTA FORA <strong>DE</strong> PONTA<br />

A1 (230 kV ou mais) 5,37 1,12<br />

A2 (88 a 138 kV) 5,77 1,33<br />

A3 (69 kV) 7,74 2,11<br />

A3a (30 kV a 44 kV) 9,04 3,02<br />

A4 (2,3 kV a 25 kV) 9,38 3,12<br />

AS (Subterrâneo) 9,81 4,80<br />

ANEXO I