MINUTA DE CONTRATO DE CONCESSÃO - Aneel
MINUTA DE CONTRATO DE CONCESSÃO - Aneel
MINUTA DE CONTRATO DE CONCESSÃO - Aneel
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
(Fls. 22/27 do Contrato de Concessão n o 001/95)<br />
ANEXO III<br />
<strong>CONTRATO</strong> <strong>DE</strong> <strong>CONCESSÃO</strong> DA ESCELSA<br />
ESTRUTURA <strong>DE</strong> MERCADO<br />
SUBGRUPO CLASSE MWh (%)<br />
A2 Industrial e outros<br />
1.817.092<br />
40,28<br />
Total A2<br />
1.817.092<br />
40,28<br />
A3a Industrial e outros<br />
175.108<br />
3,88<br />
Água, esgoto e saneamento<br />
60.908<br />
1,35<br />
Total A3a<br />
236.016<br />
5,23<br />
A4 Industrial e outros<br />
582.013<br />
12,90<br />
Água, esgoto e saneamento<br />
57.515<br />
1,28<br />
Rural<br />
27.196<br />
0,60<br />
Rural irrigação<br />
13.284<br />
0,29<br />
Total A4<br />
680.008<br />
15,07<br />
GRUPO A TOTAL 2.733.116 60,58<br />
B1 RESI<strong>DE</strong>NCIAL ( até 30)kWh<br />
9.695<br />
0,21<br />
(de 31 a 100)kWh<br />
124.092<br />
2,75<br />
(de 101 a 200)kWh<br />
305.176<br />
6,77