17.04.2013 Views

MINUTA DE CONTRATO DE CONCESSÃO - Aneel

MINUTA DE CONTRATO DE CONCESSÃO - Aneel

MINUTA DE CONTRATO DE CONCESSÃO - Aneel

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(Fls. 22/27 do Contrato de Concessão n o 001/95)<br />

ANEXO III<br />

<strong>CONTRATO</strong> <strong>DE</strong> <strong>CONCESSÃO</strong> DA ESCELSA<br />

ESTRUTURA <strong>DE</strong> MERCADO<br />

SUBGRUPO CLASSE MWh (%)<br />

A2 Industrial e outros<br />

1.817.092<br />

40,28<br />

Total A2<br />

1.817.092<br />

40,28<br />

A3a Industrial e outros<br />

175.108<br />

3,88<br />

Água, esgoto e saneamento<br />

60.908<br />

1,35<br />

Total A3a<br />

236.016<br />

5,23<br />

A4 Industrial e outros<br />

582.013<br />

12,90<br />

Água, esgoto e saneamento<br />

57.515<br />

1,28<br />

Rural<br />

27.196<br />

0,60<br />

Rural irrigação<br />

13.284<br />

0,29<br />

Total A4<br />

680.008<br />

15,07<br />

GRUPO A TOTAL 2.733.116 60,58<br />

B1 RESI<strong>DE</strong>NCIAL ( até 30)kWh<br />

9.695<br />

0,21<br />

(de 31 a 100)kWh<br />

124.092<br />

2,75<br />

(de 101 a 200)kWh<br />

305.176<br />

6,77

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!