08.04.2015 Views

Contractele de Performanta Energetica – un nou ... - Achizitii publice

Contractele de Performanta Energetica – un nou ... - Achizitii publice

Contractele de Performanta Energetica – un nou ... - Achizitii publice

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Contractele</strong> <strong>de</strong> <strong>Performanta</strong> <strong>Energetica</strong><br />

–<strong>un</strong> <strong>nou</strong> mo<strong>de</strong>l <strong>de</strong> PPP pentru proiectele <strong>de</strong><br />

eficienta energetica<br />

Contractul <strong>de</strong> <strong>Performanta</strong> <strong>Energetica</strong>(CPE),concept,<br />

avantaje, riscuri , studiu <strong>de</strong> caz<br />

Dr. ing. Corneliu Rotaru


Evolutia intensitatii energetice (IE)<br />

0,6<br />

0,5<br />

0,492<br />

0,4<br />

0,384<br />

0,3<br />

0,2<br />

0,225<br />

0,25<br />

0,161<br />

0,161<br />

0,149 0,156<br />

CS – intensitarea energertica In costuri curente<br />

PPC – intensitatea energetica corectata cu PP<br />

0,1<br />

0<br />

ROMÂNIA NM 10 UE 25 UE 15<br />

CS<br />

PPC<br />

0.4<br />

0.368<br />

0.324 0.320<br />

0.293 0.298<br />

0.3<br />

0.274<br />

0.256 0.247<br />

0.226<br />

0.197<br />

0.189 0.187 0.192 0.192<br />

0.2 0.169<br />

IEP –sca<strong>de</strong>re cu 32,9%<br />

0.158<br />

0.1<br />

IE – tendinta continua <strong>de</strong> sca<strong>de</strong>re<br />

IEF –sca<strong>de</strong>re cu 29,4%<br />

0<br />

1998 2000 2001 2002 2003 2004 2005 2006<br />

Sursa : ODYSSE<br />

2| 29.09.2010


• Strategie – HG 193 / 2004<br />

• Integrare europeana – PNAEE 2007 – 2013 / directiva 32/2006; OG 22/2008<br />

• Industrie<br />

• Acorduri pe termen l<strong>un</strong>g<br />

• Bilanturi energetice / management energetic<br />

• Investitii din Fonduri Structurale<br />

• M<strong>un</strong>icipalitati<br />

• Subventionare investitii –DH, cladiri <strong>publice</strong>, iluminat public –MECMA<br />

• Contract <strong>de</strong> performanta (ESCO)<br />

• Subventionare reabilitare locuinte / certificare energetica / auditare cladiri ldii ‐ MDRT<br />

• Populatie<br />

• Etichetare aparate electrocasnice – supravegherea pietei<br />

• Informare / educare<br />

• Transport<br />

• Feroviar<br />

• Metrou<br />

3| 29.09.2010


FTP –<strong>un</strong> <strong>nou</strong> mecanism financiar<br />

Finantarea cu a Treia Parte (FTP) –concept institutional<br />

Cladire<br />

Publica<br />

Cerere <strong>de</strong> oferta<br />

Oferta servicii<br />

ESCO<br />

Rambursare<br />

Credit<br />

Creditare dificila<br />

Banca<br />

4| 29.09.2010


Variante <strong>de</strong> finantare<br />

Cost financiar<br />

Cazul nr 1: credit bancar<br />

• Opti<strong>un</strong>i proprii <strong>de</strong> economie <strong>de</strong> eng.<br />

•Finanatare prin credit bancar(dificila)<br />

•Ec1=rata+dob<br />

•Timp <strong>de</strong> rambursare: 5 ani<br />

Factura <strong>de</strong><br />

energie<br />

Rambursare credit<br />

Factura <strong>de</strong> energie<br />

Factura <strong>de</strong> energie<br />

plata serviciuESCO<br />

Cazul nr 2<br />

Cost financiar<br />

• CPE cu economii garantate<br />

pe durata contractului<br />

Factura <strong>de</strong> energie<br />

Rambursare credit<br />

•Ec2=rata+dob+serviciu>Ec1<br />

Factura <strong>de</strong> energie<br />

Factura <strong>de</strong> energie<br />

•Timp <strong>de</strong> rambursare : 6 ani<br />

Cazul nr 3<br />

• CPE cu economii garantate pe durata<br />

contractului<br />

•Ec3=rata+dob+serviciu+benef >Ec2<br />

•Timp <strong>de</strong> rambursare : 7 ani<br />

Factura <strong>de</strong> energie<br />

plata serviciuESCO<br />

Cost financiar<br />

Rambursare credit<br />

Factura <strong>de</strong> energie<br />

Factura <strong>de</strong> energie<br />

5| 29.09.2010


Cazul nr 3 ‐ <strong>de</strong>talii<br />

6| 29.09.2010


Caz real – evolutie preturi energie<br />

valoare factura fara CPE<br />

operare e<br />

cos sturi <strong>de</strong><br />

Reducere factura<br />

client<br />

Economii <strong>de</strong> energie<br />

garantate<br />

t<br />

valoare factura cu CPE<br />

savings<br />

7| 29.09.2010<br />

aplicare masuri<br />

EE<br />

sfarsit contract


conceptul ESCO<br />

Participare Client (30 %)<br />

Participare Contractor(70 %) ESCO<br />

Costuri <strong>de</strong><br />

energie [€]<br />

Garanţia economiei<br />

<strong>de</strong> energie<br />

(19 %)<br />

Economii<br />

suplimentare<br />

<strong>de</strong> energie<br />

(25 %)<br />

Anul <strong>de</strong> bază<br />

Anul instalării<br />

8| 29.09.2010


Mecanisme <strong>de</strong> finantare – varianta1<br />

Imprumul apare in balanta ESCO (mo<strong>de</strong>lul economiilor impartite)<br />

9| 29.09.2010


Mecanisme <strong>de</strong> finantare – varianta 2<br />

Imprumutul apare in balanta clientului (mo<strong>de</strong>lul <strong>de</strong> garantare a economiilor)<br />

10 | 29.09.2010


Mecanisme <strong>de</strong> finantare – varianta 3<br />

Divi<strong>de</strong>n<strong>de</strong><br />

BANCA<br />

Plati<br />

conditionate<br />

Cont<br />

Escrow<br />

ESCO<br />

Capital social<br />

Credit<br />

Plati<br />

periodice<br />

Depozit<br />

Proiectare<br />

NOUA<br />

Co.<br />

Garantie<br />

Capital social<br />

Investitie<br />

Plati<br />

periodice<br />

Investitor<br />

(Capital Social)<br />

Divi<strong>de</strong>n<strong>de</strong><br />

CLIENT<br />

11 | 29.09.2010


Tipuri <strong>de</strong> contracte ESCO<br />

Contract <strong>de</strong> performanta –CPE<br />

NegaWattOra<br />

Contract <strong>de</strong> furnizare<br />

MegaWattOra<br />

12 | 29.09.2010


Tipuri <strong>de</strong> contracte ESCO<br />

continuare<br />

ESCO<br />

ESCO<br />

Contract <strong>de</strong> performanta –Energy<br />

Performance Contract<br />

Contract t<strong>de</strong> furnizare –Energy Delivery<br />

Contract<br />

13 | 29.09.2010


Avantaje CPE – externalizare riscuri tehnice si financiare<br />

14 | 29.09.2010


Alocarea riscurilor<br />

riscul <strong>de</strong><br />

utilizare<br />

Proprietar cladire;<br />

modificarea utilizarii => modificarea economiiloe garantate<br />

risc modificarii<br />

pretului<br />

energiei<br />

Proprietar cladire;<br />

Crestere pret => avantaj contractor<br />

Sca<strong>de</strong>re pret => avantaj proprietar<br />

risc tehnic<br />

Contractor;<br />

Garanteaza performanta, conditiile technice& disponibilitatea<br />

risc economic<br />

Contractor;<br />

pentru toata investitia<br />

Tip <strong>de</strong><br />

proprietate<br />

Echipamentul este transferat in proprietatea Proprietarului <strong>de</strong> cladire din momentul<br />

instalarii si/sau operarii<br />

15 | 29.09.2010


Studiu <strong>de</strong> caz 1 Germania<br />

16 | 29.09.2010


Studiu <strong>de</strong> caz 2 ‐ Cehia<br />

CLIENT : Autoritatea locala din Pardubice (Boemia <strong>de</strong> est)<br />

PROIECT : 30 <strong>de</strong> cladiri : scoli, spitale, centre sociale sau <strong>de</strong><br />

sanatate‐realizare in 3 etape<br />

Faza a II a : 10 scoli, 1 centru <strong>de</strong> sanatate, 1 centru social<br />

Situatia ti initiala iti a consumului i<strong>de</strong> energie :<br />

‐Gaz natural : 16 789 MWh/an<br />

‐Energie termica : 1 597 MWh/an<br />

‐Costuri <strong>de</strong> operare : 211 000 euro/an<br />

Masuri EE (selectiv):<br />

– Descentralizarea sistemului <strong>de</strong> incalzire, <strong>de</strong>cuplare <strong>de</strong> la<br />

sistemul urban si instalare cazan propriu<br />

–Reconstructia surselor <strong>de</strong> caldura (abur si apa calda)<br />

–Pompe <strong>de</strong> caldura<br />

–Reconstructia sistemului <strong>de</strong> distributie si a schimbatoarelor <strong>de</strong> caldura<br />

– Ventile termostatice, sistem <strong>de</strong> control si reglaj direct / individual room control pe<br />

camere<br />

Servicii ESCO : ‐ conceptie sistem <strong>nou</strong>; ‐ proiectare; ‐ finantare; ‐ furnizare echipament si PIF<br />

‐ formare personal exploatare; garantii;<br />

Durata contractului t : 13 ani din care 1 an <strong>de</strong> gratie<br />

17 | 29.09.2010


Studiu <strong>de</strong> caz 2 – Cehia (continuare)<br />

Investitie totala : 1 312 600 EUR<br />

Economie <strong>de</strong> energie:<br />

‐ Guarantate: gaz natural : 4 020 MWh/an<br />

energie termica : 230 GJ/an<br />

‐ Realizate :gaz natural : 4 766 MWh/an<br />

energie termica : 1 597 GJ/an<br />

Valoare economie <strong>de</strong> energie: 310 000 EUR/an din care 145 000 EUR/an din costuri <strong>de</strong> operare<br />

18 | 29.09.2010


Studiu <strong>de</strong> caz 3 ‐ Romania<br />

Mo<strong>de</strong>l <strong>de</strong> contract: BOOT/ economii impartite<br />

Credit pe 4,5 ani cu 3 l<strong>un</strong>i perioada <strong>de</strong> gratie<br />

Economie <strong>de</strong> energie : 574.464 Nm3/an<br />

Durata contractului :10 ani<br />

80% credit FREE<br />

USD 499 000<br />

20% ESCO<br />

Contributie<br />

proprie<br />

USD 124 438<br />

ESCO<br />

80%<br />

Fondul Roman <strong>de</strong> Eficienta<br />

<strong>Energetica</strong> (www.free.org.ro )<br />

Echipament (1 motor + generator) - 472,692 USD<br />

Proiectare si realizare - 150,746 USD<br />

Total proiect 623,438 USD<br />

Unitate <strong>de</strong> cogenerare in industrie<br />

19 | 29.09.2010


• www.european‐energy‐service‐initiative.net<br />

• Multumesc pentru atentie !<br />

20 | 29.09.2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!