09.02.2018 Views

259

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6<br />

南 宁 专 版<br />

2018/2/8<br />

www.chinanews.se<br />

苹 果 / 安 卓 Ipad Iphone(App Store)/ Android: 北 欧 时 报<br />

Progress of Wuxiang New District<br />

Planning and Construction, Nanning<br />

1. Overall situation of Wuxiang New<br />

District<br />

1.1 History<br />

Wuxiang New District locates at<br />

south of Yongjiang River, in Nanning<br />

city. The planning area is about 200 square<br />

kilometers, ranging from Bachijiang River to<br />

Shuitangjiang River, and Yongjiang River<br />

to Binhai. Guangxi is China’s international<br />

channel to ASEAN, new strategic pivot in<br />

south-west and middle-south development<br />

as well as the gateway in the Belt and Road<br />

Initiative.<br />

In May, 2006, Guangix party committee<br />

and Guangxi government decided to<br />

“construct Wuxiang New District and<br />

make it a new Nanning”. In October,<br />

2011, the party committee and government<br />

held a meeting and decided to speed up the<br />

construction and development of Wuxiang<br />

New District with effective measures. Since<br />

then, Nanning Municipal Committee and<br />

Nanning Government made great efforts to<br />

construct the district. In early 2013, Guangxi<br />

Party Committee and Guangxi Government<br />

established Wuxiang New District Party Affairs<br />

Committee and Management Committee.<br />

The construction of Wuxiang New District<br />

entered a new and high-speed phase. A series<br />

of major projects were started and completed.<br />

“Wuxiang speed” was upgraded over and<br />

over again and Wuxiang New District came<br />

into shape from a blueprint. A new modern<br />

ecological livable city came into being.<br />

1.2 Planning and layout<br />

According to Nanning Overall Urban<br />

Plan approved by State Council, Nanning will<br />

take Yongjiang River as the axes, expand the<br />

west-east direction, improve the south and<br />

north of Yongjiang River, and focus on the<br />

south part. The government sets the strategy to<br />

develop and construct Wuxiang New District.<br />

Nanning government refined the conceptual<br />

plan and arranged the layout as “one belt, one<br />

axes, two centers, three regions, six areas”.<br />

They are multi-functional public facility<br />

service belt along Yongjiang River; southnorth<br />

development axis; core area trade and<br />

business center, Longgang business center; the<br />

whole district was divided into three sections<br />

from north to south—life region, industry<br />

region and tourism region; in life region along<br />

the river, there are administration and business,<br />

culture, sports and health, eco-business areas;<br />

in industry region, there are trade and logistics,<br />

modern industry areas; eco-tourism area is<br />

located in Nama region.<br />

(1) Administration, Finance &<br />

Business Area. The planning area is 38 square<br />

kilometers, including headquarter base<br />

financial street, major public welfare programs<br />

in Guangxi, China-ASEAN Information<br />

Harbor administration area, Yudongxi and<br />

Panlongbinshui business and residential areas.<br />

Guangxi Sports Center, Guangxi Planning<br />

Exhibition Hall and Wuxianghu Park have<br />

been constructed. Guangxi Arts Center is<br />

under construction.<br />

(2) Culture, Sports & Health Area.<br />

The planning area is 25 square kilometers,<br />

including sports industry, culture and tourism,<br />

medical and health clusters and partial China-<br />

ASEAN Information Harbor industrial area.<br />

Guangxi Sports Center has been completed<br />

and put into use.<br />

(3) Eco-business Area. The planning<br />

area is 49 square kilometers, including<br />

Longgang business cluster, binjiang residential<br />

area and education and research area. Nanning<br />

University has been completed. A series of<br />

business and residential projects like Shanghai<br />

Shimao are under construction.<br />

(4) Business and Logistics Area. The<br />

planning area is about 32 square kilometers,<br />

including comprehensive bonded area, China-<br />

ASEAN Information Harbor industrial core<br />

base. In September, 2015, Comprehensive<br />

Bonded Area was granted by central<br />

government. The facilities include railways<br />

and road freight hub.<br />

(5) Modern Industry Area. The<br />

planning area is about 50 square meters. It is<br />

a new base for modern manufacturing cluster<br />

and industrial innovation base. It is a main base<br />

of new industries in Wuxiang New District<br />

and even in Nanning.<br />

(6) Eco-tourism Area. The planning<br />

area is about 20 square kilometers. This area<br />

develops eco-tourism based on the beautiful<br />

scenery in Bachijang River. It will also serve<br />

as an extension of urban function area and a<br />

comprehensive demonstration area of urbanrural<br />

development.<br />

2. The construction of Wuxiang New<br />

District starts to take shape<br />

In 2011, Guangxi Party Committee and<br />

Guangxi Government set the goal to achieve<br />

“new look in one year, breakthrough in five<br />

years and great-leap-forward development<br />

in ten years” in Wuxiang New District.<br />

Under the leadership of provincial and<br />

municipal party committee and government,<br />

with support of all walks of lives, Wuxiang<br />

New District Party Affairs Committee and<br />

Management Committee made great efforts<br />

during 12th five-year plan and realized the<br />

goal of achieving “breakthrough in five<br />

years”. During 12th five-year plan, Wuxiang<br />

New District made breakthrough in various<br />

works. Major economic indicators increased.<br />

Some indicators increased with three-digit<br />

number and many economic indicators<br />

appeared for the first time. The overall<br />

development momentum remained strong and<br />

“construct Wuxiang New District and make<br />

it a new Nanning” came into being from<br />

blueprint.<br />

2.1 Project investment realized<br />

leaping development<br />

The total investment during 12th fiveyear<br />

plan was 90 billion rmb, five times as<br />

the volume during 11th five-year plan. The<br />

social investment went up and hit 18 billion<br />

rmb in 2015. The driving force shifted from<br />

infrastructure construction to industrial<br />

projects. The construction of the district came<br />

into being rapidly. Wuxiang New District<br />

became a key player in urban construction and<br />

economic development.<br />

Breakthrough in infrastructure<br />

construction was made. Trunk roads, key<br />

bridges and road network construction were<br />

pushed and the main road network was<br />

formed. Subsidiary road network construction<br />

was promoted and part of it was completed.<br />

Transportation became very convenient.<br />

Municipal accessory facilities and public<br />

service facilities were under construction. The<br />

newly commenced projects during 12th fiveyear<br />

plan were as twice as the number during<br />

11th five-year plan. Sewage pipe network<br />

projects, completed pipe network and<br />

investment were as 23 times, 28 times and 39<br />

times as the figure during 11th five-year plan.<br />

Sewage plant was put into use, which was<br />

a breakthrough. Newly commenced public<br />

service projects accounted for 84% of the total<br />

projects since the construction of Wuxiang<br />

New District.<br />

2.2 Attracting leading companies<br />

into the district to promote city-industry<br />

integration<br />

Wuxiang New District took investment<br />

attraction as the key to speed up the<br />

development of Wuxiang New District. Based<br />

on the goal of city-industry integration,<br />

Wuxiang New District launched policies to<br />

fuel the development. The district attracted<br />

investment outside, offered effective service<br />

inside district, insisted on key points, and<br />

carried out “one policy for one project”.<br />

The district also opened green channel for the<br />

projects, so that big companies and big projects<br />

kept entering the district. Attracted industrial<br />

projects during 12th five-year plan were 23.85<br />

times the number during 11th five year plan.<br />

Among them, there were 11 top 500 global<br />

companies, 19 top 500 Chinese companies, 15<br />

companies listed abroad, 10 financial institutes.<br />

There were 2 projects with over 10 billion<br />

rmb investment and 62 projects with over 1<br />

billion rmb investment. The industry in the<br />

district developed as industrial cluster, and<br />

pushed the overall development in the district.<br />

2.3 Industrial projects in the district<br />

developed against negative tendency<br />

Policy study on major issues like “Two<br />

Bases One Center One CBD” construction<br />

and city and industries integration development<br />

are conducted. A serial of regulations, policies,<br />

and measures were carried out, for instance,<br />

the temporary regulation on promotion of<br />

financial street construction in new district,<br />

policies or measures on maintaining steady<br />

growth of headquarter financial street<br />

building, and suggestions on supporting and<br />

encouraging listed companies to enter New<br />

District Financial Street. All efforts were made<br />

to break the restriction bottleneck. During<br />

12th Five Year Plan, 233 industrial projects<br />

in new district have been carried out. Since<br />

2015, we actively cooperated with Guangxi<br />

Government in pushing forward China-<br />

ASEAN Information Harbor construction and<br />

finishing the planning on initial site-picking<br />

of key base. In terms of the construction<br />

of headquarter and industrial projects, 36<br />

projects are planned to be built (including 14<br />

headquarter bases and 22 industrial projects.)<br />

2.4 Approval system reform creates<br />

new soft environment in new district<br />

We explored reform and innovation of<br />

administration & approval system, adopting<br />

new approval rules. Among the new rules,<br />

“shifting retailing into wholesaling” rule<br />

decreased the approval span by 93.75%.<br />

“Standard approval” was launched and<br />

the approval time span was shortened by<br />

41.5%; “overall approval” was popularized<br />

to streamline the approval time efficiency;<br />

“exemption approval” was on trial with the<br />

evaluation of the approval system innovation;<br />

“disposal with major materials though<br />

some secondary documents not available<br />

immediately” was promoted which cuts<br />

the approval materials by 10%. After reform<br />

and innovation, key nodes of enterprises and<br />

governmental investment projects reduced<br />

to 6 from original 9 and 6 from original 11<br />

respectively; approval items of projects for<br />

business investment examination, filing,<br />

government-funded housing construction<br />

and civil service have been cut and integrated<br />

respectively by 10, 9, 12 and 8. It only takes 28<br />

days on average to approve the whole process<br />

after the streamlining. The efficiency increased<br />

by 20%.As the administration approval<br />

system in the district underwent reform and<br />

innovation, the approval efficiency raised, and<br />

investment environment was refined. It takes<br />

less than four months to complete the whole<br />

process from land biding to construction.<br />

“Wuxiang Speed” was upgraded again and<br />

again.<br />

2.5 New progress has been made in<br />

green and ecological development of new<br />

district<br />

Efforts were made in building state-level<br />

green ecological demonstartion city district.<br />

In February 2014, Ministry of Housing<br />

and Urban-Rural Development officially<br />

approved 19 square kilometers in Wuxiang<br />

District as state-level green ecological model<br />

area. By strengthening six major concepts<br />

and four measures to push forward the<br />

construction work, green buildings accounts<br />

for 93% of the total. We actively built “sponge<br />

city”. The district is a key pilot field. 240<br />

pilot projects have been decided to launch<br />

according to the pilot plan of “sponge city”<br />

in the district. The standard on city road &<br />

civil infrastructure issued by the district led<br />

the construction of pilot projects. In 2015,<br />

44 projects in the district were scheduled to<br />

launch. The strength and speed of the works<br />

in pilot rank top in the city.<br />

3. Major work measures<br />

3.1 Strengthening the instructive and<br />

regulative functions of planning in New<br />

District’s development and construction.<br />

The overall Nanning urban planning<br />

and control and planning of Wuxiang New<br />

District covered the whole area. Based on<br />

construction order and difficulty levels of<br />

land development, indexes were set in urban<br />

planning to raise utilization ratio of land.<br />

The urban design was deepened through<br />

following urban designing guidance and<br />

regulations. The district controlled and<br />

coordinated the general architectural features,<br />

colors, roof forms, facade, planting and<br />

lighting so that the natural environment and<br />

buildings can achieve harmony. The district<br />

adopted refined management to guide highintensive<br />

and high-quality comprehensive<br />

land development. Wuxiang New District<br />

encouraged development of underground<br />

space resources and land utilization expanding.<br />

The value of land was increased through<br />

strengthening facilities.<br />

3.2 Ensuring Supporting Facilities<br />

to enlarge the district’s comprehensive<br />

carrying capacity.<br />

In Specialized Planning for Public<br />

Facilities in Wuxiang New District, nonprofit<br />

content was included as an imperative<br />

condition for land leasing. It ensures the<br />

planning and construction of public facilities<br />

and infrastructure in Wuxiang New District.<br />

In terms of non-profit construction,the<br />

district gives more rights to companies to<br />

handle the issues with imperative planning<br />

index remaining the same.<br />

After finishing 11 primary and secondary<br />

schools including Nanning No.3 Middle<br />

School, and a considerable number of key<br />

projects of education, sanitation and culture,<br />

such as Guangxi International Zhuang<br />

Hospital, Stomatological Hospital of Guangxi<br />

Medical University, Nanning Children’s<br />

Hospital, Guangxi Culture and Art Centre<br />

and Guangxi New Media Centre. The district<br />

established a new series of public facility<br />

projects. The district also constructed public<br />

facilities such as drainage system, public toilets,<br />

refuse transfer station, and neighboring squares<br />

in relevant areas to improve urban functions of<br />

the New District.<br />

3.3 Enhancing industry support<br />

for city and industries integration<br />

development<br />

Efforts are made to attract strong<br />

enterprises and to boost development, which<br />

is strong support for city industries integration.<br />

Projects that settled in headquarter financial<br />

street carried out the second investment<br />

promotion; we pushed forward negotiation<br />

on cross-border industrial park and make<br />

substantial progress. Efforts are made to speed<br />

up the launch of related projects concerning<br />

Nanning core base of China-ASEAN<br />

Information Harbor. Investment promotion<br />

of new industries park, China-ASEAN<br />

International Logistics Base as well as China-<br />

ASEAN E-commerce Industrial Park were<br />

also conducted. We put great efforts on core<br />

developing area extension and completing the<br />

project layout of the headquarters financial<br />

street.<br />

3.4 Enhancing services and<br />

upgrading soft power of the district<br />

To make full use of the advantage of<br />

the district as pilot area, we set up Project<br />

Approval Office and issued “early stage<br />

project approval day” activity. The goal was<br />

to decrease the number of approval matters<br />

and increase efficiency. It was planed to put<br />

the following measures into trial: to connect<br />

approval work and performance, to let leaders<br />

and people in charge hold responsible for the<br />

approval matters and key tasks. The standard<br />

to evaluate whether duties of approval were<br />

fulfilled was to check whether all parties took<br />

their responsibilities and offered due services.<br />

With the overall reform and innovation of<br />

administration & approval system in Wuxiang<br />

New District, we have raised greatly approval<br />

efficiency and investment environment.<br />

A series of policies including Temporary<br />

Regulation on Promoting Development and<br />

Construction of Financial Street in Wuxiang<br />

New District were issued. The policy soft<br />

environment and attractiveness of New<br />

District improved. We promoted reform on<br />

human resource management system. Post<br />

appointment mechanism and performance<br />

evaluation management was carried out. In<br />

this way, payment matched the performance,<br />

officials enjoyed more flexibility in terms of<br />

positions and payments. Talents could easily<br />

stand out. This new norm provided guarantees<br />

for all tasks to be accomplished.<br />

4. Work priorities in the future<br />

In next step, Wuxiang New District<br />

will conform to the standard of “Planning<br />

at high level, Construct under high standard,<br />

Develop at high speed”. Efforts will be made<br />

in expending space, enhancing functions,<br />

promoting industries and raising qualities, in<br />

a bid to accelerate the construction of “Two<br />

bases One center One CBD” in Wuxiang<br />

District and Nanning Core Base of China-<br />

ASEAN Information Harbor. The goal is<br />

to make it a new district with the strongest<br />

agglomeration function and radiation effect in<br />

Guangxi.<br />

4.1 Applying for the title of state-level<br />

new district<br />

4.2 Expanding the scale of open<br />

cooperation<br />

4.3 Promoting city and industries<br />

integration<br />

4.4 Improving the functional facilities<br />

in the district<br />

4.5 Constructing state-level green<br />

ecological demonstration city<br />

First, greenland system of deep<br />

integration, obvious features and high qualities<br />

should be built. The system should be consist<br />

of green land in parks, along waters, for<br />

environmental protection, on streets and<br />

roads and in yards. Second, civil water system<br />

in core area featuring “one river, three<br />

streams, six lakes, multiple waters” is to be<br />

built. Third, we plan to build Wuxiangling<br />

Mountain into a high-quality city forest<br />

park featuring “to feel, know and return to<br />

nature”. It will become a “green lunge”<br />

facing Qingxiu Mountain across the river<br />

and form an ecological corridor around the<br />

“Green City”. Fourth, Yongjiang River<br />

is to be built into an ecological corridor with<br />

good environment and rich historical culture.<br />

Fifth, the New District is to be built into a<br />

demonstration district of “sponge city” after<br />

three years’ construction from 2015 to 2017.<br />

Sixth, efforts are to be made in promoting<br />

the large-scale utilization of renewableenergy-fueled<br />

buildings as well as resource<br />

conservation and recycling. Seventh, we will<br />

promote the large-scale development of the<br />

green buildings in new district and ensure that<br />

green building rate is no less than 80%.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!