OBO Bugle - US Department of State
OBO Bugle - US Department of State
OBO Bugle - US Department of State
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
New Facilities<br />
Completed<br />
New <strong>US</strong>AID Annex January 4, 2008<br />
Bamako, Mali<br />
The $14 million design-build<br />
contract was awarded<br />
to FEM-JV, a joint venture<br />
<strong>of</strong> Framaco and Metis-Epik.<br />
FEM-JV subcontracted the design<br />
to the A/E firm Karn Charuhas<br />
Chapman & Twohey (KCCT). The<br />
project consists <strong>of</strong> a two-story<br />
building with a third floor<br />
mechanical space, associated<br />
sitework, landscaping adjacent<br />
to the building, and additional<br />
staff parking. The building has<br />
approximately 2,950 square<br />
meters <strong>of</strong> interior space and a<br />
second floor landscaped terrace.<br />
It was occupied on January 4,<br />
2008, and is home to 65 <strong>US</strong>AID<br />
and Millennium Challenge<br />
Corporation (MCC) employees.<br />
The HVAC system features a dust<br />
collection system to filter the dust<br />
and dirt from the air during the<br />
Harmattan season. The <strong>OBO</strong><br />
Project Executive was Jim Duffy<br />
and the Project Director was Sid<br />
Maddox.