24.08.2013 Views

The Gran-olo-Sula Project - ESHA

The Gran-olo-Sula Project - ESHA

The Gran-olo-Sula Project - ESHA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• Two airstrips: (1) at Puketi, and (2) at<br />

Drietabbetje. Flight duration Paramaribo-<br />

Dritabbetje 50-60 min.<br />

• A railway at Futupasie for facilitating<br />

transport of goods.<br />

• Duration water transport from Albina to<br />

Dritabbetje ±2days<br />

• Some of the villages are not foreseen with<br />

electricity<br />

• Telephone connection with Paramaribo<br />

08.3.6 Infrastructure

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!