26<br />

8 Remarks<br />

<strong>ZWR2MSKUDS</strong><br />

Keep this Operating Manual available!<br />

Before putting the device into operation, please make yourself familiar with the safety precautions<br />

(→ Chapter 9).<br />

We reserve the right to apply technical modifications aimed to further improvement of the<br />

product performance.<br />

9 Safety precautions<br />

For your own safety, the following hints shall be observed. Please read them carefully, before<br />

you put the device into operation.<br />

Precautions against electrostatic discharge<br />

Upon opening and installation of components of the SHDSL transmission system, attention<br />

shall be paid to the safety precautions as stipulated by DIN 100 015.<br />

Safety precautions during thunderstorms<br />

Keep away from manipulations on the SHDSL transmission system and its components<br />

during thunderstorms (Do not disconnect or connect sub-units or cables).<br />

Grounding and potential equalization<br />

During installation, operation and maintenance of the SHDSL transmission system, the<br />

regulations as set out in DIN VDE 0800, part 2, shall be observed.<br />

Warning of dangerous electric voltage<br />

The SHDSL transmission system has interfaces being under dangerous electric voltage.<br />

Therefore, all works on the system should be performed by personnel who has the required<br />

special knowledge.<br />

© ELCON <strong>Systemtechnik</strong> GmbH 2008<br />

Version: 2008/02/01<br />

<strong>ZWR2MSKUDS</strong><br />

Zwischenregenerator für das<br />

2 MBit/s-SHDSL-Übertragungssystem über<br />

1 Paar Kupferadern<br />

Regenerative repeater for<br />

2 Mbps SHDSL transmission system via<br />

1 pair copper wire<br />

Bedienungsanleitung<br />

User manual<br />

Art.-Nr. 102024


Deutsch: Seite 1<br />

English: Page 14<br />

<strong>ZWR2MSKUDS</strong> <strong>ZWR2MSKUDS</strong><br />

7 Technical data<br />

Version: 2008/02/01 Version: 2008/02/01<br />

UKS interface: as per ETSI TS 101 524<br />

Bit rate 192 kbps … 2304 kbps<br />

Line digit rate up to 773 1 / 3 kbaud<br />

Line code TC-16-PAM<br />

Impedance 135 Ω<br />

Degree of protection TNV3<br />

Power supply:<br />

Input voltage range of the local power supply -40.5 V to -75 V �<br />

Power consumption (local / remote powered) < 3 W / < 2 W<br />

Casing:<br />

Version Metal casing with integrated display elements<br />

and physical interfaces<br />

Display elements 2 LEDs for status indication<br />

Casing dimensions 109.4 × 194 × 30 mm 3 (W × D × H)<br />

Weight ca. 0.65 kg<br />

Environmental conditions: as per ETS 300 019<br />

Operation Air temperature: -25°C … +55°C<br />

Relative air humidity: 5% … 95%<br />

Storage Air temperature: -25°C … +55°C<br />

Relative air humidity: 10% … 100%<br />

Transport Air temperature: -25°C … +70°C<br />

Relative air humidity: 60% … 95%<br />

Standards:<br />

Safety EN 60 950-1<br />

Electromagnetic compatibility EN 55022, class B<br />

ITU-T K.21<br />

ETSI EN 300 386<br />

ETSI ES 201 468<br />

25


6 Display elements<br />

The <strong>ZWR2MSKUDS</strong> front panel offers 2 light-emitting diodes to signal the different operating<br />

states. Their meaning is determined in below table:<br />

LED Colour State Meaning<br />

EIN green ON Local or remote power supply is applied to the<br />

<strong>ZWR2MSKUDS</strong>; Internal self test showed no faults<br />

blinking at<br />

1 Hz<br />

device is being initialized<br />

blinking at<br />

4 Hz<br />

Int-B-alarm set (Device PCB temperature exceeds 80°C)<br />

OFF No supply voltage<br />

UKS red ON SHDSL path is not connected, LOS, LOF<br />

blinking at<br />

4 Hz<br />

SHDSL line (UKS LT2MSKU-side) is being activated<br />

blinking at Waiting time between end of activation procedure at<br />

2 Hz LT2MSKU side and start of activation at NT2MSKU side<br />

blinking at SHDSL line (UKS NT2MSKU-side) is being activated or<br />

1 Hz device is being initialized<br />

flashing Maintenance function activated (SHDSL loop in<br />

every 5 s <strong>ZWR2MSKUDS</strong> closed or activation in diagnostics mode)<br />

flashes con- SHDSL section before <strong>ZWR2MSKUDS</strong> is being activated<br />

tinuously * (RSP signalling)<br />

OFF Faultless data transmission<br />

* Signalling may occur also then if there is no physical link to the LT2MSKU<br />

Table 2: Meaning of the LED displays<br />

Figure 9: View of the front panel with LED display<br />

<strong>ZWR2MSKUDS</strong> <strong>ZWR2MSKUDS</strong><br />

Version: 2008/02/01 Version: 2008/02/01<br />

24 1<br />

Inhalt<br />

1. Kurzbeschreibung <strong>ZWR2MSKUDS</strong> 2<br />

2. Steckerbelegung 5<br />

3. Blockschaltbild <strong>ZWR2MSKUDS</strong> 8<br />

4. Bedienelemente (Option) 9<br />

5. Montage des <strong>ZWR2MSKUDS</strong> in die ZWR-Aufnahme 10<br />

6. Anzeigeelemente 11<br />

7. Technische Daten 12<br />

8. Hinweise 13<br />

9. Sicherheitshinweise 13


1 Kurzbeschreibung <strong>ZWR2MSKUDS</strong><br />

Der <strong>ZWR2MSKUDS</strong> dient der Reichweitenerhöhung des digitalen 2 MBit/s-<br />

Übertragungssystems und kommt zum Einsatz, wenn die Leitungslänge zwischen dem Leitungsendgerät<br />

LT2MSKU und dem Netzabschlussgerät NT2MSKU die maximale Reichweite<br />

der UKS-Schnittstelle überschreitet.<br />

Mit einem <strong>ZWR2MSKUDS</strong> erzielt man eine Verdoppelung, mit zwei kaskadierten<br />

<strong>ZWR2MSKUDS</strong> eine Verdreifachung der Übertragungsreichweite eines SHDSL-Systems.<br />

Der Zwischenregenerator <strong>ZWR2MSKUDS</strong> ist mit zwei Kupferschnittstellen (UKS-<br />

Schnittstellen) ausgeführt und regeneriert das gedämpfte, verzerrte Signal der ankommenden<br />

Impulsfolgen und leitet es dann weiter.<br />

Auf der UKS-Schnittstelle wird zur Datenübertragung ein TC-16-PAM-codiertes Sendesignal<br />

verwendet. Die Übertragung erfolgt bidirektional über eine Doppelader (1-DA-System).<br />

Das anliegende Digitalsignal wird dabei transparent auf der SHDSL-Strecke durchgereicht.<br />

Die Sende- und Empfangsschaltung der Leitungsschnittstellen ist mit entsprechenden<br />

SHDSL-Transceivern mit Echokompensation realisiert. Die Übertragungsrate je Kupferdoppelader<br />

beträgt 2304 kBit/s. Anpassungen der Bitrate werden gemäß LT2MSKU-<br />

Konfiguration unterstützt.<br />

Das Übertragungssystem ist gemäß den Ausführungen der von ETSI herausgegebenen Technical<br />

Specification TS 101 524 realisiert.<br />

Per SDSL-Overhead (EOC-Kanal) können verschiedene Einstellungen des <strong>ZWR2MSKUDS</strong><br />

vom SDH-Mux/LT2MSKU aus konfiguriert und Informationen (z.B. Performancedaten oder<br />

Temperatur) abgefragt werden. Auf diesem Weg ist auch ein Softwaredownload möglich.<br />

Die Versorgungsspannung des <strong>ZWR2MSKUDS</strong> wird aus der UKS-seitigen Fernspeisung<br />

abgeleitet, diese wird im SDH-Mux/LT2MSKU bzw. im NT2MSKU vom Fernspeisemodul<br />

FSP2M bereitgestellt. Weiterhin besteht die Möglichkeit, den <strong>ZWR2MSKUDS</strong> mit einer<br />

lokalen Speisespannung (z.B. mittels Speisemodul SPM) zu versorgen, wobei dann die<br />

Fernspeisung nicht mehr genutzt wird.<br />

Die Regenerator-Gehäuse sind als Metallkassetten für die Verwendung in einer ZWR-<br />

Aufnahme / in einem ZWR-Baugruppenträger BGT bzw. in einem Zwischenregeneratoreinsatz<br />

ZWRE für den KVz oder in einer Muffe ausgeführt. Es wird für einen <strong>ZWR2MSKUDS</strong><br />

ein Steckplatz benötigt.<br />

<strong>ZWR2MSKUDS</strong> <strong>ZWR2MSKUDS</strong><br />

5 Assembly of <strong>ZWR2MSKUDS</strong> into the ZWR holder<br />

For inserting the <strong>ZWR2MSKUDS</strong> into its slot, please use one guide rail. This permits to<br />

assemble up to six <strong>ZWR2MSKUDS</strong> per ZWR holder. When plugging the <strong>ZWR2MSKUDS</strong><br />

into the ZWR holder, make sure that the LEDs on front panel are on topside. The two pilots<br />

on the housing back side are used as reverse polarity protection. The metal bracket on the<br />

front of the repeater can be used for removing the unit from the slot.<br />

Commissioning<br />

After inserting the <strong>ZWR2MSKUDS</strong> into the corresponding slot the following start-up procedure<br />

is arising. Prerequisite for putting the <strong>ZWR2MSKUDS</strong> into operation is the applied<br />

local supply voltage or an activated FSP2M which has been plugged into the LT2MSKU /<br />

NT2MSKU. The applied voltage is indicated through the green shining LED „EIN“ („ON“).<br />

Further, putting the device into operation additionally requires activation of the SHDSL<br />

transmission path from the LT and NT.<br />

1. The device is beginning with a self-test procedure in the first ca. 5 seconds. During<br />

this time all LEDs are blinking.<br />

2. After this the LT2MSKU is starting up the SHDSL line to the <strong>ZWR2MSKUDS</strong><br />

(first transmission path section) and the red LED „UKS“ for the SHDSL link is<br />

blinking at a frequency of 4 Hz.<br />

3. After successful set-up of the first transmission path section, the red LED „UKS“<br />

for the SHDSL link is blinking with 1 Hz frequency. During this time the second<br />

transmission path section between the <strong>ZWR2MSKUDS</strong> and the NT2MSKU / the<br />

second <strong>ZWR2MSKUDS</strong> will be built-up.<br />

4. As for the <strong>ZWR2MSKUDS</strong>, the two ends of the transmission line have been set up<br />

when the red LED „UKS“ goes out.<br />

The <strong>ZWR2MSKUDS</strong> is controlled by the LT2MSKU and can be managed by the Network<br />

Management System (NMS).<br />

Special characteristic during the SHDSL Start-up<br />

Please take into account, that the restart time of an aborted SHDSL line could reach up to<br />

2 minutes by using one <strong>ZWR2MSKUDS</strong> and up to 4 minutes by using two repeaters in the<br />

SHDSL transmission path (the given time targets are defined by the ITU-/ ETSI standards<br />

ITU-T G.991.2 and ETSI TS 101 524).<br />

Version: 2008/02/01 Version: 2008/02/01<br />

2 23


4 Operating elements (Option)<br />

The switch on the circuit board allows to execute a configuration of the <strong>ZWR2MSKUDS</strong>.<br />

This switch is placed inside the device and becomes accessible after removing the casing<br />

bottom plate and the plastic protective plate. For this, release the four screws on the casing<br />

bottom, but do not pull them out. Make sure that the bow-shaped handle, the screws and the<br />

four distance sleeves, which are fixed on the screws on the casing bottom inside, will not go<br />

lost. The location of the switch and its position in default state can be seen in figure 8. The<br />

switch shall be operated by means of a suitable screwdriver (blade width approx. 3 mm).<br />

When changing the switch position, make sure to not damage the PCB lying beneath.<br />

The switch „RPS CONFIG“ allows to determine for the SHDSL, whether the remote power<br />

supply shall be transmitted to the next <strong>ZWR2MSKUDS</strong> (marking: „ “) or whether this<br />

shall not be executed (marking: „ “).<br />

After setting the switch, return the plastic protective plate onto the PCB. After this, fix the<br />

casing bottom plate by fastening the four screws, while at the same time inserting the bowshaped<br />

handle. Hereby it is mandatory that the distance sleeves are again seated on the<br />

thread ends of the screws. If either plastic protective plate or distance sleeves are missing,<br />

the circuit board is not reliably fixed, thus causing the danger of short circuit and body contact.<br />

Figure 8: Switch for setting the remote power supply (default setting)<br />

<strong>ZWR2MSKUDS</strong> <strong>ZWR2MSKUDS</strong><br />

1 Kurzbeschreibung <strong>ZWR2MSKUDS</strong>/ Fortsetzung<br />

Speisekonzept<br />

Der <strong>ZWR2MSKUDS</strong> kann mit lokaler Speisung oder mit Fernspeisung (LT2MSKU-seitig<br />

oder NT2MSKU-seitig) betrieben werden. Liegt eine lokale Speisespannung an (-40,5 V �<br />

... -75 V �), so wird diese vom <strong>ZWR2MSKUDS</strong> verwendet, auch wenn noch zusätzlich<br />

eine Fernspeisespannung anliegt. Die lokale Speisung hat immer den Vorrang. Bei Fernspeisung<br />

wird der <strong>ZWR2MSKUDS</strong> über die Doppelader mit 112 V � (± 3 V �) vom Leitungsendgerät<br />

/ Netzabschlussgerät aus gespeist. Eine Umschaltung zwischen LT-seitiger und NTseitiger<br />

Fernspeisung ist nicht nötig. Wenn alle ZWR einer Linie die Durchspeisefunktion<br />

unterstützen, ist es möglich, die Fernspeisespannung zum nächsten <strong>ZWR2MSKUDS</strong> durchzureichen.<br />

Beispiele für den prinzipiellen Aufbau eines SHDSL-Systems mit einem Regenerator sowie<br />

mit zwei kaskadierten Regeneratoren werden in den nachfolgenden Bildern gezeigt.<br />

LT2MSKU<br />

mit FSP2M<br />

Bild 1: Aufbau eines 1DA-SHDSL-Systems mit einem Regenerator <strong>ZWR2MSKUDS</strong> (Bsp.)<br />

LT2MSKU<br />

mit FSP2M<br />

LT2MSKU<br />

mit FSP2M<br />

UKS (1DA)<br />

Fernspeisung<br />

über UKS<br />

ZWR2MSKU<br />

DS<br />

oder lokale oder<br />

Speisung<br />

(SPM - Option)<br />

ZWR2MSKU<br />

DS Nr. 1<br />

Bild 2: Aufbau zweier 1DA-SHDSL-Systeme mit je zwei kaskadierten Regeneratoren (Bsp.)<br />

Version: 2008/02/01 Version: 2008/02/01<br />

22 3<br />

UKS (1DA)<br />

Fernspeisung<br />

des <strong>ZWR2MSKUDS</strong> Nr. 1<br />

UKS (1DA)<br />

Fernspeisung<br />

des <strong>ZWR2MSKUDS</strong> Nr. 1<br />

ZWR2MSKU<br />

DS Nr. 1<br />

UKS (1DA)<br />

Fernspeisung<br />

über UKS<br />

UKS (1DA)<br />

UKS (1DA)<br />

weitergeleitete<br />

Fernspeisung<br />

zur Speisung<br />

des <strong>ZWR2MSKUDS</strong> Nr. 2<br />

NT2MSKU<br />

mit FSP2M<br />

ZWR2MSKU<br />

DS Nr. 2<br />

ZWR2MSKU<br />

DS Nr. 2<br />

UKS (1DA)<br />

Fernspeisung<br />

des <strong>ZWR2MSKUDS</strong> Nr. 2<br />

UKS (1DA)<br />

NT2MSKU<br />

mit FSP2M<br />

NT2MSKU


1 Kurzbeschreibung <strong>ZWR2MSKUDS</strong>/ Fortsetzung<br />

Ansichten<br />

Gehäuseboden<br />

Gehäuse<br />

Bügelgriff<br />

LED-Anzeige<br />

Bild 3: Ansicht der Gehäusefrontseite<br />

Gehäuse<br />

Positionierbolzen<br />

13-pol. Steckverbinder<br />

Bild 4: Ansicht Gehäuserückseite <strong>ZWR2MSKUDS</strong><br />

<strong>ZWR2MSKUDS</strong> <strong>ZWR2MSKUDS</strong><br />

3 Block diagram of <strong>ZWR2MSKUDS</strong><br />

The block diagram of the <strong>ZWR2MSKUDS</strong> is shown in figure 7. The device consists of the<br />

following function units:<br />

Microprocessor system<br />

consisting of microcontroller, SRAM and a FLASH.<br />

UKS interface connection<br />

consisting of one dual SHDSL transceiver with corresponding I/O circuitry, with hybrid<br />

network, transmitters and protective elements.<br />

UB power supply interface<br />

The interface is short-circuit-proof, so that a reverse polarity would cause no response of the<br />

internal fuse, and no damage to the device / sub-unit. The supply voltage ranges from<br />

-40.5 V to –75 V.<br />

Figure 7: Block diagram of <strong>ZWR2MSKUDS</strong><br />

Version: 2008/02/01 Version: 2008/02/01<br />

4 21<br />

UB<br />

UKS<br />

Power pack<br />

DC / DC<br />

EMC<br />

Line<br />

interface<br />

Remote supply<br />

DC / DC<br />

AFE/DSP<br />

Option<br />

Controller &<br />

Peripheral<br />

Dual SHDSL Transceiver<br />

AFE/DSP<br />

Line<br />

interface<br />

EMC<br />

UKS


2 Interfaces/ continuation<br />

ZWR1<br />

ZWR2<br />

ZWR3<br />

ZWR4<br />

ZWR5<br />

ZWR6<br />

Figure 6: ZWR holder incl. six <strong>ZWR2MSKUDS</strong> and connector panel<br />

<strong>ZWR2MSKUDS</strong> <strong>ZWR2MSKUDS</strong><br />

2 Steckerbelegung<br />

Steckverbinder-Anschlussbelegung des <strong>ZWR2MSKUDS</strong><br />

Stiftleiste 1:<br />

2, 3 SHDSL-Anschluss in Richtung LT<br />

7 FPE<br />

11, 12 Lokale Speisespannung im Bereich von -40,5 V � ... -75 V �<br />

11: Minuspotential<br />

12: Pluspotential<br />

Stiftleiste 2:<br />

7 FPE<br />

11, 12 SHDSL-Anschluss in Richtung NT<br />

3 7 11<br />

2 12<br />

12<br />

Version: 2008/02/01 Version: 2008/02/01<br />

20 5<br />

1<br />

2<br />

11<br />

7<br />

Bild 5: Anschlussbelegung der Steckverbinder des <strong>ZWR2MSKUDS</strong>


2 Steckerbelegung/ Fortsetzung<br />

Belegung des Anschlussfelds der ZWR-Aufnahme<br />

PIN F1 an F1 ab<br />

F2 an<br />

F2 ab<br />

→ UKS zum NT → UKS vom LT → Stromversorgung<br />

1 a/b - UKS out (ZWR1) UKS in (ZWR1) a = + ; b = - (ZWR1)<br />

2 a/b - UKS out (ZWR2) UKS in (ZWR2) a = + ; b = - (ZWR2)<br />

3 a/b - UKS out (ZWR3) UKS in (ZWR3) a = + ; b = - (ZWR3)<br />

4 a/b - UKS out (ZWR4) UKS in (ZWR4) a = + ; b = - (ZWR4)<br />

5 a/b - UKS out (ZWR5) UKS in (ZWR5) a = + ; b = - (ZWR5)<br />

6 a/b - UKS out (ZWR6) UKS in (ZWR6) a = + ; b = - (ZWR6)<br />

Tabelle 1: Belegung des Anschlussfelds der ZWR-Aufnahme<br />

<strong>ZWR2MSKUDS</strong> <strong>ZWR2MSKUDS</strong><br />

2 Interfaces/ continuation<br />

Pin assignment of connector panel of the ZWR holder<br />

PIN F1 an F1 ab<br />

F2 an<br />

F2 ab<br />

→ UKS to NT → UKS from LT → Power supply<br />

1 a/b - UKS out (ZWR1) UKS in (ZWR1) a = + ; b = - (ZWR1)<br />

2 a/b - UKS out (ZWR2) UKS in (ZWR2) a = + ; b = - (ZWR2)<br />

3 a/b - UKS out (ZWR3) UKS in (ZWR3) a = + ; b = - (ZWR3)<br />

4 a/b - UKS out (ZWR4) UKS in (ZWR4) a = + ; b = - (ZWR4)<br />

5 a/b - UKS out (ZWR5) UKS in (ZWR5) a = + ; b = - (ZWR5)<br />

6 a/b - UKS out (ZWR6) UKS in (ZWR6) a = + ; b = - (ZWR6)<br />

Table 1: Pin assignment of connector panel of the ZWR holder<br />

Version: 2008/02/01 Version: 2008/02/01<br />

6 19


2 Interfaces<br />

Pin assignment of the <strong>ZWR2MSKUDS</strong><br />

Pin connector 1:<br />

2, 3 SHDSL connection in LT direction<br />

7 FPE<br />

11, 12 Local supply voltage ranging from -40.5 V � ... -75 V �<br />

11: Negative potential<br />

12: Positive potential<br />

Pin connector 2:<br />

7 FPE<br />

11, 12 SHDSL connection in NT direction<br />

1<br />

2<br />

3 7 11<br />

2 12<br />

12<br />

11<br />

7<br />

Figure 5: Connector pin assignment of the <strong>ZWR2MSKUDS</strong><br />

<strong>ZWR2MSKUDS</strong> <strong>ZWR2MSKUDS</strong><br />

2 Steckerbelegung/ Fortsetzung<br />

ZWR1<br />

ZWR2<br />

ZWR3<br />

ZWR4<br />

ZWR5<br />

ZWR6<br />

Bild 6: ZWR-Aufnahme mit sechs <strong>ZWR2MSKUDS</strong> und Anschlussfeld<br />

Version: 2008/02/01 Version: 2008/02/01<br />

18 7


3 Blockschaltbild <strong>ZWR2MSKUDS</strong><br />

Das Blockschaltbild der <strong>ZWR2MSKUDS</strong>-Baugruppe ist in Bild 7 gezeigt. Folgende Funktionsblöcke<br />

lassen sich unterscheiden:<br />

Mikroprozessorsystem<br />

bestehend aus Mikrokontroller, SRAM und FLASH.<br />

UKS Schnittstellenanschaltung<br />

bestehend aus einem 2-fach SHDSL-Transceiver mit entsprechender Ein- und Ausgangsbeschaltung<br />

mit Hybridnetzwerk, Übertragern und Schutzelementen.<br />

UB Stromversorgungsschnittstelle<br />

Die Schnittstelle ist kurzschlusssicher und eine Verpolung führt nicht zum Ansprechen der<br />

internen Sicherung bzw. zu einer Zerstörung des Gerätes / der Baugruppe. Der Speisespannungsbereich<br />

liegt im Bereich von -40,5 V bis -75 V.<br />

UB<br />

Netzteil<br />

DC / DC<br />

UKS Leitungs-<br />

EMV schnittstelle<br />

AFE/DSP<br />

Fernspeisung<br />

DC / DC<br />

Option<br />

Controller &<br />

Peripherie<br />

Dual SHDSL-Transceiver<br />

AFE/DSP<br />

Bild 7: Blockschaltbild <strong>ZWR2MSKUDS</strong><br />

<strong>ZWR2MSKUDS</strong> <strong>ZWR2MSKUDS</strong><br />

Leitungsschnittstelle<br />

EMV<br />

UKS<br />

1 Short description of <strong>ZWR2MSKUDS</strong>/ continuation<br />

Version: 2008/02/01 Version: 2008/02/01<br />

8 17<br />

Views<br />

Casing bottom plate<br />

Casing<br />

Metal bracket<br />

LED display<br />

Figure 3: View of the casing front side<br />

Casing<br />

Pilots<br />

13-pole connectors<br />

Figure 4: View of casing back side <strong>ZWR2MSKUDS</strong>


1 Short description of <strong>ZWR2MSKUDS</strong>/ continuation<br />

Supply concept<br />

The <strong>ZWR2MSKUDS</strong> can be either locally powered or operated with remote power supply<br />

(LT2MSKU-side or NT2MSKU-side). If local supply voltage is provided (-40.5 V � ...<br />

–75 V �), then the <strong>ZWR2MSKUDS</strong> makes use of it even under the condition remote power<br />

supply would be additionally applied. Local feeding always has priority over remote power<br />

supply if both of them are available. In case of remote power supply, the <strong>ZWR2MSKUDS</strong> is<br />

fed by the line terminating unit / network terminating unit through the twin wire with<br />

112 V � (± 3 V �). Hereby it is not necessary to switch between LT-side and NT-side<br />

remote power supply. If all ZWR on a line support the power-through function, it is possible<br />

to transmit the remote power supply to the next <strong>ZWR2MSKUDS</strong>.<br />

The figures below show examples of the basic structure of an SHDSL system including one<br />

repeater, respectively, two cascaded repeaters.<br />

LT2MSKU<br />

with FSP2M<br />

Figure 1: Structure of a 1DA-SHDSL system with one repeater <strong>ZWR2MSKUDS</strong> (example)<br />

LT2MSKU<br />

with FSP2M<br />

LT2MSKU<br />

with FSP2M<br />

UKS (1DA)<br />

Remote power<br />

supply via UKS<br />

ZWR2MSKU<br />

DS<br />

or local or<br />

powering<br />

(SPM - option)<br />

UKS (1DA)<br />

Remote power<br />

supply of the<br />

<strong>ZWR2MSKUDS</strong> no. 1<br />

UKS (1DA)<br />

Remote power<br />

supply of the<br />

<strong>ZWR2MSKUDS</strong> no. 1<br />

ZWR2MSKU<br />

DS No. 1<br />

ZWR2MSKU<br />

DS No. 1<br />

UKS (1DA)<br />

Remote power<br />

supply via UKS<br />

UKS (1DA)<br />

UKS (1DA)<br />

Forwarded<br />

remote power supply<br />

for powering the<br />

<strong>ZWR2MSKUDS</strong> no. 2<br />

Figure 2: Structure of two 1DA-SHDSL systems with two cascaded repeaters per system<br />

(example)<br />

<strong>ZWR2MSKUDS</strong> <strong>ZWR2MSKUDS</strong><br />

NT2MSKU<br />

with FSP2M<br />

ZWR2MSKU<br />

DS No. 2<br />

ZWR2MSKU<br />

DS No. 2<br />

UKS (1DA)<br />

Remote power<br />

supply of the<br />

<strong>ZWR2MSKUDS</strong> no. 2<br />

UKS (1DA)<br />

NT2MSKU<br />

with FSP2M<br />

NT2MSKU<br />

4 Bedienelemente (Option)<br />

Mit dem auf der Leiterplatte befindlichen Umschalter kann eine Konfiguration des<br />

<strong>ZWR2MSKUDS</strong> vorgenommen werden. Dieser befindet sich im Inneren des Gerätes und<br />

ist nach Entfernen des Gehäusebodens und der Kunststoffschutzplatte zugänglich. Dazu sind<br />

die vier Schrauben auf der Gehäuseunterseite zu lösen (nicht herausziehen). Stellen Sie<br />

sicher, dass der Bügelgriff sowie die Schrauben und die vier Abstandshülsen, welche auf der<br />

Innenseite des Gehäusebodens auf den Schrauben stecken, nicht verloren gehen. Die Position<br />

des Schalters sowie dessen Stellung zum Zeitpunkt der Auslieferung können Sie Bild 8<br />

entnehmen. Zur Bedienung des Schaltelements muss ein geeigneter Schraubendreher (Klingenbreite<br />

ca. 3 mm) benutzt werden. Achten Sie beim Ändern der Schalterposition darauf,<br />

Leiterzüge und Bauelemente der darunter befindlichen Leiterplatte nicht zu beschädigen.<br />

Mit dem Umschalter „RPS CONFIG“ wird für die SHDSL-Strecke festgelegt, ob die Fernspeisung<br />

zum nächsten <strong>ZWR2MSKUDS</strong> durchgereicht werden soll (Kennzeichnung: „ “)<br />

oder ob die Fernspeisung nicht durchgereicht werden soll (Kennzeichnung: „ “).<br />

Legen Sie nach dem Einstellen des Schalters die Kunststoffschutzplatte wieder auf die Leiterplatte.<br />

Befestigen Sie anschließend den Gehäuseboden mit den vier Schrauben und setzen<br />

Sie gleichzeitig den Bügelgriff ein. Dabei müssen die Abstandshülsen unbedingt wieder auf<br />

den Gewindeenden der Schrauben stecken. Fehlen Kunststoffschutzplatte oder Abstandshülsen,<br />

ist die Leiterplatte nicht fixiert und es besteht Kurzschluss- bzw. Körperschlussgefahr.<br />

Bild 8: Umschalter für Fernspeisung (Auslieferungszustand)<br />

Version: 2008/02/01 Version: 2008/02/01<br />

16 9


5 Montage des <strong>ZWR2MSKUDS</strong> in die ZWR-Aufnahme<br />

Der <strong>ZWR2MSKUDS</strong> ist so in die ZWR-Aufnahme zu stecken, dass eine Führungsschiene<br />

genutzt wird. Damit lassen sich maximal sechs <strong>ZWR2MSKUDS</strong> pro ZWR-Aufnahme montieren.<br />

Achten Sie beim Einstecken des <strong>ZWR2MSKUDS</strong> in die ZWR-Aufnahme darauf,<br />

dass sich die LEDs auf der Frontseite oben befinden. Die beiden Positionierbolzen an der<br />

Gehäuserückseite dienen dabei zum Schutz gegen unbeabsichtigte Verpolung. Mittels des an<br />

der Vorderseite des Regenerators befindlichen Metallbügels kann das Gerät aus dem Einschubfach<br />

herausgezogen werden.<br />

Inbetriebnahme<br />

Nachdem der <strong>ZWR2MSKUDS</strong> in den entsprechenden Einschub gesteckt worden ist, kann<br />

das Gerät in Betrieb genommen werden. Zur Inbetriebnahme des <strong>ZWR2MSKUDS</strong> muss die<br />

lokale Versorgungsspannung anliegen bzw. im LT2MSKU / NT2MSKU ein FSP2M gesteckt<br />

und aktiviert sein. Das Vorhandensein einer Spannung wird durch das Leuchten der<br />

grünen LED „EIN“ angezeigt. Eine weitere Voraussetzung für die Inbetriebnahme ist, dass<br />

die SHDSL-Übertragungsstrecke vom LT und NT aktiviert wurde.<br />

1. Das Gerät durchläuft einen Autotest, der etwa 5 Sekunden dauert. Während dieser<br />

Zeit blinken alle LEDs.<br />

2. Anschließend beginnt das LT2MSKU mit dem Aufbau der SHDSL-Strecke zum<br />

<strong>ZWR2MSKUDS</strong> (erster Streckenabschnitt), wobei die rote LED „UKS“ der<br />

SHDSL-Übertragungsstrecke mit einer Frequenz von 4 Hz blinkt.<br />

3. Nach erfolgreichem Aufbau des ersten Streckenabschnitts blinkt die rote LED<br />

„UKS“ der Übertragungsstrecke mit einer Frequenz von 1 Hz, während dessen der<br />

zweite Streckenabschnitt zwischen dem <strong>ZWR2MSKUDS</strong> und dem NT2MSKU /<br />

dem zweiten <strong>ZWR2MSKUDS</strong> aufgebaut wird.<br />

4. Für den <strong>ZWR2MSKUDS</strong> sind beide Seiten der Übertragungsstrecke dann aufgebaut,<br />

wenn die rote LED „UKS“ erlischt.<br />

Der <strong>ZWR2MSKUDS</strong> wird durch das LT2MSKU gesteuert und kann vom Network Management<br />

System (NMS) gemanagt werden.<br />

Besonderheit beim Aufbau der SHDSL-Strecke<br />

Bitte beachten Sie, dass der Neustart einer ausgefallenen SHDSL-Strecke bis zu 2 Minuten –<br />

bei Nutzung eines <strong>ZWR2MSKUDS</strong> – und bis zu 4 Minuten – bei Nutzung von zwei Regeneratoren<br />

innerhalb der SHDSL-Übertragungsstrecke dauern kann (die zulässigen Zeiten sind<br />

in den ITU-/ ETSI-Standards ITU-T G.991.2 bzw. ETSI TS 101 524 festgelegt).<br />

<strong>ZWR2MSKUDS</strong> <strong>ZWR2MSKUDS</strong><br />

1 Short description of <strong>ZWR2MSKUDS</strong><br />

The <strong>ZWR2MSKUDS</strong> has been developed to increase the range of the digital 2 Mbps transmission<br />

system and is used if the line length between the line terminating unit LT2MSKU<br />

and the network terminating unit NT2MSKU exceeds the maximum range of the UKS interface.<br />

When using one <strong>ZWR2MSKUDS</strong> the range is doubled, whereas application of two cascaded<br />

<strong>ZWR2MSKUDS</strong> allows to triple the transmission range of the SHDSL system.<br />

The regenerative repeater <strong>ZWR2MSKUDS</strong> is equipped with two copper interfaces (UKS<br />

ports) and regenerates the attenuated and distorted signal of incoming pulse sequences and<br />

forwards it further.<br />

A TC-16-PAM-coded transmit signal is used for data transmission at the UKS interface. The<br />

bidirectional transmission runs over one twin wire (1-DA system). The supplied digital<br />

signal is transparently sent via the SHDSL path. The transmit-receive circuit at the line<br />

interfaces is implemented by adequate SHDSL transceivers using the echo compensation<br />

method. The line digit rate on the twin-wire copper line is 2304 kbps. Fractional rates are<br />

supported according to LT2MSKU configuration.<br />

The transmission system has been implemented as required by the Technical Specification<br />

ETSI TS 101 524.<br />

Individual settings of the <strong>ZWR2MSKUDS</strong> are configured per SDSL-Overhead (EOC channel)<br />

from the SDH-Mux/LT2MSKU, which also provides the option to poll certain information<br />

(e.g. performance data or temperature). Also, the software can be downloaded this way.<br />

The supply voltage of the <strong>ZWR2MSKUDS</strong> is derived from the UKS-side remote power<br />

supply that is provided to the SDH-Mux/LT2MSKU resp. to the NT2MSKU by the remote<br />

power feeding module FSP2M. It is also possible to feed the <strong>ZWR2MSKUDS</strong> with a local<br />

supply voltage (e.g. by means of the power feeding module SPM), where in such case the<br />

remote power supply is not used any more.<br />

The repeater casings are designed as metallic cassettes for use in a ZWR holder / in a ZWR<br />

subrack BGT resp. a special repeater compartment ZWRE to be plugged into a cable junction<br />

box or into a sleeve. One <strong>ZWR2MSKUDS</strong> requires one slot.<br />

Version: 2008/02/01 Version: 2008/02/01<br />

10 15


Contents<br />

1. Short description of <strong>ZWR2MSKUDS</strong> 15<br />

2. Interfaces 18<br />

3. Block diagram of <strong>ZWR2MSKUDS</strong> 21<br />

4. Operating elements (Option) 22<br />

5. Assembly of <strong>ZWR2MSKUDS</strong> into the ZWR holder 23<br />

6. Display elements 24<br />

7. Technical data 25<br />

8. Remarks 26<br />

9. Safety precautions 26<br />

<strong>ZWR2MSKUDS</strong> <strong>ZWR2MSKUDS</strong><br />

6 Anzeigeelemente<br />

An der Gerätefront des <strong>ZWR2MSKUDS</strong> befinden sich 2 Leuchtdioden, die die verschiedenen<br />

Betriebszustände signalisieren. Die Bedeutung ist in folgender Tabelle definiert:<br />

LED Farbe Zustand Bedeutung<br />

EIN grün AN lokale oder Fernspeisung liegt am <strong>ZWR2MSKUDS</strong> an,<br />

interner Selbsttest wurde fehlerfrei durchlaufen<br />

blinkt mit<br />

1 Hz<br />

Gerät wird initialisiert<br />

blinkt mit<br />

4 Hz<br />

Int-B-Alarm aktiv (Gerätetemperatur ≥ 80°C)<br />

AUS keine Speisespannung<br />

UKS rot AN SHDSL-Strecke nicht angeschlossen, LOS, LOF<br />

blinkt mit<br />

4 Hz<br />

SHDSL-Strecke (UKS LT2MSKU-seitig) wird aktiviert<br />

blinkt mit Wartezeit zwischen Ende der Aktivierung zur LT2MSKU-<br />

2 Hz Seite und Beginn der NT2MSKU-seitigen Aktivierung<br />

blinkt mit SHDSL-Strecke (UKS NT2MSKU-seitig) wird aktiviert<br />

1 Hz oder Gerät wird initialisiert<br />

blitzt alle Maintenance-Funktion aktiv (SHDSL-Schleife im<br />

5 s<br />

<strong>ZWR2MSKUDS</strong> geschlossen oder Aktivierung erfolgte im<br />

Diagnostic-Mode)<br />

blitzt dau- vor dem <strong>ZWR2MSKUDS</strong> liegender SHDSL-Streckenernd<br />

kurz * abschnitt wird aktiviert (RSP-Signalisierung)<br />

AUS fehlerfreie Datenübertragung<br />

* Signalisierung kann auch auftreten, wenn keine physische Verbindung zum LT2MSKU besteht<br />

Tabelle 2: Bedeutung der LED-Anzeigen<br />

Bild 9: Frontansicht mit LED-Anzeige<br />

Version: 2008/02/01 Version: 2008/02/01<br />

14 11


7 Technische Daten<br />

UKS-Schnittstelle: entspr. ETSI TS 101 524<br />

Bitrate 192 kBit/s … 2304 kBit/s<br />

Schrittgeschwindigkeit bis zu 773 1 / 3 kBaud<br />

Leitungscode TC-16-PAM<br />

Impedanz 135 Ω<br />

Sicherheitsgrad TNV3<br />

Stromversorgung:<br />

Eingangsspannungsbereich der Lokalspeisung -40,5 V bis -75 V �<br />

Leistungsaufnahme (lokal / ferngespeist) < 3 W / < 2 W<br />

Gehäuse:<br />

Ausführungsvariante Metallgehäuse mit integrierten Anzeige-<br />

elementen und physikalischen Schnittstellen<br />

Anzeigeelemente 2 LEDs zur Statusanzeige<br />

Gehäuseabmessungen 109,4 × 194 × 30 mm 3 (B × T × H)<br />

Gewicht ca. 0,65 kg<br />

Umweltbedingungen: entsprechend ETS 300 019<br />

Betrieb Lufttemperatur: -25°C … +55°C<br />

rel. Luftfeuchtigkeit: 5% … 95%<br />

Lagerung Lufttemperatur: -25°C … +55°C<br />

rel. Luftfeuchtigkeit: 10% … 100%<br />

Transport Lufttemperatur: -25°C … +70°C<br />

rel. Luftfeuchtigkeit: 60% … 95%<br />

Normen:<br />

Sicherheit EN 60 950-1<br />

EMV EN 55022, Kl. B<br />

ITU-T K.21<br />

ETSI EN 300 386<br />

ETSI ES 201 468<br />

<strong>ZWR2MSKUDS</strong> <strong>ZWR2MSKUDS</strong><br />

8 Hinweise<br />

Diese Anweisung aufbewahren!<br />

Bei Inbetriebnahme des Gerätes sind die Sicherheitshinweise zu beachten (→ Kapitel 9).<br />

Technische Änderungen sind dem technischen Fortschritt geschuldet und dienen der Verbesserung<br />

des Gerätes.<br />

9 Sicherheitshinweise<br />

Folgende Sicherheitshinweise sind zu Ihrer Sicherheit zu befolgen. Lesen Sie diese, bevor<br />

Sie das Gerät in Betrieb nehmen.<br />

ESD-Schutzmaßnahmen<br />

Beim Öffnen und bei Einbau von Komponenten des SHDSL-Übertragungssystems sind die<br />

Schutzmaßnahmen nach DIN 100 015 zu beachten.<br />

Vorsichtsmaßnahmen bei Gewitter<br />

Vermeiden Sie Arbeiten am SHDSL-Übertragungssystem und dessen Komponenten bei<br />

Gewittertätigkeit (Ziehen und Stecken von Baugruppen bzw. Leitungen).<br />

Erde und Potentialausgleich<br />

Bei Installation, Betrieb und Wartung des SHDSL-Übertragungssystems ist die DIN VDE<br />

0800, Teil 2 zu beachten.<br />

Warnung vor gefährlicher elektrischer Spannung<br />

Das SHDSL-Übertragungssystem enthält Schnittstellen mit gefährlicher elektrischer Spannung.<br />

Alle Arbeiten am System sollten von Fachpersonal durchgeführt werden.<br />

Version: 2008/02/01 Version: 2008/02/01<br />

12 13

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!