14.12.2012 Aufrufe

Praktika in der AT&S Attractive to HE students

Praktika in der AT&S Attractive to HE students

Praktika in der AT&S Attractive to HE students

MEHR ANZEIGEN
WENIGER ANZEIGEN

Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.

YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.

Leoben<br />

20 Jahre<br />

20 years<br />

2002<br />

Wirtschaftswachstum durch Technologie<br />

High-Tech Modul für Datenübertragung<br />

Economic Growth Via Technology<br />

High-Tech Module for Data Transfer<br />

SIM Karte e<strong>in</strong>es heutigen Mobiltelefons<br />

(Alle Abbildungen im Verhältnis 1:1)<br />

SIM Card of a State-of-the-Art Mobile Phone<br />

(All Figures <strong>in</strong> the Ratio 1:1)


2<br />

Inhalt / Contents<br />

Seite/Page 6<br />

Vorstand<br />

20-jähriges Bestehen <strong>der</strong> AT&S Leoben<br />

Board of Direc<strong>to</strong>rs<br />

20 year anniversary of AT&S Leoben<br />

Seite/Page 11<br />

Rückblicke<br />

Steirische High-Tech Geschichte<br />

Look<strong>in</strong>g back<br />

Styrian high-tech s<strong>to</strong>ry<br />

Seite/Page 19<br />

AT&S Ch<strong>in</strong>a<br />

Baufortschritt<br />

AT&S Ch<strong>in</strong>a<br />

Construction progress<br />

Seite/Page 31<br />

Highlight<br />

Die leuchtende Leiterplatte<br />

Highlight<br />

The illum<strong>in</strong>ated pr<strong>in</strong>ted circuit board<br />

Seite/Page 42<br />

Chronik<br />

Aktivitäten <strong>der</strong> Belegschaftsvertretung<br />

Chronicle<br />

Activities of the Works Council<br />

Edi<strong>to</strong>rial<br />

Liebe Leser<strong>in</strong>!<br />

Lieber Leser!<br />

Vor Ihnen liegt die Jubiläumsausgabe<br />

„20 Jahre AT&S<br />

Leoben“ – 20 Jahre, <strong>in</strong> denen<br />

sich e<strong>in</strong>e kle<strong>in</strong>e steirische<br />

Betriebsstätte <strong>der</strong> VOEST<br />

zum Sitz e<strong>in</strong>es börsenotierten,<br />

<strong>in</strong>ternationalen High-Tech<br />

Konzerns entwickelt hat.<br />

Zwölf Mitarbeiter haben<br />

<strong>in</strong> e<strong>in</strong>em Wechselbad<br />

<strong>der</strong> Gefühle<br />

den Standort<br />

durch diese Zeitspanne<br />

h<strong>in</strong>durch<br />

begleitet. Diesen<br />

Mitarbeitern ist es<br />

auch zu verdanken,<br />

dass Sie nicht nur<br />

trockene Zahlen<br />

und Fakten vor<br />

sich sehen, son<strong>der</strong>n e<strong>in</strong>en<br />

illustrierten Rückblick mit<br />

persönlichen Er<strong>in</strong>nerungen.<br />

Darum e<strong>in</strong> herzliches<br />

Dankeschön für die Unterstützung<br />

und den Lesern viel<br />

Spaß bei <strong>der</strong> Zeitreise.<br />

Gelegenheit, die AT&S<br />

Leoben mit Ihrer Familie zu<br />

besichtigen, haben Sie beim<br />

„Tag <strong>der</strong> offenen Tür“ am<br />

Freitag, dem 24. Mai von<br />

15:00 Uhr bis 18:00 Uhr und<br />

am Samstag, dem 25. Mai<br />

von 9:00 Uhr bis 13:00 Uhr.<br />

Ihre<br />

Helga Kokail<br />

Impressum:<br />

Herausgeber:<br />

Austria Technologie & Systemtechnik<br />

Aktiengesellschaft,<br />

Fabriksgasse 13, 8700 Leoben<br />

www.ats.net<br />

Redaktion und für den Inhalt<br />

verantwortlich: Helga Kokail<br />

Übersetzung:<br />

APT Transtelex Plc, 585a Fulham Road,<br />

Fulham Broadway, London SW6 5UA, GB<br />

Konzeption und Gestaltung:<br />

Dietmar Tadler<br />

Desk<strong>to</strong>p-Publish<strong>in</strong>g: Sab<strong>in</strong>e Peter<br />

Druck: Obersteirische Druckerei<br />

& Verlagsgesellschaft mbH<br />

Ostererweg 3, Postfach 560<br />

8700 Leoben<br />

Dear Rea<strong>der</strong>s<br />

You are look<strong>in</strong>g at the<br />

anniversary issue “20 Years of<br />

AT&S Leoben” – twenty years<br />

dur<strong>in</strong>g which a small office <strong>in</strong><br />

Styria belong<strong>in</strong>g <strong>to</strong> VOEST<br />

developed <strong>in</strong><strong>to</strong> the headquarters<br />

of an <strong>in</strong>ternational<br />

high-tech <strong>in</strong>dustrial group<br />

quoted on the s<strong>to</strong>ck market.<br />

Twelve<br />

colleagues take us<br />

through their<br />

thoughts and<br />

feel<strong>in</strong>gs about this<br />

period <strong>in</strong> the<br />

company’s his<strong>to</strong>ry.<br />

We have these<br />

colleagues <strong>to</strong><br />

thank for the fact<br />

that you are not<br />

presented with dry facts and<br />

figures but with a picture of<br />

the past illustrated with their<br />

personal memories.<br />

And so our heartfelt<br />

thanks for their support, and<br />

we hope our rea<strong>der</strong>s enjoy this<br />

journey back <strong>in</strong> time.<br />

You have the opportunity<br />

<strong>to</strong> visit the AT&S Leoben<br />

plant with your family at the<br />

“Open Door Day” on Friday,<br />

May 24 (3:00 p.m.– 6:00 p.m.)<br />

and Saturday, May 25<br />

(9:00 a.m. – 1:00 p.m.).<br />

Yours<br />

Helga Kokail<br />

Masthead:<br />

Publisher:<br />

Austria Technologie & Systemtechnik<br />

Aktiengesellschaft,<br />

Fabriksgasse 13, 8700 Leoben<br />

www.ats.net<br />

Edi<strong>to</strong>rial responsible for content:<br />

Helga Kokail<br />

Translation:<br />

APT Transtelex Plc, 585a Fulham Road,<br />

Fulham Broadway, London SW6 5UA, GB<br />

Conception and design:<br />

Dietmar Tadler<br />

Desk<strong>to</strong>p-Publish<strong>in</strong>g: Sab<strong>in</strong>e Peter<br />

Pr<strong>in</strong>ted by: Obersteirische Druckerei<br />

& Verlagsgesellschaft mbH<br />

Ostererweg 3, Postfach 560<br />

8700 Leoben


Der Standort Leoben feiert se<strong>in</strong>en zwanzigjährigen<br />

Bestand. Als Diversifikationsprojekt <strong>der</strong> VOEST-Alp<strong>in</strong>e<br />

entstanden, hat dieser zunächst e<strong>in</strong>e wechselvolle Entwicklung<br />

erlebt, ehe er 1987 zum selbständigen Unternehmen<br />

AT&S gemacht wurde. Dessen Sanierung wurde 1990 den<br />

erfolgreichen Geschäftsführern <strong>der</strong> EUMIG <strong>in</strong> Fohnsdorf,<br />

Dkfm. Helmut Zoidl und Ing. Willibald Dörfl<strong>in</strong>ger übertragen.<br />

Später übertrug man <strong>der</strong> Geschäftsführung auch die Verantwortung<br />

über die Steirische Elektronik und es wurde für alle drei<br />

verstaatlichten Leiterplattenhersteller e<strong>in</strong> zukunftsweisendes<br />

Unternehmenskonzept erarbeitet.<br />

Im Zuge <strong>der</strong> Privatisierung 1994 wurde Leoben zum Zentrum<br />

<strong>der</strong> unter e<strong>in</strong>em Unternehmensdach zusammengeführten<br />

Standorte, zu denen – von e<strong>in</strong>em deutschen Standort (Augsburg)<br />

hat man sich bereits wie<strong>der</strong> getrennt – auch e<strong>in</strong> Standort <strong>in</strong> Indien<br />

(Nanjangud) und demnächst e<strong>in</strong> weiterer <strong>in</strong> Ch<strong>in</strong>a (Shanghai)<br />

zählen. Damit hat sich die AT&S unter <strong>der</strong> Führung von<br />

Ing. Dörfl<strong>in</strong>ger und Dr. Sommerer von Leoben aus zu e<strong>in</strong>em<br />

global tätigen höchst erfolgreichen Unternehmen entwickelt.<br />

Wesentlichen Anteil an dieser Entwicklung hatte auch <strong>der</strong> ebenfalls<br />

von <strong>der</strong> EUMIG kommende langjährige Betriebsratsobmann<br />

Karl Lierzer mit se<strong>in</strong>en KollegenInnen. Diese verantwortungsvolle<br />

Aufgabe hat <strong>in</strong>zwischen Gerhard Fürstler übernommen.<br />

Die stürmische Entwicklung des Unternehmens, vor allem<br />

aber des Standortes wird durch den Umstand charakterisiert, dass<br />

1994 das Werk <strong>in</strong> Leoben halb leer war und nicht viele davon<br />

überzeugt waren, es jemals voll nutzen zu können. Dies war e<strong>in</strong>e<br />

krasse Fehlannahme, wie das zusätzlich entstandene Werk II<br />

e<strong>in</strong>drucksvoll belegt. Ziel ist, durch Konzentration <strong>der</strong> Aktivitäten<br />

die volle Auslastung bei<strong>der</strong> Werke sicherzustellen. Dies gilt, wenn<br />

auch mit an<strong>der</strong>en produktionstechnischen Schwerpunkten, ebenso<br />

für die beiden an<strong>der</strong>en Standorte <strong>in</strong> Fohnsdorf und Fehr<strong>in</strong>g.<br />

Die Standorte <strong>in</strong> Indien und Ch<strong>in</strong>a tragen im Zuge <strong>der</strong><br />

Globalisierung dem Umstand Rechnung, dass weltweit 60% <strong>der</strong><br />

für uns relevanten Geschäftsaktivitäten <strong>in</strong> Asien stattf<strong>in</strong>den<br />

Hannes Androsch<br />

Aus Sturm- und<br />

Drangzeit erfolgreich<br />

weiter <strong>in</strong> die Zukunft<br />

From a Time of “S<strong>to</strong>rm and Stress”<br />

<strong>to</strong> Success <strong>in</strong> the Future<br />

The Leoben site is celebrat<strong>in</strong>g<br />

twenty years of existence.<br />

Initially a diversification<br />

project on the part of VOEST-<br />

Alp<strong>in</strong>e, its development was somewhat<br />

chequered at first until it<br />

became the <strong>in</strong>dependent company<br />

AT&S <strong>in</strong> 1987. Its reorganisation<br />

was entrusted <strong>in</strong> 1990 <strong>to</strong> the successful<br />

managers of EUMIG <strong>in</strong><br />

Fohnsdorf – Helmut Zoidl, a<br />

bus<strong>in</strong>ess school graduate, and<br />

Willibald Dörfl<strong>in</strong>ger, a professional<br />

eng<strong>in</strong>eer. Subsequently, the responsibility<br />

of Steirische Elektronik was<br />

also assigned <strong>to</strong> the successful<br />

management and for all three<br />

state-owned PCB-manufacturers a<br />

forward-look<strong>in</strong>g bus<strong>in</strong>ess concept<br />

was developed.<br />

As a result of privatisation <strong>in</strong> 1994 Leoben became a centre<br />

for the sites which had been gathered un<strong>der</strong> one company umbrella,<br />

<strong>to</strong> which sites <strong>in</strong> India (Nanjangud) and later Ch<strong>in</strong>a<br />

(Shanghai) were added. Unfortunately, the plant <strong>in</strong> Germany<br />

(Augsburg) had <strong>to</strong> be closed. Un<strong>der</strong> the direction of Ing.<br />

Dörfl<strong>in</strong>ger and Dr. Sommerer operat<strong>in</strong>g from Leoben, AT&S<br />

developed <strong>in</strong><strong>to</strong> a globally active and highly successful company.<br />

A large part <strong>in</strong> this development was played by Karl Lierzer and<br />

his colleagues. Lierzer also came from EUMIG and had been a<br />

Works Council representative for many years. In the meantime<br />

Gerhard Fürstler has taken over this responsible task.<br />

The s<strong>to</strong>rmy development of the company, and <strong>in</strong> particular<br />

of the Leoben site, is illustrated by the fact that <strong>in</strong> 1944 the<br />

works <strong>in</strong> Leoben were half empty and nobody was conv<strong>in</strong>ced that<br />

it could ever be fully operational aga<strong>in</strong>. This was a crass and<br />

3


werden. Die Expansionsstrategie <strong>der</strong> AT&S ist Abbild <strong>der</strong><br />

Entwicklung <strong>der</strong> mobilen Telekommunikation, dessen weltweite<br />

Benutzerzahl <strong>in</strong> den letzten zehn Jahren von 10 Millionen auf<br />

1000 Millionen gestiegen ist. Die Fülle von neuen Anwendungsmöglichkeiten<br />

im Bereich <strong>der</strong> Datenübertragung und <strong>der</strong> Telematik<br />

im Au<strong>to</strong>mobilwesen wird e<strong>in</strong>e ähnliche rasante Entwicklung<br />

und damit auch für AT&S mit sich br<strong>in</strong>gen.<br />

1994 waren <strong>in</strong> H<strong>in</strong>terberg noch 545 Mitarbeiter beschäftigt.<br />

Inzwischen s<strong>in</strong>d es nach 179,43 Millionen Euro Investitionen<br />

1.250 Mitarbeiter. Dies ist wesentlicher Teil <strong>der</strong> Gesamtentwicklung<br />

des Unternehmens, das von e<strong>in</strong>em Umsatz von 96 Millionen<br />

Euro im Jahr 1994 auf e<strong>in</strong>en Umsatz von 275 Millionen Euro<br />

(Vorschau) im Wirtschaftsjahr 2001/2002 gewachsen ist sowie<br />

von 1.274 Mitarbeitern auf 2.613 Beschäftigte (Vorschau).<br />

Dazu wurden <strong>in</strong>sgesamt 310,1 Millionen Euro an Investitionen<br />

getätigt, die natürlich auch verdient werden müssen. Möglich war<br />

dies durch die Selbstf<strong>in</strong>anzierungskraft des Unternehmens und<br />

e<strong>in</strong>em erfolgreichen Börsegang im Juli 1999.<br />

Nach e<strong>in</strong>em Rekordjahr 2000/2001 <strong>in</strong> Bezug auf Umsatz<br />

(323 Millionen Euro) und Ergebnis (37 Millionen Euro) hat sich<br />

das Ende März zu Ende gegangene letzte Wirtschaftsjahr viel<br />

schwieriger gestaltet. Der massive E<strong>in</strong>bruch im Telekommunikations-Infrastrukturbereich,<br />

welchen die AT&S Augsburg vorwiegend<br />

bediente, führte <strong>in</strong> <strong>der</strong> Folge auch zur Schliessung dieses<br />

Standortes. Es musste e<strong>in</strong>e Verr<strong>in</strong>gerung <strong>der</strong> Umsätze h<strong>in</strong>genommen<br />

werden. Auch das Ergebnis ist deutlich niedriger ausgefallen.<br />

Dennoch ist es auch <strong>in</strong> dieser schwierigen Situation e<strong>in</strong> Positives,<br />

während die meisten Mitbewerber rote Zahlen schreiben mussten<br />

o<strong>der</strong> gar <strong>in</strong>solvent wurden.<br />

Dies ist zum e<strong>in</strong>en auf die weltweite Rezession zurückzuführen,<br />

zum weiteren hat die Telekommunikations<strong>in</strong>dustrie,<br />

4<br />

Hannes Androsch<br />

Alte Papierfabrik am heutigen AT&S Standort / Old papermill on <strong>to</strong>day’s AT&S plant<br />

<strong>in</strong>correct assumption as was dramatically proved by the arrival of<br />

Works No. II. The aim is <strong>to</strong> secure the full capacity operation of<br />

both works by the concentration of activities. This also applies<br />

<strong>to</strong> the Fohnsdorf and Fehr<strong>in</strong>g sites, even though the focuses of<br />

production are different.<br />

As far as the India and Ch<strong>in</strong>a sites are concerned we have <strong>to</strong><br />

bear <strong>in</strong> m<strong>in</strong>d the fact that <strong>in</strong> the course of globalisation 60% of<br />

the bus<strong>in</strong>ess of relevance <strong>to</strong> us world-wide will be transacted <strong>in</strong><br />

Asia. AT&S’s expansion strategy is a reflection of the developments<br />

<strong>in</strong> mobile telecommunications, the number of users of<br />

which has grown <strong>in</strong> the last ten years from 10 million <strong>to</strong> 1000<br />

million. The abundance of new applications <strong>in</strong> data transmission<br />

and telematics <strong>in</strong> car manufacture will cause a similar lightn<strong>in</strong>g<br />

development, and AT&S will reap the benefit.<br />

In 1994 there were 545 employees work<strong>in</strong>g <strong>in</strong> H<strong>in</strong>terberg.<br />

The number has risen after <strong>in</strong>vestments of 179.43 million Euros<br />

<strong>to</strong> 1,250 employees. This is a consi<strong>der</strong>able percentage of the <strong>to</strong>tal<br />

development of the company, which has grown from a turnover<br />

of 96 million Euros <strong>in</strong> 1994 <strong>to</strong> a turnover of 275 million Euros<br />

(predicted) <strong>in</strong> the 2001/2002 f<strong>in</strong>ancial year, and from 1,274 <strong>to</strong><br />

2,613 employees (predicted). In addition a <strong>to</strong>tal of 310.1 million<br />

Euros have been <strong>in</strong>vested which naturally must be earned. All this<br />

has been made possible by the self-f<strong>in</strong>anc<strong>in</strong>g power of the company<br />

and a successful flotation on the s<strong>to</strong>ck market <strong>in</strong> July 1999.<br />

After a record year <strong>in</strong> 2000/2001 <strong>in</strong> relation <strong>to</strong> turnover<br />

(323 million Euros) and results (37 million Euros), the last<br />

f<strong>in</strong>ancial year which ended at the end of March has proved <strong>to</strong> be<br />

much more difficult. The massive downturn <strong>in</strong> the sec<strong>to</strong>r of<br />

telekom-<strong>in</strong>frastructure, which was ma<strong>in</strong>ly served out of Augsburg,<br />

led <strong>to</strong> the clos<strong>in</strong>g of this site. We have had <strong>to</strong> swallow a<br />

reduction <strong>in</strong> sales. The results have also been noticeably lower.


High-Tech im Grünen / High-tech out <strong>in</strong> the open<br />

die mit beträchtlichen Überkapazitäten konfrontiert ist, e<strong>in</strong>en<br />

schweren E<strong>in</strong>bruch erlitten und schließlich verzögert sich die<br />

E<strong>in</strong>führung neuer Anwendungsmöglichkeiten, <strong>in</strong>sbeson<strong>der</strong>e<br />

<strong>der</strong> dritten Generation <strong>der</strong> Datenübertragung durch mobile<br />

Telekommunikation. Im Falle <strong>der</strong> AT&S kam erschwerend die<br />

notwendig gewordene Schließung des Werkes Augsburg und die<br />

damit verbundenen Kosten h<strong>in</strong>zu sowie die unvermeidbaren<br />

Vorlaufkosten des Standortes Shanghai. Umso bemerkenswerter<br />

ist das dennoch erzielte positive Ergebnis.<br />

In schwierigen Zeiten zeigt sich erst die wahre Stärke e<strong>in</strong>es<br />

Unternehmens, die Fähigkeit se<strong>in</strong>es Managements und aller<br />

Mitarbeiter. In <strong>der</strong> Folge wird die AT&S gestärkt aus dem<br />

nunmehrigen Konsolidierungsprozess hervorgehen und für die<br />

kommenden Anfor<strong>der</strong>ungen gut gerüstet se<strong>in</strong>. Dabei wird<br />

die unternehmerische Strategie, die natürlich <strong>in</strong> dem rasch<br />

wechselnden Umfeld nicht auf Bewahrungsstrategie, son<strong>der</strong>n auf<br />

e<strong>in</strong>e s<strong>in</strong>nvolle Expansionsstrategie setzen muss, auf die vielfach<br />

geän<strong>der</strong>ten Umstände abzustellen se<strong>in</strong>.<br />

Dazu gehört <strong>in</strong>sbeson<strong>der</strong>e die bestmögliche Positionierung<br />

<strong>in</strong> <strong>der</strong> Wertschöpfungskette und die partnerschaftliche<br />

Zusammenarbeit mit den wichtigsten Endproduktherstellern wie<br />

auch mit den zunehmend bedeutenden Vertragsherstellern<br />

(CEMs = contract electronic manufactures). Ebenso wird man<br />

sich vermehrt auf den asiatischen Markt fokussieren müssen.<br />

Technologie- und Kostenführerschaft, Qualitäts- und Lieferperformance,<br />

Geschw<strong>in</strong>digkeit und Flexibilität, Kundenorientierung<br />

und Partnerschaft werden entscheidende Orientierungen<br />

bleiben. Das Management und das gesamte Team werden sich<br />

engagiert und mit Committment auf diese Ziele und Aufgaben<br />

ausrichten, um den erfolgreichen Weg <strong>der</strong> AT&S auch <strong>in</strong><br />

Zukunft fortzusetzen.<br />

Hannes Androsch<br />

However there are positive fac<strong>to</strong>rs even <strong>in</strong> this situation, s<strong>in</strong>ce<br />

most of our competi<strong>to</strong>rs have either gone <strong>in</strong><strong>to</strong> the red or even<br />

become <strong>in</strong>solvent.<br />

On the one hand this is due <strong>to</strong> the world-wide recession, on<br />

the other the telecommunications <strong>in</strong>dustry, confronted by consi<strong>der</strong>able<br />

over-capacity, has suffered a serious setback and is now<br />

delay<strong>in</strong>g the <strong>in</strong>troduction of new applications, particularly the<br />

third generation of data transmission via mobile telecommunications.<br />

AT&S for its part has had the demoralis<strong>in</strong>g experience of<br />

hav<strong>in</strong>g <strong>to</strong> shut its Augsburg works and shoul<strong>der</strong> the consequent<br />

costs on <strong>to</strong>p of the unavoidable start-up costs of the Shanghai<br />

site. The positive results achieved are all the more remarkable <strong>in</strong><br />

the circumstances.<br />

Hard times br<strong>in</strong>g out the real strength of a company and<br />

the calibre of its management and workers. In the process<br />

AT&S will emerge strengthened from the present consolidation<br />

process and be well equipped for the challenges ahead. The<br />

company’s strategy, which <strong>in</strong> the rapidly chang<strong>in</strong>g environment<br />

has <strong>to</strong> concentrate not on preservation but on sensible expansion,<br />

must be geared <strong>to</strong> the altered circumstances <strong>in</strong> which we f<strong>in</strong>d<br />

ourselves.<br />

For this we need <strong>to</strong> occupy the best possible position <strong>in</strong> the<br />

net product cha<strong>in</strong> and cont<strong>in</strong>ue <strong>to</strong> cooperate <strong>in</strong> partnership with<br />

the most important end-product manufacturers and the <strong>in</strong>creas<strong>in</strong>gly<br />

more significant contract electronic manufacturers (CEM’s).<br />

Likewise we shall have <strong>to</strong> focus anew on the Asian market. Technological<br />

and <strong>to</strong>tal cost lea<strong>der</strong>ship, quality and supply performance,<br />

speed and flexibility, cus<strong>to</strong>mer orientation and partnership<br />

will be the decisive fac<strong>to</strong>rs. The management and the whole<br />

team will rema<strong>in</strong> committed <strong>to</strong> these tasks and targets <strong>in</strong> or<strong>der</strong> <strong>to</strong><br />

cont<strong>in</strong>ue on AT&S’s successful path <strong>in</strong> the future.<br />

5


Brief des Vorstandes<br />

Letter of the Board<br />

Sehr geehrte Damen und Herren,<br />

Sehr geehrte Mitarbeiter<strong>in</strong>nen,<br />

sehr geehrte Mitarbeiter,<br />

die vorliegende Zeitung ist vor allem dem<br />

20-jährigen Bestehen unseres Werkes <strong>in</strong> Leoben<br />

gewidmet.<br />

Auf Grundlage e<strong>in</strong>es im Jahre 1981 mit <strong>der</strong><br />

IBM <strong>in</strong> S<strong>in</strong>delf<strong>in</strong>gen unterzeichneten Liefervertrages<br />

über die Herstellung von mehrlagigen<br />

Leiterplatten wurde im Jahre 1982 mit e<strong>in</strong>er<br />

Investitionssumme von 14,5 Millionen Euro<br />

(200 Millionen Schill<strong>in</strong>g) das Werk Leoben<br />

errichtet. Dieses g<strong>in</strong>g im April 1983 mit ca.<br />

180 Beschäftigten <strong>in</strong> Betrieb. Nach e<strong>in</strong>er bewegten<br />

Entwicklung, die nicht immer nur positiv<br />

verlaufen ist, son<strong>der</strong>n gerade Anfang <strong>der</strong> 90iger<br />

Jahre durch heftige Krisen gekennzeichnet war,<br />

konnte sich die AT&S mit dem Werk Leoben<br />

durch Hochtechnologie, Kompetenz und E<strong>in</strong>satzbereitschaft<br />

<strong>der</strong> Mitarbeiter zu e<strong>in</strong>em Weltunternehmen<br />

entwickeln.<br />

Derzeit s<strong>in</strong>d <strong>in</strong> Leoben 1.250 Mitarbeiter<br />

beschäftigt und im abgelaufenen Wirtschaftsjahr<br />

wurde e<strong>in</strong> Umsatz von etwa 167 Millionen Euro<br />

(2,3 Milliarden Schill<strong>in</strong>g) erzielt.<br />

Das Werk Leoben ist damit maßgeblich für<br />

den Gesamterfolg <strong>der</strong> AT&S Gruppe verantwortlich.<br />

Neben dieser wirtschaftlichen Entwicklung<br />

muss ganz beson<strong>der</strong>s hervorgehoben werden,<br />

dass sich Leoben zum Technologiezentrum <strong>der</strong><br />

AT&S Gruppe – wahrsche<strong>in</strong>lich aber <strong>der</strong> gesamten<br />

Leiterplatten<strong>in</strong>dustrie <strong>in</strong> Europa – entwickelt<br />

hat. Gleichzeitig unterstützen die Mitarbeiter<br />

dieses Werkes maßgeblich den Aufbau unserer<br />

neuen Fertigungsstätte <strong>in</strong> Ch<strong>in</strong>a, was letztendlich<br />

auch zu e<strong>in</strong>er Standortsicherung <strong>in</strong> Leoben<br />

beiträgt. Aufgrund unserer Aktivitäten <strong>in</strong> Ch<strong>in</strong>a<br />

ist es bereits heute möglich, maßgebliche Exporte<br />

(<strong>in</strong> Höhe von 7, 7 Millionen Euro/106 Millionen<br />

Schill<strong>in</strong>g) von Leoben nach Ch<strong>in</strong>a durchzuführen.<br />

Das abgelaufene Wirtschaftsjahr war für die<br />

gesamte Leiterplatten<strong>in</strong>dustrie von e<strong>in</strong>em noch<br />

6<br />

Vorstand / The Board of Direc<strong>to</strong>rs<br />

Ladies and Gentlemen,<br />

Colleagues,<br />

This newspaper is dedicated <strong>to</strong> the 20-year<br />

anniversary of our works <strong>in</strong> Leoben.<br />

Follow<strong>in</strong>g the signature <strong>in</strong> 1981 of a supply<br />

agreement with IBM <strong>in</strong> S<strong>in</strong>delf<strong>in</strong>gen for the<br />

manufacture of multilayer pr<strong>in</strong>ted circuit boards,<br />

the Leoben works was constructed <strong>in</strong> the follow<strong>in</strong>g<br />

year with an <strong>in</strong>vested sum of 14.5 million<br />

Euros (200 million Schill<strong>in</strong>gs). It went <strong>in</strong><strong>to</strong><br />

production <strong>in</strong> April 1983 with approx. 180<br />

employees. After a somewhat eventful development<br />

which was not always positively directed<br />

and <strong>in</strong> fact featured a series of crises at the<br />

beg<strong>in</strong>n<strong>in</strong>g of the n<strong>in</strong>eties, AT&S succeeded <strong>in</strong><br />

develop<strong>in</strong>g <strong>in</strong><strong>to</strong> a global enterprise at the works<br />

<strong>in</strong> Leoben by d<strong>in</strong>t of high technology, efficiency<br />

and the commitment of its employees.<br />

Currently there are 1,250 employees at<br />

Leoben, and <strong>in</strong> the last f<strong>in</strong>ancial year we achieved<br />

a turnover of some 167 million Euros (2.3 billion<br />

Schill<strong>in</strong>gs).<br />

The Leoben plant is therefore responsible<br />

for the success of the AT&S Group as a whole.<br />

Besides this commercial success we should note<br />

that Leoben has developed <strong>in</strong><strong>to</strong> the technological<br />

centre of the AT&S Group – and probably<br />

of the pr<strong>in</strong>ted circuit board <strong>in</strong>dustry of the whole<br />

of Europe. At the same time the employees <strong>in</strong><br />

these works are support<strong>in</strong>g our new production<br />

facility <strong>in</strong> Ch<strong>in</strong>a, which <strong>in</strong> the last analysis also<br />

helps secure the Leoben site. As a result of our<br />

activities <strong>in</strong> Ch<strong>in</strong>a we are now able <strong>to</strong> export<br />

on a substantial scale from Leoben <strong>to</strong> Ch<strong>in</strong>a<br />

(<strong>to</strong> the value of 7.7 million Euros/106 million<br />

Schill<strong>in</strong>gs).<br />

The last f<strong>in</strong>ancial year was accompanied by a<br />

setback <strong>in</strong> the market for the entire pr<strong>in</strong>ted<br />

circuit board <strong>in</strong>dustry the like of which we have<br />

never seen before. It is therefore not surpris<strong>in</strong>g<br />

that our sites <strong>in</strong> Austria were also affected by this<br />

development.<br />

Derzeit s<strong>in</strong>d <strong>in</strong> Leoben<br />

1.250 Mitarbeiter<br />

beschäftigt und im<br />

abgelaufenen Wirtschaftsjahr<br />

wurde e<strong>in</strong><br />

Umsatz von etwa<br />

167 Millionen Euro<br />

(2,3 Milliarden Schill<strong>in</strong>g)<br />

erzielt.<br />

Currently there are 1,250<br />

employees at Leoben,<br />

and <strong>in</strong> the last f<strong>in</strong>ancial<br />

year we achieved a<br />

turnover of some<br />

167 million Euros<br />

(2.3 billion Schill<strong>in</strong>gs).


nie da gewesenen Markte<strong>in</strong>bruch begleitet. Es ist<br />

daher ke<strong>in</strong> Wun<strong>der</strong>, dass auch unsere Standorte<br />

<strong>in</strong> Österreich von dieser Entwicklung bee<strong>in</strong>flusst<br />

waren.<br />

Wir s<strong>in</strong>d s<strong>to</strong>lz, dass es uns und damit allen<br />

Mitarbeitern gelungen ist, <strong>in</strong> e<strong>in</strong>em Jahr, <strong>in</strong> dem<br />

die meisten unserer Konkurrenzunternehmen <strong>in</strong><br />

Europa, USA aber auch Asien Umsatze<strong>in</strong>brüche<br />

zwischen 30% und 60% erzielten, mit e<strong>in</strong>em<br />

Rückgang des Gesamtumsatzes von lediglich<br />

15% gegenüber dem Vorjahr maßgeblich Marktanteilsgew<strong>in</strong>ne<br />

zu erreichen.<br />

Dieser Erfolg war nur durch die hohe<br />

Innovationskraft und <strong>der</strong> daraus resultierenden<br />

hervorragenden Technologie, die Produktqualität,<br />

die Lieferverlässlichkeit und absolute Kundenorientierung<br />

<strong>der</strong> Standorte <strong>in</strong>nerhalb <strong>der</strong> AT&S<br />

Gruppe möglich.<br />

All dies ist natürlich das Ergebnis hochqualifizierter<br />

und motivierter Mitarbeiter, die gerade<br />

<strong>in</strong> diesem Jahr geme<strong>in</strong>sam mit <strong>der</strong> Belegschaftsvertretung<br />

bewiesen haben, dass sie <strong>in</strong> <strong>der</strong> Lage<br />

und bereit s<strong>in</strong>d, im Interesse des Unternehmens<br />

Zusatzbelastungen wie beispielsweise erhöhte<br />

Flexibilität <strong>in</strong> Kauf zu nehmen. Nur so war es<br />

möglich, trotz <strong>der</strong> Schließungskosten <strong>in</strong> Augsburg,<br />

<strong>der</strong> bereits beträchtlichen Aufwendungen<br />

für unser Projekt <strong>in</strong> Ch<strong>in</strong>a, aber auch trotz noch<br />

nie vorher da gewesener F&E Tätigkeiten e<strong>in</strong><br />

positives wirtschaftliches Ergebnis zu erzielen.<br />

Spätestens <strong>in</strong> diesem Jahr wurde fast allen<br />

Marktteilnehmern klar, dass die Leiterplatten<strong>in</strong>dustrie<br />

sich <strong>in</strong> e<strong>in</strong>em Wandel bef<strong>in</strong>det.<br />

Konkurse, Werksschließungen und Firmenzusammenschlüsse<br />

s<strong>in</strong>d die offensichtlichen Beweise<br />

für diese Entwicklung.<br />

Wir s<strong>in</strong>d zuversichtlich, dass die AT&S <strong>in</strong><br />

diesen Zeiten des Wandels ihre Marktposition<br />

behaupten und sogar ausbauen und somit auch<br />

zukünftig e<strong>in</strong> erfolgreicher „Spieler“ im Bereich<br />

<strong>der</strong> Verb<strong>in</strong>dungstechnologien se<strong>in</strong> wird.<br />

Wir werden unseren zukünftigen Erfolg durch<br />

starke Partnerschaften, durch die Ausweitung<br />

unserer Aktivitäten <strong>in</strong> neue Märkte und zu neuen<br />

Kunden durch Technologie-, Qualitäts- und<br />

vermehrt auch durch Kostenführerschaft sichern.<br />

Die Zutaten für Leiterplatten wie Material,<br />

Chemie aber auch Masch<strong>in</strong>en können von allen<br />

Marktteilnehmern gekauft werden. Die AT&S<br />

zeichnet sich jedoch darüber h<strong>in</strong>aus durch erstklassig<br />

ausgebildete und erfahrene, aber auch<br />

motivierte Mitarbeiter aus, die die technologische<br />

Kompetenz des Unternehmens sicherstellen und<br />

damit den wirtschaftlichen Erfolg langfristig<br />

garantieren.<br />

Dafür dürfen wir allen Mitarbeitern e<strong>in</strong> recht<br />

herzliches Dankeschön aussprechen und freuen<br />

uns auf e<strong>in</strong>e geme<strong>in</strong>same erfolgreiche Zukunft.<br />

Vorstand / The Board of Direc<strong>to</strong>rs<br />

We are proud that <strong>in</strong> a year <strong>in</strong> which most of<br />

our competi<strong>to</strong>rs <strong>in</strong> Europe and the USA and even<br />

<strong>in</strong> Asia have suffered collapses of turnover of<br />

between 30% and 60% we and all our colleagues<br />

have succeeded <strong>in</strong> achiev<strong>in</strong>g important ga<strong>in</strong>s <strong>in</strong><br />

market share with a mere 15% reduction <strong>in</strong><br />

turnover.<br />

This success was made possible only by the<br />

high levels of <strong>in</strong>novation and the outstand<strong>in</strong>g<br />

technology they generated, the quality of product,<br />

the reliability of supply and the absolute<br />

cus<strong>to</strong>mer orientation of the constituent members<br />

of the AT&S Group.<br />

All of this is of course the result of hav<strong>in</strong>g<br />

highly qualified and motivated employees who<br />

have proved this year <strong>in</strong> conjunction with the<br />

Works Council that they are able and will<strong>in</strong>g <strong>to</strong><br />

take on board additional burdens such as<br />

<strong>in</strong>creased flexibility <strong>in</strong> the<br />

<strong>in</strong>terests of the company.<br />

Only thus has it been possible<br />

despite the expense of clos<strong>in</strong>g<br />

down Augsburg and the<br />

already consi<strong>der</strong>able cost of<br />

our project <strong>in</strong> Ch<strong>in</strong>a, and<br />

despite our unprecedented<br />

R&D activities, <strong>to</strong> achieve a<br />

positive commercial result.<br />

Lately it has become clear<br />

<strong>to</strong> almost all participants <strong>in</strong><br />

the market that the pr<strong>in</strong>ted<br />

circuit board <strong>in</strong>dustry is at a<br />

watershed. Bankruptcies,<br />

closures and mergers are the<br />

obvious symp<strong>to</strong>ms of this<br />

development.<br />

We are confident that<br />

dur<strong>in</strong>g this period of change<br />

AT&S will ma<strong>in</strong>ta<strong>in</strong> its market position and even<br />

expand on it and carry on be<strong>in</strong>g a successful<br />

“player” <strong>in</strong> the field of connective technology <strong>in</strong><br />

the future.<br />

We shall secure our future success through<br />

strong partnerships, the expansion of our activities<br />

<strong>in</strong><strong>to</strong> new markets and <strong>to</strong> new cus<strong>to</strong>mers by<br />

be<strong>in</strong>g at the forefront of technology, quality and,<br />

<strong>in</strong>creas<strong>in</strong>gly, costs.<br />

The <strong>in</strong>gredients of pr<strong>in</strong>ted circuit boards<br />

such as raw material, chemicals and mach<strong>in</strong>es can<br />

be bought by any participant <strong>in</strong> the market.<br />

What dist<strong>in</strong>guishes AT&S, however, is its highly<br />

tra<strong>in</strong>ed, experienced and motivated staff who<br />

ensure the company’s technological competence<br />

and are therefore a guarantee of its commercial<br />

success <strong>in</strong> the long term.<br />

We should therefore like <strong>to</strong> express our<br />

s<strong>in</strong>cere and heartfelt thanks <strong>to</strong> all our employees<br />

and look forward <strong>to</strong> a successful future <strong>to</strong>gether.<br />

Die AT&S zeichnet sich<br />

jedoch durch erstklassig<br />

ausgebildete und motivierte<br />

Mitarbeiter aus, die den<br />

wirtschaftlichen Erfolg<br />

langfristig garantieren.<br />

What dist<strong>in</strong>guishes AT&S,<br />

is its highly tra<strong>in</strong>ed and<br />

motivated staff who are a<br />

guarantee of its commercial<br />

success <strong>in</strong> the long term.<br />

7


Die Leiterplatten <strong>der</strong> VOEST-ALPINE<br />

Anfang <strong>der</strong> 80er Jahre entschied die<br />

VOEST-ALPINE AG ihr Produktionssortiment<br />

auszuweiten und <strong>in</strong> die Leiterplattenproduktion<br />

e<strong>in</strong>zusteigen. Im Jahr 1981<br />

wurde mit <strong>der</strong> IBM-S<strong>in</strong>delf<strong>in</strong>gen e<strong>in</strong> Abnahmevertrag<br />

für Mehrlagen-Leiterplatten im Ausmaß<br />

von 150 m 2 pro Tag abgeschlossen. In <strong>der</strong> Folge<br />

wurde unter wesentlicher Beteiligung <strong>der</strong> IBM<br />

bei <strong>der</strong> Planung und Auslegung <strong>in</strong> Leoben – am<br />

Gelände e<strong>in</strong>er alten Papierfabrik – 1982 e<strong>in</strong>e<br />

Leiterplattenfertigung als Betriebsstätte <strong>der</strong><br />

VOEST-ALPINE AG errichtet.<br />

Bereits drei Jahre später wurde die ursprüngliche<br />

Liefermenge auf 1.000 m 2 pro Tag aufges<strong>to</strong>ckt<br />

und letzten Endes schließlich die<br />

Abnahme e<strong>in</strong>er Gesamtkapazität von 1.500 m 2<br />

täglich vere<strong>in</strong>bart. Aufgrund dieser Zusage erweiterte<br />

die VOEST <strong>in</strong> den Folgejahren mit e<strong>in</strong>em<br />

Investitionsvolumen von rund 72,67 Millionen<br />

Euro (1 Milliarde Schill<strong>in</strong>g) das Werk Leoben. Im<br />

Jahr 1987 war <strong>der</strong> Ausbau dann abgeschlossen.<br />

In <strong>der</strong> Zwischenzeit war jedoch wegen <strong>der</strong><br />

Errichtung eigener Fertigungskapazitäten <strong>der</strong><br />

IBM <strong>in</strong> S<strong>in</strong>delf<strong>in</strong>gen die vertraglich vere<strong>in</strong>barte<br />

Lieferabnahmemenge wie<strong>der</strong> um rund zwei<br />

Drittel reduziert worden.<br />

Die neu errichteten Fertigungsgebäude<br />

wurden daher nur zu e<strong>in</strong>em ger<strong>in</strong>gen Teil<br />

benötigt, <strong>der</strong> überwiegende Teil – <strong>in</strong>klusive <strong>der</strong><br />

beträchtlich erweiterten Infrastruktur – blieb<br />

ungenutzt.<br />

Im Rahmen <strong>der</strong> Neustrukturierung <strong>der</strong><br />

AUSTRIAN INDUSTRIES AG (Gründung von<br />

<strong>in</strong>sgesamt fünf operativen branchenorientierten<br />

Hold<strong>in</strong>ggesellschaften) wurde die AT&S Leoben<br />

als AT&S Austria Technologie & Systemtechnik<br />

GmbH gesellschaftsrechtlich verselbständigt und<br />

<strong>in</strong> die E+E Elektro- und Elektronik Industriehol-<br />

8<br />

20 Jahre AT&S Leoben / 20 Years of AT&S Leoben<br />

Wachstum<br />

durch Technologie!<br />

Growth Via Technology<br />

VOEST-ALPINE’s Pr<strong>in</strong>ted Circuit Boards<br />

At the beg<strong>in</strong>n<strong>in</strong>g of the 80’s VOEST-<br />

ALPINE AG decided <strong>to</strong> expand its<br />

product range and <strong>to</strong> branch out <strong>in</strong><strong>to</strong> the<br />

production of pr<strong>in</strong>ted circuit boards. In 1981 a<br />

Supply Agreement for 150 m 2 per day of multilayer<br />

circuit boards was concluded with IBM-<br />

S<strong>in</strong>delf<strong>in</strong>gen. Subsequently with substantial<br />

support from IBM <strong>in</strong> plann<strong>in</strong>g and design a<br />

circuit board production facility was built by<br />

VOEST-ALPINE AG on the site of an old paper<br />

fac<strong>to</strong>ry <strong>in</strong> Leoben.<br />

Three years later the orig<strong>in</strong>al output was<br />

<strong>in</strong>creased <strong>to</strong> 1,000 m 2 per day, and eventually<br />

agreement <strong>to</strong> supply a <strong>to</strong>tal capacity of 1,500 m 2<br />

per day was concluded. In the light of this commitment<br />

VOEST extended the works at Leoben<br />

with <strong>in</strong>vestments of around 72.67 million Euros<br />

(1 billion Schill<strong>in</strong>gs). The extension was completed<br />

<strong>in</strong> 1987.<br />

In the meantime, however, follow<strong>in</strong>g<br />

the construction by IBM of its own manufactur<strong>in</strong>g<br />

capacity <strong>in</strong> S<strong>in</strong>delf<strong>in</strong>gen, the contracted<br />

supply quantity was reduced by some two<br />

thirds.<br />

Therefore only a small part of the newly<br />

added production facility was needed. Most of<br />

the capacity – <strong>in</strong>clud<strong>in</strong>g the consi<strong>der</strong>ably<br />

extended <strong>in</strong>frastructure – rema<strong>in</strong>ed unused.<br />

As a result of the restructur<strong>in</strong>g of<br />

AUSTRIAN INDUSTRIES AG (the creation of<br />

a <strong>to</strong>tal of five operational <strong>in</strong>dustry-oriented<br />

hold<strong>in</strong>g companies) AT&S Leoben became an<br />

<strong>in</strong>dependent organisation un<strong>der</strong> company<br />

rules as Austria Technologie & Systemtechnik<br />

GmbH and <strong>in</strong>corporated <strong>in</strong><strong>to</strong> the E+E Elektround<br />

Elektronik Industriehold<strong>in</strong>g AG of AUS-<br />

TRIAN INDUSTRIES AG as a 100% subsidiary<br />

company.<br />

Wirtschaftskreislauf:<br />

Die Nachfrage nach immer<br />

kle<strong>in</strong>eren Endprodukten treibt<br />

die M<strong>in</strong>iaturisierung voran.<br />

Economic circulation:<br />

The demand for ever smaller<br />

endproducts pushes ahead the<br />

m<strong>in</strong>iaturisation.<br />

Privatisierung:<br />

1994 wurden die Gesellschaftsanteile<br />

<strong>der</strong> Bietergruppe<br />

Androsch, Dörfl<strong>in</strong>ger,<br />

Zoidl zugesprochen.<br />

Privatisation:<br />

1994 the company shares<br />

were awarded <strong>to</strong> the<br />

bidd<strong>in</strong>g group of Androsch,<br />

Dörfl<strong>in</strong>ger and Zoidl.


d<strong>in</strong>g AG <strong>der</strong> AUSTRIAN INDUSTRIES AG. als<br />

100%ige Tochter e<strong>in</strong>gebracht.<br />

Endlich Sanierungskonzept mit Hand<br />

und Fuß<br />

Die sowohl umsatz- als auch ergebnismäßig<br />

katastrophale Geschäftsentwicklung führte 1989<br />

zu e<strong>in</strong>em Wechsel <strong>in</strong> <strong>der</strong> Geschäftsführung, <strong>der</strong><br />

jedoch ebenfalls nicht den erwarteten<br />

Umschwung brachte. Im März 1990 wurde daher<br />

die Geschäftsführung <strong>der</strong> EUMIG – die Herren<br />

Dörfl<strong>in</strong>ger und Zoidl – auch mit <strong>der</strong> Verantwortung<br />

für die AT&S beauftragt. Ihr Sanierungskonzept,<br />

das auch e<strong>in</strong> Ansteigen des Gesamtumsatzes<br />

<strong>in</strong>nerhalb von vier Jahren um rund 100%<br />

be<strong>in</strong>haltete, konnte bereits <strong>in</strong> den ersten beiden<br />

Jahren realisiert werden.<br />

Im März 1992 reduzierten sich die garantierten<br />

Abnahmemengen <strong>der</strong> IBM – aufgrund von<br />

Auslastungsproblemen <strong>der</strong> eigenen Kapazitäten –<br />

von rund 65% auf praktisch Null. Obwohl die<br />

Umsätze mit an<strong>der</strong>en Kunden beträchtlich gesteigert<br />

werden konnten, verzögerte sich damit <strong>der</strong> –<br />

ursprünglich für Ende 1993 – geplante Abschluss<br />

<strong>der</strong> Sanierung des Unternehmens.<br />

Mark<strong>to</strong>rientierung, Technologievorsprung<br />

und Privatisierung<br />

Hand <strong>in</strong> Hand mit <strong>der</strong> zunehmenden Mark<strong>to</strong>rientierung<br />

g<strong>in</strong>g e<strong>in</strong> Technologiewechsel zu dünneren<br />

Lam<strong>in</strong>aten <strong>in</strong> Fe<strong>in</strong>stleitertechnik für den<br />

Telekommunikationssek<strong>to</strong>r. Dieser Schritt führte<br />

bald zu Erfolgen, die weit über den Erwartungen<br />

lagen.<br />

Durch diverse Umstrukturierungen <strong>in</strong>nerhalb<br />

<strong>der</strong> verstaatlichten Industrie wurden die<br />

AT&S und ihre Töchter (EUMIG Fohnsdorf und<br />

STEIRISC<strong>HE</strong> Electronic) wie<strong>der</strong> zur ÖIAG<br />

gehörig. Die ÖIAG suchte bald darauf Käufer für<br />

den Leiterplattenbereich, <strong>der</strong> nicht länger zu den<br />

Kernbereichen <strong>der</strong> Verstaatlichten Industrie<br />

zählen sollte.<br />

Das folgende Jahr, 1994 wurde <strong>in</strong> zweierlei<br />

H<strong>in</strong>sicht e<strong>in</strong> bedeutsames: Erstens gelang <strong>in</strong><br />

diesem Jahr <strong>der</strong> Turn-around, d.h. <strong>der</strong><br />

Umschwung von e<strong>in</strong>er Verlust- zu e<strong>in</strong>er Gew<strong>in</strong>nsituation<br />

und zweitens wurden am 7. November<br />

1994 die Gesellschaftsanteile <strong>der</strong> Bietergruppe<br />

Androsch, Dörfl<strong>in</strong>ger, Zoidl zugesprochen.<br />

Im Jahr darauf, 1995 zählte die AT&S<br />

Gruppe bereits zu den großen Leiterplattenherstellern<br />

<strong>der</strong> Welt und galt <strong>in</strong> Europa technologisch<br />

als Nummer 1. Alle Maßnahmen <strong>der</strong> neuen<br />

Eigentümer zielten darauf ab die erreichte<br />

Position abzusichern. Frühzeitig erkannte man,<br />

dass das Unternehmen h<strong>in</strong>sichtlich Technologie,<br />

Qualitätsniveau, Liefertreue und Umweltverträglichkeit<br />

jeweils am neuesten Stand zu halten war.<br />

20 Jahre AT&S Leoben / 20 Years of AT&S Leoben<br />

F<strong>in</strong>ally a Reorganisation Plan At All Costs<br />

The catastrophic development of the bus<strong>in</strong>ess,<br />

from the po<strong>in</strong>t of view of both turnover and<br />

results, led at 1989 <strong>to</strong> a change of management,<br />

which was equally unsuccessful <strong>in</strong> br<strong>in</strong>g<strong>in</strong>g about<br />

the expected reversal of fortunes. In March 1990<br />

therefore Messrs. Dörfl<strong>in</strong>ger and Zoidl, senior<br />

executives with EUMIG, were given the responsibility<br />

of runn<strong>in</strong>g AT&S. Their reorganisation<br />

plan, which <strong>in</strong>cluded a 100% <strong>in</strong>crease <strong>in</strong> <strong>to</strong>tal<br />

turnover, was successfully implemented <strong>in</strong> the<br />

first two years.<br />

In March 1992 the supply quantities guaranteed<br />

by IBM were reduced from about 65% <strong>to</strong><br />

practically zero due <strong>to</strong> their own problems of full<br />

capacity. Although the company was able <strong>to</strong><br />

<strong>in</strong>crease substantially its sales <strong>to</strong> other cus<strong>to</strong>mers,<br />

the date for the completion of the reorganisation<br />

process – orig<strong>in</strong>ally scheduled for the end of 1993<br />

– was delayed.<br />

Market Orientation, Technological Advance<br />

and Privatisation<br />

Hand <strong>in</strong> hand with the <strong>in</strong>creas<strong>in</strong>g market orientation,<br />

the technology changed <strong>to</strong> th<strong>in</strong>ner lam<strong>in</strong>ates<br />

and ultra-f<strong>in</strong>e conduc<strong>to</strong>rs for the telecommunications<br />

sec<strong>to</strong>r. This step soon brought<br />

results which were far beyond expectations.<br />

By means of a series of restructur<strong>in</strong>gs with<strong>in</strong><br />

the nationalised <strong>in</strong>dustry AT&S and its subsidiaries<br />

(EUMIG Fohnsdorf and STEIRISC<strong>HE</strong><br />

Der <strong>in</strong>ternationale Markt<br />

for<strong>der</strong>te bereits vehement<br />

e<strong>in</strong>e schnellere Weiterentwicklung<br />

<strong>in</strong> Richtung<br />

neuer Technologien.<br />

At the time the <strong>in</strong>ternational<br />

market was cry<strong>in</strong>g out for<br />

the speedier development of<br />

new technologies.<br />

9


Schneller, besser, high-tech<br />

Die Verschmelzung <strong>der</strong> AT&S Gruppe zu e<strong>in</strong>em<br />

Unternehmen erfolgte 1996 im letzten Schritt<br />

unter dem unternehmenspolitischen Gesichtspunkt,<br />

dass die AT&S Aktiengesellschaft nun<br />

unter e<strong>in</strong>heitlichem Namen und im e<strong>in</strong>heitlichen<br />

Ersche<strong>in</strong>ungsbild auftreten konnte.<br />

Der <strong>in</strong>ternationale Markt for<strong>der</strong>te bereits<br />

vehement e<strong>in</strong>e schnellere Weiterentwicklung <strong>in</strong><br />

Richtung neuer Technologien (Laserbohren,<br />

HDI-Microvia etc.) zur Erzielung noch fe<strong>in</strong>erer<br />

Oberflächenstrukturen für höhere Packungsdichten.<br />

Um angesichts s<strong>in</strong>ken<strong>der</strong> Preise ke<strong>in</strong>e<br />

Ertragse<strong>in</strong>brüche zu erleiden, mussten Umsätze<br />

und Betriebsleistung stark erhöht werden.<br />

Gebäude, Masch<strong>in</strong>en und E<strong>in</strong>richtungen sollten<br />

noch besser genutzt werden. Also wurden 1997<br />

<strong>der</strong> 4-Schichtbetrieb e<strong>in</strong>geführt, die Vertriebsaktivitäten<br />

erhöht und beträchtliche Investitionen<br />

<strong>in</strong> neue Technologien getätigt.<br />

Der Schritt zum Global Player<br />

Im Herbst 1998 überschlugen sich die Ereignisse<br />

und gleich mehrere Expansionsprojekte <strong>der</strong><br />

AT&S AG wurden endgültig entschieden.<br />

Um die Beziehungen zum deutschen Markt,<br />

<strong>in</strong>sbeson<strong>der</strong>e zum wichtigen Geschäftspartner<br />

Siemens zu vertiefen, wurde das ehemalige<br />

Siemens Leiterplattenwerk ALTEC <strong>in</strong> Augsburg –<br />

e<strong>in</strong> weiterer Sanierungsfall – übernommen. Der<br />

geographisch weiteste Schritt war <strong>der</strong> Kauf des<br />

10<br />

20 Jahre AT&S Leoben / 20 Years of AT&S Leoben<br />

Electronic) were re-<strong>in</strong>corporated <strong>in</strong> ÖIAG<br />

(Österreichische Industrie AG). Soon after,<br />

ÖIAG sought buyers for the pr<strong>in</strong>ted circuit board<br />

sec<strong>to</strong>r which was no longer <strong>to</strong> be a core sec<strong>to</strong>r of<br />

the nationalised <strong>in</strong>dustry.<br />

The next year, 1994, was a momen<strong>to</strong>us<br />

one <strong>in</strong> two respects. In the first place the<br />

turn-around occurred, the reversal of fortunes<br />

from a los<strong>in</strong>g <strong>to</strong> a w<strong>in</strong>n<strong>in</strong>g situation, and <strong>in</strong> the<br />

second place the company shares were awarded <strong>to</strong><br />

the bidd<strong>in</strong>g group of Androsch, Dörfl<strong>in</strong>ger and<br />

Zoidl.<br />

By the follow<strong>in</strong>g year, 1995, the AT&S<br />

Group had become one of the large manufacturers<br />

of pr<strong>in</strong>ted circuit boards <strong>in</strong> the world and was<br />

regarded <strong>in</strong> Europe as the technological lea<strong>der</strong>.<br />

All the measures taken by the new owners were<br />

aimed at secur<strong>in</strong>g the new position ga<strong>in</strong>ed. Early<br />

on there was a recognition that the company had<br />

<strong>to</strong> be kept at the forefront of technology, quality<br />

control, delivery and the conservation of the<br />

environment.<br />

Faster, Better, Hi-tech<br />

The f<strong>in</strong>al stage – the merger of the AT&S Group<br />

<strong>in</strong><strong>to</strong> a s<strong>in</strong>gle company – occurred <strong>in</strong> 1996<br />

as a policy move <strong>to</strong> present AT&S Aktiengesellschaft<br />

un<strong>der</strong> a unified name and with a<br />

unified image.<br />

At the time the <strong>in</strong>ternational market was<br />

cry<strong>in</strong>g out for the speedier development of new<br />

Qualität durch beherrschte<br />

Prozesse.<br />

Quality with controlled<br />

processes.<br />

Technisches Know-how und<br />

Technical know-how and<br />

menschliche Sorgfalt<br />

human circumspection<br />

ergänzen e<strong>in</strong>an<strong>der</strong>.<br />

complement one another.


größten <strong>in</strong>dischen Leiterplattenfertigers, Indal<br />

Electronics. Ltd.<br />

Leiterplattenwerk <strong>der</strong> Zukunft<br />

Für Leoben und die angrenzenden Bezirke war<br />

die Entscheidung über den Bau e<strong>in</strong>es neuen<br />

Werkes am Standort Leoben am bedeutsamsten.<br />

Mit e<strong>in</strong>em gesamten Investitionsvolumen <strong>in</strong><br />

<strong>der</strong> Höhe von rund 109 Millionen Euro<br />

(1.500 Millionen Schill<strong>in</strong>g) sollten <strong>in</strong> Leoben II<br />

Zukunftstechnologien umgesetzt und an die<br />

450 neue Arbeitsplätze geschaffen werden.<br />

In unzähligen Arbeitsstunden erstellten die<br />

Techniker unter enormen E<strong>in</strong>satz Term<strong>in</strong>pläne<br />

und Pflichtenhefte. In bee<strong>in</strong>druckend kurzer Zeit<br />

wurde das Produktionsgebäude im wahrsten<br />

S<strong>in</strong>ne des Wortes aus dem Boden gestampft.<br />

Die Installation <strong>der</strong> ersten Masch<strong>in</strong>en startete<br />

term<strong>in</strong>gerecht im November 1999, mit dem<br />

unabd<strong>in</strong>gbaren Ziel im Dezember 1999 mit <strong>der</strong><br />

Produktion zu beg<strong>in</strong>nen und im Jänner 2000 die<br />

ersten Umsätze zu erzielen.<br />

Schon während <strong>der</strong> Bauphase wurden die<br />

ersten Mitarbeiter e<strong>in</strong>gestellt, <strong>in</strong> Leoben I gründlich<br />

geschult und schrittweise mit <strong>der</strong> neuen<br />

Fertigungsanlage vertraut gemacht.<br />

Das mo<strong>der</strong>nste Leiterplattenwerk Europas<br />

g<strong>in</strong>g – unter strikter E<strong>in</strong>haltung von Zeitplänen<br />

und Kosten – nach <strong>der</strong> Rekordbauzeit von rund<br />

10 Monaten <strong>in</strong> Betrieb.<br />

Die wertvollen Erfahrungen, die während des<br />

Baues <strong>in</strong> allen Bereichen gemacht wurden, werden<br />

nun für die weitere Expansion <strong>der</strong> AT&S<br />

genutzt. Im Mai 2001 erfolgte <strong>der</strong> Spatenstich für<br />

den Standort AT&S Ch<strong>in</strong>a <strong>in</strong> Shanghai, <strong>der</strong> e<strong>in</strong>e<br />

Kopie von Leoben II se<strong>in</strong> wird und ebenfalls den<br />

high-tech Leiterplattenbereich am <strong>in</strong>ländischen,<br />

ch<strong>in</strong>esischen Markt beliefern wird.<br />

Er<strong>in</strong>nerungen<br />

aus 20 Jahren<br />

Helmut Zellner, E<strong>in</strong>trittsdatum:<br />

1. Dezember 1982<br />

Was hat sich am meisten geän<strong>der</strong>t?<br />

„Anfangs ist es ke<strong>in</strong> Renommee gewesen, für die<br />

AT&S zu arbeiten, heute hat sich das Image<br />

unseres Unternehmens grundlegend geän<strong>der</strong>t.<br />

Vor allem <strong>in</strong> Leoben und Umgebung hat die<br />

AT&S nun e<strong>in</strong>en positiven Ruf als Arbeitgeber<br />

und High-Tech Konzern.“<br />

Stichwort: Unternehmenskultur<br />

„Zu Beg<strong>in</strong>n gab es ke<strong>in</strong>e AT&S Kultur, son<strong>der</strong>n<br />

nur e<strong>in</strong>e IBM-Kultur. Wir s<strong>in</strong>d ja auch von IBM<br />

20 Jahre AT&S Leoben / 20 Years of AT&S Leoben<br />

technologies (laser drill<strong>in</strong>g, HDI Microvia etc.)<br />

<strong>in</strong> or<strong>der</strong> <strong>to</strong> achieve even f<strong>in</strong>er surface structures<br />

for higher pack<strong>in</strong>g densities. In or<strong>der</strong> <strong>to</strong> avoid a<br />

profits crisis due <strong>to</strong> fall<strong>in</strong>g prices, sales and<br />

output had <strong>to</strong> be <strong>in</strong>creased consi<strong>der</strong>ably.<br />

Build<strong>in</strong>gs, mach<strong>in</strong>es and equipment had <strong>to</strong> be<br />

even better used.<br />

And so <strong>in</strong> 1997 a four-shift system was<br />

<strong>in</strong>troduced, sales activities were <strong>in</strong>creased<br />

and substantial <strong>in</strong>vestments made <strong>in</strong> new technologies.<br />

The Step Up To Global Player<br />

In the Autumn of 1998 events escalated, and<br />

several expansion projects were f<strong>in</strong>ally decided by<br />

AT&S AG simultaneously.<br />

In or<strong>der</strong> <strong>to</strong> strengthen ties with the German<br />

market, particularly with the important bus<strong>in</strong>ess<br />

partner Siemens, the former Siemens circuit<br />

board works ALTEC <strong>in</strong> Augsburg was taken over<br />

– another case of reorganisation. The furthest<br />

step geographically was the purchase of India’s<br />

ma<strong>in</strong> manufacturer of pr<strong>in</strong>ted circuit boards<br />

Indal Electronics Ltd.<br />

A PCB Plant For The Future<br />

For Leoben and the surround<strong>in</strong>g region the<br />

decision <strong>to</strong> build a new plant on the Leoben site<br />

was of great significance. With a <strong>to</strong>tal <strong>in</strong>vestment<br />

volume of about 109 million Euros (1,500 million<br />

Schill<strong>in</strong>gs), future technologies were <strong>to</strong> be<br />

implemented <strong>in</strong> Leoben II and up <strong>to</strong> 450 new<br />

jobs created.<br />

Countless work<strong>in</strong>g hours were spent by the<br />

technicians with enormous commitment<br />

produc<strong>in</strong>g schedules and job descriptions. In an<br />

impressively short time the production build<strong>in</strong>g<br />

was literally stamped out of the ground. The first<br />

mach<strong>in</strong>es were <strong>in</strong>stalled on schedule <strong>in</strong> November<br />

1999 with the absolute aim of start<strong>in</strong>g production<br />

<strong>in</strong> December 1999 and achiev<strong>in</strong>g the first<br />

sales <strong>in</strong> January 2000.<br />

While build<strong>in</strong>g was still un<strong>der</strong>way the first<br />

employees were taken on, given thorough tra<strong>in</strong><strong>in</strong>g<br />

<strong>in</strong> Leoben and gradually made familiar with<br />

the new manufactur<strong>in</strong>g plant.<br />

The most mo<strong>der</strong>n PCB plant <strong>in</strong> Europe<br />

began operations <strong>in</strong> a record time of some<br />

10 months – with strict observance of timetables<br />

and costs.<br />

The valuable experience ga<strong>in</strong>ed dur<strong>in</strong>g the<br />

construction period <strong>in</strong> all parts of the operation<br />

will now be put <strong>to</strong> use <strong>in</strong> AT&S’s further<br />

expansion. In May 2001 the first phase was<br />

begun of AT&S’s Ch<strong>in</strong>a branch <strong>in</strong> Shanghai,<br />

which will be a copy of Leoben II and will likewise<br />

supply high-tech pr<strong>in</strong>ted circuit boards <strong>to</strong><br />

the Ch<strong>in</strong>ese domestic market.<br />

35<br />

439<br />

1.250<br />

1982 1992 2002<br />

1.400<br />

1.200<br />

1.000<br />

800<br />

600<br />

400<br />

200<br />

Abb. 1: Personalentwicklung<br />

1982 – 2002 (AT&S Leoben)<br />

Figure 1: Development<br />

of personnel 1982 – 2002<br />

(AT&S Leoben)<br />

28,3<br />

193<br />

0<br />

1982 1992 2002<br />

0<br />

240<br />

200<br />

160<br />

120<br />

80<br />

40<br />

Abb. 2: Umsatzentwicklung<br />

<strong>in</strong> Mio. Euro (AT&S Leoben)<br />

Figure 2: Development<br />

of sales <strong>in</strong> million Euros<br />

(AT&S Leoben)<br />

0<br />

11


e<strong>in</strong>geschult worden und IBM war ‚unser‘ Kunde.<br />

Es dauerte, bis sich e<strong>in</strong>e geme<strong>in</strong>same AT&S Kultur<br />

aus den verschiedenen Standorten entwickelte.<br />

Vor <strong>der</strong> Entwicklung des ‚AT&S‘ Gefühls<br />

waren die Mentalitätsunterschiede zwischen den<br />

Standorten oft problematisch, es herrschte e<strong>in</strong>e<br />

gewisse Rivalität. Heute hat zwar je<strong>der</strong> Standort<br />

immer noch se<strong>in</strong>e Identität, aber im Vor<strong>der</strong>grund<br />

steht doch das ‚Mite<strong>in</strong>an<strong>der</strong>‘.“<br />

Stichwort: Know-how<br />

„Früher hat man alles Know-how von IBM übernommen,<br />

mit <strong>der</strong> neuen Geschäftsführung 1990<br />

(W. Dörfl<strong>in</strong>ger) hat die AT&S endlich Eigendynamik<br />

bekommen. Es gab e<strong>in</strong> klares Ziel: Die<br />

Spitzenposition zu erreichen. Es war wie die Umrüstung<br />

von e<strong>in</strong>em Segelboot zu e<strong>in</strong>em Mo<strong>to</strong>rboot.“<br />

Stichwort: Kunde<br />

„In <strong>der</strong> AT&S herrschte die E<strong>in</strong>stellung: Es gibt<br />

zwei Kunden und diese Kunden heißen IBM<br />

und <strong>der</strong> freie Markt. Wobei beim freien Markt<br />

ke<strong>in</strong>e großen Unterschiede gemacht wurden.<br />

E<strong>in</strong> Wahns<strong>in</strong>n, wenn man bedenkt, wie viele<br />

verschiedene Kunden und Marktsegemente die<br />

AT&S heute bedient.<br />

Bei den Anfor<strong>der</strong>ungen galt e<strong>in</strong>fach die<br />

Prämisse: Wenn IBM das akzeptiert, dann wird<br />

es dem freien Markt wohl auch genügen.“<br />

Friedrich E<strong>der</strong>, E<strong>in</strong>trittsdatum:<br />

1. Ok<strong>to</strong>ber 1981<br />

„Was sich <strong>in</strong> den 20 Jahren am meisten geän<strong>der</strong>t<br />

hat? Alles! Das E<strong>in</strong>zige, das gleich geblieben ist,<br />

s<strong>in</strong>d die fortlaufenden Än<strong>der</strong>ungen und Anpassungen.<br />

Im Laufe <strong>der</strong> Unternehmensgeschichte<br />

erfolgten Anpassungen <strong>in</strong> <strong>der</strong> Organisationsform,<br />

an den Markt und an die Kundenbedürfnisse“.<br />

Stichwort: Wende<br />

„Die entscheidende Wende erfolgte mit dem<br />

Wechsel <strong>der</strong> Geschäftsführung 1990, erst da<br />

richtete man sich am Kunden aus. Es war sicherlich<br />

nicht e<strong>in</strong>fach den Gedanken <strong>der</strong> Kundenorientierung<br />

<strong>in</strong> den Köpfen <strong>der</strong> Mitarbeiter zu<br />

verankern.“<br />

Stichwort: Arbeitgeber<br />

„Es ist heutzutage ja nicht mehr üblich von <strong>der</strong><br />

‚Wiege bis zur Bahre‘ bei e<strong>in</strong>em Arbeitgeber zu<br />

bleiben. Aber die 20 Dienstjahre bei <strong>der</strong> AT&S<br />

s<strong>in</strong>d wie im Flug vergangen. Es bestand nie die<br />

Notwendigkeit, an<strong>der</strong>swo neue Herausfor<strong>der</strong>ungen<br />

zu suchen, weil es <strong>in</strong>nerhalb <strong>der</strong> AT&S<br />

immer spannend war und immer neue Aufgaben<br />

gestellt wurden.“<br />

12<br />

20 Jahre AT&S Leoben / 20 Years of AT&S Leoben<br />

20 years back <strong>to</strong> m<strong>in</strong>d<br />

Helmut Zellner, start<strong>in</strong>g date:<br />

December 1, 1982<br />

What has changed most?<br />

“At first there was no kudos work<strong>in</strong>g for AT&S,<br />

but <strong>to</strong>day our company’s image is quite different.<br />

In Leoben and the surround<strong>in</strong>g district AT&S<br />

now has an excellent reputation as an employer<br />

and high-tech concern.”<br />

Key phrase: company ethos<br />

“At the beg<strong>in</strong>n<strong>in</strong>g there was no company ethos,<br />

only an IBM ethos. We had been tra<strong>in</strong>ed by IBM<br />

and IBM was ‘our’ client. It lasted until a common<br />

AT&S ethos developed from the various<br />

branches.<br />

Before the ‘AT&S feel<strong>in</strong>g’ developed, the<br />

differences of mentality between the branches<br />

often caused problems and a certa<strong>in</strong> amount of<br />

rivalry. Nowadays each site has reta<strong>in</strong>ed its own<br />

identity, but ‘<strong>to</strong>getherness’ is still the watchword.”<br />

Key word: know-how<br />

“Previously all the know-how was imported from<br />

IBM. When the new management (W. Dörfl<strong>in</strong>ger)<br />

came <strong>in</strong> 1990, AT&S acquired its own<br />

dynamic. There was a clear target: <strong>to</strong> reach the<br />

<strong>to</strong>p spot. It was like convert<strong>in</strong>g a sail<strong>in</strong>g boat <strong>in</strong><strong>to</strong><br />

a mo<strong>to</strong>r cruiser.”<br />

Key word: cus<strong>to</strong>mer<br />

“The way AT&S saw it was that there were two<br />

cus<strong>to</strong>mers, and these cus<strong>to</strong>mers were called IBM<br />

and the free market. Little dist<strong>in</strong>ction was made<br />

with<strong>in</strong> the free market, which was idiotic when<br />

you th<strong>in</strong>k how many different cus<strong>to</strong>mers and<br />

market segments AT&S services these days.<br />

The consensus op<strong>in</strong>ion was that if IBM likes<br />

it, then the rest of the free market will like it <strong>to</strong>o.”<br />

Friedrich E<strong>der</strong>, start<strong>in</strong>g date:<br />

Oc<strong>to</strong>ber 1, 1981<br />

“You ask what has changed most <strong>in</strong> the last 20<br />

years? Well, everyth<strong>in</strong>g has! The only th<strong>in</strong>g that<br />

has stayed the same is the constant changes and<br />

adjustments. Dur<strong>in</strong>g the company’s his<strong>to</strong>ry<br />

changes have occurred <strong>in</strong> the shape of the organisation,<br />

<strong>in</strong> the market and <strong>in</strong> cus<strong>to</strong>mers’ needs.”<br />

Key phrase: turn<strong>in</strong>g po<strong>in</strong>t<br />

“The decisive turn<strong>in</strong>g po<strong>in</strong>t came with the<br />

change of management <strong>in</strong> 1990, when for the<br />

first time the company focussed on the cus<strong>to</strong>mer.<br />

Helmut Zellner:<br />

Es gab e<strong>in</strong> klares Ziel: Die<br />

Spitzenposition zu erreichen.<br />

There was a clear target:<br />

<strong>to</strong> reach the <strong>to</strong>p spot.<br />

Friedrich E<strong>der</strong>:<br />

Innerhalb <strong>der</strong> AT&S war es<br />

immer spannend.<br />

Work<strong>in</strong>g at AT&S has<br />

always been excit<strong>in</strong>g.


Gerhard Erker, E<strong>in</strong>trittsdatum:<br />

1. Ok<strong>to</strong>ber 1982<br />

„Ich me<strong>in</strong>e, dass die Mitarbeiter, die von Anfang<br />

an dabei waren, e<strong>in</strong>e völlig an<strong>der</strong>e E<strong>in</strong>stellung<br />

zum Unternehmen haben, als jene die erst später<br />

hier begonnen haben. Man fühlt nach 20 Jahren<br />

e<strong>in</strong>e größere Verbundenheit mit <strong>der</strong> AT&S, man<br />

idealisiert sie und identifiziert sich.“<br />

Stichwort: Wachstum<br />

„Es ersche<strong>in</strong>t unglaublich, dass die AT&S e<strong>in</strong>mal<br />

nur e<strong>in</strong>e e<strong>in</strong>zige Kostenstelle <strong>der</strong> VOEST war! Ich<br />

er<strong>in</strong>nere mich noch an e<strong>in</strong>en Investitionsantrag <strong>in</strong><br />

<strong>der</strong> Höhe von 72,67 Millionen Euro (1 Milliarde<br />

Schill<strong>in</strong>g).<br />

Früher war das Unternehmen noch familiärer,<br />

wir waren anfangs ja nur ca. 50 Mitarbeiter.<br />

Heute ist das Unternehmen gewaltig gewachsen<br />

und die Atmosphäre mit damals nicht mehr zu<br />

vergleichen. Die AT&S hat den Mitarbeitern aber<br />

immer die Chance gegeben mit zu wachsen, die<br />

galt es nur zu nutzen.“<br />

Stichwort: Werdegang<br />

„Ich habe <strong>in</strong> <strong>der</strong> Produktion, im Bereich Galvanik<br />

(Gold/Kupfer/Entek) begonnen. Wir haben bei<br />

den neuen Masch<strong>in</strong>en selbst die ersten Versuche<br />

gestartet und oft von <strong>der</strong> Früh bis spät <strong>in</strong> die<br />

Nacht h<strong>in</strong>e<strong>in</strong> gearbeitet. Vom Schicht- über<br />

Schulungskoord<strong>in</strong>a<strong>to</strong>r, b<strong>in</strong> ich im Bereich<br />

Controll<strong>in</strong>g/Buchhaltung gelandet. Zuerst lief die<br />

gesamte Verwaltung ja über die VOEST <strong>in</strong><br />

Donawitz/Seegraben. Wir haben uns viel selbst<br />

erarbeiten müssen. Die erste e<strong>in</strong>gelangte Rechnung<br />

wurde am 1. April 1989 auf unser eigenes<br />

EDV-Rechnungssystem ‚Profid‘ gebucht.“<br />

Wadie Gayed, E<strong>in</strong>trittsdatum: 1. Mai 1982<br />

„Als E<strong>in</strong>ziger <strong>der</strong> ‚20jährigen Garde‘ habe ich<br />

noch immer den selben Verantwortungsbereich<br />

wie zu me<strong>in</strong>em Dienstantritt, nämlich das Qualitätsmanagement.<br />

Sonst ist gar nichts gleich<br />

geblieben.“<br />

Stichwort: Verän<strong>der</strong>ung<br />

„Grundlegend hat sich – Gott sei Dank – die<br />

E<strong>in</strong>stellung zur ‚Produktqualität‘ geän<strong>der</strong>t. Unter<br />

<strong>der</strong> Unternehmensleitung 1982–1989 zählte nur<br />

die Stückzahl.“<br />

Stichwort: Geflügelte Worte<br />

Dialog: „Unser Yield ist unter 50%, wir verbrauchen<br />

zu viel Vormaterial.“(E<strong>in</strong>käufer) –<br />

„Dann bestellen Sie halt das doppelte Material!“<br />

(Geschäftsführung <strong>in</strong> den 80ern)<br />

20 Jahre AT&S Leoben / 20 Years of AT&S Leoben<br />

It was certa<strong>in</strong>ly not easy <strong>to</strong> sow the idea of<br />

cus<strong>to</strong>mer orientation <strong>in</strong> employees’ m<strong>in</strong>ds.”<br />

Key word: employer<br />

“Nowadays it’s no longer normal <strong>to</strong> rema<strong>in</strong> with<br />

the same employer ‘from the cradle <strong>to</strong> the grave’.<br />

But the 20 years which I’ve spent work<strong>in</strong>g for<br />

AT&S have simply flown by. I’ve never felt the<br />

need <strong>to</strong> look for new opportunities elsewhere,<br />

s<strong>in</strong>ce work<strong>in</strong>g at AT&S has always been excit<strong>in</strong>g<br />

and challeng<strong>in</strong>g.”<br />

Gerhard Erker, start<strong>in</strong>g date:<br />

Oc<strong>to</strong>ber 1, 1982<br />

“I th<strong>in</strong>k that those employees who were here<br />

from the start have a completely different attitude<br />

<strong>to</strong>wards the company from those who started<br />

here later. After 20 years you feel a closer relationship<br />

with AT&S – you idealise it and it becomes<br />

part of your identity.”<br />

Key word: growth<br />

“It seems <strong>in</strong>credible that AT&S was once just a<br />

cost centre of VOEST! I can still remember an<br />

<strong>in</strong>vestment of 72.67 million Euros (1 billion<br />

Schill<strong>in</strong>gs).<br />

In the early days the company was much<br />

more personal – we started with about 50 employees.<br />

Today the company has grown hugely,<br />

and you can no longer compare the present<br />

atmosphere with what it once was. AT&S has<br />

always given its employees the chance <strong>to</strong> grow<br />

with it – it’s up <strong>to</strong> you <strong>to</strong> grasp that chance.”<br />

Key phrase: career development<br />

“I began <strong>in</strong> the Production Division, <strong>in</strong> the<br />

electroplat<strong>in</strong>g shop (gold/copper/Entek). We<br />

tested the new mach<strong>in</strong>es ourselves and often<br />

worked from early <strong>in</strong> the morn<strong>in</strong>g till late at<br />

night. From shift coord<strong>in</strong>a<strong>to</strong>r via tra<strong>in</strong><strong>in</strong>g<br />

coord<strong>in</strong>a<strong>to</strong>r I landed up <strong>in</strong> cost<strong>in</strong>g and bookkeep<strong>in</strong>g.<br />

At first the adm<strong>in</strong>istration was run by<br />

VOEST <strong>in</strong> Donawitz/Seegraben. We had <strong>to</strong><br />

work out a lot of it ourselves. The first <strong>in</strong>voice<br />

received was entered <strong>in</strong> the books on April 1,<br />

1989 on our own EDP account<strong>in</strong>g system<br />

‘Profid’.”<br />

Wadie Gayed, start<strong>in</strong>g date:<br />

May 1, 1982<br />

“As the only one of the ‘20-year-old guard’ I still<br />

have the same responsibilities as when I jo<strong>in</strong>ed<br />

the company, namely quality management. Apart<br />

from that noth<strong>in</strong>g has stayed the same.”<br />

Gerhard Erker:<br />

Es ersche<strong>in</strong>t unglaublich,<br />

dass die AT&S e<strong>in</strong>mal nur<br />

e<strong>in</strong>e e<strong>in</strong>zige Kostenstelle <strong>der</strong><br />

VOEST war!<br />

It seems <strong>in</strong>credible that<br />

AT&S was once just a cost<br />

centre of VOEST!<br />

Wadie Gayed:<br />

Qualität und Lieferperformance<br />

s<strong>in</strong>d heilig.<br />

Quality and supply<br />

performance are sacrosanct.<br />

13


Stichwort: Qualifizierte Prozesse<br />

„Die Produktion war für die Qualität nicht direkt<br />

verantwortlich, sie sollte Mengen produzieren.<br />

Und was produziert wurde war meist nicht<br />

e<strong>in</strong>wandfrei, deshalb wurden manche Aufträge bis<br />

zu 15mal im F<strong>in</strong>al Inspect von <strong>der</strong> Qualitätskontrolle<br />

zurückgewiesen. Die AT&S war letztendlich<br />

als ‚Meister <strong>der</strong> Nacharbeit‘ berühmt.<br />

Wir steckten ungeheuer viel Energie und<br />

Kreativität <strong>in</strong> Entwicklung neuer Methoden zur<br />

Fehlerbehebung, anstatt dass wir uns auf die<br />

Prozessverbesserung bzw. die Beseitigung <strong>der</strong><br />

Fehlerursachen konzentriert hätten.<br />

Prozesse, die wegen e<strong>in</strong>es schlechten Yields<br />

(30%–50%) gesperrt wurden, wurden von <strong>der</strong><br />

Geschäftsführung freigegeben, um ‚liefern‘ zu<br />

können.“<br />

Stichwort: Neuausrichtung<br />

„Für mich war das Wichtigste, dass die neue<br />

Geschäftsführung une<strong>in</strong>geschränkt zur Produktqualität<br />

stand. Der Yield wurde jährlich erhöht,<br />

Schrott und Nacharbeit wurden m<strong>in</strong>imiert (jede<br />

Nacharbeit musste von <strong>der</strong> Geschäftsführung<br />

persönlich genehmigt werden) und die Lieferperformance<br />

war ‚heilig‘. Unter dem ersten<br />

Geschäftsführer und se<strong>in</strong>em Nachfolger haben<br />

sich Lieferterm<strong>in</strong>e oft bis zu drei Monaten nach<br />

h<strong>in</strong>ten verschoben. Mit Dörfl<strong>in</strong>ger hat sich das<br />

1990 grundlegend geän<strong>der</strong>t. Nicht zu vergessen:<br />

Die verschiedenen Verantwortlichkeiten wurden<br />

richtig zugeordnet.“<br />

Karl Gutsche, E<strong>in</strong>trittsdatum:<br />

8. Februar 1982 (1986)<br />

„Ich kam nicht direkt zur AT&S <strong>in</strong> Leoben,<br />

son<strong>der</strong>n über den Umweg Engerwitzdorf<br />

(20 km nördlich von L<strong>in</strong>z), sodass me<strong>in</strong>e<br />

eigentliche Zeit <strong>in</strong> Leoben erst im Jahre 1986<br />

begann. Engerwitzdorf war e<strong>in</strong> Schwesternwerk<br />

<strong>der</strong> AT&S Leoben und produzierte für die IBM<br />

Teilprozesse für die Chip-Herstellung. Dieses<br />

Werk wurde im Laufe <strong>der</strong> Zeit ebenfalls ausgeglie<strong>der</strong>t<br />

und privatisiert.“<br />

„Es ist schon e<strong>in</strong>e großartige Sache mitzuerleben,<br />

wie aus e<strong>in</strong>er kle<strong>in</strong>en Kostenstelle von <strong>der</strong><br />

VOEST-Alp<strong>in</strong>e e<strong>in</strong> selbständiges Unternehmen<br />

wird, wobei sich das Wachstum nicht alle<strong>in</strong>e nur<br />

auf e<strong>in</strong>en Standort bezieht, son<strong>der</strong>n noch vier<br />

Werke h<strong>in</strong>zukamen.“<br />

„Es gab natürlich nicht nur e<strong>in</strong> bergauf,<br />

son<strong>der</strong>n es kam – bed<strong>in</strong>gt durch die <strong>in</strong>ternationale<br />

Marktsituation – auch zu ‚Durststrecken‘<br />

im Unternehmen. Auch solche Erfahrungen<br />

gehören <strong>in</strong> <strong>der</strong> langen Zeit <strong>der</strong> Betriebsangehörigkeit<br />

dazu.“<br />

14<br />

20 Jahre AT&S Leoben / 20 Years of AT&S Leoben<br />

Key word: change<br />

“Basically the attitude <strong>to</strong>wards quality of product<br />

has changed, thank goodness. Un<strong>der</strong> the management<br />

<strong>in</strong> control between 1982 and 1989 it was<br />

only quantity that counted.”<br />

Key word: quotation<br />

Dialogue: “Our yield is less than 50%, we are<br />

us<strong>in</strong>g <strong>to</strong>o much <strong>in</strong>put material.”(Buyer) –<br />

“Or<strong>der</strong> twice as much then!” (Management <strong>in</strong> the<br />

eighties).<br />

Key phrase: qualified processes<br />

“The Production Division was not directly<br />

responsible for quality – its job was <strong>to</strong> produce <strong>in</strong><br />

quantity. And what was produced was mostly<br />

faulty, and therefore a lot of or<strong>der</strong>s were rejected<br />

by quality control as many as 15 times <strong>in</strong> the f<strong>in</strong>al<br />

<strong>in</strong>spection process. AT&S were no<strong>to</strong>rious as<br />

‘masters of ref<strong>in</strong>ish<strong>in</strong>g’. We <strong>in</strong>vested huge<br />

amounts of energy and creativity develop<strong>in</strong>g new<br />

methods of troubleshoot<strong>in</strong>g <strong>in</strong>stead of concentrat<strong>in</strong>g<br />

on improv<strong>in</strong>g our processes and remov<strong>in</strong>g<br />

the causes of the problems.<br />

Processes which had been blocked because of<br />

poor yield (30%–50%) were released by the<br />

management so that they could ‘deliver’.”<br />

Key phrase: new direction<br />

As far as I was concerned the most important<br />

po<strong>in</strong>t was that the new bosses were unequivocally<br />

<strong>in</strong> favour of product quality. The yield rose year<br />

by year, and waste and ref<strong>in</strong>ish<strong>in</strong>g were m<strong>in</strong>imised<br />

(any ref<strong>in</strong>ish<strong>in</strong>g had <strong>to</strong> be personally<br />

approved by one of the senior executives), and<br />

supply performance was sacrosanct. Un<strong>der</strong> the<br />

first Manag<strong>in</strong>g Direc<strong>to</strong>r and his successor delivery<br />

dates were often up <strong>to</strong> three months late. Dörfl<strong>in</strong>ger<br />

changed all this <strong>in</strong> 1990. Another po<strong>in</strong>t<br />

worth remember<strong>in</strong>g is that all the various responsibilities<br />

were allocated correctly.<br />

Karl Gutsche, start<strong>in</strong>g date:<br />

February 8, 1982 (1986)<br />

“I didn’t come <strong>in</strong><strong>to</strong> AT&S <strong>in</strong> Leoben directly but<br />

via Engerwitzdorf (20 km north of L<strong>in</strong>z), and so<br />

my actual service <strong>in</strong> Leoben didn’t start until<br />

1986. Engerwitzdorf was a subsidiary of AT&S<br />

Leoben and produced part-processes for chip<br />

manufacture for IBM. In the course of time these<br />

works were dis<strong>in</strong>corporated and privatised.”<br />

“It was a marvellous experience <strong>to</strong> see an<br />

<strong>in</strong>dependent company emerg<strong>in</strong>g from VOEST-<br />

Alp<strong>in</strong>e’s t<strong>in</strong>y cost centre, a development which<br />

<strong>in</strong>cluded not just one site, but four more fac<strong>to</strong>ries<br />

as well.”<br />

Karl Gutsche<br />

Die AT&S hat sich zu e<strong>in</strong>em<br />

sicheren Arbeitgeber <strong>in</strong><br />

unserer Region entwickelt.<br />

AT&S has developed <strong>in</strong><strong>to</strong><br />

a secure employer for our<br />

region.<br />

Gottfried Weiss<br />

Der technologische Werdegang<br />

<strong>der</strong> Leiterplatte war<br />

unheimlich <strong>in</strong>teressant zu<br />

beobachten.<br />

The technological development<br />

of the pr<strong>in</strong>ted circuit<br />

board has been <strong>in</strong>credibly<br />

<strong>in</strong>terest<strong>in</strong>g <strong>to</strong> observe.


„Insgesamt gesehen hat sich die AT&S zu<br />

e<strong>in</strong>em sicheren Arbeitgeber <strong>in</strong> unserer Region<br />

entwickelt.“<br />

Gottfried Weiss, E<strong>in</strong>trittsdatum:<br />

20. Dezember 1982<br />

„Ich habe <strong>in</strong> <strong>der</strong> Abteilung Galvanik begonnen,<br />

b<strong>in</strong> dann <strong>in</strong> die mechanische Fertigung/Bereich<br />

Fräsen gewechselt und seit zwei Jahren Vorarbeiter<br />

<strong>in</strong> <strong>der</strong> mechanischen Fertigung. Die AT&S ist<br />

mir <strong>in</strong> dieser Zeit wirklich vertraut geworden, da<br />

ich alle wirtschaftlichen Höhen und Tiefen<br />

miterlebt habe.“<br />

„Gleich geblieben ist eigentlich gar nichts.<br />

Das Unternehmen ist unglaublich gewachsen, <strong>der</strong><br />

technologische Werdegang <strong>der</strong> Leiterplatte war<br />

unheimlich <strong>in</strong>teressant zu beobachten und die<br />

Arbeitsbed<strong>in</strong>gungen haben sich natürlich auch<br />

verän<strong>der</strong>t. Durch die Au<strong>to</strong>matisierung ist vieles<br />

erleichtert worden. Beim Kupferau<strong>to</strong>maten<br />

beispielsweise haben wir die Bä<strong>der</strong> noch händisch<br />

gemischt – heute gibt es die Dosierleitungen.“<br />

Anita Lang, E<strong>in</strong>trittsdatum:<br />

20. Dezember 1982<br />

„Ich b<strong>in</strong> von Beg<strong>in</strong>n an – früher noch im<br />

2-Schichtbetrieb – im Fo<strong>to</strong>bereich tätig. Früher<br />

habe ich noch alle Kolleg<strong>in</strong>nen und Kollegen<br />

gekannt, aber durch das enorme Wachstum <strong>der</strong><br />

Firma ist das heute nicht mehr möglich.“<br />

„Die AT&S war immer e<strong>in</strong> fairer Arbeitgeber<br />

für die Frauen <strong>in</strong> <strong>der</strong> Region. Der Verdienst ist<br />

gut, durch den Schichtbetrieb kann man sich die<br />

Freizeit genau e<strong>in</strong>teilen und das Arbeitsklima ist<br />

auch immer angenehm gewesen.“<br />

Gerhard Freydl, E<strong>in</strong>trittsdatum: 13. April 1982<br />

Stichwort: Arbeitgeber<br />

„Für die AT&S zu arbeiten bedeutet nicht nur<br />

‚se<strong>in</strong>en Job zu machen‘ son<strong>der</strong>n, sich ständig<br />

weiter zu entwickeln. Das Unternehmen entwickelt<br />

sich weiter und for<strong>der</strong>t von jedem, sich<br />

mit neuen Situationen ause<strong>in</strong>an<strong>der</strong> zu setzen und<br />

diese zu bewältigen.“<br />

Stichwort: Meilenste<strong>in</strong><br />

„Der Bau von Werk II am Standort Leoben war<br />

sicherlich e<strong>in</strong>zigartig <strong>in</strong> <strong>der</strong> bisherigen Geschichte<br />

<strong>der</strong> AT&S. Mit <strong>der</strong> Vollendung hat die AT&S<br />

bewiesen, dass sie <strong>in</strong> <strong>der</strong> Lage ist, Projekte je<strong>der</strong><br />

Größenordnung – unter präziser E<strong>in</strong>haltung <strong>der</strong><br />

Zeit- und Kostenpläne – abzuwickeln.“<br />

20 Jahre AT&S Leoben / 20 Years of AT&S Leoben<br />

“Of course it was not all uphill. The situation<br />

on the <strong>in</strong>ternational market brought hard times<br />

<strong>to</strong> the company <strong>to</strong>o. Such experiences are also<br />

part and parcel of my long years of service with<br />

the company.”<br />

“When all’s said and done, AT&S has developed<br />

<strong>in</strong><strong>to</strong> a secure employer for our region.”<br />

Gottfried Weiss, start<strong>in</strong>g date:<br />

December 20, 1982<br />

“I began <strong>in</strong> electroplat<strong>in</strong>g, then changed <strong>to</strong><br />

mechanical f<strong>in</strong>ish<strong>in</strong>g/mill<strong>in</strong>g, and for two years<br />

have been a foreman <strong>in</strong> the mechanical f<strong>in</strong>ish<strong>in</strong>g<br />

department. Dur<strong>in</strong>g this time AT&S has become<br />

particularly dear <strong>to</strong> me, s<strong>in</strong>ce I have shared all its<br />

ups and downs as a bus<strong>in</strong>ess.”<br />

“Noth<strong>in</strong>g has stayed the same, <strong>in</strong> fact. The<br />

company has experienced unbelievable growth,<br />

the technological development of the pr<strong>in</strong>ted<br />

circuit board has been <strong>in</strong>credibly <strong>in</strong>terest<strong>in</strong>g <strong>to</strong><br />

observe, and work<strong>in</strong>g conditions have naturally<br />

changed as well. Au<strong>to</strong>misation has made th<strong>in</strong>gs a<br />

lot easier. For example <strong>in</strong> the copper process we<br />

used <strong>to</strong> mix the baths by hand, now we have<br />

au<strong>to</strong>matic feed l<strong>in</strong>es.”<br />

Anita Lang, start<strong>in</strong>g date: December 20, 1982<br />

“I’ve been <strong>in</strong> the pho<strong>to</strong> section from the start –<br />

we still worked a 2-shift system <strong>in</strong> the early days.<br />

I used <strong>to</strong> know all my fellow employees, but that’s<br />

not possible these days after the firm’s enormous<br />

growth.”<br />

“AT&S has always been a fair employer for<br />

the women of the region. Earn<strong>in</strong>gs are good, the<br />

shift system enables you <strong>to</strong> arrange your free time<br />

as you want it, and the work<strong>in</strong>g atmosphere has<br />

always been extremely pleasant.”<br />

Gerhard Freydl, start<strong>in</strong>g date: 13th April 1982<br />

Key word: employer<br />

“Work<strong>in</strong>g for AT&S means not only ‘do<strong>in</strong>g your<br />

job’ but also develop<strong>in</strong>g personally on a permanent<br />

basis. As the company itself develops, it asks<br />

everybody <strong>to</strong> adapt <strong>to</strong> new situations and <strong>to</strong><br />

master them.”<br />

Key word: miles<strong>to</strong>ne<br />

“The construction of plant II at Leoben was a<br />

unique event <strong>in</strong> AT&S’s his<strong>to</strong>ry. Its completion<br />

proved that AT&S is able <strong>to</strong> implement projects<br />

of any size – at the same time keep<strong>in</strong>g precisely <strong>to</strong><br />

scheduled times and costs.”<br />

Anita Lang:<br />

Die AT&S war immer e<strong>in</strong><br />

fairer Arbeitgeber für die<br />

Frauen.<br />

AT&S has always been a<br />

fair employer for the women.<br />

Gerhard Freydl:<br />

Für die AT&S zu arbeiten<br />

bedeutet nicht nur ‚se<strong>in</strong>en<br />

Job zu machen‘.<br />

Work<strong>in</strong>g for AT&S means<br />

not only ‘do<strong>in</strong>g your job’.<br />

15


Neues<br />

aus den Werken<br />

News from the plants<br />

AT&S Fehr<strong>in</strong>g weiter<br />

ausgebaut – Kapazität<br />

um 20% erhöht<br />

Klaus Konrad<br />

Innerhalb von knapp drei Wochen wurde <strong>der</strong><br />

Engpass Galvanik entschärft und die Anwendung<br />

<strong>der</strong> Tent<strong>in</strong>g-Technologie am Standort erweitert.<br />

Durch den Umbau des Galvanikbereiches<br />

gelang es dem Standort Fehr<strong>in</strong>g e<strong>in</strong>e Kapazitätserhöhung<br />

von 20% im Bereich <strong>der</strong> durchkontaktierten<br />

Leiterplatte (DK) zu erzielen. Mit <strong>der</strong><br />

Inbetriebnahme <strong>der</strong> neuen Horizontal-L<strong>in</strong>ien<br />

steigert sich die Wochenkapazität von 5.000 m 2<br />

DK auf 6.000 m 2 durchkontaktierte Leiterplatten!<br />

Die AT&S Fehr<strong>in</strong>g beliefert mit ihren Produkten<br />

vorwiegend die Au<strong>to</strong>mobil<strong>in</strong>dustrie, für <strong>der</strong>en<br />

<strong>der</strong>zeitigen Boom <strong>der</strong> Ausbau <strong>in</strong> <strong>der</strong> Hauptsache<br />

auch getätigt wurde. Insgesamt betrug des<br />

Investitionsvolumen rund 2 Millionen Euro.<br />

Umbau <strong>in</strong> Rekordzeit<br />

Aufgrund <strong>der</strong> umbaubed<strong>in</strong>gten Kapazitätsm<strong>in</strong><strong>der</strong>ung<br />

von 50% wurde das Projekt <strong>in</strong>nerhalb<br />

kürzester Zeit abgeschlossen. Den externen und<br />

<strong>in</strong>ternen Projektbeteiligten gelang die Fertigstellung<br />

<strong>in</strong> <strong>der</strong> kurzen Montagezeit von zwei<br />

Wochen und e<strong>in</strong>er Qualifikations- und Inbetriebnahmezeit<br />

von drei bis vier Tagen.<br />

Um möglichst wenig Zeit bei <strong>der</strong> Qualifikation<br />

zu verlieren, wurden <strong>in</strong> Zusammenarbeit<br />

mit den Kollegen <strong>in</strong> Leoben die Durchkontaktierungsprozesse<br />

Compact CP/Seleo und<br />

Neopact <strong>in</strong> Komb<strong>in</strong>ation mit dem Inpulsesystem<br />

vorab qualifiziert.<br />

Vorbereitende Prozessverbesserungen<br />

Im Vorfeld des Projektes wurden bereits zahlreiche<br />

Prozesse optimiert und Investitionen <strong>in</strong> neue<br />

16<br />

AT&S Standorte / AT&S plants<br />

AT&S Fehr<strong>in</strong>g further<br />

expanded – output<br />

<strong>in</strong>creased by 20%<br />

Klaus Konrad<br />

Electro-plat<strong>in</strong>g section bottleneck cleared <strong>in</strong> just<br />

three weeks and tent<strong>in</strong>g technology application<br />

extended.<br />

By rebuild<strong>in</strong>g the electro-plat<strong>in</strong>g section,<br />

the Fehr<strong>in</strong>g plant has succeeded <strong>in</strong> <strong>in</strong>creas<strong>in</strong>g<br />

output by 20% <strong>in</strong> through-contact pr<strong>in</strong>ted<br />

circuit boards. With commission<strong>in</strong>g of the new<br />

horizontal [assembly] l<strong>in</strong>es, weekly output of<br />

through-contact pr<strong>in</strong>ted circuit boards has<br />

risen from 5,000 m 2 <strong>to</strong> 6,000 m 2 ! AT&S<br />

Fehr<strong>in</strong>g ma<strong>in</strong>ly supplies the car <strong>in</strong>dustry,<br />

whose current boom was the ma<strong>in</strong> reason for<br />

Klaus Konrad, Abteilungsleiter<br />

Galvanik, AT&S Fehr<strong>in</strong>g<br />

Klaus Konrad, Head of the<br />

Department Plat<strong>in</strong>g, AT&S Fehr<strong>in</strong>g


Ausstattung getätigt. Beispielsweise wurden die<br />

Ätzkapazitäten durch die Anschaffung e<strong>in</strong>er<br />

neuen sauren Ätzl<strong>in</strong>ie und die Durchlaufgeschw<strong>in</strong>digkeiten<br />

bei den Durchkontaktierungsprozessen<br />

erhöht sowie die Abläufe im Fo<strong>to</strong>bereich<br />

perfektioniert.<br />

Danksagung<br />

Betreut wurde das gesamte Projekt von Herrn<br />

Erw<strong>in</strong> Reis<strong>in</strong>ger, <strong>der</strong> als Prozesstechniker für den<br />

Bereich Durchkontaktieren und Kupfervorverstärkung<br />

zuständig ist.<br />

Für die Umsetzung dieses Projektes, das<br />

plangemäß über die Bühne lief, möchten wir uns<br />

auf diesem Weg für die Zusammenarbeit mit <strong>der</strong><br />

Fa. ATOtech, <strong>in</strong>sbeson<strong>der</strong>e für den reibungslosen<br />

Montagee<strong>in</strong>satz unter <strong>der</strong> Leitung von Herrn Paul<br />

Ruh, bedanken. Weiters auch bei den Mitarbeitern,<br />

die aufgrund ihrer Flexibilität <strong>in</strong> <strong>der</strong> Arbeitszeit<br />

e<strong>in</strong>en großen Beitrag dazu geleistet haben.<br />

AT&S Fohnsdorf 2001 –<br />

E<strong>in</strong> turbulentes Jahr<br />

Das Team<br />

Das abgelaufene Geschäftsjahr war aufgrund <strong>der</strong><br />

wirtschaftlich angespannten Sitaution auch für<br />

Fohnsdorf sehr turbulent. Dies führte zu<br />

verschiedenen Zeitpunkten wie<strong>der</strong>holt zu Spannungen<br />

am Standort, welche zusätzlich durch<br />

personelle Verän<strong>der</strong>ungen <strong>in</strong> e<strong>in</strong>igen Bereichen<br />

verstärkt wurden.<br />

AT&S Standorte / AT&S plants<br />

the expansion. Total <strong>in</strong>vestment was about<br />

2 million Euros.<br />

Conversion <strong>in</strong> record time<br />

Because of the 50% reduction <strong>in</strong> output<br />

caused by the conversion work, the project was<br />

completed rapidly. Those <strong>in</strong>volved <strong>in</strong>-house<br />

and externally managed <strong>to</strong> complete the project<br />

<strong>in</strong> a short <strong>in</strong>stallation time of two weeks,<br />

with three <strong>to</strong> four days of quality test<strong>in</strong>g and<br />

commission<strong>in</strong>g.<br />

In or<strong>der</strong> <strong>to</strong> spend as little time as possible on<br />

quality test<strong>in</strong>g, the Compact CP/Seleo and<br />

Neopact through-contact process comb<strong>in</strong>ed with<br />

the ‘Inpulse’ system was tested <strong>in</strong> advance with<br />

the help of our colleagues from Leoben.<br />

Improvements <strong>in</strong> the preparation processes<br />

Many processes were optimised and <strong>in</strong>vestments<br />

<strong>in</strong> new equipment made <strong>in</strong> prepar<strong>in</strong>g this<br />

project. For example, etch<strong>in</strong>g capacity was<br />

<strong>in</strong>creased by acquir<strong>in</strong>g a new acid etch l<strong>in</strong>e, the<br />

speed of through-contact processes was <strong>in</strong>creased,<br />

and the pho<strong>to</strong>graphic division processes<br />

perfected.<br />

Thanks<br />

The whole project was led by Erw<strong>in</strong> Reis<strong>in</strong>ger<br />

who, as process eng<strong>in</strong>eer, is responsible for the<br />

through-contact and copper pre-re<strong>in</strong>forcement<br />

divisions.<br />

We would like <strong>to</strong> take this opportunity <strong>to</strong><br />

express our thanks for the completion of this<br />

project on schedule, and for the co-operation<br />

with ATOtech, <strong>in</strong> particular for the smooth<br />

assembly work headed by Paul Ruh. Thanks go<br />

Projektleiter Erw<strong>in</strong> Reis<strong>in</strong>ger<br />

Projectlea<strong>der</strong> Erw<strong>in</strong> Reis<strong>in</strong>ger<br />

Umbau <strong>der</strong> DK-L<strong>in</strong>ien<br />

SeleoCP Cu6 und Neopact Cu6<br />

Conversion of the SeleoCP<br />

Cu6 and Neopact Cu6 PCB<br />

assembly l<strong>in</strong>es.<br />

17


Unbeachtet dieser Störfak<strong>to</strong>ren konnten durch<br />

die konstruktive Zusammenarbeit aller Abteilungen,<br />

jedoch etliche, für die Zukunft wichtige,<br />

Verän<strong>der</strong>ungen und Verbesserungen e<strong>in</strong>geleitet<br />

und zum Teil auch schon umgesetzt werden.<br />

Aufbruch <strong>in</strong> Neue Technologien<br />

Immerh<strong>in</strong> wurden <strong>in</strong> den ersten drei Quartalen<br />

2001/2002 rd. 30% des Umsatzes mit neuen<br />

Technologien wie HDI-Microvias, HDI <strong>in</strong><br />

Komb<strong>in</strong>ation mit Buried Vias, sowie Produkten<br />

mit Hochfrequenzmaterialien wie Arlon und<br />

Rogers erzielt.<br />

Die Anwendung dieser Technologien war vor<br />

allem <strong>in</strong> den Bereichen Mobile Phone und Base<br />

Station. Weiters wurden neue Technolgien wie<br />

Differentielle Impedanzen, Halogenreduzierte<br />

Basismaterialien, komb<strong>in</strong>iertes Oberflächenf<strong>in</strong>ish<br />

chem. Sn und galv. Ni/Au und sogenannte<br />

Hybridaufbauten – z.B. FR4 mit Arlon o<strong>der</strong><br />

Rogers – qualifiziert und stehen nun für die<br />

Umsetzung <strong>in</strong> <strong>der</strong> Serienfertigung bereit.<br />

Service is our Success<br />

Lieferzeiten s<strong>in</strong>d nicht nur <strong>in</strong> <strong>der</strong> Großserienfertigung,<br />

son<strong>der</strong>n vor allem im Pro<strong>to</strong>typengeschäft<br />

e<strong>in</strong> aktuelles Thema. Die For<strong>der</strong>ungen unserer<br />

Kunden werden diesbezüglich immer anspruchsvoller<br />

d.h. Lieferzeiten von 4 bis 5 Tagen selbst<br />

für hochkomplexe Produkte wie 10-Lagen Multilayer<br />

mit Core-Laser Technologie und kontrollierten<br />

Impedanzen s<strong>in</strong>d <strong>der</strong>zeit gefor<strong>der</strong>t. Um<br />

diesen Ansprüchen gerrecht werden zu können<br />

wurde unter an<strong>der</strong>em <strong>der</strong> Logistik-Bereich auf<br />

4-Schicht umgestellt und <strong>in</strong> den Abteilungen PE<br />

& CAM e<strong>in</strong> 24-Stunden Bereitschaftsdienst<br />

e<strong>in</strong>geführt. Die Umstellung weiterer Abteilungen<br />

auf 19-Schichten Verfügbarkeit ist <strong>der</strong>zeit <strong>in</strong><br />

Vorbereitung. Aktuell konnten durch die bereits<br />

umgesetzten Maßnahmen die Lieferzeiten für<br />

18<br />

AT&S Standorte / AT&S plants<br />

also <strong>to</strong> colleagues who by be<strong>in</strong>g flexible <strong>in</strong> their<br />

work<strong>in</strong>g schedules made a big contribution.<br />

AT&S Fohnsdorf 2001 –<br />

A Turbulent Year<br />

The team<br />

The past f<strong>in</strong>ancial year has been a turbulent one<br />

for Fohnsdorf due <strong>to</strong> the critical economic situation.<br />

This has led <strong>to</strong> repeated periods of tension<br />

on the site at various times which have been<br />

aggravated by changes of personnel <strong>in</strong> some of<br />

the areas.<br />

Nevertheless, despite these disturb<strong>in</strong>g fac<strong>to</strong>rs<br />

it has been possible <strong>to</strong> <strong>in</strong>troduce several changes<br />

and improvements which are important for the<br />

future, some of which have even been implemented,<br />

thanks <strong>to</strong> the constructive cooperation of<br />

all our departments.<br />

Breakthroughs <strong>in</strong> new technologies<br />

All the same <strong>in</strong> the first three quarters of<br />

2001/2002 around 30% of the turnover has<br />

<strong>in</strong>volved new technologies such as HDI<br />

Microvias, HDI <strong>in</strong> comb<strong>in</strong>ation with Buried Vias<br />

and products with high-frequency materials such<br />

as Arlon and Rogers.<br />

These technologies were mostly evident <strong>in</strong> the<br />

mobile phone and base station areas. In addition<br />

new technologies such as differential impedances,<br />

halogen-reduced base materials, a comb<strong>in</strong>ed<br />

surface f<strong>in</strong>ish with chemical Sn and galvanised<br />

Ni/Au and so-called hybrid structures – e.g. FR4<br />

with Arlon or Rogers – have been <strong>in</strong>troduced and<br />

are now ready for series production.<br />

Service is our Success<br />

Delivery times are a current <strong>to</strong>pic of discussion<br />

not only <strong>in</strong> large-scale production plants but also<br />

<strong>in</strong> the development of pro<strong>to</strong>types. Our cus<strong>to</strong>mers’<br />

requirements are becom<strong>in</strong>g more and<br />

more demand<strong>in</strong>g <strong>in</strong> this respect, i.e. current<br />

delivery times of 4 <strong>to</strong> 5 days, even for such highly<br />

complex products as 10 layers multilayer with<br />

core-laser technology and controlled impedances.<br />

In or<strong>der</strong> <strong>to</strong> be able <strong>to</strong> meet these demands Logistics<br />

was placed on a 4-shift system, and a 24-hour<br />

emergency service was <strong>in</strong>troduced <strong>in</strong> the PE and<br />

CAM departments. Plans are currently un<strong>der</strong>way<br />

for mak<strong>in</strong>g other departments available on a 19shift<br />

basis. At the present moment the measures<br />

already <strong>in</strong>troduced have enabled delivery times<br />

for 4- and 6-layer circuit boards <strong>to</strong> be reduced <strong>to</strong><br />

3 days, for 8-layered boards <strong>to</strong> 4 days, and for<br />

boards with from 10 <strong>to</strong> 16 layers <strong>to</strong> 5 days.<br />

Das neue Werk wächst<br />

zusehends.<br />

The new plant is grow<strong>in</strong>g<br />

visibly.


Laserplatten bei 4 und 6 Lagen auf 3 Tage, bei<br />

8 Lagen auf 4 Tage und bei Platten von 10 bis<br />

16 Lagen auf 5 Tage reduziert werden.<br />

Die Komb<strong>in</strong>ation von Neuen Technologien<br />

und deutlich verbesserten Lieferzeiten s<strong>in</strong>d zwar<br />

ke<strong>in</strong>e Garantie für die Zukunft, werden uns aber<br />

helfen sie wesentlich abgesicherter zu gestalten.<br />

AT&S Ch<strong>in</strong>a<br />

Baufortschritt<br />

Seit dem Spatenstich im Mai 2001 liegen aufregende<br />

und geschäftige Monate h<strong>in</strong>ter dem Team<br />

des AT&S Ch<strong>in</strong>a Projektes. Der Bau des Werkes<br />

schreitet zügig voran und spätestens im Mai 2002<br />

ist die Fertigstellung <strong>der</strong> Dachkonstruktion<br />

geplant. In den folgenden zwei Monaten werden<br />

dann die verschiedenen Installationen und die<br />

Fe<strong>in</strong>abstimmungen vorgenommen und es sollen<br />

die ersten Tests stattf<strong>in</strong>den.<br />

Personal im Überblick<br />

Mit März 2002 waren <strong>in</strong> <strong>der</strong> AT&S Ch<strong>in</strong>a 86<br />

junge (das Durchschnittsalter beträgt 30 Jahre),<br />

motivierte und engagierte MitarbeiterInnen<br />

beschäftigt. Davon s<strong>in</strong>d 31% weiblich und 88%<br />

s<strong>in</strong>d Ch<strong>in</strong>esen.<br />

Knapp die Hälfte <strong>der</strong> Mitarbeiter hat bereits<br />

Erfahrung <strong>in</strong> <strong>der</strong> Leiterplatten<strong>in</strong>dustrie und<br />

<strong>in</strong>sgesamt 98% haben e<strong>in</strong>e akademische o<strong>der</strong><br />

fachspezifische Ausbildung.<br />

Market<strong>in</strong>g & Vertrieb<br />

Obwohl noch im Bau bef<strong>in</strong>dlich, hat die AT&S<br />

Ch<strong>in</strong>a bereits an drei Fachmessen <strong>in</strong> den letzten<br />

neun Monaten teilgenommen. Auf <strong>der</strong> Cebit<br />

Ch<strong>in</strong>a, <strong>der</strong> Ch<strong>in</strong>a Industrie Ausstellung und <strong>der</strong><br />

CPCA (Ch<strong>in</strong>a Pr<strong>in</strong>ted Circuit Association =<br />

AT&S Standorte / AT&S plants<br />

This comb<strong>in</strong>ation of new technologies and<br />

much improved delivery times are, it is true, no<br />

guarantee for the future, but they will help us <strong>to</strong><br />

organise our services on a much more secure<br />

basis.<br />

AT&S Ch<strong>in</strong>a<br />

Construction progress<br />

S<strong>in</strong>ce the first s<strong>to</strong>ne was laid <strong>in</strong> May 2001 the<br />

AT&S Ch<strong>in</strong>a Project team can look back on<br />

excit<strong>in</strong>g and busy months. Plant construction is<br />

progress<strong>in</strong>g and the roof is scheduled for completion<br />

<strong>in</strong> May 2002. The next two months will see<br />

the various <strong>in</strong>stallations and f<strong>in</strong>e adjustments be<strong>in</strong>g<br />

made and the first tests should also take place.<br />

Staff overview<br />

As of March 2002, 86 young (average age 30)<br />

motivated and committed employees were work<strong>in</strong>g<br />

at AT&S Ch<strong>in</strong>a, of whom 31% are women<br />

and 88% Ch<strong>in</strong>ese.<br />

Half the employees already have experience<br />

<strong>in</strong> the pr<strong>in</strong>ted circuit <strong>in</strong>dustry and a <strong>to</strong>tal of<br />

98% have an academic and <strong>in</strong>dustry-related<br />

tra<strong>in</strong><strong>in</strong>g.<br />

Market<strong>in</strong>g and Sales<br />

Although still un<strong>der</strong> construction, AT&S Ch<strong>in</strong>a<br />

has already participated <strong>in</strong> three specialist trade<br />

fairs <strong>in</strong> the last n<strong>in</strong>e months. Future domestic and<br />

<strong>in</strong>ternational clients had an opportunity <strong>to</strong> <strong>to</strong>uch<br />

base with AT&S at Cebit Ch<strong>in</strong>a, the Ch<strong>in</strong>a<br />

Industry Exhibition and CPCA (Ch<strong>in</strong>a Pr<strong>in</strong>ted<br />

Circuit Association) 2002. In particular CPCA<br />

also offered an opportunity <strong>to</strong> get <strong>to</strong> know important<br />

suppliers and potential ancillary suppliers<br />

for the future.<br />

Der Countdown läuft<br />

The countdown is runn<strong>in</strong>g<br />

19


Leiterplattenvere<strong>in</strong>igung von Ch<strong>in</strong>a) 2002 hatten<br />

die zukünftigen lokalen und <strong>in</strong>ternationalen<br />

Kunden die Gelegenheit erste Kontakte mit <strong>der</strong><br />

AT&S zu knüpfen. Vor allem die CPCA bot<br />

außerdem die Gelegenheit, auch wichtige Lieferanten<br />

und potenzielle Zulieferer für die weitere<br />

Zukunft kennen zu lernen.<br />

Messesplitter: Pech hatte <strong>der</strong> Repräsentant<br />

e<strong>in</strong>er europäischen Leiterplattenvere<strong>in</strong>igung, <strong>der</strong><br />

bei <strong>der</strong> CPCA-Eröffnungszeremonie das „rote<br />

Band“ durchschneiden sollte. Se<strong>in</strong> Taxifahrer<br />

brachte ihn unglücklicherweise zu e<strong>in</strong>er gleichzeitig<br />

stattf<strong>in</strong>denden an<strong>der</strong>en Elektronikmesse <strong>in</strong><br />

Shanghai. Gastfreundlich, wie man <strong>in</strong> Ch<strong>in</strong>a ist,<br />

durfte er aber dort das Ritual vornehmen.<br />

AT&S India<br />

In <strong>der</strong> zweiten Jahreshälfte lag die Gesamtleistung<br />

des Standortes AT&S India wie<strong>der</strong> deutlich im<br />

Aufwärtstrend. Die <strong>in</strong>dischen Kollegen setzten das<br />

im Vorjahr beschlossene Maßnahmenpaket konsequent<br />

um und erzielten bereits erste Ergebnisse.<br />

Kostensenkungprogramme ohne weitere<br />

Investitionen<br />

Wie bei <strong>der</strong> Führungskräfteklausur im Ok<strong>to</strong>ber<br />

2001 aufgezeigt, konnten <strong>in</strong> allen Bereichen<br />

nennenswerte Fortschritte erzielt werden. Die<br />

Schwerpunkte <strong>der</strong> Kostenreduzierung lagen <strong>in</strong> <strong>der</strong><br />

Verbesserung des Yields, Prozessoptimierungen im<br />

Logistikbereich und Beschaffungswesen sowie<br />

auch <strong>in</strong> <strong>der</strong> Reduktion <strong>der</strong> Energie-, Instandhaltungs-,<br />

Personal-, Reise- und Fahrzeugkosten.<br />

E<strong>in</strong>en doppelt positiven Effekt des Kostensenkungsprogrammes<br />

zeigten die Bestrebungen<br />

des <strong>in</strong>dischen Umweltteams. Der Verbrauch von<br />

Edelmetallen stieg weiter an, durch Ausschuss<br />

o<strong>der</strong> alle<strong>in</strong> beim Prozessschritt Fräsen g<strong>in</strong>g jedoch<br />

e<strong>in</strong> hoher Anteil verloren und belastete zusätzlich<br />

noch die Umwelt. Aus diesem Grund setzte man<br />

gezielte Aktionen zur Rückgew<strong>in</strong>nung und<br />

Wie<strong>der</strong>verwendung <strong>der</strong> Rohs<strong>to</strong>ffe. Mittlerweile<br />

belaufen sich die E<strong>in</strong>sparungen von Gold, Silber,<br />

Kupfer, etc. bereits auf 141.000,– Euro.<br />

Zusammenfassend ist festzustellen, dass<br />

durch die e<strong>in</strong>geleiteten Maßnahmen die angepeilte<br />

Kostensenkung von 3,7 Millionen Euro<br />

erreicht werden wird.<br />

Personelle Verstärkung<br />

Während <strong>der</strong> zweiten Jahreshälfte kooperierte<br />

Indien verstärkt mit den österreichischen<br />

KollegInnen h<strong>in</strong>sichtlich Know-how Transfer.<br />

Im Ok<strong>to</strong>ber besuchten Kurt Kladensky, Peter<br />

Mart<strong>in</strong>, Manfred Skledar und Erw<strong>in</strong> Ma<strong>der</strong> den<br />

20<br />

AT&S Standorte / AT&S plants<br />

Trade Fair confusion: The representative of a<br />

European Pr<strong>in</strong>ted Circuit Association who was <strong>to</strong><br />

cut the red tape at the CPCA open<strong>in</strong>g ceremony<br />

had some bad luck. Unfortunately his taxi driver<br />

<strong>to</strong>ok him <strong>to</strong> another electronic trade fair runn<strong>in</strong>g<br />

at the same time <strong>in</strong> Shanghai. Hospitable as ever,<br />

the Ch<strong>in</strong>ese allowed him <strong>to</strong> conduct the ceremony<br />

there.<br />

AT&S India<br />

The second half-year saw a clear upward trend<br />

<strong>in</strong> AT&S India’s performance. Our Indian<br />

colleagues are consistently implement<strong>in</strong>g the<br />

package of measures adopted the previous year<br />

and have already achieved results.<br />

Cost reduction programmes without<br />

more <strong>in</strong>vestment costs<br />

As shown <strong>in</strong> the Oc<strong>to</strong>ber 2001 management<br />

report, there was substantial progress <strong>in</strong> all divisions.<br />

Major cost reductions were achieved <strong>in</strong><br />

productivity improvements, process optimisation<br />

<strong>in</strong> logistics and quality, as well as <strong>in</strong> reduc<strong>in</strong>g<br />

costs for power supplies, ma<strong>in</strong>tenance, staff, travel<br />

and vehicles.<br />

Efforts by the Indian environmental team<br />

showed a double positive effect <strong>in</strong> the cost<br />

reduction programme. Precious-metal<br />

consumption cont<strong>in</strong>ued <strong>to</strong> grow, but a lot was<br />

lost through waste or <strong>in</strong> the mill<strong>in</strong>g process,<br />

which also pollutes the environment. For this<br />

reason, targets were set for recover<strong>in</strong>g and<br />

recycl<strong>in</strong>g raw materials. Meanwhile sav<strong>in</strong>gs of<br />

141,000 Euro are already be<strong>in</strong>g made on gold,<br />

silver, copper etc.<br />

To summarise, we can state that the measures<br />

<strong>in</strong>troduced will achieve the reduction <strong>in</strong> costs of<br />

3.7 million Euros aimed for.<br />

Bereit für die Kunden<br />

Ready for the cus<strong>to</strong>mers<br />

AT&S Messestand<br />

AT&S stall<br />

Interessiertes Messepublikum<br />

Interested visi<strong>to</strong>rs at the exhibition


Standort, um geme<strong>in</strong>sam mit den <strong>in</strong>dischen<br />

Kollegen Prozesse wie Bohren, Siebdruck, etc. zu<br />

optimieren.<br />

Wadie Gayed, Walter Pessl und Simon Sebanz<br />

nahmen im November den 6 Sigma Prozess und<br />

das Qualitätssystem unter die Lupe und leiteten<br />

entsprechende Projekte e<strong>in</strong>. Damit ist gesichert,<br />

dass auch die AT&S India den hohen Qualitätsanfor<strong>der</strong>ungen<br />

<strong>der</strong> Kunden gerecht wird.<br />

Waltraud Musilek und Nabil Taufik verschafften<br />

sich e<strong>in</strong>en Überblick über das F<strong>in</strong>anzmanagement<br />

<strong>der</strong> AT&S India. Venkatesh Ravi<br />

und Anthony Balraj kamen nach Österreich, um<br />

sich mit den neuesten Versionen von SAP ver-<br />

traut zu machen. Gerald Kammersberger und<br />

Robert Schweiger unterstützten im Februar vor<br />

Ort die Installation des SAP Moduls für den<br />

Instandhaltungsbereich.<br />

AT&S India unter den Top 10<br />

Nach <strong>der</strong> neuesten Statistik, veröffentlicht vom<br />

Export Software Council (ESC), ist die AT&S<br />

India als Nummer 9 unter die Top 10 Exporteure<br />

von elektronischen Komponenten aufgenommen<br />

worden.<br />

In den nächsten Jahren besteht die berechtigte<br />

Chance, den zweiten Platz zu erreichen.<br />

Verstärkung <strong>der</strong> Geschäftsführung<br />

Neben V. K. Bhatnagar (CEO) zeichnen nun<br />

Hans Peter Jung als COO und Pradeep Mehta<br />

(siehe Personalia) als CFO seit 1. April 2002 für<br />

die Geschicke des Standortes mitverantwortlich.<br />

In e<strong>in</strong>em nach wie vor von schwierigen<br />

Bed<strong>in</strong>gungen geprägtem Marktumfeld ist die<br />

Aufteilung <strong>der</strong> Geschäftsbereiche strategisch<br />

s<strong>in</strong>nvoll. Zukünftig kann sich jedes Mitglied <strong>der</strong><br />

Geschäftsführung auf se<strong>in</strong>e Stärken konzentrieren<br />

und se<strong>in</strong> Tätigkeitsfeld so effizient gestalten, dass<br />

die AT&S India das Gesamtergebnis <strong>der</strong> AT&S<br />

AG positiv bee<strong>in</strong>flussen wird.<br />

Wir wünschen <strong>der</strong> Geschäftsführung <strong>der</strong><br />

AT&S India viel Erfolg für die Zukunft und<br />

versichern unsere vollste Unterstützung!<br />

Der Vorstand <strong>der</strong> AT&S AG<br />

AT&S Standorte / AT&S plants<br />

Staff<br />

In the second half-year, India co-operated <strong>in</strong>creas<strong>in</strong>gly<br />

with their Austrian colleagues on know-how<br />

transfer.<br />

In Oc<strong>to</strong>ber, Kurt Kladensky, Peter Mart<strong>in</strong>,<br />

Manfred Skledar and Erw<strong>in</strong> Ma<strong>der</strong> visited the<br />

plant <strong>in</strong> or<strong>der</strong> <strong>to</strong> optimise with their Indian<br />

colleagues processes such as drill<strong>in</strong>g, screen<br />

pr<strong>in</strong>t<strong>in</strong>g etc.<br />

Wadie Gayed, Walter Pessl and Simon<br />

Sebanz focused on the 6 Sigma process and the<br />

quality assurance system and <strong>in</strong>troduced appropriate<br />

projects. This will guarantee AT&S India<br />

meet<strong>in</strong>g their clients’ demands for high quality.<br />

Waltraud Musilek and Nabil Taufik reviewed<br />

f<strong>in</strong>ance management at AT&S India. Venkatesh<br />

Ravi and Anthony Balraj came <strong>to</strong> Austria <strong>to</strong> learn<br />

about the latest SAP versions. In February Gerald<br />

Kammersberger and Robert Schweiger gave onsite<br />

<strong>in</strong>stallation support for the SAP module <strong>in</strong><br />

the ma<strong>in</strong>tenance division.<br />

AT&S India <strong>in</strong> Top 10<br />

Accord<strong>in</strong>g <strong>to</strong> the latest statistics published by the<br />

Export Software Council (ESC), AT&S India<br />

came n<strong>in</strong>th <strong>in</strong> the Top 10 electronic component<br />

exporters.<br />

There is every chance they will make second<br />

place <strong>in</strong> the next few years.<br />

Management team strengthened<br />

Along with V. K. Bhatnagar (CEO), Hans Peter<br />

Jung as COO and Pradeep Mehta (see Personalities)<br />

have been jo<strong>in</strong>tly responsible for this plant<br />

s<strong>in</strong>ce 1 April 2002. In a market environment that<br />

cont<strong>in</strong>ues <strong>to</strong> be hard pressed, the splitt<strong>in</strong>g of<br />

bus<strong>in</strong>ess divisions is strategically sensible. In<br />

future, each member of management can concentrate<br />

on his strengths and organise his bus<strong>in</strong>ess so<br />

that AT&S India has a positive effect on the<br />

overall results of AT&S AG.<br />

We wish the management of AT&S India<br />

every success <strong>in</strong> the future and can assure them<br />

of our full support!<br />

AT&S AG Board.<br />

In<strong>der</strong> und Österreicher im Team<br />

Indian and Austrians <strong>in</strong> the team<br />

Neuer COO, Hans Peter Jung<br />

New COO, Hans Peter Jung<br />

21


In dieser Ausgabe möchten wir über die Performance<br />

<strong>der</strong> AT&S-Aktie im abgelaufenen<br />

Wirtschaftsjahr 2001/2002 berichten. Nach<br />

wie vor stellen die fundamentalen Unternehmensdaten,<br />

die Entwicklung im Technologiebereich<br />

und die Entwicklungen an den Kapitalmärkten<br />

die wesentlichen Eckpfeiler <strong>der</strong> Kursbildung<br />

dar.<br />

Fundamental betrachtet ist die AT&S e<strong>in</strong><br />

kerngesundes und stark f<strong>in</strong>anziertes Unternehmen.<br />

Die Kapitalmärkte spiegelten im vergangenen<br />

Wirtschaftsjahr naturgemäß die negativen<br />

Konjunkturszenarien wi<strong>der</strong>. Im Beson<strong>der</strong>en die<br />

Technologiewerte mussten im vergangenen Jahr<br />

kräftig Fe<strong>der</strong>n lassen. Dies lässt sich anhand <strong>der</strong><br />

relevanten Indizes gut beobachten, unter denen<br />

<strong>der</strong> NEMAX50 aber auch <strong>der</strong> NASDAQ-Index<br />

hervorzuheben s<strong>in</strong>d. Im abgelaufenen Wirtschaftsjahr<br />

lässt sich generell e<strong>in</strong> relativ hoher<br />

Gleichlauf <strong>der</strong> AT&S-Aktie mit diesen Märkten<br />

erkennen, die Bewegungen des AT&S-Kurses<br />

waren also während e<strong>in</strong>em Gutteil des Jahres<br />

marktunterstützt. Schließlich lässt sich e<strong>in</strong>e hohe<br />

Korrelation zu bestimmten E<strong>in</strong>zelwerten –<br />

etwa zu Konkurrenten o<strong>der</strong> auf Kundenseite –<br />

feststellen. Durch die Stärken und die gute<br />

Positionierung <strong>der</strong> AT&S ist allerd<strong>in</strong>gs mittel- bis<br />

längerfristig wie<strong>der</strong> von e<strong>in</strong>em Steigen des Kurses<br />

<strong>der</strong> Aktie auszugehen.<br />

Aktienrückkaufprogramm<br />

Der Vorstand <strong>der</strong> AT&S hat sich im Herbst<br />

letzten Jahres für e<strong>in</strong>en Aktienrückkauf ent-<br />

22<br />

Inves<strong>to</strong>r Relations<br />

Die Entwicklung <strong>der</strong> AT&S<br />

Aktie im abgelaufenen<br />

Wirtschaftsjahr 2001/2002<br />

The development of AT&S shares<br />

<strong>in</strong> the past f<strong>in</strong>ancial year 2001/2002<br />

In this issue we report on<br />

the performance of<br />

AT&S shares <strong>in</strong> the past<br />

f<strong>in</strong>ancial year 2001/2002.<br />

Now as then the company’s<br />

fundamental statistics, its<br />

technological development<br />

and the developments <strong>in</strong> the<br />

capital markets form the<br />

corners<strong>to</strong>nes of the formation<br />

of share prices.<br />

AT&S is basically an<br />

extremely healthy and<br />

strongly f<strong>in</strong>anced company.<br />

The capital markets have<br />

naturally reflected the past<br />

f<strong>in</strong>ancial year’s negative<br />

economic scenarios. Technology<br />

prices <strong>in</strong> particular did<br />

not escaped unscathed last<br />

year. This is clear from the<br />

relevant <strong>in</strong>dices –<br />

NEMAX50 and NASDAQ <strong>to</strong> mention only two.<br />

In the past f<strong>in</strong>ancial year a relatively high correlation<br />

between AT&S shares and these markets can<br />

generally speak<strong>in</strong>g be observed. The movements<br />

<strong>in</strong> the AT&S price were therefore supported by<br />

the market for a good proportion of the year. In<br />

fact one can see a high correlation with certa<strong>in</strong><br />

<strong>in</strong>dividual prices – those of competi<strong>to</strong>rs and<br />

cus<strong>to</strong>mers for example. The strength and<br />

favourable position of AT&S will ensure a rise <strong>in</strong><br />

the share price <strong>in</strong> the medium <strong>to</strong> long term.<br />

IR Manager Manfred Weierer


schieden. Voraussetzung war e<strong>in</strong> Beschluss <strong>in</strong> <strong>der</strong><br />

letzten Hauptversammlung. Seit 18. Ok<strong>to</strong>ber<br />

2001 besteht nun also für die AT&S die<br />

Möglichkeit, bis zu 10% des Grundkapitals, d.h.<br />

2.800.000 eigene Aktien, zurückzukaufen. Die<br />

813.700 rückgekauften Aktien sollen <strong>in</strong> erster<br />

L<strong>in</strong>ie für die Mitarbeiterbeteiligungs- bzw. S<strong>to</strong>ck-<br />

Option-Programme <strong>der</strong> AT&S sowie für Zwecke<br />

im Zusammenhang mit Akquisitionen verwendet<br />

werden.<br />

Achte ordentliche Hauptversammlung<br />

für AT&S Aktionäre<br />

Die Hauptversammlung ist das Zusammentreffen<br />

<strong>der</strong> Aktionäre und wird m<strong>in</strong>destens e<strong>in</strong>mal im<br />

Jahr abgehalten. Voraussetzung für die Ausübung<br />

des Stimmrechts ist die H<strong>in</strong>terlegung <strong>der</strong> Aktien –<br />

typischerweise bei <strong>der</strong> Depot-Bank – <strong>in</strong>nerhalb<br />

<strong>der</strong> H<strong>in</strong>terlegungsfrist (heuer von Dienstag,<br />

18. Juni 2002 bis Montag, 1. Juli 2002). Die<br />

Aktien selbst bleiben bis zum Ablauf <strong>der</strong> Hauptversammlung<br />

h<strong>in</strong>terlegt. Über die erfolgte H<strong>in</strong>terlegung<br />

wird e<strong>in</strong>e Bestätigung ausgestellt, die zur<br />

Hauptversammlung mitgebracht werden sollte.<br />

160 %<br />

140 %<br />

120 %<br />

100 %<br />

80 %<br />

60 %<br />

40 %<br />

20 %<br />

0 %<br />

01.04.2001<br />

15.04.2001<br />

29.04.2001<br />

13.05.2001<br />

27.05.2001<br />

10.06.2001<br />

24.06.2001<br />

08.07.2001<br />

22.07.2001<br />

Die nächste ordentliche Hauptversammlung <strong>der</strong><br />

AT&S f<strong>in</strong>det am Freitag, dem 5. Juli 2002, im<br />

„Communications Center Donawitz“ (CCD) <strong>der</strong><br />

VOEST-ALPINE statt und beg<strong>in</strong>nt um 10:00<br />

Uhr (E<strong>in</strong>lass ab 09:00 Uhr).<br />

Inves<strong>to</strong>r Relations<br />

S<strong>to</strong>ck redemption programme<br />

In the Autumn last year the AT&S Board of<br />

Direc<strong>to</strong>rs decided <strong>to</strong> operate a programme of s<strong>to</strong>ck<br />

redemption. This was triggered by a resolution at<br />

the last Ma<strong>in</strong> Meet<strong>in</strong>g. S<strong>in</strong>ce Oc<strong>to</strong>ber 18, 2001<br />

AT&S has been entitled <strong>to</strong> repurchase up <strong>to</strong> 10%<br />

of its authorised capital, i.e. 2,800,000 of its own<br />

shares. The 813,700 redeemed shares are <strong>to</strong> be<br />

used primarily for AT&S’s employee profit-shar<strong>in</strong>g<br />

and s<strong>to</strong>ck option schemes and for purposes connected<br />

with acquisitions.<br />

The Eighth Ord<strong>in</strong>ary General Meet<strong>in</strong>g<br />

for AT&S sharehol<strong>der</strong>s<br />

The General Meet<strong>in</strong>g is when the sharehol<strong>der</strong>s<br />

get <strong>to</strong>gether and is held at least once a year. In<br />

or<strong>der</strong> <strong>to</strong> exercise their vot<strong>in</strong>g rights sharehol<strong>der</strong>s<br />

must deposit shares – typically with the Deposit<br />

Bank – with<strong>in</strong> the deposit period (this year from<br />

Tuesday June 18, 2002 <strong>to</strong> Monday July 1, 2002).<br />

The shares rema<strong>in</strong> <strong>in</strong> deposit until the end of the<br />

General Meet<strong>in</strong>g. A receipt is given for each<br />

deposit which must be brought <strong>to</strong> the Ma<strong>in</strong><br />

Meet<strong>in</strong>g.<br />

05.08.2001<br />

19.08.2001<br />

02.09.2001<br />

16.09.2001<br />

30.09.2001<br />

14.10.2001<br />

28.10.2001<br />

11.11.2001<br />

25.11.2001<br />

09.12.2001<br />

AT&S NEMAX50 NASDAQ SOX<br />

23.12.2001<br />

The next ord<strong>in</strong>ary General Meet<strong>in</strong>g of AT&S<br />

takes place on Friday July 5, 2002 <strong>in</strong><br />

VOEST-ALPINE’s “Communications Centre<br />

Donawitz” (CCD) beg<strong>in</strong>n<strong>in</strong>g at 10 am (admission<br />

from 9 am).<br />

06.01.2002<br />

20.01.2002<br />

03.02.2002<br />

17.02.2002<br />

03.03.2002<br />

17.03.2002<br />

23<br />

31.03.2002


Univ. Prof. Dr. Günther Leis<strong>in</strong>g<br />

Interne Forschung prägt Trends und bietet dem Kunden auch<br />

zukünftig maßgeschnei<strong>der</strong>te Lösungen für se<strong>in</strong>e Bedürfnisse.<br />

Know-how Vorsprung schafft Wettbewerbsvorsprung.<br />

Wissenschaftliche Forschung und Entwicklung s<strong>in</strong>d aufwändig.<br />

Trotzdem rechnet sich auch e<strong>in</strong>e unternehmenseigene<br />

(<strong>in</strong>terne) Forschungsabteilung, denn unser letztendliches Ziel ist<br />

es ja, dem Kunden immer ausgereifte Lösungen nach<br />

neusystemtechnischen Stand zu präsentieren – also e<strong>in</strong>e Art<br />

Baukastensystem zur Verfügung zu stellen, mit dem sich alle<br />

denkbaren Ankontaktierungsaufgaben sowohl heute als auch <strong>in</strong><br />

Zukunft realisieren lassen.<br />

Für den europäischen Marktführer AT&S ist es unbed<strong>in</strong>gt<br />

erfor<strong>der</strong>lich, sich rechtzeitig mit aktuellen Trends ause<strong>in</strong>an<strong>der</strong>zusetzen,<br />

sie sogar an vor<strong>der</strong>ster Front mitzuprägen und damit<br />

die Leiterplattentechnologie entscheidend zu bee<strong>in</strong>flussen.<br />

Angesichts <strong>der</strong> rasanten Technologieentwicklung ist schließlich<br />

e<strong>in</strong> Know-how-Vorsprung fast schon gleichzusetzen mit e<strong>in</strong>em<br />

erheblichen Wettbewerbsvorsprung.<br />

E<strong>in</strong>es darf man nicht vergessen: Dem Kunden ist Tag für Tag<br />

zu beweisen, dass an <strong>der</strong> AT&S ke<strong>in</strong> Weg vorbeiführt.<br />

Dies kann nur gel<strong>in</strong>gen, <strong>in</strong>dem noch mehr Funktionen <strong>in</strong><br />

die Leiterplatte <strong>in</strong>tegriert werden, <strong>in</strong>dem noch leistungsfähigere<br />

Basismaterialien und Leitungskonzepte entwickelt und e<strong>in</strong>gesetzt<br />

werden und <strong>in</strong>dem gleichzeitig die Kosten für die Verb<strong>in</strong>dungslösungen<br />

auf Basis organischer Leiterplattensubstrate so niedrig<br />

wie irgend möglich gehalten werden.<br />

SIMOV, Grüne Leiterplatte, Hochfrequenzanwendung<br />

& Co.<br />

Zum Glück bietet die Leiterplattentechnik genügend Spielraum<br />

und wird die Leiterplatte das zentrale Element <strong>der</strong> Verb<strong>in</strong>dungstechnik<br />

se<strong>in</strong>. E<strong>in</strong> hohes Potenzial <strong>in</strong> dieser H<strong>in</strong>sicht weist die<br />

Integration von passiven o<strong>der</strong> gar aktiven Bauelementen direkt <strong>in</strong><br />

die Leiterplatte auf.<br />

24<br />

Technologie / Technology<br />

Die Zukunft <strong>der</strong><br />

Leiterplattentechnologie<br />

Teil II<br />

The future for the pr<strong>in</strong>ted circuit <strong>in</strong>dustry Part II<br />

Dr. Günther Leis<strong>in</strong>g, University professor<br />

Internal research places its mark on trends and offers clients<br />

tailor-made solutions for their needs <strong>in</strong> the future as well.<br />

Know-how advantage br<strong>in</strong>gs competitive advantage.<br />

Scientific R&D is costly. Despite the fact that a company’s<br />

own (<strong>in</strong>ternal) research department pays for itself because our<br />

goal is, after all, <strong>to</strong> present the client solutions that are constantly<br />

be<strong>in</strong>g upgraded <strong>in</strong> accordance with the latest system technology –<br />

<strong>in</strong> other words <strong>to</strong> offer the client a k<strong>in</strong>d of component-based<br />

system that will allow any imag<strong>in</strong>able tasks <strong>in</strong>volv<strong>in</strong>g contacts <strong>to</strong><br />

be realised now or <strong>in</strong> the future.<br />

As the European market lea<strong>der</strong>, AT&S just has <strong>to</strong> tackle<br />

current trends <strong>in</strong> good time, and be <strong>in</strong>volved <strong>in</strong> shap<strong>in</strong>g these<br />

trends at the cutt<strong>in</strong>g edge of technology, and thereby decisively<br />

<strong>in</strong>fluence pr<strong>in</strong>ted circuit technology. Given the rapid<br />

development of technology, be<strong>in</strong>g ahead <strong>in</strong> know-how is a major<br />

competitive advantage.<br />

One th<strong>in</strong>g you should not forget: the client has <strong>to</strong> be shown<br />

day <strong>in</strong> day out that there is no avoid<strong>in</strong>g AT&S.<br />

Success will only come by <strong>in</strong>tegrat<strong>in</strong>g more functions on<strong>to</strong><br />

the pr<strong>in</strong>ted circuit board, by develop<strong>in</strong>g and us<strong>in</strong>g more powerful<br />

basic materials and performance concepts and at the same time<br />

by keep<strong>in</strong>g the costs for communications solutions based on<br />

organic pr<strong>in</strong>ted circuit substrates as low as possible.<br />

SIMOV, a company produc<strong>in</strong>g green (ecological) pr<strong>in</strong>ted<br />

circuit boards, and high-frequency applications<br />

Fortunately, pr<strong>in</strong>ted circuit technology offers sufficient scope for<br />

developments, and the PCB will be the central component of<br />

communications equipment. In this respect, the <strong>in</strong>tegration<br />

of passive or even active components directly <strong>in</strong><strong>to</strong> the PCB is<br />

show<strong>in</strong>g great potential.<br />

Some time ago, AT&S AG acquired the licence for the<br />

SIMOV technology (Siemens Multi-layer Surface Wir<strong>in</strong>g) developed<br />

by Siemens, by which resistances, condensers and <strong>in</strong>duc-


Die AT&S AG hat schon vor e<strong>in</strong>iger Zeit die Lizenz <strong>der</strong> von<br />

Siemens entwickelten SIMOV-Technologie (Siemens-<br />

Mehrschicht-Oberflächenverdrahtung) erworben, mittels <strong>der</strong><br />

Wi<strong>der</strong>stände, Kondensa<strong>to</strong>ren und Induktivitäten <strong>in</strong>s Innere <strong>der</strong><br />

Mehrlagenschaltung verlagert werden. Mit Hilfe dieser Technik<br />

können <strong>der</strong> Bestückungsaufwand und damit auch die Baugruppenkosten<br />

erheblich reduziert werden.<br />

In Zukunft beson<strong>der</strong>s wichtig ist aber auch die Realisierung<br />

<strong>der</strong> „Grünen Leiterplatte“, die ke<strong>in</strong> Blei und ke<strong>in</strong> Halogen mehr<br />

enthält. Immerh<strong>in</strong> for<strong>der</strong>t <strong>der</strong> europäische Gesetzgeber die<br />

Umsetzung <strong>der</strong> verschärften Umweltschutzbestimmungen <strong>in</strong>nerhalb<br />

von wenigen Jahren.<br />

Selbstverständlich spielt die schnelle und sichere Signalübertragung<br />

e<strong>in</strong>e herausragende Rolle. Immerh<strong>in</strong> kann man davon<br />

ausgehen, dass <strong>in</strong> den nächsten Jahren Hochfrequenz-Anwendungen<br />

stark zunehmen werden – sei es im Bereich <strong>der</strong> Mobilkommunikation,<br />

<strong>der</strong> Telekommunikations<strong>in</strong>frastruktur, im Internetsek<strong>to</strong>r<br />

o<strong>der</strong> auch im PC-Bereich.<br />

Impedanzkontrolle und Wärmemanagement s<strong>in</strong>d ja schon<br />

lange wichtige Themen <strong>in</strong> <strong>der</strong> Leiterplattentechnik. In Zukunft<br />

wird die Bedeutung dieser beiden Bereiche stark zunehmen.<br />

Die AT&S AG befasst sich <strong>in</strong>tensiv mit dieser Problematik.<br />

E<strong>in</strong>en Ausweg aus <strong>der</strong> Misere könnte hier <strong>in</strong> e<strong>in</strong>igen Jahren<br />

z.B. die Abkehr von <strong>der</strong> traditionellen Kupfertechnik bieten.<br />

Statt die Signale über Kupferleiterbahnen zu übertragen,<br />

könnten nämlich auch Lichtwellenleiter <strong>in</strong> die Leiterplatte<br />

<strong>in</strong>tegriert werden. Lichtwellenleiter erlauben die Übertragung<br />

deutlich höherer Signalbandbreiten ohne störenden Wellenwi<strong>der</strong>stand<br />

und eignen sich damit bestens für Hochfrequenzanwendungen.<br />

Die Strukturierung <strong>der</strong> Lichtwellenleiter ist<br />

jedoch heute noch überaus schwierig. Die AT&S AG arbeitet<br />

auf diesem Gebiet <strong>in</strong>tensiv mit namhaften Forschungs<strong>in</strong>stituten,<br />

wie z.B. <strong>der</strong> Fraunhofergesellschaft IZM <strong>in</strong> Berl<strong>in</strong> o<strong>der</strong> dem<br />

Institut für Nanostrukturierte Materialien und Pho<strong>to</strong>nik <strong>in</strong><br />

Weiz, zusammen.<br />

Überhaupt bietet die Nanotechnologie noch viele bislang<br />

ungenutzte Chancen für die Leiterplattentechnik. So könnte die<br />

Nanotechnologie bei <strong>der</strong> Realisierung von Fe<strong>in</strong>stleiterstrukturen<br />

mit Hilfe <strong>der</strong> Laserdirektbelichtung o<strong>der</strong> <strong>der</strong> Laserdirektstrukturierung<br />

gute Dienste leisten.<br />

Visionen realisieren – Marktchancen richtig e<strong>in</strong>schätzen<br />

Die genannten Beispiele zeigen, dass das Zukunftspotenzial <strong>der</strong><br />

Leiterplattentechnologie nach wie vor enorm ist. Um dieses<br />

Potenzial aber auch nutzen zu können, ist die Bereitschaft<br />

gefor<strong>der</strong>t auf Visionen e<strong>in</strong>zugehen, aber gleichzeitig <strong>der</strong>en<br />

Realisierungs- und Markchancen kritisch abzuschätzen.<br />

Schließlich besteht angesichts <strong>der</strong> hohen Lohnkosten <strong>in</strong> Westund<br />

Mitteleuropa die entscheidende Chance dar<strong>in</strong>, immer mehr<br />

Funktionen <strong>in</strong> die Leiterplatte zu <strong>in</strong>tegrieren. Denn damit wird<br />

die Leiterplatte noch über viele Jahre h<strong>in</strong>weg nicht nur<br />

konkurrenzfähig, son<strong>der</strong>n geradezu unverzichtbar <strong>in</strong> <strong>der</strong> Elektronikfertigung<br />

se<strong>in</strong>. Die AT&S AG wird auf Grund <strong>der</strong> nun<br />

vorgenommenen Weichenstellungen ganz wesentlich dazu<br />

beitragen, die Technologie auf dem Gebiet <strong>der</strong> Verb<strong>in</strong>dungstechnik<br />

weiter voran zutreiben.<br />

Technologie / Technology<br />

tions are moved <strong>in</strong>side the<br />

multi-layer wir<strong>in</strong>g. With this<br />

technique, the number of <strong>in</strong>serts<br />

and therefore component costs<br />

can be substantially reduced.<br />

But <strong>in</strong> future the creation of<br />

the “Green PCB” conta<strong>in</strong><strong>in</strong>g no<br />

lead or halogen will be especially<br />

important. The European<br />

legisla<strong>to</strong>r is still demand<strong>in</strong>g that<br />

stricter environmental protection<br />

requirements must be<br />

implemented with<strong>in</strong> a few years.<br />

Of course rapid and secure<br />

signal transmission plays a<br />

prom<strong>in</strong>ent role. After all one can<br />

assume that high-frequency<br />

applications will <strong>in</strong>crease greatly<br />

<strong>in</strong> the next few years: either <strong>in</strong><br />

mobile communications, the<br />

telecommunications <strong>in</strong>frastructure,<br />

on the Internet or <strong>in</strong> the<br />

PC field.<br />

Control of impedance and<br />

thermal management have long Univ. Prof. Dr. Günther Leis<strong>in</strong>g<br />

been important areas <strong>in</strong> PCB Dr. Günther Leis<strong>in</strong>g, University professor<br />

technology. The importance of<br />

these two fields will grow apace <strong>in</strong> future. AT&S AG is <strong>in</strong>tensively<br />

<strong>in</strong>volved with this technology. A way out of the problem<br />

could <strong>in</strong> a few years time be a move away from traditional copper<br />

technology. Instead of transmitt<strong>in</strong>g signals over copper wire<br />

routes, optical waveguides could be <strong>in</strong>tegrated <strong>in</strong><strong>to</strong> the PCB.<br />

Optical waveguides make it possible <strong>to</strong> transmit substantially<br />

higher signal bandwidths without wave <strong>in</strong>terference and are best<br />

suited for high-frequency applications. But at present it is the<br />

structure of the optical waveguide that is still quite difficult.<br />

AT&S AG is collaborat<strong>in</strong>g <strong>in</strong> this field with famous research<br />

<strong>in</strong>stitutions e.g. the Frauenhoffergesellschaft IZM Berl<strong>in</strong> or the<br />

Institute for Nanostructure Materials and Pho<strong>to</strong>n Science <strong>in</strong> Weiz.<br />

Nanotechnology offers many as yet unexplored opportunities<br />

for PCB technology. Nanotechnology could be very useful <strong>in</strong><br />

[very] f<strong>in</strong>e conduc<strong>to</strong>r structures us<strong>in</strong>g direct laser exposure or for<br />

direct laser structur<strong>in</strong>g.<br />

Mak<strong>in</strong>g visions come true means correctly assess<strong>in</strong>g<br />

market opportunities<br />

The examples given above show that the future potential for<br />

pr<strong>in</strong>ted circuit technology is still enormous. But <strong>to</strong> be able <strong>to</strong> use<br />

this potential, a read<strong>in</strong>ess <strong>to</strong> pursue visions is required, while at<br />

the same time assess<strong>in</strong>g critically their chances of be<strong>in</strong>g<br />

realised and marketed. In the f<strong>in</strong>al analysis, given the high wage<br />

costs <strong>in</strong> western and central Europe, the critical opportunity will<br />

lie <strong>in</strong> <strong>in</strong>tegrat<strong>in</strong>g more and more functions on<strong>to</strong> the PCB.<br />

Because <strong>in</strong> that way, the PCB will not only rema<strong>in</strong> competitive<br />

for many years <strong>to</strong> come, but also be <strong>in</strong>dispensable <strong>in</strong> electronics<br />

manufacture. Given the direction that has been set, AT&S AG<br />

will contribute substantially <strong>to</strong> driv<strong>in</strong>g communications<br />

technology further.<br />

25


Quo vadis Qualitätswesen? Quo vadis<br />

Umweltschutz?<br />

Welche Richtung schlagen Qualität,<br />

Umweltschutz und Arbeitssicherheit e<strong>in</strong>?<br />

Friedrich Zeman, Dagmar Griesenauer<br />

Qualität, Umwelt und Arbeitssicherheit s<strong>in</strong>d<br />

wichtige Themen, die nicht länger getrennt von<br />

e<strong>in</strong>an<strong>der</strong> betrachtet werden dürfen. AT&S<br />

vere<strong>in</strong>t die Systeme im „Integrierten Managementsystem“.<br />

Wer mit offenen Augen durch unsere Firma<br />

geht, hat auf den Schautafeln die Worte „Integriertes<br />

Managementsystem“ gelesen. Auch <strong>in</strong><br />

den schriftlichen Unterlagen wie Handbuch,<br />

Procedures (Verfahrensanweisungen), Process<br />

<strong>in</strong>struction (Prozessanweisung) etc. sche<strong>in</strong>en diese<br />

Worte immer wie<strong>der</strong> auf. Viele werden me<strong>in</strong>en:<br />

„Schon wie<strong>der</strong> etwas Neues.“ An<strong>der</strong>e vielleicht:<br />

Gibt es ke<strong>in</strong>e ISO 9001 o<strong>der</strong> 14001 mehr?“<br />

Qualität – Produk<strong>to</strong>rientierung<br />

Um diese bzw. ähnliche Fragen o<strong>der</strong> Gedanken<br />

beantworten zu können, ist e<strong>in</strong> Blick <strong>in</strong> die<br />

Vergangenheit erfor<strong>der</strong>lich.<br />

Das Qualitätswesen begann ursprünglich mit<br />

e<strong>in</strong>er Qualitätskontrolle. Dieses System war wie<br />

<strong>der</strong> Name besagt e<strong>in</strong>e Produktionskontrolle,<br />

meist am Ende e<strong>in</strong>er Produktionskette. Man<br />

sortierte <strong>in</strong> „gut“ und „schlecht“.<br />

Mit Beg<strong>in</strong>n <strong>der</strong> Normung baute man Qualitätsmanagementsysteme<br />

auf. Es wurden die<br />

Abläufe zwar beschrieben, aber die Normenreihe<br />

ISO 9000 war letztendlich wie<strong>der</strong>um e<strong>in</strong>e<br />

Produktnorm, d.h. man konzentrierte sich<br />

wie<strong>der</strong>um nur auf das Produkt, allerd<strong>in</strong>gs schon<br />

mit Zwischenkontrollen.<br />

Umwelt – Konzentration auf Prozesse<br />

Durch die zum damaligen Zeitpunkt dramatische<br />

Entwicklung im Umweltschutz, begannen e<strong>in</strong>ige<br />

26<br />

Qualität – Umwelt – Arbeitssicherheit / Quality – Environment – Job Security<br />

IMS – Integriertes<br />

Managementsystem<br />

IMS – Integrated Management System<br />

Whither goes quality? Whither goes environmental<br />

protection?<br />

What is the future for quality, environmental<br />

protection and job security?<br />

Friedrich Zeman, Dagmar Griesenauer<br />

Quality, the environment and job security are<br />

important <strong>to</strong>pics which can no longer be regarded<br />

<strong>in</strong> isolation from one another. AT&S has<br />

comb<strong>in</strong>ed these systems <strong>in</strong> the “Integrated<br />

Management System”.<br />

Any visi<strong>to</strong>r <strong>to</strong> our firm who has used his eyes<br />

will have seen display boards with the words<br />

“Integrated Management System” on them. These<br />

words also leap from the pages of written documents<br />

such as manuals, procedures and process<br />

<strong>in</strong>structions etc. Some will th<strong>in</strong>k: “A new <strong>in</strong>itiative.<br />

Here we go aga<strong>in</strong>!” Others might th<strong>in</strong>k:<br />

“What’s happened <strong>to</strong> ISO 9001 or 14001?”<br />

Quality – product orientation<br />

In or<strong>der</strong> <strong>to</strong> be able <strong>to</strong> answer these and similar<br />

questions or thoughts we need <strong>to</strong> take a look back<br />

<strong>in</strong><strong>to</strong> the past.<br />

Quality procedures orig<strong>in</strong>ally started with<br />

quality control. This system, as the name implies,<br />

was a production control, usually at the end of a<br />

production cha<strong>in</strong>. Items were sorted <strong>in</strong><strong>to</strong> “good”<br />

and “bad” categories.<br />

When standardisation came <strong>in</strong>, quality<br />

management systems were created. They <strong>in</strong>cluded<br />

descriptions of processes, it is true, but at the end<br />

of the day the ISO 9000 standard was still a<br />

product standard, i.e. it still focussed on the<br />

product alone, although with <strong>in</strong>termediate controls.<br />

The environment – concentration on<br />

processes<br />

The dramatic development <strong>in</strong> environmental<br />

protection which <strong>to</strong>ok place at that time<br />

Dagmar Griesenauer<br />

Friedrich Zeman


Qualität – Umwelt – Arbeitssicherheit / Quality – Environment – Job Security<br />

Län<strong>der</strong>, auch auf diesem Sek<strong>to</strong>r Normen zu<br />

entwickeln.<br />

Ausgehend von Amerika, weiter über Großbritannien<br />

bzw. nach Mitteleuropa wurden<br />

Umweltmanagementsysteme aufgebaut. Es sei<br />

nur die EMAS-Verordnung <strong>der</strong> europäischen<br />

Union und die <strong>in</strong>ternational gültige Norm ISO<br />

14001 erwähnt. Diese Norm war eigentlich die<br />

erste prozessorientierte Norm. Darauf basierend<br />

wurde ISO 9000:2000 erarbeitet, welche nun<br />

ebenfalls prozessorientiert ist.<br />

Arbeitssicherheit – Une<strong>in</strong>heitliche<br />

Hand-habung<br />

Lei<strong>der</strong> konnte die Arbeitssicherheit <strong>in</strong> dieser<br />

Richtung nicht mithalten. Es wurden zwar<br />

ebenfalls diverse Normen erstellt, aber ke<strong>in</strong>e<br />

wirklich <strong>in</strong>ternationale, welche <strong>in</strong> irgende<strong>in</strong>er<br />

Form an die vorhandenen anschließen kann. Die<br />

Gründe s<strong>in</strong>d vielfältig. E<strong>in</strong> Hauptgrund ist sicher,<br />

dass für die Arbeitssicherheit nationale Gesetze<br />

und Verordnungen bestehen, welche e<strong>in</strong>er Internationalisierung<br />

im Wege stehen.<br />

Die AT&S hat sicher e<strong>in</strong> funktionierendes<br />

Qualitäts- und Umweltmanagementsystem.<br />

Die Arbeitssicherheit hatte zwar ebenfalls e<strong>in</strong>en<br />

hohen Stellenwert, war aber noch <strong>in</strong> ke<strong>in</strong> System<br />

<strong>in</strong>tegriert.<br />

Zwischenzeitlich haben sich aber auch die<br />

Organisationsstrukturen verän<strong>der</strong>t. Die Integration<br />

<strong>der</strong> neuen Strukturen<br />

und Systeme ist nun das<br />

Ziel des <strong>in</strong>tegrierten<br />

Managementsystems,<br />

wobei die Leiter <strong>der</strong><br />

Bereiche Qualität, Umwelt<br />

und Arbeitssicherheit auch<br />

weiterh<strong>in</strong> für ihr jeweiliges<br />

Aufgabengebiet verantwortlich<br />

s<strong>in</strong>d.<br />

Die Revision <strong>der</strong> ISO<br />

9000-Reihe erleichtert<br />

nun die Verknüpfung aller E<strong>in</strong>zelsysteme. Das<br />

Schwergewicht liegt nun auf Prozesssicherheit<br />

Management-<br />

Management-<br />

Geschäfts-<br />

Bus<strong>in</strong>ess-<br />

Support<br />

Support<br />

und <strong>der</strong> kont<strong>in</strong>uierlichen Verbesserung und nicht<br />

wie bisher bei e<strong>in</strong>em Nachweissystem.<br />

Im Mittelpunkt des Systems steht <strong>der</strong> Kunde,<br />

wobei „Kunde“ weitreichen<strong>der</strong> zu verstehen ist.<br />

Innerhalb von Prozessketten gibt es immer Kunden,<br />

nämlich den Nachfolgeprozess.<br />

Und <strong>in</strong> dieser Kette hat je<strong>der</strong> die Verpflichtung<br />

zur kont<strong>in</strong>uierlichen Verbesserung auf allen<br />

Gebieten.<br />

Zusammenfassend kann daher gesagt werden,<br />

dass durch die Implementierung e<strong>in</strong>es<br />

<strong>in</strong>tegrierten Managementsystems alle bisherigen<br />

E<strong>in</strong>zelsysteme nunmehr gleichwertig weiterbestehen<br />

und weiter verbessert werden.<br />

prompted a few countries <strong>to</strong> develop standards<br />

for this sec<strong>to</strong>r as well.<br />

Beg<strong>in</strong>n<strong>in</strong>g <strong>in</strong> America and cont<strong>in</strong>u<strong>in</strong>g via<br />

Great Brita<strong>in</strong> and Central Europe environmental<br />

management systems were created. We need<br />

mention only the EMAS Or<strong>der</strong> of the European<br />

Union and the <strong>in</strong>ternationally valid standard ISO<br />

14001. This standard was <strong>in</strong> fact the first processoriented<br />

norm. Based on this, ISO 9000:2000<br />

was formulated and is likewise process-oriented.<br />

Job security – unequal treatment<br />

Unfortunately job security has not taken the<br />

same course. A number of different standards<br />

have appeared, but none of them are truly <strong>in</strong>ternational<br />

and capable of be<strong>in</strong>g l<strong>in</strong>ked <strong>in</strong> with<br />

exist<strong>in</strong>g standards <strong>in</strong> any form. The reasons are<br />

many and various. One th<strong>in</strong>g is certa<strong>in</strong> – national<br />

laws and prescriptions are prov<strong>in</strong>g <strong>to</strong> be an<br />

obstacle <strong>to</strong> the <strong>in</strong>ternationalisation of job security<br />

norms.<br />

AT&S has a function<strong>in</strong>g quality and environmental<br />

management system. There is no doubt<br />

that job security is a high priority, but it has not<br />

yet been <strong>in</strong>corporated <strong>in</strong><strong>to</strong> a system.<br />

In the meantime, however, organisational<br />

structures have changed. The <strong>in</strong>tegration of the<br />

new structures and systems is now the aim of the<br />

<strong>in</strong>tegrated management system, with the heads of<br />

quality, environment and job security be<strong>in</strong>g<br />

Qualität<br />

Quality<br />

IMS<br />

Umwelt<br />

Environment<br />

Sicherheit<br />

Security<br />

responsible for their own particular area.<br />

The revision of the ISO 9000 series makes it<br />

easier <strong>to</strong> knit <strong>to</strong>gether all the <strong>in</strong>dividual systems.<br />

The focus is now on process security and cont<strong>in</strong>uous<br />

improvement, rather than on a system of<br />

verification as was the case <strong>in</strong> the past.<br />

At the centre of the system stands the cus<strong>to</strong>mer,<br />

us<strong>in</strong>g the word cus<strong>to</strong>mer <strong>in</strong> its widest<br />

sense. With<strong>in</strong> process cha<strong>in</strong>s there are always<br />

cus<strong>to</strong>mers, namely the succession process.<br />

And <strong>in</strong> this cha<strong>in</strong> everybody has a duty <strong>to</strong><br />

work for cont<strong>in</strong>uous improvement <strong>in</strong> all areas.<br />

Summaris<strong>in</strong>g we can say that by implement<strong>in</strong>g<br />

an <strong>in</strong>tegrated management system all previous<br />

<strong>in</strong>dividual systems will cont<strong>in</strong>ue on an equal basis<br />

and un<strong>der</strong>go cont<strong>in</strong>uous improvement.<br />

Prozesse<br />

Processes<br />

Prozesse<br />

Processes<br />

Prozesse<br />

Processes<br />

Abb.: Qualitäts-, Umweltund<br />

Sicherheitsanfor<strong>der</strong>ungen<br />

werden <strong>in</strong> die verschiedenen<br />

Unternehmensprozesse<br />

<strong>in</strong>tegriert und als ganzheitliches<br />

Managementsystem<br />

dargestellt.<br />

Fig.: Quality, environmental<br />

and security requirements are<br />

<strong>in</strong>corporated <strong>in</strong> the various<br />

company processes and<br />

presented as an <strong>in</strong>tegrated<br />

management system.<br />

27


Als Alternative zum Universitätsstudium gew<strong>in</strong>nen die<br />

Studiengänge an den Fachhochschulen immer mehr an<br />

Attraktivität. „Schuld“ daran s<strong>in</strong>d Praxisnähe, <strong>in</strong>tensive<br />

Studentenbetreuung, Auslandssemester und nicht zuletzt die<br />

Berufsnähe – durch Pflichtpraktika <strong>in</strong> Unternehmen – auf die<br />

die Fachhochschulen gesteigerten Wert legen. Die Berufspraktika<br />

geben den Studierenden die Möglichkeit, Erlerntes <strong>in</strong> die Praxis<br />

umzusetzen und durch das „daily bus<strong>in</strong>ess“ <strong>in</strong> <strong>der</strong> Wirtschaft<br />

neues Know-how zu erwerben.<br />

Im Gegenzug erhält das Unternehmen „Verstärkung“ <strong>der</strong><br />

meist knappen Personalressourcen durch motivierte Nachwuchskräfte.<br />

Internationalität und Mobilität:<br />

Alexan<strong>der</strong> Gepp<br />

Die Fachhochschule<br />

Alexan<strong>der</strong> Gepp besucht die Fachhochschule (FH) Kufste<strong>in</strong>,<br />

wo er den Studienlehrgang für Internationale Wirtschaft und<br />

Management belegt. Diese Ausbildung dauert vier Jahre<br />

und be<strong>in</strong>haltet zwei <strong>Praktika</strong>, wobei e<strong>in</strong>es davon im Ausland zu<br />

absolvieren ist.<br />

Der <strong>Praktika</strong>nt<br />

Der gebürtige Grazer ist 22 Jahre alt, hoch motiviert und weiß<br />

ganz genau, was er will. Das lässt sich u.a. auch mühelos aus<br />

se<strong>in</strong>er sportlichen Karriere ableiten. Alexan<strong>der</strong> Gepp ist Extrem-<br />

Radrennfahrer, <strong>der</strong> an den härtesten Radmarathons <strong>der</strong> Welt<br />

entwe<strong>der</strong> bereits teilgenommen hat o<strong>der</strong> <strong>in</strong> naher Zukunft<br />

teilnehmen wird.<br />

Warum die AT&S?<br />

Geprägt durch das <strong>in</strong>ternationale Niveau <strong>der</strong> FH Kufste<strong>in</strong><br />

(Unterrichtssprache ist englisch), hat sich Alexan<strong>der</strong> Gepp e<strong>in</strong><br />

ebensolches Unternehmen mit Sitz <strong>in</strong> Österreich gesucht. Se<strong>in</strong>e<br />

28<br />

Human Resources<br />

Attraktiv für<br />

Fachhochschüler –<br />

<strong>Praktika</strong> <strong>in</strong> <strong>der</strong> AT&S<br />

<strong>Attractive</strong> <strong>to</strong> <strong>HE</strong> <strong>students</strong> – work experience at AT&S<br />

Courses at Fachhochschulen (Colleges of Higher Education)<br />

are becom<strong>in</strong>g <strong>in</strong>creas<strong>in</strong>gly attractive <strong>to</strong> <strong>students</strong> as an<br />

alternative <strong>to</strong> university study. The “blame” for this rests<br />

with their practical relevance, <strong>in</strong>tensive student counsell<strong>in</strong>g,<br />

study periods abroad and, last but not least, vocational relevance<br />

– through compulsory work experience <strong>in</strong> <strong>in</strong>dustry – on which<br />

the Fachhochschulen place great value. Vocational experience<br />

gives <strong>students</strong> the chance <strong>to</strong> put what they have learned <strong>in</strong><strong>to</strong><br />

practice and <strong>to</strong> acquire new know-how via the “daily bus<strong>in</strong>ess”<br />

of the world of commerce.<br />

For their part companies receive “re<strong>in</strong>forcements” for<br />

their mostly scarce personnel resources <strong>in</strong> the shape of highly<br />

motivated young staff.<br />

Internationalism and mobility:<br />

Alexan<strong>der</strong> Gepp<br />

The Fachhochschule<br />

Alexan<strong>der</strong> Gepp is a student at the<br />

Fachhochschule <strong>in</strong> Kufste<strong>in</strong> where he is<br />

study<strong>in</strong>g International Bus<strong>in</strong>ess and<br />

Management. The course lasts four<br />

years and <strong>in</strong>cludes two practical periods,<br />

one of which has <strong>to</strong> be spent abroad.<br />

The student tra<strong>in</strong>ee<br />

Alexan<strong>der</strong> was born <strong>in</strong> Graz and is<br />

22 years old, is highly motivated and<br />

knows exactly what he wants. You can<br />

tell that this is so from his sport<strong>in</strong>g<br />

activities. Alexan<strong>der</strong> Gepp is a longdistance<br />

rac<strong>in</strong>g cyclist who has either<br />

already taken part <strong>in</strong> the hardest cycle<br />

marathons <strong>in</strong> the world or is due <strong>to</strong> take<br />

part <strong>in</strong> them <strong>in</strong> the near future.<br />

© Roland Auferbauer


Wahl fiel auf die AT&S und so hat Herr Gepp se<strong>in</strong> erstes Praktikum<br />

am Standort Leoben <strong>in</strong> <strong>der</strong> HR Abteilung absolviert.<br />

Das Praktikum<br />

Während des Praktikums, das <strong>in</strong>sgesamt fünf Monate dauerte,<br />

stand Herr Gepp unter <strong>der</strong> Obhut von VP HR Wolfgang<br />

Tenschert. Aus diversen Projekten wählte Alexan<strong>der</strong> Gepp e<strong>in</strong>e<br />

Aufgabenstellung als Schwerpunkt. Fasz<strong>in</strong>iert hat ihn vor<br />

allem die Matrixorganisation mit <strong>der</strong> er sich <strong>in</strong>tensiv – auch im<br />

Rahmen e<strong>in</strong>er Befragung – ause<strong>in</strong>an<strong>der</strong>setzte.<br />

Auch mit den an<strong>der</strong>en Führungskräften im Personalbereich<br />

arbeitete er eng zusammen und leistete Beiträge zu den Themen:<br />

E-learn<strong>in</strong>g<br />

Leistungsbeurteilungssysteme<br />

Qualifikations-Datenbank<br />

Opera<strong>to</strong>r Tra<strong>in</strong><strong>in</strong>g für Ch<strong>in</strong>a<br />

Feedback zum jobspezifischen Tra<strong>in</strong><strong>in</strong>g <strong>der</strong> ch<strong>in</strong>esischen<br />

Kollegen<br />

Resümee von Herrn Gepp:<br />

„E<strong>in</strong> sehr vielfältiges Praktikum mit verschiedenen Themenstellungen<br />

im Personalbereich, aber auch mit <strong>der</strong> Möglichkeit,<br />

abteilungsübergreifend tätig zu se<strong>in</strong>. Ich konnte eigenständig<br />

arbeiten und habe vor allem das Vertrauen geschätzt, das man<br />

mir überall im Unternehmen, beson<strong>der</strong>s aber seitens me<strong>in</strong>er<br />

Betreuer entgegen brachte.“<br />

Export – Die Chance für weltweiten<br />

Wirtschaftsaufschwung: Bernhard Seidl<br />

Die Fachhochschule<br />

Bernhard Seidl <strong>in</strong>teressiert sich für <strong>in</strong>ternationales Wirtschafts-<br />

Know-how, <strong>in</strong>ternationale Wirtschaftsbeziehungen, Fremdsprachen<br />

und das Ausland im allgeme<strong>in</strong>en. Genau das bietet<br />

ihm die Fachhochschule IMC Krems <strong>in</strong> e<strong>in</strong>em vierjährigen<br />

Fachhochschulstudium mit zwei Auslandspraktika, das er als<br />

Mag. (FH) für Expor<strong>to</strong>rientiertes Management EU-ASEAN-<br />

NAFTA abschließen kann.<br />

Wie kommt <strong>der</strong> <strong>Praktika</strong>nt zur AT&S?<br />

Bernhard Seidl ist 24 Jahre alt und stammt aus dem Bezirk<br />

Feldbach. Um e<strong>in</strong>en <strong>in</strong>teressanten Praxisplatz zu „ergattern“, hat<br />

sich Herr Seidl an den größten weltweit agierenden Arbeitgeber<br />

<strong>der</strong> Region gewandt, die AT&S (Standort Fehr<strong>in</strong>g). Mit Erfolg,<br />

denn nach e<strong>in</strong>er 4-wöchigen E<strong>in</strong>arbeitungszeit <strong>in</strong> Österreich<br />

wird Bernhard Seidl nun bis Ende Juli am Standort AT&S India<br />

arbeiten.<br />

Das Praktikum<br />

Unter <strong>der</strong> Patronanz von Sen. VP Supply Cha<strong>in</strong> Management,<br />

Herrn Eberhard Rueß <strong>in</strong> Österreich und Controller Ingo Hofmaier<br />

<strong>in</strong> Nanjangud wird Herr Seidl e<strong>in</strong>e Prozessanalyse <strong>in</strong> <strong>der</strong><br />

bzw. über die Materialbeschaffung durchführen und für mehr<br />

Kostentransparenz <strong>der</strong> Material- und Anschaffungsnebenkosten<br />

sorgen. Weiters beschäftigt er sich mit Optimierungsmöglichkeiten<br />

im Beschaffungsprozess und arbeitet folglich mit den Abteilungen<br />

Vertrieb, E<strong>in</strong>kauf, Logistik und Controll<strong>in</strong>g zusammen.<br />

Human Resources<br />

Why AT&S?<br />

Prompted by the <strong>in</strong>ternational emphasis at Kufste<strong>in</strong> Fachhochschule<br />

(the language of <strong>in</strong>struction is English), Alexan<strong>der</strong> Gepp<br />

looked for a similarly oriented company <strong>in</strong> Austria. His choice fell<br />

on AT&S, and so Mr. Gepp spent his first period of work experience<br />

on the Leoben site <strong>in</strong> the Human Resources Department.<br />

Practical tra<strong>in</strong><strong>in</strong>g<br />

Dur<strong>in</strong>g his period of practical tra<strong>in</strong><strong>in</strong>g, which lasted five months<br />

<strong>in</strong> all, Mr. Gepp was <strong>in</strong> the care of VP HR Wolfgang Tenschert.<br />

Out of the special subjects open <strong>to</strong> him Alexan<strong>der</strong> Gepp chose<br />

the matrix organisation, which particularly fasc<strong>in</strong>ated him and of<br />

which he made a detailed study us<strong>in</strong>g survey techniques.<br />

He also worked closely with other senior executives <strong>in</strong><br />

personnel and made several contributions <strong>in</strong> the areas of:<br />

e-learn<strong>in</strong>g<br />

performance evaluation systems<br />

a qualifications data base<br />

opera<strong>to</strong>r tra<strong>in</strong><strong>in</strong>g for Ch<strong>in</strong>a<br />

feedback <strong>to</strong> the job-specific tra<strong>in</strong><strong>in</strong>g of Ch<strong>in</strong>ese colleagues<br />

Resumé by Mr. Gepp:<br />

“A very varied practical period with different projects <strong>in</strong> the<br />

personnel area, but also with the chance of work<strong>in</strong>g across the<br />

departments. I was able <strong>to</strong> work <strong>in</strong>dependently and appreciated<br />

most of all the trust placed <strong>in</strong> me all over the company, but<br />

specially by those who looked after me.”<br />

Export – the chance of an upturn <strong>in</strong><br />

bus<strong>in</strong>ess world-wide: Bernhard Seidl<br />

The Fachhochschule<br />

Bernhard Seidl is <strong>in</strong>terested <strong>in</strong> <strong>in</strong>ternational<br />

bus<strong>in</strong>ess know-how, <strong>in</strong>ternational<br />

commercial relations, foreign languages<br />

and foreign countries <strong>in</strong> general. This is<br />

exactly what is on offer at IMC Krems<br />

Fachhochschule on a four-year higher<br />

education course with two periods of practical work abroad.<br />

This will enable him <strong>to</strong> graduate with a Master’s degree <strong>in</strong><br />

Export-oriented Management EU-ASEAN-NAFTA.<br />

How did he come <strong>to</strong> AT&S as a student tra<strong>in</strong>ee?<br />

Bernhard Seidl is 24 years old and comes from the district of<br />

Feldbach. In or<strong>der</strong> <strong>to</strong> “bag” an <strong>in</strong>terest<strong>in</strong>g practical placement<br />

Seidl applied <strong>to</strong> the largest employer <strong>in</strong> the region with <strong>in</strong>terests<br />

world-wide – AT&S Fehr<strong>in</strong>g. Successfully, s<strong>in</strong>ce after a 4-week<br />

familiarisation period <strong>in</strong> Austria Bernhard Seidl is <strong>to</strong> work at<br />

AT&S’s site <strong>in</strong> India until the end of July.<br />

Practical tra<strong>in</strong><strong>in</strong>g<br />

Un<strong>der</strong> the aegis of Sen. VP Supply Cha<strong>in</strong> Management,<br />

Eberhard Rueß <strong>in</strong> Austria and Cost Controller Ingo Hofmaier <strong>in</strong><br />

Nanjangud Mr. Seidl will carry out a process analysis <strong>in</strong> or about<br />

material procurement and look <strong>in</strong><strong>to</strong> the problem of greater<br />

transparency of the subsidiary cost of material and purchas<strong>in</strong>g.<br />

He will also exam<strong>in</strong>e ways of optimis<strong>in</strong>g the procurement<br />

29


Erwartungen versus erste E<strong>in</strong>drücke:<br />

„Es zeichnet sich jetzt schon ab, dass mir me<strong>in</strong> Praktikum viele<br />

wichtige Erfahrungen vermitteln wird. Bei <strong>der</strong> AT&S ist man<br />

tatsächlich verantwortlich und darf nicht nur dem Betreuer<br />

über die Schulter schauen. In <strong>der</strong> Zeit vor <strong>der</strong> Abreise habe ich<br />

viele E<strong>in</strong>drücke von Indien „vom Hören-Sagen“ gesammelt und<br />

auch e<strong>in</strong>e Literaturliste zum E<strong>in</strong>lesen bekommen. Ich b<strong>in</strong><br />

gespannt auf die fremde Kultur, das gute und scharfe Essen<br />

und wie die Zusammenarbeit mit den <strong>in</strong>dischen Kollegen<br />

klappen wird.“<br />

Rückmeldung aus Indien:<br />

„Nach e<strong>in</strong>em Monat <strong>in</strong> Indien kann ich schon sagen, dass dies<br />

das wohl fasz<strong>in</strong>ierendste Land ist, das ich bis jetzt kennengelernt<br />

habe. Die kulturellen Unterschiede s<strong>in</strong>d zwar nicht immer leicht<br />

zu verstehen bzw. zu akzeptieren, sorgen dafür aber für<br />

spannende und herausfor<strong>der</strong>nde Monate. Zudem ist durch die<br />

professionelle Betreuung und Unterstützung auch wirklich<br />

konstruktive Arbeit gewährleistet.<br />

Praxis und wissenschaftliche Betrachtung<br />

Die Praxisnähe <strong>der</strong> Fachhochschulen schmälert jedoch <strong>in</strong><br />

ke<strong>in</strong>ster Weise den Wert <strong>der</strong> wissenschaftlichen Arbeiten wie <strong>der</strong><br />

Diplomarbeit o<strong>der</strong> Dissertation. Diese schriftlichen Abhandlungen<br />

s<strong>in</strong>d zum e<strong>in</strong>en notwendiger Abschluss und „i-Tüpfelchen“<br />

e<strong>in</strong>er anspruchsvollen Ausbildung, zum an<strong>der</strong>en leisten sie<br />

wertvolle Beiträge zu konkreten o<strong>der</strong> aktuellen Themen <strong>der</strong><br />

Wirtschaftspraxis.<br />

Die AT&S unterstützt Diplomanden bzw. Dissertanten<br />

und hat von folgenden Arbeiten profitiert bzw. erhofft sich<br />

<strong>in</strong>teressante Betrachtungen über die Themen:<br />

30<br />

„E<strong>in</strong>e his<strong>to</strong>rische Betriebsanalyse“ von Renate Wieland<br />

„Die Energiewirtschaft des Leiterplattenherstellers AT&S<br />

(e<strong>in</strong>e Darstellung am Beispiel von Erdgas)“ von Gert<br />

Breitfuß<br />

„Die Energiewirtschaft des Leiterplattenherstellers AT&S<br />

(e<strong>in</strong>e Darstellung am Beispiel von elektrischem Strom)“ von<br />

Ralf Slim<br />

„Untersuchungen zu Wasser- und Energiee<strong>in</strong>sparungen <strong>in</strong><br />

<strong>der</strong> Leiterplattenfertigung“ von Andreas Kollegger<br />

„Market<strong>in</strong>gkonzeption zum alternativen E<strong>in</strong>satz von<br />

Messgeräten im Hochtechnologiebereich (Arbeitstitel)“<br />

von Roland Kirschner<br />

“Triphenylene <strong>der</strong>ivatives as hole transport agents <strong>in</strong> organic<br />

light emitt<strong>in</strong>g diodes” von Markus Emerich<br />

“Electro-optical properties of organic th<strong>in</strong>-film devices”<br />

und „Micro- und Nanostrukturierung von elektroaktiven<br />

Materialien“ von Erik Mo<strong>der</strong>egger<br />

“Investigations on the operational stability and performance<br />

improvements of blue light emitt<strong>in</strong>g organic th<strong>in</strong> film<br />

devices” von Stefan Müllegger<br />

“Systematic characterization and modelization of organic<br />

light emitt<strong>in</strong>g devices” von Alexan<strong>der</strong> Pogantsch<br />

“Organic light emitt<strong>in</strong>g diodes with improved performance<br />

by cathode modifications” von Christian Süss<br />

„Fabrication and Characterisation of lightemitt<strong>in</strong>g organic<br />

electrochemical lense“ von Franz-Peter Wenzel<br />

Human Resources<br />

process, and therefore he will be work<strong>in</strong>g jo<strong>in</strong>tly with the departments<br />

of Sales, Purchas<strong>in</strong>g, Logistics and Cost Control.<br />

Expectations versus impressions:<br />

“It is obvious <strong>to</strong> me already that my period of practical work will<br />

generate a lot of important experiences. At AT&S you are really<br />

responsible for what you do, and you’re not allowed just <strong>to</strong> look<br />

over your men<strong>to</strong>r’s shoul<strong>der</strong>. In the period before my departure<br />

I’ve gathered a lot of impressions of India “from hearsay” and<br />

also acquired a read<strong>in</strong>g list. I’m dy<strong>in</strong>g <strong>to</strong> experience the different<br />

culture and the spicy food, and <strong>to</strong> f<strong>in</strong>d out how collaborat<strong>in</strong>g<br />

with Indian colleagues will turn out.”<br />

Report<strong>in</strong>g back from India:<br />

“After one month <strong>in</strong> India I can truthfully say that this is the<br />

most fasc<strong>in</strong>at<strong>in</strong>g country I’ve been <strong>to</strong> up till now. The cultural<br />

differences aren’t easy <strong>to</strong> un<strong>der</strong>stand or accept, it’s true, but they<br />

make it certa<strong>in</strong> that these will be excit<strong>in</strong>g and challeng<strong>in</strong>g<br />

months. In addition the professional care and support I get<br />

ensure that I can do some really constructive work.”<br />

Practical experience and scientific study<br />

The practical relevance of the Fachhochschulen (Colleges of<br />

Higher Education) <strong>in</strong> no way lessens the value of scientific studies<br />

such as degree coursework or dissertations. These written treatises<br />

are on the one hand a “dott<strong>in</strong>g of the i’s” – a fitt<strong>in</strong>g conclusion <strong>to</strong><br />

a demand<strong>in</strong>g education, and on the other a valuable contribution<br />

<strong>to</strong> specific or current aspects of commercial practice.<br />

AT&S supports <strong>students</strong> who are on degree or higher degree<br />

courses, and it has either benefited from the follow<strong>in</strong>g studies or<br />

hopes <strong>to</strong> ga<strong>in</strong> someth<strong>in</strong>g of <strong>in</strong>terest from them:<br />

“A his<strong>to</strong>rical operational analysis” by Renate Wieland<br />

“Energy management by the pr<strong>in</strong>ted circuit board<br />

manufacturers AT&S (a presentation based on the example<br />

of natural gas)” by Gert Breitfuß<br />

“Energy management by the pr<strong>in</strong>ted circuit board<br />

manufacturers AT&S (a presentation based on the example<br />

of electricity)” by Ralf Slim<br />

“An exam<strong>in</strong>ation of water and energy sav<strong>in</strong>g <strong>in</strong> the<br />

manufacture of pr<strong>in</strong>ted circuit boards” by Andreas Kollegger<br />

“Market<strong>in</strong>g conception for the alternative use of measur<strong>in</strong>g<br />

devices <strong>in</strong> the field of high technology (work<strong>in</strong>g title)” by<br />

Roland Kirschner<br />

“Triphenylene <strong>der</strong>ivatives as hole transport agents <strong>in</strong> organic<br />

light-emitt<strong>in</strong>g diodes” by Markus Emerich<br />

“Electro-optical properties of organic th<strong>in</strong>-film devices” and<br />

“Micro- and nano-structur<strong>in</strong>g of electro-active materials” by<br />

Erik Mo<strong>der</strong>egger<br />

“Investigations on the operational stability and performance<br />

improvements of blue light-emitt<strong>in</strong>g organic th<strong>in</strong>-film<br />

devices” by Stefan Müllegger<br />

“Systematic characterisation and modelisation of organic<br />

light-emitt<strong>in</strong>g devices” by Alexan<strong>der</strong> Pogantsch<br />

“Organic light-emitt<strong>in</strong>g diodes with improved performance<br />

by cathode modifications” by Christian Süss<br />

“Fabrication and characterisation of light-emitt<strong>in</strong>g organic<br />

electrochemical lenses” by Franz-Peter Wenzel


Die leuchtende<br />

Leiterplatte – Wissen<br />

schaft Wirtschaft<br />

AT&S und SDS sichern<br />

Technologieführerschaft<br />

Als erstes österreichisches Unternehmen hat<br />

sich die, im Juni 1997 unter maßgeblicher<br />

Beteiligung von Prof. Günther Leis<strong>in</strong>g,<br />

Sen. VP Technology gegründete, SDS Display<br />

Systems (SDS) das Ziel gesetzt, Ergebnisse<br />

<strong>der</strong> universitären Grundlagenforschung<br />

technologisch umzusetzen und eigene Entwicklungen<br />

<strong>in</strong> Form von neuartigen Flachbildanzeigen<br />

auf den Markt zu br<strong>in</strong>gen. Seit den<br />

ersten Monaten bis zum heutigen Tag<br />

zeichnete sich die Entwicklungsarbeit bei SDS<br />

durch e<strong>in</strong>e stetige Leistungssteigerung <strong>der</strong><br />

Pro<strong>to</strong>typen aus.<br />

Die AT&S beauftragte die Firma SDS mit<br />

<strong>der</strong> Durchführung e<strong>in</strong>es Projektes, welches die<br />

technische Machbarkeit <strong>der</strong> Integration organischer<br />

Leuchtelemente direkt auf <strong>der</strong> Leiterplatte<br />

zeigen sollte. Das Projekt „Display on Board“<br />

wurde geme<strong>in</strong>sam von AT&S und SDS erfolgreich<br />

und <strong>in</strong>nerhalb des geplanten Zeitrahmens<br />

durchgeführt. E<strong>in</strong> unabhängiges Assessment<br />

Team bestätigte <strong>der</strong> neuen Technologie Alle<strong>in</strong>stellungsmerkmale<br />

und empfahl <strong>der</strong> AT&S AG<br />

die Weiterverfolgung des Projekts.<br />

Die Realisierung dieser Technologie fügt<br />

sich gut <strong>in</strong> die Gesamtstrategie von AT&S, <strong>in</strong><br />

Zukunft den Mehrwert <strong>der</strong> Leiterplatte durch<br />

Integration von Funktionselementen, wie<br />

passiven und aktiven Bauelementen zu erhöhen.<br />

Um die wertvollen Dienste von SDS zukünftig<br />

une<strong>in</strong>geschränkt nutzen zu können, hat die<br />

AT&S daher zum 1. April 2002 das Unternehmen<br />

übernommen.<br />

Highlights<br />

Kreuz und quer durch<br />

die AT&S<br />

Criss-cross through AT&S<br />

The Illum<strong>in</strong>ated<br />

Circuit Board – Bus<strong>in</strong>ess<br />

from Science<br />

AT&S and SDS secure technological<br />

lea<strong>der</strong>ship<br />

SDS Display Systems (SDS), formed <strong>in</strong> June<br />

1997 un<strong>der</strong> the aegis of Professor Günther<br />

Leis<strong>in</strong>g, Sen. VP Technology, set itself the task<br />

of becom<strong>in</strong>g the first Austrian company <strong>to</strong><br />

convert the results of fundamental academic<br />

research <strong>in</strong><strong>to</strong> technological projects and market<br />

its own developments <strong>in</strong> the form of novel<br />

flat-screen displays. From the first months <strong>to</strong> the<br />

present day SDS’s development work has been<br />

dist<strong>in</strong>guished by a cont<strong>in</strong>uous stream of quality<br />

pro<strong>to</strong>types.<br />

AT&S commissioned SDS <strong>to</strong> implement a<br />

project the purpose of which was <strong>to</strong> demonstrate<br />

the technical feasibility of <strong>in</strong>tegrat<strong>in</strong>g organic<br />

Technologische Umsetzung<br />

universitärer Grundlagenforschung<br />

Technological realization<br />

of fundamental academic<br />

research<br />

Kooperation zwischen SDS<br />

und AT&S<br />

Cooperation between SDS<br />

and AT&S<br />

31


Siemens zeichnet<br />

AT&S als „Lieferant des<br />

Jahres“ aus<br />

Die Führungsspitze des Geschäftsbereiches CO<br />

(Komponenten) von Siemens, Präsident<br />

Karlhe<strong>in</strong>z Kaul und Vice-Präsident Karl-He<strong>in</strong>z<br />

Weiß, zeichnete im Jänner 2002 die AT&S als<br />

Lieferant des Jahres aus. „Die AT&S habe <strong>in</strong><br />

e<strong>in</strong>em sehr schwierigen Geschäftsfeld <strong>in</strong> den<br />

Bereichen Qualität, Logistik, Lieferperformance<br />

und Service konstant sehr gute Leistungen<br />

erbracht,“ so Präsident Kaul. In weiterer Folge<br />

sollten die Verdienste <strong>der</strong> AT&S auch die<br />

Geschäfte mit Siemens Medical Solutions <strong>in</strong> den<br />

USA positiv bee<strong>in</strong>flussen und zu e<strong>in</strong>em weiteren<br />

Ausbau <strong>der</strong> Partnerschaft führen.<br />

Neben AT&S erhielten nur noch zwei<br />

weitere Lieferanten aus an<strong>der</strong>en Materialfel<strong>der</strong>n<br />

von <strong>in</strong>sgesamt rund 150 Zulieferern das Prädikat<br />

„Lieferant des Jahres“.<br />

Botschaft aus Nörvenich <strong>in</strong> eigener Sache:<br />

Unser Dank gilt vor allem den AT&S Mitarbeitern<br />

<strong>in</strong> den Werken Fohnsdorf und Fehr<strong>in</strong>g, die<br />

mit ihrem vorbildlichen E<strong>in</strong>satz zu diesem geme<strong>in</strong>samen<br />

Erfolg beigetragen haben!<br />

Standort Nörvenich<br />

nunmehr zu 100% AT&S<br />

Die AT&S Leiterplatten Vertriebs GmbH. <strong>in</strong><br />

Nörvenich – e<strong>in</strong>em idyllischen Örtchen zwischen<br />

Düsseldorf und Köln – nahm ihre Geschäftstätigkeit<br />

bereits im Jahr 1993 auf. Die AT&S AG<br />

selbst war an <strong>der</strong> Unternehmung bis da<strong>to</strong> mit<br />

26% beteiligt. Unter Geschäftsführer Herbert<br />

Ahns erzielte das vierköpfige Vertriebsteam, das<br />

anfangs über e<strong>in</strong>em Friseurladen angesiedelt war,<br />

<strong>in</strong>nerhalb kürzester Zeit beachtliche Erfolge.<br />

Bereits 1995 hatte sich <strong>der</strong> Umsatz – Dank des<br />

Hauptkunden Siemens mit dem das AT&S<br />

Partnerschaftspr<strong>in</strong>zip gelebt wird – be<strong>in</strong>ahe<br />

verdreifacht. Im Mai 2000 wurde das Geschäftsfeld<br />

erweitert und das Design- und Logistikcenter<br />

Nörvenich eröffnet. Auf 4.500 m 2 wird nun mit<br />

über 20 MitarbeiterInnen auch Entwicklungsarbeit<br />

geleistet und die Lagerhaltung für die<br />

Kunden übernommen.<br />

Bis da<strong>to</strong> hat sich Nörvenich als wichtiger<br />

Partner mit wichtigen Kunden bewährt, <strong>der</strong> mit<br />

den österreichischen Standorten eng kooperierte.<br />

Um die AT&S Synergien, wie beispielsweise<br />

32<br />

Highlights<br />

light elements directly on the pr<strong>in</strong>ted circuit<br />

board. The project entitled “Display on Board”<br />

was successfully implemented jo<strong>in</strong>tly by AT&S<br />

and SDS with<strong>in</strong> the planned time scale. An<br />

<strong>in</strong>dependent assessment team confirmed the<br />

unique sell<strong>in</strong>g po<strong>in</strong>ts of the new technology and<br />

recommended that AT&S should cont<strong>in</strong>ue with<br />

the project.<br />

The realisation of this technology fits <strong>in</strong> well<br />

with AT&S’s general strategy of <strong>in</strong>creas<strong>in</strong>g the<br />

added value of the pr<strong>in</strong>ted circuit board <strong>in</strong> future<br />

by the <strong>in</strong>tegration of functional elements such as<br />

active and passive components.<br />

In or<strong>der</strong> <strong>to</strong> have unlimited use of the<br />

valuable services of SDS <strong>in</strong> the future AT&S <strong>to</strong>ok<br />

over the company on April 1, 2002.<br />

Siemens names AT&S<br />

“Supplier of the Year”<br />

The chiefs of Siemens CO (Components) Division,<br />

President Karlhe<strong>in</strong>z Kaul und Vice-President<br />

Karl-He<strong>in</strong>z Weiß, named AT&S <strong>in</strong> January<br />

2002 Supplier of the Year. “AT&S has consistently<br />

performed very well <strong>in</strong> the areas of quality,<br />

logistics, supply performance and service <strong>in</strong> a very<br />

difficult sec<strong>to</strong>r” said President Kaul. As a consequence<br />

AT&S’s contributions should have a<br />

positive effect on the bus<strong>in</strong>ess of Siemens Medical<br />

Solutions <strong>in</strong> the USA and lead <strong>to</strong> a further extension<br />

of the partnership.<br />

Besides AT&S two of about 150 other<br />

suppliers from other fields were granted the title<br />

“Supplier of the Year”.<br />

Message from Nörvenich on their own behalf:<br />

Our thanks are due most of all <strong>to</strong> the AT&S<br />

employees <strong>in</strong> the Fohnsdorf and Fehr<strong>in</strong>g works<br />

Die Wiege des Erfolges <strong>in</strong> Nörvenich<br />

The cradle of success <strong>in</strong> Nörvenich<br />

Tanja Heidbüchel und Harald<br />

Jacobi aus <strong>der</strong> AT&S Nörvenich<br />

nahmen die Auszeichnung<br />

entgegen.<br />

Tanja Heidbüchel and Harald<br />

Jacobi from AT&S Nörvenich<br />

accept the award.


Kommunikation, Logistik, Personaladm<strong>in</strong>istration,<br />

etc. zukünftig optimal nutzen zu können, ist<br />

<strong>der</strong> Standort seit 1. April 2002 zu 100% <strong>in</strong> die<br />

AT&S <strong>in</strong>tegriert.<br />

Willkommen <strong>in</strong> <strong>der</strong> AT&S!<br />

Run<strong>der</strong> Tisch <strong>in</strong><br />

Nörvenich – Alles für<br />

den Kunden<br />

Am 8. und 9. März 2002 trafen sich Vertreter <strong>der</strong><br />

AT&S Fohnsdorf mit dem Team aus Deutschland<br />

<strong>in</strong> Nörvenich. Unter dem Mot<strong>to</strong> „Das Email<br />

ersetzt nie die persönliche Kommunikation“,<br />

wurde die zukünftige Zusammenarbeit zwischen<br />

Fertigung und Vertrieb – unter Berücksichtigung<br />

<strong>der</strong> Aspekte Design und Logistik – <strong>in</strong> persönlichen<br />

Gesprächen erörtert. In erster L<strong>in</strong>ie sollten<br />

Missverständnisse und Differenzen aufgeklärt<br />

und darüber h<strong>in</strong>aus e<strong>in</strong>e geme<strong>in</strong>same Vertrauensbasis<br />

für die Zukunft aufgebaut werden.<br />

Haben sich die Erwartungen erfüllt?<br />

Gastgeber Herbert Ahns über das Meet<strong>in</strong>g:<br />

Angeregt von Herrn Drofenik waren die Gespräche<br />

für uns sowohl sachlich als auch vom „tim<strong>in</strong>g“ her<br />

gut und wichtig. Nach <strong>der</strong> vollständigen Übernahme<br />

<strong>der</strong> Vertriebs GmbH durch die AT&S AG<br />

war dies e<strong>in</strong> guter Zeitpunkt, die Zusammenarbeit<br />

neu auszurichten und zu optimieren.<br />

In <strong>der</strong> Sache war es unser Anliegen, darzulegen,<br />

dass 1.000 km Distanz zum Werk natürlich<br />

absolute Kundennähe bedeutet. Die Kommunikation<br />

<strong>in</strong> die Fachabteilungen <strong>in</strong> Fohnsdorf bedarf<br />

dann aber e<strong>in</strong>er an<strong>der</strong>en, besseren Qualität.<br />

Highlights<br />

who have contributed <strong>to</strong> our jo<strong>in</strong>t success with<br />

their exemplary commitment!<br />

The Nörvenich site<br />

is 100% AT&S<br />

from now on<br />

AT&S Leiterplatten Vertriebs GmbH. <strong>in</strong><br />

Nörvenich – an idyllic little place between<br />

Düsseldorf and Cologne – began trad<strong>in</strong>g as long<br />

ago as 1993. AT&S AG itself had a 26%<br />

hold<strong>in</strong>g <strong>in</strong> the company at that time. Un<strong>der</strong><br />

Manag<strong>in</strong>g Direc<strong>to</strong>r Herbert Ahns the four-man<br />

strong sales team, who were first housed above<br />

a hairdress<strong>in</strong>g salon, achieved consi<strong>der</strong>able<br />

success very quickly. By 1995 sales – thanks <strong>to</strong><br />

their ma<strong>in</strong> cus<strong>to</strong>mer Siemens with whom<br />

AT&S was work<strong>in</strong>g <strong>in</strong> partnership – had almost<br />

tripled.<br />

In May 2000 the bus<strong>in</strong>ess was expanded by<br />

the open<strong>in</strong>g of the Design and Logistics Centre<br />

<strong>in</strong> Nörvenich. Now more than 20 employees<br />

<strong>in</strong> a space of 4,500 m 2 also do development<br />

work and have taken on responsibility for warehous<strong>in</strong>g<br />

for cus<strong>to</strong>mers.<br />

To date Nörvenich has proved <strong>to</strong> be an<br />

important partner with important cus<strong>to</strong>mers<br />

which cooperates closely with the Austrian sites.<br />

In or<strong>der</strong> that Nörvenich will be able <strong>to</strong> profit <strong>in</strong><br />

future from AT&S synergies, such as communications,<br />

logistics, personnel adm<strong>in</strong>istration etc.,<br />

it has been taken over 100% by AT&S.<br />

Welcome <strong>to</strong> AT&S!<br />

Deutschland und Österreich<br />

<strong>in</strong> <strong>der</strong> AT&S vere<strong>in</strong>t<br />

Germany and Austria<br />

united <strong>in</strong> the AT&S<br />

33


Und dann gilt es noch, das Gesagte mit<br />

gleichem Verständnis umzusetzen.<br />

Wir danken den Kollegen aus Fohnsdorf für<br />

die Reise nach Nörvenich!<br />

Unser ganzes Team – Vertrieb Logistik und<br />

Design – ist angetreten, <strong>in</strong>sbeson<strong>der</strong>e den<br />

Standort Fohnsdorf im laufenden Geschäftsjahr<br />

mit neuen Kunden und mehr Auftragsvolumen<br />

zu sichern. Dies ist unser Ziel und daran lassen<br />

wir uns messen – versprochen!<br />

Bilanz vom Standortleiter<br />

<strong>der</strong> AT&S Fohnsdorf, Dietmar Drofenik:<br />

Unser Team ist zwar mit konkreten Vorstellungen<br />

über die zu diskutierenden Themen zu diesem<br />

Meet<strong>in</strong>g aufgebrochen, so richtig e<strong>in</strong>schätzen,<br />

was uns <strong>in</strong> Nörvenich erwarten würde, konnten<br />

wir aber dennoch nicht. Die auslösenden<br />

Fak<strong>to</strong>ren, welche dieses Meet<strong>in</strong>g unbed<strong>in</strong>gt<br />

notwendig machten, waren nicht dazu angetan<br />

schon bei <strong>der</strong> Begrüßung e<strong>in</strong>e positive Stimmung<br />

zu verbreiten.<br />

Umso positiver die Bilanz <strong>der</strong> beiden – zu<br />

kurzen – Tage <strong>in</strong> denen wir die fast schon legendäre<br />

Gastfreundschaft unserer Kollegen <strong>in</strong><br />

Nörvenich empfangen durften.<br />

In überaus sachlichen und konstruktiven<br />

Diskussionen und e<strong>in</strong>em anschließenden Workshop<br />

wurden geme<strong>in</strong>sam Ziele und Maßnahmen<br />

für die Zukunft ausgearbeitet, welche wir geme<strong>in</strong>sam<br />

<strong>in</strong> den nächsten Monaten umsetzen werden.<br />

Das wir trotz <strong>der</strong>, am Beg<strong>in</strong>n des Meet<strong>in</strong>gs herrschenden<br />

spannungsgeladenen Atmosphäre zu<br />

gegenseitigen Verständnis und e<strong>in</strong>er geme<strong>in</strong>samen<br />

Vorgangsweise für die Zukunft gekommen s<strong>in</strong>d,<br />

ist für mich <strong>der</strong> erste Ansatz zu e<strong>in</strong>er auf Vertrauen<br />

basierenden Zusammenarbeit. Denn nur<br />

geme<strong>in</strong>sam wird es uns gel<strong>in</strong>gen die Herausforde-<br />

34<br />

Highlights<br />

Round table <strong>in</strong><br />

Nörvenich –<br />

All for the Cus<strong>to</strong>mers<br />

On March 8 and 9, 2002 representatives of<br />

AT&S Fohnsdorf met the German team <strong>in</strong><br />

Nörvenich. Un<strong>der</strong> the slogan “E-mail will never<br />

replace personal communication” future<br />

cooperation between production and sales was<br />

discussed person <strong>to</strong> person with the emphasis on<br />

design and logistics. The first priority was <strong>to</strong><br />

clear up misun<strong>der</strong>stand<strong>in</strong>gs and differences and<br />

beyond that build up a common basis of trust for<br />

the future.<br />

Were these expectations fulfilled?<br />

Remarks by host Herbert Ahns about the<br />

meet<strong>in</strong>g:<br />

The discussions <strong>in</strong>stigated by Mr. Drofenik were<br />

good for us and important from the po<strong>in</strong>t of view<br />

of both subject matter and tim<strong>in</strong>g. Follow<strong>in</strong>g the<br />

complete take-over of Vertriebs GmbH by AT&S<br />

AG, this was a good time <strong>to</strong> give our collaboration<br />

a new direction and improve it.<br />

In this context it was our concern <strong>to</strong> po<strong>in</strong>t<br />

out that 1,000 km from the works <strong>to</strong> our cus<strong>to</strong>mers<br />

is no great distance. We therefore need <strong>to</strong><br />

replace the communications at Fohnsdorf with<br />

better quality systems.<br />

Another priority is <strong>to</strong> implement what we<br />

discussed with the same discernment we brought<br />

<strong>to</strong> the discussions.<br />

A big thank you <strong>to</strong> our colleagues from<br />

Fohnsdorf for the trip <strong>to</strong> Nörvenich!<br />

Our whole team – Sales, Logistics and Design<br />

– is determ<strong>in</strong>ed <strong>to</strong> secure new cus<strong>to</strong>mers and<br />

more or<strong>der</strong>s for the Fohnsdorf site <strong>in</strong> particular <strong>in</strong><br />

Aufbau e<strong>in</strong>er Vertrauensbasis<br />

Build<strong>in</strong>g up a common basis<br />

of trust


ungen, die auf uns zukommen zu meistern und<br />

an ihnen zu wachsen.<br />

Aus <strong>der</strong> Sicht von Fohnsdorf e<strong>in</strong>e gelungene<br />

Veranstaltung, wie sie besser nicht se<strong>in</strong> hätte<br />

können. Auf diesem Wege nochmals herzlichen<br />

Dank an das Team <strong>in</strong> Nörvenich und an Herbert<br />

Ahns für die exzellente Organisation und die<br />

konstruktive Zusammenarbeit. – Den Erfolg<br />

müssen wir uns nun erarbeiten.<br />

AT&S dokumentiert<br />

Umweltbewusstse<strong>in</strong> –<br />

4. Platz beim AERA<br />

Im Jahr 2001 hat sich die AT&S erstmalig an <strong>der</strong><br />

Ausschreibung für den Austrian Environmental<br />

Report Award (AERA = Auszeichnung <strong>der</strong> besten<br />

österreichischen Umwelterklärungen) beteiligt<br />

und gleich den vierten Rang erreicht.<br />

Der AERA wird von <strong>der</strong> Kammer <strong>der</strong> Wirtschaftstreuhän<strong>der</strong><br />

und <strong>der</strong> Industriellenvere<strong>in</strong>igung<br />

<strong>in</strong> Zusammenarbeit mit dem Umweltm<strong>in</strong>isterium<br />

vergeben. Die österreichischen Unternehmen<br />

sollen mit dem AERA motiviert werden, ihr<br />

Umweltbewusstse<strong>in</strong> auch schriftlich zu belegen.<br />

Das funktioniert recht gut: Laut Kammer <strong>der</strong><br />

Wirtschaftstreuhän<strong>der</strong> schneidet Österreich im<br />

europäischen Vergleich nicht schlecht ab – bezogen<br />

auf die E<strong>in</strong>wohnerzahl gibt es bei uns die<br />

meisten Umwelterklärungen.<br />

AT&S VP Production Wilfried Stroißnigg<br />

und Umweltbeauftragter Friedrich Zeman appellieren<br />

an die weitere Unterstützung aller Mitarbeiter<strong>in</strong>nen<br />

und Mitarbeiter <strong>in</strong> Sachen Umwelt:<br />

Der vierte Rang ist auch e<strong>in</strong> Ansporn, den Umweltschutz<br />

<strong>in</strong> <strong>der</strong> AT&S weiter zu verbessern!<br />

Kostensenkung<br />

umgesetzt – Hohes<br />

E<strong>in</strong>sparungspotenzial<br />

<strong>in</strong> <strong>der</strong> Multilayerproduktion<br />

erreicht<br />

Das Projekt Backhaus<br />

Klaus Tomaschitz, <strong>der</strong> Abteilungsleiter des Bereichs<br />

Pressen/Relam<strong>in</strong>ation <strong>in</strong> <strong>der</strong> AT&S Leoben<br />

hat <strong>in</strong> Zusammenarbeit mit <strong>der</strong> Firma Dieter<br />

Backhaus Technologie GmbH e<strong>in</strong> Verfahren<br />

entwickelt, welches <strong>in</strong> <strong>der</strong> Multilayerfertigung<br />

enorme Vorteile br<strong>in</strong>gt. Ziel <strong>der</strong> Überlegungen<br />

war, den Prozess dah<strong>in</strong>gehend zu optimieren, dass<br />

Highlights<br />

the current f<strong>in</strong>ancial year. This is our aim and we<br />

shall be judged by it – I promise!<br />

Report by the Chief Executive of AT&S<br />

Fohnsdorf, Dietmar Drofenik:<br />

Our team started with specific ideas about the<br />

<strong>to</strong>pics discussed at this meet<strong>in</strong>g, but we were not<br />

able <strong>to</strong> estimate accurately what we were <strong>to</strong><br />

expect <strong>in</strong> Nörvenich. The decid<strong>in</strong>g fac<strong>to</strong>rs which<br />

made it vital <strong>to</strong> have this meet<strong>in</strong>g were not calculated<br />

<strong>to</strong> produce a positive atmosphere from the<br />

start.<br />

All the more positive then was the outcome<br />

of the two – <strong>to</strong>o short – days <strong>in</strong> which we were<br />

able <strong>to</strong> enjoy the almost legendary hospitality of<br />

our colleagues <strong>in</strong> Nörvenich.<br />

In the course of very relevant and constructive<br />

discussions and a subsequent workshop we<br />

worked out jo<strong>in</strong>t objectives and measures for the<br />

future which we shall implement jo<strong>in</strong>tly <strong>in</strong> the<br />

next few months. The fact that despite the tension-laden<br />

atmosphere at the beg<strong>in</strong>n<strong>in</strong>g of the<br />

meet<strong>in</strong>g we were able <strong>to</strong> achieve mutual un<strong>der</strong>stand<strong>in</strong>g<br />

and a common procedure for the future<br />

is, as far as I am concerned, the first <strong>in</strong>dication of<br />

the possibility of a collaboration based on trust.<br />

After all only <strong>to</strong>gether can we succeed <strong>in</strong> fac<strong>in</strong>g<br />

the forthcom<strong>in</strong>g challenges and overcom<strong>in</strong>g<br />

them.<br />

From Fohnsdorf’s po<strong>in</strong>t of view this could<br />

not have been a more successful event. We have<br />

<strong>to</strong> extend our heartfelt thanks <strong>to</strong> the team <strong>in</strong><br />

Nörvenich and <strong>to</strong> Herbert Ahns for the excellent<br />

organisation and constructive collaboration. Our<br />

next task is its successful implementation.<br />

AT&S documents<br />

environmental<br />

consciousness –<br />

4th place <strong>in</strong> the AERA<br />

In 2001 AT&S <strong>to</strong>ok part for the first time <strong>in</strong><br />

the Austrian Environmental Report Award<br />

(AERA = award for the best environmental<br />

reports <strong>in</strong> Austria) and straight away ga<strong>in</strong>ed<br />

fourth place.<br />

The AERA is awarded by the Chamber of<br />

Professional Accountants and the Industrial<br />

Association <strong>in</strong> collaboration with the M<strong>in</strong>istry of<br />

the Environment. The idea is that the AERA<br />

motivates Austrian companies <strong>to</strong> put down their<br />

thoughts on environmental consciousness <strong>in</strong><br />

writ<strong>in</strong>g. This works really well: accord<strong>in</strong>g <strong>to</strong> the<br />

Chamber of Professional Accountants Austria<br />

Urkundenübergabe durch<br />

den Bundesm<strong>in</strong>ister für<br />

Land- und Forstwirtschaft,<br />

Umwelt und Wasserwirtschaft,<br />

Mag. Helmut<br />

Molterer<br />

Hand-over of documents by<br />

the Fe<strong>der</strong>al M<strong>in</strong>ister for<br />

Agriculture and Forestry, the<br />

Environment, Water Supply<br />

and Distribution Helmut<br />

Molterer<br />

Klaus Tomaschitz, Abteilungsleiter<br />

Pressen/Relam<strong>in</strong>ation <strong>in</strong><br />

<strong>der</strong> AT&S Leoben<br />

Klaus Tomaschitz, Head of<br />

the Press/Relam<strong>in</strong>ation<br />

Department at AT&S Leoben<br />

35


Kosten gesenkt, die Kapazität und <strong>der</strong> Yield<br />

verbessert, die Arbeit erleichtert und die Umwelt<br />

weniger belastet würden.<br />

Die herkömmliche Vorgangsweise<br />

im Prozessschritt Pressen<br />

Im Arbeitsgang Pressen werden die e<strong>in</strong>zelnen<br />

Leiterplatten-Innenlagen mit Prepreg (e<strong>in</strong>er Klebeschicht)<br />

händisch nach e<strong>in</strong>em vorgegebenen<br />

Schema abgelegt. Zwischen die e<strong>in</strong>zelnen Multilayer<br />

werden 1,5 mm starke Edelstahlbleche mit<br />

planer und fehlerfreier Oberfläche gelegt. Um diese<br />

Stahlbleche vor austretendem Harz und Ankleben<br />

des Multilayers zu schützen, müssen temperaturbeständige<br />

Trennfolien e<strong>in</strong>gesetzt werden.<br />

Allerd<strong>in</strong>gs haben die benötigten Trennfolien<br />

e<strong>in</strong>e Reihe von Nachteilen:<br />

Hoher Zeitaufwand im Lay up (15% Mehraufwand)<br />

durch das Legen<br />

Elektrostatische Aufladung, wodurch Partikel<br />

auf die Kupferoberfläche gelangen, die zu<br />

E<strong>in</strong>drücken führen können<br />

Hoher Re<strong>in</strong>igungsaufwand, um diese Partikel<br />

zu entfernen<br />

Thermischer „Schrumpf“, <strong>der</strong> Spannungen<br />

im Multilayer erzeugen kann<br />

Umweltbelastende Entsorgung nach jedem<br />

Pressvorgang<br />

Das optimierte Verfahren<br />

Anstelle <strong>der</strong> herkömmlichen Bleche werden nur<br />

noch extrem harte Bleche von 0,5 mm Stärke<br />

verwendet, die mit e<strong>in</strong>er Antihaft-Emulsion<br />

beschichtet s<strong>in</strong>d. Das <strong>der</strong>art beschichtete Stahlblech<br />

wird mit <strong>der</strong> harzbeschichteten Kupferfolie<br />

(o<strong>der</strong> blanker Kupferfolie) verbunden. Somit ist<br />

die empf<strong>in</strong>dliche Seite <strong>der</strong> Kupferfolie gegen<br />

Partikel von außen geschützt und <strong>der</strong> hohe<br />

Re<strong>in</strong>igungsaufwand im Lay Up entfällt. Die<br />

Zeitersparnis beim Legen beträgt rd. 55%, die<br />

aufwändige Entsorgung entfällt ebenfalls.<br />

Mittels e<strong>in</strong>es weiteren neuen Verfahrens<br />

(ohne mechanischem Bürsten) werden die Bleche<br />

gesäubert und wie<strong>der</strong> <strong>der</strong> Produktion zugeführt.<br />

Zwecks Umsetzung und Vertrieb wurde im<br />

November 2001 die Gesellschaft C2C (Copper <strong>to</strong><br />

Copper/Kupfer zu Kupfer) Technologie für<br />

Leiterplatten GmbH gegründet, die sich zu 65%<br />

im Eigentum <strong>der</strong> AT&S bef<strong>in</strong>det. Das Verfahren<br />

selbst wurde patentiert.<br />

AT&S Vertriebsmeet<strong>in</strong>g<br />

Am 11. und 12. April fand <strong>in</strong> <strong>der</strong> AT&S Leoben<br />

das jährliche Vertriebsmeet<strong>in</strong>g statt, zu dem sich<br />

rund 25 Teilnehmer aus aller Welt e<strong>in</strong>fanden. Ziel<br />

36<br />

Highlights<br />

does not compare <strong>to</strong>o badly with the rest of<br />

Europe <strong>in</strong> this context – <strong>in</strong> relation <strong>to</strong> the number<br />

of <strong>in</strong>habitants we produce the most environmental<br />

reports.<br />

AT&S VP Production Wilfried Stroißnigg<br />

and Environmental Representative Friedrich<br />

Zeman appeal for the further support of all male<br />

and female colleagues <strong>in</strong> environmental matters.<br />

Fourth place is an <strong>in</strong>centive <strong>to</strong> improve environmental<br />

protection at AT&S even more!<br />

Cost reduction achieved<br />

– high potential<br />

sav<strong>in</strong>gs <strong>in</strong> multilayer<br />

production<br />

The Backhaus project<br />

Klaus Tomaschitz, Head of the Press/Relam<strong>in</strong>ation<br />

Department at AT&S Leoben <strong>in</strong> collaboration<br />

with the firm of Dieter Backhaus Technologie<br />

GmbH has developed a process which br<strong>in</strong>gs<br />

enormous benefits <strong>to</strong> multilayer production. The<br />

aim of the project was <strong>to</strong> optimise the process <strong>in</strong><br />

such a way as <strong>to</strong> reduce costs, improve capacity<br />

and yield, facilitate work<strong>in</strong>g and present less<br />

threat <strong>to</strong> the environment.<br />

Previous press<strong>in</strong>g techniques<br />

In the press<strong>in</strong>g process the <strong>in</strong>dividual <strong>in</strong>ner layers<br />

of the circuit board are treated manually with<br />

Prepreg (an adhesive coat<strong>in</strong>g) accord<strong>in</strong>g <strong>to</strong> a<br />

prescribed method. Between each layer 1.5 mm<br />

sta<strong>in</strong>less steel sheets with a perfectly plane surface<br />

are laid. In or<strong>der</strong> <strong>to</strong> protect these steel sheets from<br />

be<strong>in</strong>g contam<strong>in</strong>ated by res<strong>in</strong> and adher<strong>in</strong>g <strong>to</strong> the<br />

multilayer, temperature-resistant separat<strong>in</strong>g film<br />

has <strong>to</strong> be <strong>in</strong>terposed.<br />

Inevitably the separat<strong>in</strong>g film has a number<br />

of disadvantages:<br />

Longer lay-up time (15% higher)<br />

Electrostatic charges, result<strong>in</strong>g <strong>in</strong> particles<br />

be<strong>in</strong>g attracted on <strong>to</strong> the copper surface<br />

which can lead <strong>to</strong> <strong>in</strong>dentation<br />

High cost of clean<strong>in</strong>g <strong>in</strong> or<strong>der</strong> <strong>to</strong> remove<br />

these particles<br />

Thermal “shr<strong>in</strong>k” which can produce stresses<br />

<strong>in</strong> the multilayer<br />

Environmentally pollut<strong>in</strong>g waste after each<br />

press<strong>in</strong>g operation<br />

The optimised process<br />

Instead of the conventional sheets, extremely hard<br />

sheets 0.5 mm thick are used which are coated<br />

with an anti-stick emulsion. The coated steel<br />

Dick Barry, New England/USA<br />

Friedrich E<strong>der</strong>, Österreich


des Treffens ist <strong>der</strong> Erfahrungsaustausch, die<br />

Darstellung des Geschäftsverlaufs und die Abstimmung<br />

<strong>der</strong> zukünftigen Vertriebsstrategie.<br />

E<strong>in</strong> zusätzliches Highlight <strong>der</strong> Veranstaltung<br />

bildete <strong>der</strong> Vortrag des AT&S Aufsichtsratsmitgliedes<br />

Hans Jörg Kaltenbrunner über die AMS,<br />

den Halbleiterhersteller <strong>in</strong> Unterpremstätten.<br />

Neue Bonus Regelung<br />

für AT&S<br />

Die kollektive Gew<strong>in</strong>nbeteiligung (KG)<br />

<strong>der</strong> AT&S Mitarbeiter<br />

Im Februar 2002 e<strong>in</strong>igten sich die Geschäftsführung<br />

und <strong>der</strong> Zentralbetriebsrat <strong>in</strong> e<strong>in</strong>er<br />

Betriebsvere<strong>in</strong>barung über die Neuregelung <strong>der</strong><br />

AT&S Erfolgsbeteiligung. Als Basis wird das<br />

<strong>in</strong>tegrierte Management- und Bonussystem EVA<br />

(siehe auch AT&S Mitarbeitermagaz<strong>in</strong>, Ausgabe<br />

15) herangezogen.<br />

Ab dem Wirtschaftsjahr 2002/2003 ermittelt<br />

das Controll<strong>in</strong>g für jeden Standort bzw. jedes<br />

EVA Center pro Quartal die Höhe <strong>der</strong> kollektiven<br />

Gew<strong>in</strong>nbeteiligung (KG). In vierteljährlichen<br />

Abständen, werden die EVA-Rentabilitäten<br />

veröffentlicht. Mit e<strong>in</strong>em Wort: Das Bonussystem<br />

ist transparent und je<strong>der</strong> Mitarbeiter weiß genau,<br />

<strong>in</strong> welcher Höhe <strong>der</strong> Bonus ausfallen wird.<br />

1) Anspruchberechtigung –<br />

Wer bekommt die KG?<br />

Anspruchsberechtigt s<strong>in</strong>d alle Mitarbeiter (Arbeiter<br />

und Angestellte), die m<strong>in</strong>destens zwei vollendete<br />

Dienstjahre – gerechnet vom Beg<strong>in</strong>n e<strong>in</strong>es<br />

Wirtschaftsjahres (Stichtag 1. April) an – bei <strong>der</strong><br />

AT&S beschäftigt s<strong>in</strong>d.<br />

Highlights<br />

sheet is attached <strong>to</strong> the res<strong>in</strong>-coated copper film<br />

(or pla<strong>in</strong> copper film). This protects the sensitive<br />

side of the copper film from particles imp<strong>in</strong>g<strong>in</strong>g<br />

from outside, and there is no longer any need for<br />

costly clean<strong>in</strong>g <strong>in</strong> the lay-up process. The time<br />

sav<strong>in</strong>g is about 55%, and there is likewise no<br />

more costly waste.<br />

By means of another new process (without<br />

mechanical brushes) the sheets are cleaned and<br />

fed <strong>in</strong><strong>to</strong> the production l<strong>in</strong>e.<br />

For realisation and market<strong>in</strong>g purposes a<br />

company – C2C (Copper <strong>to</strong> Copper) Technologie<br />

für Leiterplatten GmbH – was founded <strong>in</strong><br />

November 2001 which is 65% owned by AT&S.<br />

The process itself has been patented.<br />

AT&S sales meet<strong>in</strong>g<br />

On April 11 and 12, the annual sales meet<strong>in</strong>g<br />

<strong>to</strong>ok place at AT&S Leoben. The aim of the<br />

meet<strong>in</strong>g was an exchange of op<strong>in</strong>ions, a presentation<br />

of the pattern of the year’s bus<strong>in</strong>ess and the<br />

agreement of a future sales strategy.<br />

An additional highlight of the event was the<br />

talk by a member of the AT&S Supervisory<br />

Board, Hans Jörg Kaltenbrunner, about AMS,<br />

the semiconduc<strong>to</strong>r manufacturer <strong>in</strong> Unterpremstätten.<br />

New bonus rul<strong>in</strong>g<br />

for AT&S<br />

The collective profit-shar<strong>in</strong>g scheme (CP)<br />

for AT&S employees<br />

In February 2002 the management and the<br />

Central Works Council jo<strong>in</strong>tly agreed a new<br />

rul<strong>in</strong>g for AT&S’s profit-shar<strong>in</strong>g scheme. It will<br />

be based on the <strong>in</strong>tegrated management and<br />

bonus systems EVA (see the AT&S house magaz<strong>in</strong>e,<br />

issue 15).<br />

From the f<strong>in</strong>ancial year 2002/2003 the<br />

Cost<strong>in</strong>g Department will determ<strong>in</strong>e the level of<br />

CP per quarter for each site and each EVA<br />

Centre. The EVA profitability rates will be<br />

published at quarterly <strong>in</strong>tervals. In other words,<br />

the bonus system will be transparent and each<br />

employee will know exactly what the level of<br />

bonus will be.<br />

1) Entitlement – who will benefit from CP?<br />

All employees (waged and salaried staff) will be<br />

entitled who have completed at least two years of<br />

Das Steuerungskonzept<br />

<strong>der</strong> AT&S Zukunft.<br />

The control concept for<br />

AT&S’s future.<br />

37


Teilzeitbeschäftigte Mitarbeiter erhalten<br />

e<strong>in</strong>en aliquoten Anteil (bezogen auf die Normalarbeitszeit).<br />

Karenzierte MitarbeiterInnen und<br />

Präsenzdiener haben Anspruch auf die KG, für<br />

den Zeitraum, <strong>in</strong> dem sie auch e<strong>in</strong>en Entgeltanspruch<br />

gegenüber <strong>der</strong> AT&S hatten. Für Lehrl<strong>in</strong>ge<br />

gilt e<strong>in</strong>e Son<strong>der</strong>regelung.<br />

2) Berechnung<br />

Die KG wird ausbezahlt, wenn die EVA-Rentabilität<br />

8% übersteigt bzw. bis maximal bzw. <strong>in</strong>klusive<br />

19% je festgelegtem EVA Center.<br />

Das Bonus Maximum bleibt gleich wie beim<br />

bisher gültigen System Euro 1.526,14 bzw. Bonus<br />

M<strong>in</strong>imum Euro 0,00.<br />

Folgende EVA Center wurden festgelegt:<br />

A) EVA Center Werk Leoben<br />

EVA Center Werk Fehr<strong>in</strong>g<br />

EVA Center Werk Fohnsdorf<br />

B) EVA Center AT&S Gruppe<br />

Der Betrag für die KG setzt sich aus zwei Teilen<br />

zusammen (A und B).<br />

Teil A: 60% des Betrages stammen vom EVA<br />

Center dem <strong>der</strong> Mitarbeiter zugeordnet ist<br />

(Standort).<br />

Teil B: 40% des Betrages stammen vom EVA<br />

Center AT&S Gruppe.<br />

Wenn am Standort (aus Teil A) ke<strong>in</strong> Bonus<br />

erreicht wird, wird auch ke<strong>in</strong> Bonus aus <strong>der</strong><br />

AT&S Gruppe ausgeschüttet.<br />

3) Auszahlung<br />

Die Auszahlung <strong>der</strong> KG erfolgt auch weiterh<strong>in</strong><br />

mit <strong>der</strong> – nach Bilanzfeststellung – ersten Lohnbzw.<br />

Gehaltsauszahlung.<br />

Das ch<strong>in</strong>esische<br />

Neujahrsfest – Auftakt<br />

zum Jahr des Pferdes<br />

Das ch<strong>in</strong>esische Neujahrsfest ist e<strong>in</strong> wichtiger<br />

Bestandteil <strong>der</strong> ch<strong>in</strong>esischen Kultur. Es ist die<br />

Zeit <strong>der</strong> Familie, <strong>der</strong> gegenseitigen Besuche und<br />

Glückwünsche für die Zukunft.<br />

Nicht an<strong>der</strong>s als sonst überall <strong>in</strong> Ch<strong>in</strong>a,<br />

wurde auch <strong>in</strong> <strong>der</strong> AT&S Ch<strong>in</strong>a gefeiert.<br />

E<strong>in</strong> ganz beson<strong>der</strong>es Fest, da man ja das erste<br />

ch<strong>in</strong>esische Neujahr <strong>in</strong> <strong>der</strong> Geschichte des<br />

Unternehmens geme<strong>in</strong>sam beg<strong>in</strong>g. Das<br />

Unternehmen organisierte für alle Mitarbeiter<br />

e<strong>in</strong>e Jahresabschlussfeier. Abgesehen vom guten<br />

ch<strong>in</strong>esischen Essen gab es auch Spiele, die sowohl<br />

den Österreichern als auch den Ch<strong>in</strong>esen Spass<br />

machten.<br />

38<br />

Highlights<br />

service with AT&S – calculated from the start of<br />

the f<strong>in</strong>ancial year (i.e. April 1).<br />

Part-time employees will receive an aliquot<br />

proportion (related <strong>to</strong> normal work<strong>in</strong>g hours).<br />

Employees on sick pay or on national military<br />

service can claim CP for the period dur<strong>in</strong>g which<br />

they have had a claim for compensation from<br />

AT&S. There are special rules for apprentices.<br />

2) Calculation<br />

CP is paid out if EVA profits exceed 8% or up <strong>to</strong><br />

a maximum or <strong>in</strong>clusive of 19% per registered<br />

EVA Centre.<br />

The maximum bonus rema<strong>in</strong>s the same as<br />

with the previous system 1,526.14 Euros or<br />

m<strong>in</strong>imum bonus 0.00 Euros.<br />

The follow<strong>in</strong>g EVA Centres have been<br />

registered:<br />

A) EVA Centre Plant Leoben<br />

EVA Centre Plant Fehr<strong>in</strong>g<br />

EVA Centre Plant Fohnsdorf<br />

B) EVA Centre AT&S Group<br />

The level of CP is composed of two parts<br />

(A and B).<br />

Part A: 60% comes from the EVA Centre <strong>to</strong><br />

which the employee is allocated (works).<br />

Part B: 40% comes from the EVA Centre AT&S<br />

Group.<br />

If no bonus is achieved at the works (Part A),<br />

no bonus will be distributed from the AT&S<br />

Group.<br />

3) Payment<br />

The CP is paid out with the first wage or<br />

salary payment – after the balance sheet has been<br />

declared.<br />

The Ch<strong>in</strong>ese New Year –<br />

prelude <strong>to</strong> the Year of<br />

the Horse<br />

The Ch<strong>in</strong>ese New Year is an important<br />

<strong>in</strong>gredient of Ch<strong>in</strong>ese culture. It is a time for the<br />

family, for mutual visits and for best wishes for<br />

the future.<br />

AT&S Ch<strong>in</strong>a celebrated the occasion just<br />

like everybody everywhere else <strong>in</strong> Ch<strong>in</strong>a. It was a<br />

quite special holiday, s<strong>in</strong>ce this was the first<br />

Ch<strong>in</strong>ese New Year <strong>in</strong> the his<strong>to</strong>ry of the company<br />

which was jo<strong>in</strong>tly celebrated. The company<br />

organised an end-of-year party for all its<br />

employees. Besides good Ch<strong>in</strong>ese food there were<br />

games enjoyed by both the Austrian and Ch<strong>in</strong>ese<br />

cont<strong>in</strong>gents.<br />

Ausgelassenheit beim<br />

Neujahrsfest<br />

A lively New Year party


In stillem Gedenken<br />

an Horst Weigl<br />

Nach langer, schwerer Krankheit starb am Samstag, den 20. März<br />

2002 <strong>der</strong> langjährige AT&S Mitarbeiter Horst Weigl im<br />

63. Lebensjahr.<br />

Horst Weigl wurde am 5. August 1939 <strong>in</strong> Kirchdorf,<br />

Oberösterreich, geboren und erlernte den Beruf des Masch<strong>in</strong>enschlossers.<br />

1965 kam Weigl erstmals mit <strong>der</strong> EUMIG <strong>in</strong><br />

Kirchdorf <strong>in</strong> Kontakt, womit se<strong>in</strong>e AT&S Karriere begann.<br />

Herr Weigl war <strong>in</strong>sgesamt 36 Jahre bei <strong>der</strong> EUMIG<br />

Fohnsdorf bzw. <strong>der</strong> AT&S AG beschäftigt, wo er sich mit<br />

unheimlichem Engagement bis zum Prokuristen und Leiter des<br />

Bereiches Materialwirtschaft hocharbeitete. Dienstzeit gab es<br />

für ihn ke<strong>in</strong>e, wann immer die Firma ihn brauchte, war er zur<br />

Stelle. Aus gesundheitlichen Gründen musste Horst Weigl se<strong>in</strong>e<br />

Berufslaufbahn 2001 vorzeitig beenden.<br />

„Horst war für mich nicht nur e<strong>in</strong> herausragen<strong>der</strong> Arbeitskollege,<br />

son<strong>der</strong>n auch e<strong>in</strong> guter Freund. Er war kompetent,<br />

ehrlich, hilfsbereit und immer zur Stelle, wenn man ihn brauchte.<br />

Se<strong>in</strong> Verlust schmerzt sehr und ich wünsche jetzt vor allem se<strong>in</strong>en<br />

Angehörigen viel Kraft und Stärke,“ so AT&S Vorstandsvorsitzen<strong>der</strong><br />

Willi Dörfl<strong>in</strong>ger.<br />

Diesen Wünschen schließen sich auch alle AT&S Mitarbeiter<strong>in</strong>nen<br />

und Mitarbeiter an, die Horst Weigl als Kollegen,<br />

Chef und Mensch schätzten.<br />

Wie e<strong>in</strong> Espresso:<br />

MMag. Birgit Slotta-Bachmayr<br />

macht müde Geister munter!<br />

(Rrröst-)Frisch vom <strong>in</strong>ternationalen Kaffeekonzern Tchibo hat<br />

die AT&S Personalentwicklung Verstärkung bekommen.<br />

Die neue Leiter<strong>in</strong> <strong>der</strong> Personalentwicklung, Frau MMag.<br />

Birgit Slotta-Bachmayr wird die Aktivitäten ihrer Abteilung auf<br />

<strong>in</strong>ternationaler Ebene koord<strong>in</strong>ieren. Konkret bedeutet dies, dass<br />

die gebürtige Oberösterreicher<strong>in</strong> Stellen- und Leistungsbeurteilungssysteme,<br />

Nachfolge- und Laufbahnplanungen sowie<br />

Führungskräfte-Entwicklungsprogramme <strong>in</strong>nerhalb <strong>der</strong> AT&S<br />

<strong>in</strong>stallieren wird. Birgit Slotta-Bachmayr hat die Studien <strong>der</strong><br />

Psychologie und Pädagogik abgeschlossen und so mit Sicherheit<br />

e<strong>in</strong> „Gspür“ für die Enwicklungsmöglichkeiten <strong>der</strong> AT&S MitarbeiterInnen.<br />

Personalia / Personalities<br />

Über unsere Kollegen …<br />

About our colleagues …<br />

In Memory of<br />

Horst Weigl<br />

On Saturday March 20, 2002 Horst Weigl, an<br />

employee of AT&S of many years’ stand<strong>in</strong>g,<br />

passed away after a long and serious illness at<br />

the age of 62.<br />

Horst Weigl was born on August 5, 1939<br />

<strong>in</strong> Kirchdorf, Upper Austria and served his<br />

apprenticeship as a mach<strong>in</strong>e fitter. In 1965<br />

Weigl came <strong>in</strong><strong>to</strong> contact with EUMIG for the first time, at which<br />

po<strong>in</strong>t his career with AT&S began.<br />

Mr. Weigl was employed for a <strong>to</strong>tal of 36 years at EUMIG<br />

Fohnsdorf and AT&S AG, where he showed extraord<strong>in</strong>ary<br />

commitment, ris<strong>in</strong>g <strong>to</strong> Company Secretary and Head of Material<br />

Management. Hours of duty meant noth<strong>in</strong>g <strong>to</strong> him – whenever<br />

the firm needed him he was at his post. Horst Weigl had <strong>to</strong> end<br />

his career prematurely <strong>in</strong> 2001 on health grounds.<br />

AT&S Board Chairman Willi Dörfl<strong>in</strong>ger: “As far as I’m<br />

concerned Horst was not only an outstand<strong>in</strong>g colleague, but also<br />

a good friend. He was competent, honest, helpful and always<br />

there when you needed him. His loss is very pa<strong>in</strong>ful, and may<br />

God grant those dear <strong>to</strong> him strength and fortitude”.<br />

All employees at AT&S, who valued Horst Weigl as a<br />

colleague, lea<strong>der</strong> and human be<strong>in</strong>g, jo<strong>in</strong> the Chairman <strong>in</strong> these<br />

remarks.<br />

Like an espresso:<br />

MMag. Birgit Slotta-<br />

Bachmayr enlivens<br />

tired spirits!<br />

(Arrroma-)Fresh from the <strong>in</strong>ternational coffee<br />

group Tchibo comes a new re<strong>in</strong>forcement <strong>to</strong><br />

AT&S’s personnel development team.<br />

The new Head of Personnel Development, Birgit Slotta-<br />

Bachmayr, is <strong>to</strong> coord<strong>in</strong>ate the activities of her department at an<br />

<strong>in</strong>ternational level. Specifically this means that the native of Upper<br />

Austria will <strong>in</strong>stall appo<strong>in</strong>tments and performance evaluation<br />

systems, succession and career plann<strong>in</strong>g and executive development<br />

programmes. Birgit Slotta-Bachmayr has completed her psychological<br />

and pedagogical studies and will certa<strong>in</strong>ly be a welcome boost<br />

<strong>to</strong> the development opportunities of her AT&S colleagues.<br />

39


E<strong>in</strong>mal Ch<strong>in</strong>a und re<strong>to</strong>ur –<br />

Mag. Mart<strong>in</strong> Keil<br />

Den Tiroler Mart<strong>in</strong> Keil zog es immer schon <strong>in</strong> die Ferne. Bereits<br />

während se<strong>in</strong>es Studiums <strong>der</strong> Internationalen Wirtschaftswissenschaften<br />

<strong>in</strong> Innsbruck war er <strong>in</strong>tensiv <strong>in</strong> <strong>der</strong> weltweiten Studentenvere<strong>in</strong>igung<br />

AIESEC tätig. Se<strong>in</strong>em Mot<strong>to</strong> „<strong>in</strong>ternationale<br />

Herausfor<strong>der</strong>ung und Eigen<strong>in</strong>itative“ blieb Herr Mag. Keil auch<br />

nach dem Studium konsequent treu, so reiste er zu se<strong>in</strong>em ersten<br />

Dienstantritt als Assistent des österreichischen Handelsdelegierten<br />

<strong>in</strong> Pek<strong>in</strong>g mittels transsibirischer Eisenbahn.<br />

Mit dem Fußfassen <strong>der</strong> AT&S <strong>in</strong> Ch<strong>in</strong>a eröffnete sich für<br />

ihn die Gelegenheit, das nächste Wunschziel, se<strong>in</strong>e fachliche<br />

Kompetenz <strong>in</strong>nerhalb e<strong>in</strong>es europäischen Konzerns mit Ch<strong>in</strong>aausrichtung<br />

zu verbessern, erfüllt zu bekommen. Als Assistent des<br />

Vorstandes kann sich Mag. Mart<strong>in</strong> Keil nun als kompetente<br />

Schnittstelle zwischen dem Unternehmenssitz <strong>in</strong> Leoben und den<br />

<strong>in</strong>ternationalen Standorten beweisen.<br />

Pradeep Mehta,<br />

CFO <strong>der</strong> AT&S India<br />

Geboren: 25. September 1961<br />

Nationalität: Indien<br />

Familienstand: verheiratet, zwei Söhne<br />

Ausbildung:<br />

1980 Abschluss des Wirtschaftstudiums (Bachelor of<br />

Commerce), Universität von Rajasthan, Jaipur<br />

1985 Mitglied <strong>der</strong> Vere<strong>in</strong>igung <strong>der</strong> Wirtschaftsprüfer<br />

1986 Abschluss <strong>der</strong> Rechtswissenschaften,<br />

Universität von Rajasthan, Jaipur<br />

1989 Mitglied <strong>der</strong> Vere<strong>in</strong>igung <strong>der</strong> „Company Secretaries“<br />

(Leiter <strong>der</strong> Allgeme<strong>in</strong>e Verwaltung/Adm<strong>in</strong>istration)<br />

Berufslaufbahn:<br />

1983–1987 M. C. Bhandari & Co, Neu Delhi: Leiter für<br />

Revision/Recht<br />

1987–1989 Punsumi India Ltd., Jaipur: Leiter des F<strong>in</strong>anz- und<br />

Rechnungswesens<br />

1989–1992 Grenadille Ltd., Nigeria: Leiter für Systemlösungen<br />

1992–1994 Premium International Ltd., Neu Delhi:<br />

Geschäftsführer<br />

1994–1996 Grand Hyatt Hotel, Neu Delhi: Geschäftsführer<br />

(F<strong>in</strong>anzbereich) und Leiter Adm<strong>in</strong>istration<br />

1996–2000 GE Power Services India Ltd., Neu Delhi:<br />

CFO und Leiter Adm<strong>in</strong>istration<br />

2000–2002 Enron India: Leiter des F<strong>in</strong>anzbereichs<br />

„Ich freue mich darauf, <strong>der</strong> AT&S anzugehören. Was mich am<br />

meisten fasz<strong>in</strong>iert, ist das technische Know-how und die Kundenorientierung<br />

des Unternehmens.<br />

Ich beg<strong>in</strong>ne me<strong>in</strong>e Arbeit <strong>in</strong> e<strong>in</strong>er schwierigen konjunkturellen<br />

Zeit – beson<strong>der</strong>s was die wirtschaftliche Lage des Leiterplattenmarktes<br />

betrifft.<br />

40<br />

Personalia / Personalities<br />

Once round Ch<strong>in</strong>a<br />

and back –<br />

Mag. Mart<strong>in</strong> Keil<br />

The Tyrolean Mart<strong>in</strong> Keil has always had a<br />

yen for far-off places. When he was study<strong>in</strong>g<br />

<strong>in</strong>ternational economics <strong>in</strong> Innsbruck he<br />

was active <strong>in</strong> the world-wide student association<br />

AIESEC. Even after complet<strong>in</strong>g his<br />

studies Mr. Keil rema<strong>in</strong>ed consistently true <strong>to</strong> AIESEC’s mot<strong>to</strong><br />

“International Challenge and Initiative” by travell<strong>in</strong>g <strong>to</strong> his first<br />

job as Assistant <strong>in</strong> the Austrian Trade Delegation <strong>in</strong> Pek<strong>in</strong>g by the<br />

Trans-Siberian Railway.<br />

The launch of AT&S <strong>in</strong> Ch<strong>in</strong>a presented him with the<br />

opportunity <strong>to</strong> fulfil his next aim of improv<strong>in</strong>g his technical<br />

competence <strong>in</strong> a European company which had ties with Ch<strong>in</strong>a.<br />

As Assistant <strong>to</strong> the Board of Direc<strong>to</strong>rs Mart<strong>in</strong> Keil can now act as<br />

a competent <strong>in</strong>termediary between head office <strong>in</strong> Leoben and the<br />

<strong>in</strong>ternational branches.<br />

Pradeep Mehta,<br />

CFO of AT&S India<br />

Date of birth: September 25, 1961<br />

Nationality: Indian<br />

Familial status: married, two sons<br />

Education:<br />

1980 Completed economic studies<br />

(Bachelor of Commerce), University of Rajasthan, Jaipur<br />

1985 Member of the Association of Audi<strong>to</strong>rs<br />

1986 Completed legal studies, University of Rajasthan, Jaipur<br />

1989 Member of the Association of Company Secretaries<br />

(Head of General Adm<strong>in</strong>istration)<br />

Employment:<br />

1983–1987 M. C. Bhandari & Co, New Delhi: Head of<br />

Audit/Law<br />

1987–1989 Punsumi India Ltd., Jaipur: Head of F<strong>in</strong>ance and<br />

Account<strong>in</strong>g<br />

1989–1992 Grenadille Ltd., Nigeria: Head of Systems Solutions<br />

1992–1994 Premium International Ltd., New Delhi: Senior<br />

executive<br />

1994–1996 Grand Hyatt Hotel, New Delhi: Senior executive<br />

(F<strong>in</strong>ance) and Head of Adm<strong>in</strong>istration<br />

1996–2000 GE Power Services India Ltd., New Delhi:<br />

CFO and Head of Adm<strong>in</strong>istration<br />

2000–2002 Enron India: Head of F<strong>in</strong>ance<br />

“I’m look<strong>in</strong>g forward <strong>to</strong> work<strong>in</strong>g for AT&S. What fasc<strong>in</strong>ates me<br />

most of all is the company’s technical know-how and cus<strong>to</strong>mer<br />

orientation.<br />

I’m beg<strong>in</strong>n<strong>in</strong>g work at a difficult time for the economy –<br />

particularly as regards the economic position of the pr<strong>in</strong>ted<br />

circuit board market.


Es gibt enormen Druck auf Kosten, Lieferzeiten und<br />

Qualität. Der Wettbewerb ist überaus stark und es ist e<strong>in</strong>e<br />

Herausfor<strong>der</strong>ung se<strong>in</strong>e Stärken und Schwächen genau<br />

wahrzunehmen.<br />

Unter solchen Bed<strong>in</strong>gungen wird von Mitarbeitern verlangt,<br />

immer wie<strong>der</strong> Alternativen und Verbesserungsmöglichkeiten zu<br />

f<strong>in</strong>den. Es ist die Leistung, die am Ende des Arbeitestages zählt.<br />

Die absolute Priorität liegt dar<strong>in</strong>, die Erwartungshaltung <strong>der</strong><br />

Kunden noch zu übertreffen.<br />

Das Team des F<strong>in</strong>anzbereichs wird se<strong>in</strong> Bestes geben, um<br />

die weltweite AT&S Strategie zu unterstützen. Das oberste Ziel<br />

ist es, dass das Unternehmen erfolgreich ist und <strong>der</strong> Wert für die<br />

Eigentümer gesteigert wird.<br />

Ich freue mich darauf, me<strong>in</strong>en Beitrag zu leisten, um die<br />

AT&S India zu neuen Erfolgen zu br<strong>in</strong>gen.“<br />

Karriere <strong>in</strong>nerhalb <strong>der</strong> AT&S –<br />

Gratulation zum doppelten<br />

E<strong>in</strong>satz!<br />

Herr Helmut Zellner ist seit 20 Jahren bei <strong>der</strong> AT&S<br />

beschäftigt und hat seit se<strong>in</strong>em E<strong>in</strong>tritt am 1. Dezember 1982<br />

zum e<strong>in</strong>en e<strong>in</strong>e abwechslungsreiche Berufslaufbahn, zum<br />

an<strong>der</strong>en e<strong>in</strong> umfangreiches Weiterbildungsprogramm h<strong>in</strong>ter<br />

sich. Begonnen hat Helmut Zellner im Produktionsbereich, <strong>in</strong><br />

<strong>der</strong> Abteilung Siebdruck, blickte aber immer wie<strong>der</strong> über den<br />

„Tellerrand“ <strong>in</strong> an<strong>der</strong>e Bereiche des Unternehmens.<br />

Der ambitionierte Mitarbeiter wollte auch privat se<strong>in</strong> Wissen<br />

erweitern und legte 1988 <strong>in</strong> <strong>der</strong> Abendschule die HTL Matura<br />

für Masch<strong>in</strong>enbau <strong>in</strong> Kapfenberg ab. Nach dem Mot<strong>to</strong> „gesun<strong>der</strong><br />

Geist <strong>in</strong> e<strong>in</strong>em gesunden Körper“ machte er aus Interesse nebenbei<br />

auch noch die Ausbildung zum Heilmasseur.<br />

Die berufliche Laufbahn von Herrn Zellner entwickelte sich<br />

zwischenzeitlich bereits <strong>in</strong> Richtung Vertrieb, da ihn die Nähe<br />

zum Kunden beson<strong>der</strong>s reizte.<br />

Um <strong>in</strong> diesem Bereich beson<strong>der</strong>s sattelfest zu se<strong>in</strong>, belegte<br />

<strong>der</strong> gebürtige Leobner im Jahre 1997 den Fachhochschullehrgang<br />

für Market<strong>in</strong>g mit dem Schwerpunkt „Internationale Geschäftstätigkeit“<br />

am Campus Graz.<br />

Da Kundenorientierung mehr als nur e<strong>in</strong> Schlagwort bei <strong>der</strong><br />

AT&S ist, man denke an das Partnerschaftspr<strong>in</strong>zip, untersuchte<br />

Helmut Zellner die „Kundenorientierung <strong>in</strong> <strong>der</strong> Elektro- und<br />

Elektronik<strong>in</strong>dustrie am Beispiel <strong>der</strong> AT&S AG“ mittels Fragebogenaktion<br />

an den österreichischen Standorten. Zu Jahresbeg<strong>in</strong>n<br />

feierte Helmut Zellner se<strong>in</strong>en Abschluss mit dem Titel<br />

Ing. Mag. (FH). Gratulation zum beispielhaften E<strong>in</strong>satz – neben<br />

Beruf und Familie – an den Jungakademiker!<br />

Die Ergebnisse <strong>der</strong> Studie werden mit den entsprechenden<br />

Aktionsplänen noch veröffentlicht.<br />

E<strong>in</strong> Wort <strong>in</strong> eigener Sache:<br />

„Ich danke allen Kolleg<strong>in</strong>nen und Kollegen, die den Fragebogen<br />

beantwortet haben für ihre Unterstützung sowie dem Vorstand<br />

und <strong>der</strong> Belegschaftsvertretung für die Möglichkeit zur Durchführung<br />

<strong>der</strong> Analyse im Unternehmen.“<br />

Personalia / Personalities<br />

This exerts enormous pressure on costs, delivery times and<br />

quality. The competition is strong everywhere, and this challenges<br />

us <strong>to</strong> keep a sharp eye on our strengths and weaknesses.<br />

In these circumstances our employees need <strong>to</strong> keep look<strong>in</strong>g<br />

for alternatives and means of improvement. It is performance<br />

which counts at the end of the day. Our absolute priority must be<br />

<strong>to</strong> exceed the expectations of our cus<strong>to</strong>mers.<br />

The f<strong>in</strong>ance team will do its best <strong>to</strong> support AT&S’s worldwide<br />

strategy. Our ma<strong>in</strong> aim will be <strong>to</strong> ensure that the company<br />

is successful and its value is <strong>in</strong>creased for the owners.<br />

I look forward <strong>to</strong> mak<strong>in</strong>g a contribution <strong>to</strong>wards the future<br />

success of AT&S India.”<br />

A career with AT&S –<br />

Congratulations on a double<br />

commitment!<br />

Helmut Zellner has worked for AT&S<br />

for 20 years, and s<strong>in</strong>ce his entry <strong>in</strong><strong>to</strong> the<br />

firm on December 1, 1982 he has had on<br />

the one hand an <strong>in</strong>terest<strong>in</strong>g and varied<br />

career, and on the other an extensive<br />

tra<strong>in</strong><strong>in</strong>g programme. Helmut Zellner<br />

began <strong>in</strong> the Production Division, <strong>in</strong><br />

the screen pr<strong>in</strong>t<strong>in</strong>g department, but<br />

time and aga<strong>in</strong> he has “looked over the<br />

parapet” <strong>to</strong> other areas of the company’s<br />

activities.<br />

This ambitious employee decided <strong>to</strong> widen his knowledge<br />

privately, and <strong>in</strong> 1988 he sat the HTL Matura exam<strong>in</strong>ation <strong>in</strong><br />

Mechanical Eng<strong>in</strong>eer<strong>in</strong>g at the even<strong>in</strong>g <strong>in</strong>stitute <strong>in</strong> Kapfenberg.<br />

In accordance with the mot<strong>to</strong> “a healthy m<strong>in</strong>d <strong>in</strong> a healthy body”<br />

he also tra<strong>in</strong>ed out of <strong>in</strong>terest as a masseur.<br />

In the <strong>in</strong>terim Mr. Zellner’s career developed <strong>in</strong> sales, s<strong>in</strong>ce<br />

he is especially fond of the contact with cus<strong>to</strong>mers.<br />

In or<strong>der</strong> <strong>to</strong> ga<strong>in</strong> a firm grasp of this area of the company’s<br />

activities, the native of Leoben <strong>to</strong>ok a course <strong>in</strong> Market<strong>in</strong>g with<br />

specialisation <strong>in</strong> “International Bus<strong>in</strong>ess” at the Graz Institute of<br />

Higher Education.<br />

S<strong>in</strong>ce cus<strong>to</strong>mer orientation is more than a mere slogan at<br />

AT&S – th<strong>in</strong>k of the pr<strong>in</strong>ciple of partnership – Helmut Zellner<br />

exam<strong>in</strong>ed “cus<strong>to</strong>mer orientation <strong>in</strong> the electrical and electronics<br />

<strong>in</strong>dustry based on the practice at AT&S” by means of questionnaires<br />

sent <strong>to</strong> the Austrian centres. At the beg<strong>in</strong>n<strong>in</strong>g of the year<br />

Helmut Zellner graduated with the title Ing. Mag. (FH). Congratulations<br />

<strong>to</strong> the young graduate for exemplary commitment –<br />

<strong>to</strong> career and family!<br />

The results of his study are <strong>to</strong> be published with correspond<strong>in</strong>g<br />

action plans.<br />

A word on his own behalf:<br />

“I thank all my male and female colleagues who responded <strong>to</strong> the<br />

questionnaire for their support, and also the Board of Direc<strong>to</strong>rs<br />

and workers’ representatives for the chance <strong>to</strong> carry out the<br />

analysis <strong>in</strong> the company.”<br />

41


Aktivitäten <strong>der</strong><br />

Belegschaftsvertretung<br />

Activities of the Works council<br />

AT&S Leoben<br />

Zur Weihnachtsfeier am 8. Dezember 2001 im<br />

Leobner Congreßzentrum fanden sich neben<br />

Aufsichtsratsvorsitzenden Hannes Androsch,<br />

Vorstandsvorsitzenden Willi Dörfl<strong>in</strong>ger und<br />

F<strong>in</strong>anzvorstand Harald Sommerer erstmalig auch<br />

zahlreiche ch<strong>in</strong>esischen KollegInnen e<strong>in</strong>, die <strong>in</strong><br />

<strong>der</strong> AT&S Leoben ausgebildet werden.<br />

Für e<strong>in</strong>en guten Zweck!<br />

Am Donnerstag, dem 13. Dezember 2001 wurde<br />

<strong>in</strong> <strong>der</strong> BAWAG Leoben dem AT&S Mitarbeiter<br />

Franz König e<strong>in</strong> Teil des Erlöses aus <strong>der</strong> Weihnachts<strong>to</strong>mbola<br />

<strong>der</strong> AT&S Leoben übergeben.<br />

Herr König war bei <strong>der</strong> AT&S Leoben/<br />

Abteilung Pressen beschäftigt und ist bereits seit<br />

über e<strong>in</strong>em Jahr im Krankenstand, da er am<br />

chronischen Leriche-Syndrom (Verschluss <strong>der</strong><br />

Aorta) leidet und im Vorjahr <strong>in</strong> e<strong>in</strong>er schweren<br />

Operation e<strong>in</strong>e Hauptschlaga<strong>der</strong>prothese erhielt.<br />

42<br />

Chronik / Chronicle<br />

AT&S Leoben<br />

On December 8, 2001 a number of Ch<strong>in</strong>ese<br />

colleagues who are be<strong>in</strong>g tra<strong>in</strong>ed at AT&S<br />

Leoben were present for the first time at the<br />

Christmas celebrations at the Congress Centre <strong>in</strong><br />

Leoben along with Supervisory Board Chairman<br />

Hannes Androsch, Chairman of the Board of<br />

Direc<strong>to</strong>rs Willi Dörfl<strong>in</strong>ger and F<strong>in</strong>ance Direc<strong>to</strong>r<br />

Harald Sommerer.<br />

For a good cause!<br />

On Thursday December 13, 2001 <strong>in</strong> the<br />

BAWAG <strong>in</strong> Leoben former AT&S employee<br />

Franz König was handed part of the profits from<br />

AT&S Leoben’s Christmas <strong>to</strong>mbola.<br />

Mr. König used <strong>to</strong> work for AT&S Leoben <strong>in</strong><br />

the Press Department and has been on sick leave<br />

for over a year. He suffers from chronic Leriche<br />

Syndrome (blocked aorta) and un<strong>der</strong>went a<br />

serious operation last year for the <strong>in</strong>sertion of a<br />

ma<strong>in</strong> artery stent.<br />

Grosser Andrang bei <strong>der</strong><br />

Weihnachtsfeier<br />

Big run at the Christmas party


„Danke!“<br />

„Ich möchte mich auf diesem Wege bei allen<br />

Kolleg<strong>in</strong>nen und Kollegen sowohl für die<br />

f<strong>in</strong>anzielle als auch für die seelische Unterstützung<br />

bedanken. Die Zusammenarbeit mit den Kollegen<br />

<strong>in</strong> <strong>der</strong> AT&S Leoben fehlt mir auch beson<strong>der</strong>s!<br />

E<strong>in</strong> großes Dankeschön gilt auch <strong>der</strong><br />

Belegschaftsvertretung, <strong>der</strong>en Tür für mich<br />

immer offen ist und natürlich <strong>der</strong> Geschäftsleitung,<br />

welche den Erlös von <strong>der</strong> Weihnachtsfeier<br />

großzügig verdoppelt hat!“<br />

Schiausflug nach Schladm<strong>in</strong>g<br />

Der BRV. Arb Gerhard Fürstler veranstaltete für<br />

alle Schichten Schiausflüge nach Schladm<strong>in</strong>g.<br />

Unsere sportlichen Mitarbeiter hatten optimales<br />

Schiwetter (wenn Engel reisen!) und viel Spaß<br />

am Berg.<br />

Vertrauen bestätigt<br />

Auf Grund <strong>der</strong> Verunsicherung <strong>der</strong> Mitarbeiter<br />

durch kursierende Gerüchte über die Arbeitsplatzsituation<br />

<strong>in</strong> <strong>der</strong> AT&S Leoben, veranstaltete<br />

BRV Arb. Gerhard Fürstler <strong>in</strong> Leoben fünf<br />

Gruppenversammlungen. Die Mitarbeiter aller<br />

Schichten wurden vom Vorstand über die<br />

wirtschaftliche Lage <strong>der</strong> AT&S <strong>in</strong>formiert.<br />

Positiv ist, dass überaus viele unserer Mitarbeiter<br />

durch ihre Teilnahme ihr Interesse zeigten<br />

und viele Fragen an die Vorstände stellten.<br />

Die Gruppenversammlungen waren e<strong>in</strong> sehr<br />

großer Erfolg und haben das Vertrauen <strong>in</strong> die<br />

AT&S wie<strong>der</strong> hergestellt.<br />

Schiausflug Reiteralm<br />

BRV Ang. Wolfgang Fleck veranstaltete am 19.<br />

Jänner 2002 e<strong>in</strong>en Schiausflug auf die Reiteralm.<br />

Chronik / Chronicle<br />

“Thank you!”<br />

“I should like <strong>to</strong> take this opportunity <strong>to</strong> thank<br />

all my fellow workers for both their f<strong>in</strong>ancial and<br />

their spiritual support. I particularly miss work<strong>in</strong>g<br />

with my colleagues <strong>in</strong> AT&S Leoben.<br />

A huge thank you is also due <strong>to</strong> the Works<br />

Council whose door has always been open <strong>to</strong><br />

me, and of course the management, who<br />

generously doubled the tak<strong>in</strong>gs from the Christmas<br />

party!”<br />

Ski trip <strong>to</strong> Schladm<strong>in</strong>g<br />

The Workers’ Rep (waged staff) Gerhard Fürstler<br />

has organised ski trips <strong>to</strong> Schladm<strong>in</strong>g for all<br />

shifts. Our sporty colleagues had perfect weather<br />

for ski<strong>in</strong>g (as if!) and thoroughly enjoyed themselves<br />

<strong>in</strong> the mounta<strong>in</strong>s.<br />

Confidence confirmed<br />

Because of the uncerta<strong>in</strong>ty among employees<br />

caused by the rumours go<strong>in</strong>g around about the<br />

job situation <strong>in</strong> AT&S Leoben, Workers’ Rep<br />

(waged staff) Gerhard Fürstler has organised five<br />

group meet<strong>in</strong>gs <strong>in</strong> Leoben. Employees from all<br />

shifts were <strong>in</strong>formed by members of the Board of<br />

AT&S’s f<strong>in</strong>ancial position.<br />

One positive conclusion from these meet<strong>in</strong>gs<br />

is that the overwhelm<strong>in</strong>g majority of our colleagues<br />

demonstrated their <strong>in</strong>terest by tak<strong>in</strong>g part<br />

and ask<strong>in</strong>g Board members a large number of<br />

questions.<br />

The group meet<strong>in</strong>gs were a great success and<br />

have res<strong>to</strong>red confidence <strong>in</strong> AT&S.<br />

Ski trip <strong>to</strong> the Reiteralm<br />

Workers’ Rep (salaried staff) Wolfgang Fleck<br />

organised a ski trip <strong>to</strong> the Reiteralm on January<br />

Spaß im Schnee<br />

Fun <strong>in</strong> the Snow<br />

43


An die 50 Kolleg<strong>in</strong>nen und Kollegen nahmen<br />

daran teil. Bei schönem Wetter und besten<br />

Pistenbed<strong>in</strong>gungen konnten sich alle dem Carven<br />

voll und ganz h<strong>in</strong>geben.<br />

AT&S Leoben beim Weltcupf<strong>in</strong>ale<br />

<strong>in</strong> <strong>der</strong> Flachau<br />

Vom BRV Ang. Wolfgang Fleck wurde am<br />

9. März 2002 e<strong>in</strong> Tagesausflug zum Schiweltcupf<strong>in</strong>ale<br />

organisiert. Mit zwei Reisebussen<br />

fuhren 90 Kolleg<strong>in</strong>nen und Kollegen sowie <strong>der</strong>en<br />

Angehörige zum Weltcupf<strong>in</strong>ale <strong>in</strong> die Flachau.<br />

Dieser Ausflug wurde mit e<strong>in</strong>em Schiausflug<br />

gekoppelt. So manchen bleibt es sicher lange <strong>in</strong><br />

Er<strong>in</strong>nerung, konnte man doch die besten Schi-<br />

rennläufer <strong>der</strong> Welt hautnah erleben. Bei <strong>der</strong><br />

Heimreise wurden alle Teilnehmer noch zu e<strong>in</strong>em<br />

Abendessen e<strong>in</strong>geladen, wo man die E<strong>in</strong>drücke<br />

dieses Tages Revue passieren ließ.<br />

AT&S Leoben ermittelte ihre Betriebsschimeister<br />

Bereits Anfang März stellten sich 70 Mitarbeiter<br />

dem bereits traditionellen AT&S Firmenschirennen.<br />

Austragungsort war die W<strong>in</strong>tersportarena<br />

Gaal.<br />

Das man dieses Rennen (e<strong>in</strong>en Nachtriesen<strong>to</strong>rlauf)<br />

trotz sommerlicher Temperaturen durchführen<br />

konnte, lag vor allem am enormen E<strong>in</strong>satz<br />

des Veranstaltervere<strong>in</strong>es Schiclub Gaal und am<br />

Haup<strong>to</strong>rganisa<strong>to</strong>r BRV Ang. Fleck Wolfgang.<br />

So wurde die sehr weiche Wasserschipiste durch<br />

Verwendung von B<strong>in</strong>demittel <strong>in</strong> e<strong>in</strong>e harte griffige<br />

Rennpiste verzaubert. Dafür muss man auch allen<br />

freiwilligen Helfern e<strong>in</strong> großes Lob aussprechen.<br />

Bei <strong>der</strong> anschließenden Siegerehrung wurden<br />

die Gew<strong>in</strong>ner durch die AT&S Belegschaftsver-<br />

44<br />

Chronik / Chronicle<br />

19, 2002. About 50 male and female colleagues<br />

<strong>to</strong>ok part. The weather was f<strong>in</strong>e and the piste<br />

conditions perfect, and so everybody was able <strong>to</strong><br />

enjoy the ski<strong>in</strong>g.<br />

AT&S Leoben at the World Cup F<strong>in</strong>al<br />

<strong>in</strong> Flachau<br />

On March 9, 2002 Workers’ Rep (salaried staff)<br />

Wolfgang Fleck organised a day’s excursion <strong>to</strong> the<br />

World Ski<strong>in</strong>g Cup. Two coaches are <strong>to</strong> take 90<br />

colleagues plus their dependants <strong>to</strong> the World<br />

Cup F<strong>in</strong>al <strong>in</strong> Flachau.<br />

This excursion was coupled with a ski trip.<br />

For a long time <strong>to</strong> come a lot of us will remember<br />

be<strong>in</strong>g close enough <strong>to</strong> <strong>to</strong>uch the best skiers <strong>in</strong> the<br />

world. On the way home everybody was <strong>in</strong>vited<br />

<strong>to</strong> a meal where they reviewed the events and<br />

impressions of the day.<br />

AT&S Leoben’s Works Ski Championship<br />

At the beg<strong>in</strong>n<strong>in</strong>g of March 70 employees entered<br />

the traditional AT&S Ski Championship. The<br />

start was at the w<strong>in</strong>ter sports arena <strong>in</strong> Gaal.<br />

The fact that this race (an even<strong>in</strong>g giant<br />

slalom) was possible despite summer temperatures<br />

was ma<strong>in</strong>ly due <strong>to</strong> the enormous commitment of<br />

the hosts – the Gaal Ski Club – and of the chief<br />

organiser Workers’ Rep (salaried staff) Wolfgang<br />

Fleck. The very soft water-ski piste was magically<br />

transformed <strong>in</strong><strong>to</strong> a hard, firm ski piste us<strong>in</strong>g a<br />

b<strong>in</strong>d<strong>in</strong>g agent. Special praise should go <strong>to</strong> all those<br />

who gave voluntary assistance on the day.<br />

At the presentation ceremony the w<strong>in</strong>ners<br />

were congratulated by AT&S Works Council<br />

representatives Wolfgang Fleck (salaried staff)<br />

and Gerhard Fürstler (waged staff) <strong>to</strong>gether with<br />

the HRM Austria Engelbert Liebm<strong>in</strong>ger. The<br />

Die Betriebsschimeister<br />

Wolfgang Weisl und Eva<br />

Kollmann<br />

AT&S Ski Champions<br />

Wolfgang Weisl and Eva<br />

Kollmann<br />

Benny Raich ganz nah<br />

Benny Raich live


Ergebnisse/Results:<br />

M<strong>in</strong>i männl./Infant male<br />

1. Fleck Chris<strong>to</strong>ph<br />

2. Ste<strong>in</strong>er Dom<strong>in</strong>ik<br />

3. Breitfuß Gregor<br />

K<strong>in</strong><strong>der</strong> I weibl./Child I fem.<br />

1. Lampl Tanja<br />

2. Zenz Car<strong>in</strong>a<br />

3. Hoffelner Vera<br />

K<strong>in</strong><strong>der</strong> I männl./Child I male<br />

1. Stadler Marco<br />

2. Le<strong>in</strong>weber Stefan<br />

K<strong>in</strong><strong>der</strong> II weibl./Child II fem.<br />

1. Hoffelner Anja<br />

2. Lampl Bianca<br />

K<strong>in</strong><strong>der</strong> II männl./Child II male<br />

1. Vockenberger Michael<br />

2. Gössler Thomas<br />

3. Le<strong>in</strong>weber Christian<br />

Schüler I weibl./Junior I fem.<br />

1. Fleck Melanie<br />

2. Fleck Stephanie<br />

3. Nestler Marion<br />

Schüler I männl./Junior I male<br />

1. Reiter Mart<strong>in</strong><br />

2. Nestler Thomas<br />

treter BRV Ang. Fleck Wolfgang und BRV Arb.<br />

Fürstler Gerhard sowie dem Personalchef Liebm<strong>in</strong>ger<br />

Engelbert geehrt. Betriebsschimeister bei<br />

den Damen wurde Kollmann Eva und bei den<br />

Herren Weisl Wolfgang, <strong>der</strong> auch gleichzeitig die<br />

Tagesbestzeit bei den Herren fuhr. Die Tagesbestzeit<br />

bei den Damen wurde von Fleck Melanie,<br />

Schüler I weibl. erzielt.<br />

1. Leobener Firmenlauf<br />

Am 1. Leobener Firmenlauf am 8. April 2002<br />

nahmen 28 MitarbeiterInnen <strong>der</strong> AT&S aus den<br />

Standorten Leoben und Fohnsdorf teil. Insgesamt<br />

kämpften rund 550 Läufer bei frostigen Temperaturen<br />

auf <strong>der</strong> 5 km langen Strecke um den Sieg.<br />

Die schnellste AT&S Mannschaft erreichte Rang<br />

17, durchs Ziel kamen aber alle.<br />

Die AT&S erhielt e<strong>in</strong>en Son<strong>der</strong>preis für die<br />

meisten Teilnehmer aus e<strong>in</strong>em Unternehmen. Der<br />

Preis – e<strong>in</strong> K2 Kick Scooter – wurde an den „gemütlichsten“<br />

Läufer, Friedrich Beller, weitergegeben.<br />

Chronik / Chronicle<br />

Schüler II weibl./Junior II fem.<br />

1. Nestler Ariane<br />

Schüler II männl./Junior II male<br />

1. Zenz Stefan<br />

2. Kranz Jürgen<br />

Jugend weibl./Youth fem.<br />

1. Motschlmaier Daniela<br />

Damen AK/Ladies All-Com.<br />

1. Kollmann Eva<br />

2. Nestler Judith<br />

3. Nestler Margit<br />

Damen Allgem./Ladies General<br />

1. Sundl Elfriede<br />

2. Schörkl Heike<br />

Damen Gäste/Ladies Guests<br />

1. Fleck Sigrid<br />

2. Le<strong>in</strong>weber Monika<br />

3. Lampl Evel<strong>in</strong>e<br />

Snowboard Herren/Snowboard Mens<br />

1. Mörzl Stefan<br />

Herren AK III/Mens All-Com. III<br />

1. Kranz Alfred<br />

Herren AK II/Mens All-Com. II<br />

1. Le<strong>in</strong>weber Christian<br />

2. Fürstler Gerhard<br />

3. Wölfler Günther<br />

Herren AK I a/Mens All-Com. I a<br />

1. Gössler Wolfgang<br />

2. Hoffelner Harald<br />

3. Kreith Konrad<br />

Herren AK I b/Mens All-Com. I b<br />

1. Reiter Franz<br />

2. Schmücker Christian<br />

3. Christandl Robert<br />

Herren Allgem./Mens General<br />

1. Haiden Gerhard<br />

2. Pilgram Chris<strong>to</strong>ph<br />

3. Mussger An<strong>to</strong>n<br />

Herren Gäste/Mens Guests<br />

1. Nestler Herbert<br />

2. Zenz Josef<br />

3. Nestler Franz<br />

Rennklasse/Rac<strong>in</strong>g class<br />

1. Weisl Wolfgang<br />

2. Fleck Hellfried<br />

3. Fleck Wolfgang<br />

women’s Works Ski Champion was Eva<br />

Kollmann, and the men’s Wolfgang Weisl, who also<br />

ga<strong>in</strong>ed the day’s best time <strong>in</strong> the men’s events.<br />

The day’s best time <strong>in</strong> the women’s events was<br />

achieved by Melanie Fleck, Junior I female.<br />

1st Leoben Bus<strong>in</strong>ess Race<br />

On April 8, 2002 28 employees from AT&S<br />

Leoben and AT&S Fohnsdorf <strong>to</strong>ok part <strong>in</strong> the 1st<br />

Leoben works race. A <strong>to</strong>tal of 550 or so runners<br />

competed <strong>in</strong> freez<strong>in</strong>g temperatures for vic<strong>to</strong>ry <strong>in</strong><br />

the 5 km race. The fastest AT&S team achieved<br />

17th place (Team AT&S 1: Wolfgang Weisl,<br />

Robert Golob, Hellfried Fleck). In the <strong>in</strong>dividual<br />

competition the best AT&S runner, Wolfgang<br />

Weisl, ga<strong>in</strong>ed 22nd place.<br />

AT&S received a special prize for the highest<br />

number of participants from one company. The<br />

K2 Kick Scooter (a high-tech scooter) was<br />

awarded <strong>to</strong> the “friendliest” runner Friedrich<br />

Beller.<br />

Mannschaftswertung/Team result<br />

1. A-Team/A-Team: Weisl W./Vockenberger<br />

Ch./Haiden G./Reiter F.<br />

2. Team Büro I/Team Office I:<br />

Fleck W./Gössler W./Kollmann E./<br />

Fürstler G.<br />

3. Team Büro II/Team Office II:<br />

Fleck H./Stadler W./Mörzl S./<br />

Pilgram C.<br />

Viele Teilnehmer aus <strong>der</strong><br />

AT&S rannten mit.<br />

Many participants from<br />

AT&S were runn<strong>in</strong>g.<br />

45


AT&S Fohnsdorf<br />

3. März 2001: Betriebskegelturnier<br />

Unsere traditionelle Betriebskegelmeisterschaft<br />

garantierte nicht nur Spannung auf den Kegelbahnen,<br />

son<strong>der</strong>n auch Geme<strong>in</strong>schaftsgeist unter<br />

den rund 130 Teilnehmern.<br />

In <strong>der</strong> Damene<strong>in</strong>zelwertung siegte Moser<br />

Christ<strong>in</strong>e mit 69 Holz vor Hatz Christa mit<br />

68 Holz. Dritte wurde Hollerer Frieda mit<br />

66 Holz.<br />

In <strong>der</strong> Herrene<strong>in</strong>zelwertung war Kugler<br />

Christian mit 82 Holz e<strong>in</strong>same Spitze. Mit 76<br />

Holz sicherte sich Seidl Ferd<strong>in</strong>and den zweiten<br />

Platz. Dritter wurde Mattl Franz mit 75 Holz.<br />

In <strong>der</strong> Mannschaftswertung kamen folgende<br />

Ergebnisse zustande:<br />

Damen:<br />

1. Ste<strong>in</strong>er Maria, Schiefer Herta, Baumgartner<br />

Christ<strong>in</strong>e, Schieg Hedwig (246 Holz)<br />

2. Wagner Sab<strong>in</strong>e, Beer Gisela, Knill Ehrentraud,<br />

Degold Ursula (230 Holz)<br />

3. Meßner Sab<strong>in</strong>e, Hatz Christa, Zarfl Mar<strong>in</strong>a,<br />

Ha<strong>in</strong>gartner Helga (228 Holz)<br />

Herren:<br />

1. Kokail Heimo, Pirzl Kurt, Ste<strong>in</strong>wid<strong>der</strong> Erw<strong>in</strong>,<br />

Kugler Christian (271 Holz)<br />

2. Raunig Odo, Baumgartner Re<strong>in</strong>hard sen.,<br />

Klöckl Karl, Reiter Adolf (268 Holz)<br />

3. S<strong>to</strong>cker Adolf, S<strong>to</strong>cker Arm<strong>in</strong>, S<strong>to</strong>cker Heimo,<br />

Keller Heimo (258 Holz)<br />

46<br />

Chronik / Chronicle<br />

AT&S Fohnsdorf<br />

March 3, 2001: Works Bowls Tournament<br />

Our traditional works bowls team ensured not<br />

only excitement on the bowl<strong>in</strong>g alleys, but also<br />

community spirit among the approx. 130 participants.<br />

In the Ladies Individual Competition the<br />

w<strong>in</strong>ner was Christ<strong>in</strong>e Moser with 69 woods<br />

aga<strong>in</strong>st Christa Hatz with 68 woods. Third was<br />

Frieda Hollerer with 66 woods.<br />

In the Men’s Individual Competition Christian<br />

Kugler was easily first with 82 woods. Ferd<strong>in</strong>and<br />

Seidl secured second place with 76 woods. Third<br />

was Franz Mattl with 75 woods.<br />

In the Team Competition the results were as<br />

follows:<br />

Ladies:<br />

1. Ste<strong>in</strong>er Maria, Schiefer Herta, Baumgartner<br />

Christ<strong>in</strong>e, Schieg Hedwig (246 woods)<br />

2. Wagner Sab<strong>in</strong>e, Beer Gisela, Knill Ehrentraud,<br />

Degold Ursula (230 woods)<br />

3. Meßner Sab<strong>in</strong>e, Hatz Christa, Zarfl Mar<strong>in</strong>a,<br />

Ha<strong>in</strong>gartner Helga (228 woods)<br />

Men:<br />

1. Kokail Heimo, Pirzl Kurt, Ste<strong>in</strong>wid<strong>der</strong> Erw<strong>in</strong>,<br />

Kugler Christian (271 woods)<br />

2. Raunig Odo, Baumgartner Re<strong>in</strong>hard sen.,<br />

Klöckl Karl, Reiter Adolf (268 woods)<br />

3. S<strong>to</strong>cker Adolf, S<strong>to</strong>cker Arm<strong>in</strong>, S<strong>to</strong>cker Heimo,<br />

Keller Heimo (258 woods)<br />

Spaß für die Kle<strong>in</strong>en<br />

bei <strong>der</strong> Nikolofeier und<br />

für die Großen bei den<br />

Betriebskegelmeisterschaften.<br />

Fun for the kids with<br />

Santa Claus and for the<br />

adults at the works bowls<br />

<strong>to</strong>urnament.


2. Dezember 2001: Nikolofeier<br />

Etwa 270 K<strong>in</strong><strong>der</strong> unserer MitarbeiterInnen, im<br />

Alter bis 15 Jahren, verfolgten mit großer Begeisterung<br />

im Diesel-K<strong>in</strong>o <strong>in</strong> <strong>der</strong> Arena am Waldfeld<br />

zwei <strong>to</strong>lle Filme, die den Auftakt <strong>der</strong> Nikolofeier<br />

bildeten.<br />

Mit <strong>der</strong> Österreichpremiere von „ATLAN-<br />

TIS“ und dem K<strong>in</strong>ohit <strong>in</strong> Amerika „HARRY<br />

POTTER“ wurde wirklich e<strong>in</strong> Top-Programm<br />

geboten. Im Anschluss kam <strong>der</strong> Nikolaus und<br />

überreichte jedem K<strong>in</strong>d e<strong>in</strong> Nikolosackerl.<br />

12. Dezember 2001: Siegerehrung –<br />

Sektion Go-Kart<br />

Nach 12 gefahrenen Rennen, die 2001 <strong>in</strong> <strong>der</strong><br />

Kart-Halle <strong>in</strong> Spielberg absolviert wurden, standen<br />

die Sieger fest. Erster mit 70 Punkten wurde<br />

Köck Klaus, gefolgt von Büsel Jürgen mit 55<br />

Punkten und Skabraut Thomas mit 42 Punkten.<br />

9. – 10. Februar 2002:<br />

Schiausflug nach Schladm<strong>in</strong>g<br />

Diesmal war e<strong>in</strong> 2-Tages-Ausflug mit Nächtigung<br />

<strong>in</strong> Schladm<strong>in</strong>g geplant. Für jene, die sich nicht<br />

auf den Pisten tummeln wollten stand e<strong>in</strong>em<br />

Bade- o<strong>der</strong> Saunavergnügen nichts im Wege.<br />

BRV Schumy Markus<br />

AT&S Fehr<strong>in</strong>g<br />

Alle Jahre wie<strong>der</strong>...<br />

kommt für die K<strong>in</strong><strong>der</strong> unserer Kolleg<strong>in</strong>nen und<br />

Kollegen <strong>der</strong> Weihnachtsmann – und mit ihm<br />

das legendäre MOKI-K<strong>in</strong><strong>der</strong>theater. Vom Theaterstück<br />

„Der weiße Planet“, waren K<strong>in</strong><strong>der</strong> und<br />

Eltern gleichermaßen begeistert.<br />

Nach <strong>der</strong> spannenden Aufführung gab es<br />

e<strong>in</strong>e Jause. Anschließend kam <strong>der</strong> Weihnachtsmann<br />

mit <strong>to</strong>llen Geschenken. Dieser Nachmittag<br />

ist auch für uns Erwachsene e<strong>in</strong>e bes<strong>in</strong>nliche<br />

Atempause <strong>in</strong> <strong>der</strong> hektischen Vorweihnachtszeit.<br />

Als Belohnung für unsere Mühe dürfen wir<br />

immer wie<strong>der</strong> auf`s Neue <strong>in</strong> leuchtende K<strong>in</strong><strong>der</strong>augen<br />

blicken.<br />

Die Belegschaftsvertretung <strong>der</strong> Arbeiter und<br />

Angestellten bedankt sich beson<strong>der</strong>s beim Vorstand<br />

für die f<strong>in</strong>anzielle Unterstützung.<br />

BRV Ang. Rosemarie Sonnberger<br />

BRV Arb. Johann Fuchs<br />

Chronik / Chronicle<br />

December 2, 2001: Santa Claus Day<br />

About 270 children up <strong>to</strong> 15 years old belong<strong>in</strong>g<br />

<strong>to</strong> our employees watched two super films <strong>in</strong> the<br />

Diesel C<strong>in</strong>ema <strong>in</strong> the Arena am Waldfeld –<br />

mak<strong>in</strong>g an enthusiastic start <strong>to</strong> Santa Claus Day.<br />

The Austrian premier of “ATLANTIS” and<br />

the American hit “HARRY POTTER” provided a<br />

<strong>to</strong>p-grade programme. Afterwards Santa Claus<br />

came and gave each child a little sack of presents.<br />

December 12, 2001: presentation ceremony –<br />

go-kart section<br />

After 12 races run <strong>in</strong> 2001 <strong>in</strong> the Kart Hall <strong>in</strong><br />

Spielberg the w<strong>in</strong>ners have been decided. First<br />

with 70 po<strong>in</strong>ts was Klaus Köck, followed by<br />

Jürgen Büsel with 55 po<strong>in</strong>ts and Thomas<br />

Skabraut with 42 po<strong>in</strong>ts.<br />

February 9 <strong>to</strong> 10, 2002:<br />

ski trip <strong>to</strong> Schladm<strong>in</strong>g<br />

This time we planned a 2-day trip with overnight<br />

stay <strong>in</strong> Schladm<strong>in</strong>g. Those who did not fancy<br />

romp<strong>in</strong>g among the pistes were able <strong>to</strong> enjoy the<br />

swimm<strong>in</strong>g pool and the sauna.<br />

Workers’ Rep Schumy Markus<br />

AT&S Fehr<strong>in</strong>g<br />

Every year once aga<strong>in</strong>...<br />

Father Christmas comes for our colleagues’<br />

children – and with him the legendary MOKI<br />

Children’s Theatre. The play “The White Planet”<br />

was enthusiastically received by children and<br />

parents alike.<br />

Applause followed the excit<strong>in</strong>g performance,<br />

and then Father Christmas arrived with some<br />

super presents. This afternoon is a quiet breath<strong>in</strong>g<br />

space for us grown-ups <strong>to</strong>o <strong>in</strong> the hectic period<br />

before Christmas.<br />

As a reward for our efforts we are given lots<br />

of opportunities <strong>to</strong> glimpse aga<strong>in</strong> the light <strong>in</strong> our<br />

children’s eyes.<br />

The Works Councils for salaried and waged<br />

staff would like <strong>to</strong> extend special thanks <strong>to</strong> the<br />

Board of Direc<strong>to</strong>rs for its f<strong>in</strong>ancial support.<br />

Workers’ Rep (salaried staff)<br />

Rosemarie Sonnberger<br />

Workers’ Rep (waged staff) Johann Fuchs<br />

Was für e<strong>in</strong> Theater<br />

What a theatre<br />

Für alle K<strong>in</strong><strong>der</strong> gab es<br />

Geschenke<br />

All children got presents<br />

47


1982<br />

Leiterplatte zur Leistungssteigerung von Computern (ab 1983)<br />

Pr<strong>in</strong>ted Circuit Board Increas<strong>in</strong>g the Efficiency of Personal Computers<br />

(from 1983)

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!