Warum sich Managed Services doch lohnen - Fujitsu
Warum sich Managed Services doch lohnen - Fujitsu
Warum sich Managed Services doch lohnen - Fujitsu
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
VISIT 2010 – <strong>Fujitsu</strong> Forum Europe 1
Sourcing & Deployment – Room 5<br />
Shaping<br />
tomorrow<br />
with you.<br />
VISIT 2010 – <strong>Fujitsu</strong> Forum Europe<br />
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Christian Günther<br />
Head of LANXESS IT Global<br />
Infrastructure<br />
14:00 h
INTERNAL USE ONLY
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Christian Günther<br />
Head of<br />
LANXESS IT Global Infrastructure
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Agenda<br />
� Company introduction LANXESS<br />
� Context, Options and Decision of LANXESS IT<br />
� Project planning <strong>Managed</strong> Storage<br />
� 100 Days Operation: Experience<br />
� Abstract and Lessons Learned<br />
�Questions & Answers<br />
5<br />
Christian Günther, IT-IFS<br />
24-Nov-2010
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
LANXESS @ a Glance: Product Portfolio<br />
Broad product range comprising premium chemicals, rubber and polymers<br />
� Basic chemicals<br />
� Active ingredients (custom manufacturing) and intermediates for<br />
6<br />
pharmaceuticals and crop protection products<br />
� Material protection products<br />
� Finishing agents for leather<br />
� Ion exchange resins, especially for water treatment<br />
� Inorganic pigments for coloring concrete and surface coatings<br />
� Dyes and inorganic and organic pigments for coloring plastics<br />
� Plastics additives such as flame retardants and plasticizers<br />
� Solid rubber and rubber chemicals for the rubber and tire industry<br />
� Plastics for automotive, electrical appliances, furniture, sports and<br />
leisure<br />
� Perlon wire for technical applications<br />
Christian Günther, IT-IFS<br />
24-Nov-2010
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
The team is set, the chemistry is right and the strategy fits.<br />
LANXESS is a leader in specialty chemicals and operates in all important global markets.<br />
In 2009, the company achieved sales of EUR 5,057 million.<br />
Many forces combine at LANXESS' 42 sites worldwide to produce the optimal result. This<br />
applies both to the products and processes themselves and to the 14,500 or so staff in 23<br />
countries that are responsible for the company’s day-to-day business.<br />
LANXESS is treading the path that is inherent in its name: Combined from the French verb<br />
“lancer” meaning to thrust forward and the English noun “success”, LANXESS represents<br />
the determined will to achieve and the readiness to embrace continual change.<br />
7<br />
Christian Günther, IT-IFS<br />
24-Nov-2010
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Facts & Figures<br />
8<br />
Sales in the year 2009 EUR 5.057 bn<br />
Sales in 9M / 2010 EUR 5.288 bn<br />
Employees worldwide (as of: 2010-09-30)<br />
Portfolio<br />
Global orientation<br />
LANXESS is one of Germany’s most important providers of polymers and chemicals<br />
Christian Günther, IT-IFS<br />
24-Nov-2010<br />
14,539<br />
Performance Polymers<br />
Advanced Intermediates<br />
Performance Chemicals<br />
42 production sites worldwide
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
9<br />
Storage management is like a Gordian knot. But <strong>Fujitsu</strong> has cut the knot for us,<br />
solving our problems with the growing flood of data by using its <strong>Managed</strong><br />
Storage solution for operations in our European storage environment.<br />
What‘s more, the chemistry between <strong>Fujitsu</strong> and LANXESS is also good. Here<br />
you can learn more about how this concept for flexible capacity provisioning<br />
really works.<br />
Christian Günther, IT-IFS<br />
24-Nov-2010
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
LANXESS is growing<br />
… continuously<br />
10<br />
Christian Günther, IT-IFS<br />
24-Nov-2010<br />
15.09.2010 | Press Release,<br />
LANXESS sets ambitious growth target<br />
EUR 1.4 billion EBITDA pre exceptionals targeted in 2015<br />
FY 2010 earnings forecast confirmed<br />
Focus on megatrends and emerging markets<br />
Further growth from investment projects and acquisitions<br />
Product innovation promotes sustainability<br />
Feasibility study for new Asian Nd-PBR plant
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Screenshot Wirtschaftsnachrichten 2008<br />
11<br />
Christian Günther, IT-IFS<br />
24-Nov-2010
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Context 2008/2009<br />
• End-of-life server hardware because of overdue investments<br />
• Growing demand of storage – storage had to be extended or changed urgently<br />
• Project for consolidation and virtualization was in the pipeline<br />
• Storage is „KEY“ for success<br />
• Worldwide economic crisis<br />
• Revenue forecast fell back to the level of the founding year<br />
• IT was challenged to identify possible savings<br />
• Savings had to take effect in 2009 already<br />
• Investments were limited hardly<br />
12<br />
Christian Günther, IT-IFS<br />
24-Nov-2010
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Need for Decision: Storage System<br />
13<br />
Context 2008/2009<br />
• Dedicated server per application<br />
• Low capacity utilization<br />
• Complex system environment<br />
• High complexity in backup<br />
• High administrative costs<br />
• No Reporting<br />
• Best effort operating<br />
• Technology freeze<br />
Christian Günther, IT-IFS<br />
24-Nov-2010<br />
Target scenario 2010<br />
• One, central storage system with different<br />
performance classes<br />
• High availability based on an SLA with<br />
99.5%<br />
• Virtual environment, high utilization<br />
• Flexible call-off for changing volume<br />
• Low costs<br />
• Consolidated reporting<br />
• SLA based operation<br />
• Technology leap
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Motivation of LANXESS IT<br />
14<br />
Requirements from LXS:<br />
technical equipment which enables LANXESS IT to react flexible and cost-efficient<br />
to their customers’ requirements, step cost need to be reduced<br />
Christian Günther, IT-IFS<br />
24-Nov-2010
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Possible Options<br />
15<br />
Inhouse Operation:<br />
LANXESS IT is responsible<br />
for IT operations and acts as<br />
an internal service provider.<br />
Offshoring / Nearshoring:<br />
The services are provided in<br />
European countries (Nearshoring)<br />
or outside Europe (Offshoring.<br />
Christian Günther, IT-IFS<br />
24-Nov-2010<br />
Outsourcing:<br />
An external service provider is<br />
responsible for IT operations.<br />
WHO:<br />
Outsourcing<br />
vs.<br />
Inhouse<br />
Operation<br />
Sourcing<br />
Decision<br />
<strong>Managed</strong> <strong>Services</strong>:<br />
Centralized management of a<br />
local system, usually in<br />
preparation for an outsourcing.
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Choice of <strong>Managed</strong> Storage<br />
LANXESS evaluated the different types, ranging<br />
from in-house self operation to Outsourcing.<br />
Based on previous experience and present<br />
proposals LANXESS decided for a <strong>Managed</strong><br />
Service for their storage.<br />
16<br />
Christian Günther, IT-IFS<br />
24-Nov-2010
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
LANXESS‘ Decision Criteria<br />
• Reduction of investments, IT-budget becoming more constant and<br />
calculable<br />
• Flexible an SLA-based IT-Service<br />
17<br />
• Pay as you Use<br />
• On Demand (capacity may be resized within few hours / days)<br />
• Entrance to up-to-date technology with reduced risk<br />
• Reduced complexity of IT Infrastructure Management<br />
• Optimized skill-profile for the selected technology<br />
• Savings / benefits take effect in the actual year<br />
• Option for a later Insourcing<br />
• Choice of the hardware location (at the service provider or on-site in<br />
LANXESS‘ data center)<br />
Christian Günther, IT-IFS<br />
24-Nov-2010<br />
�<br />
�<br />
� ��<br />
� ��
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
From the first Contact to Operation Takeover<br />
1. The idea of <strong>Managed</strong> Storage occurred on an exhibition.<br />
2. LANXESS-view: How could we compare in-house self operation, total<br />
Outsourcing and managed Service under the aspects of total costs<br />
analysis, SLA and requirements coverage?<br />
18<br />
Decision<br />
Christian Günther, IT-IFS<br />
24-Nov-2010<br />
RFP<br />
13 Months<br />
Choice<br />
Project<br />
Transition<br />
Operation
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Timeline of the Transition Stage<br />
until the Operation Takeover by <strong>Fujitsu</strong><br />
19<br />
setup systems<br />
and other<br />
infrastructure<br />
Phase 1<br />
19.10.2009 04.12.2009 01.02.2010<br />
31.01.2015<br />
Christian Günther, IT-IFS<br />
24-Nov-2010<br />
Transition<br />
migration data Operation:<br />
further expansion<br />
according to growth<br />
Phase 2<br />
19<br />
Operate (60 Months)
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
RACI*1-Matrix: Responsibilities<br />
Aktivität Lanxess <strong>Fujitsu</strong><br />
Beistellen der Storage-Infrastruktur und aktiven SAN-Komponenten V<br />
Monitoring: Überwachung der Storage-Infrastruktur und aktiven SAN-Komponenten V<br />
Release- und Patchmanagement der Storage-Infrastruktur und aktiven SAN-Komponenten V<br />
Beistellen der RZ-Infrastruktur (Stellfläche, Strom, Klimatechnik, Höheneinheiten, etc.) V<br />
Durchführen der storageseitigen Verkabelung (Storage-Switch) V<br />
Durchführen der serverseitigen Verkabelung (Server-Switch) V<br />
Durchführen der raumübergreifenden Verkabelung (Rack-Rack) V<br />
Beistellen der Netzwerk (LAN) Infrastruktur V<br />
Beistellen der Management-Infrastruktur (Mgmt.-/Reporting-Server, etc.) V<br />
Monitoring: Überwachung der Management-Infrastruktur V<br />
Release- und Patchmanagement der Management-Infrastruktur V<br />
Beistellen des Remote-Zugangs für das Remote Management V<br />
Volume-Management (Anlegen, Verwalten, Mappen, Löschen) V<br />
Snapshot/Checkpoint (Anlegen, Ändern, Löschen, Überwachen) V<br />
Capacity Management: Überwachen der Vorhaltekapazität V<br />
Virenscanning V<br />
Vorgaben für Setup der LAN-Controller/HBAs V<br />
Setup der LAN-Controller/HBAs inkl. Firmware V<br />
Backup V<br />
20<br />
Christian Günther, IT-IFS<br />
24-Nov-2010<br />
*1 Responsible - Accountable -Consulted - Informed
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
<strong>Fujitsu</strong> / LANXESS Operation Model<br />
21<br />
Christian Günther, IT-IFS<br />
24-Nov-2010<br />
ITIL based<br />
SPOC for<br />
LANXESS
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Operation Characteristics<br />
Operation Time<br />
Service Time<br />
Standby Time<br />
Response Time for<br />
incidents<br />
Time to Fix<br />
Max. Workorder<br />
Flexibility<br />
SLA<br />
22<br />
Christian Günther, IT-IFS<br />
24-Nov-2010<br />
Monday 0:00 till Sunday 24:00 (7x24)<br />
Monday till Friday from 8:00 to 18:00 (5x10)<br />
Monday till Friday each from 18:00 to 8:00<br />
+ weekends and holidays<br />
Depending on incident-classification and date/time<br />
from 15 up to 480 minutes<br />
Depending on incident-classification 4 hours up-to<br />
next business day<br />
3 business days for Change Requests<br />
15% of the capacity booked per performance class<br />
98-99,5% availability per month<br />
22
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
100 Days Operation: Experience<br />
23<br />
Positive Experience Lessons Learned<br />
� Very reliable operation<br />
� High SLA fulfillment<br />
� Professional services<br />
� Flexibility of costs via projects<br />
� Technology leap achieved<br />
� Flexibility of costs achieved<br />
� Complexity reduced<br />
� Important IT resources now<br />
available for projects again<br />
Christian Günther, IT-IFS<br />
24-Nov-2010<br />
� The requirements aligned on the<br />
existing data centre infrastructure<br />
had been underestimated. Here we<br />
should have planned more<br />
conservative.<br />
� Contact design for the first <strong>Managed</strong><br />
Service contract was complex, since<br />
many legal questions were<br />
answered for the first time.<br />
� Service Management and Interface<br />
Management needs another skill<br />
profile which needs to bee planned<br />
and built up parallel.
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Yes, <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
• Invoicing depending on consumption „pay-as-you-use“<br />
• Speed-up for processes of procurement and usage<br />
• Possibility for flexible reaction on storage demands from business<br />
units<br />
• Transparent and foreseeable storage costs<br />
• No assets included in property<br />
• Option to use expert skills which internal are not available<br />
• SAL supporting business‘ requirements<br />
• Standardized operation processes and interfaces<br />
• 7x24h ITIL-based operations<br />
• maximum flexibility in future options<br />
24<br />
Christian Günther, IT-IFS<br />
24-Nov-2010
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Next Steps …. @LANXESS IT Roadmap<br />
• <strong>Managed</strong> Backup<br />
• Transparency of performance<br />
• Backup as service not as technology<br />
• Different SLAs to support the business requirements<br />
25<br />
• Transparency of costs<br />
• Foreseeable backup costs (Budget)<br />
• Ability for usage based cost allocation<br />
• Proportion for future increasing capacity demand<br />
• Improved rate of equity<br />
• Assets do not appear in LANXESS’ balance sheet<br />
• Concentration on core competencies<br />
• Own employees are available for more valued tasks<br />
Christian Günther, IT-IFS<br />
24-Nov-2010
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
Questions ?<br />
26<br />
Christian Günther, IT-IFS<br />
24-Nov-2010
Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />
27<br />
Thank you for your attention<br />
Christian Günther, IT-IFS<br />
24-Nov-2010<br />
Christian Günther<br />
LANXESS Deutschland GmbH<br />
Information Technology<br />
Head of<br />
Global Infrastructure<br />
Chemiepark Leverkusen<br />
Gebäude: E60, Raum: 643<br />
D-51369 Leverkusen, Deutschland<br />
e-Mail: christian.guenther@lanxess.com