19.02.2013 Views

Warum sich Managed Services doch lohnen - Fujitsu

Warum sich Managed Services doch lohnen - Fujitsu

Warum sich Managed Services doch lohnen - Fujitsu

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

VISIT 2010 – <strong>Fujitsu</strong> Forum Europe 1


Sourcing & Deployment – Room 5<br />

Shaping<br />

tomorrow<br />

with you.<br />

VISIT 2010 – <strong>Fujitsu</strong> Forum Europe<br />

Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Christian Günther<br />

Head of LANXESS IT Global<br />

Infrastructure<br />

14:00 h


INTERNAL USE ONLY


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Christian Günther<br />

Head of<br />

LANXESS IT Global Infrastructure


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Agenda<br />

� Company introduction LANXESS<br />

� Context, Options and Decision of LANXESS IT<br />

� Project planning <strong>Managed</strong> Storage<br />

� 100 Days Operation: Experience<br />

� Abstract and Lessons Learned<br />

�Questions & Answers<br />

5<br />

Christian Günther, IT-IFS<br />

24-Nov-2010


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

LANXESS @ a Glance: Product Portfolio<br />

Broad product range comprising premium chemicals, rubber and polymers<br />

� Basic chemicals<br />

� Active ingredients (custom manufacturing) and intermediates for<br />

6<br />

pharmaceuticals and crop protection products<br />

� Material protection products<br />

� Finishing agents for leather<br />

� Ion exchange resins, especially for water treatment<br />

� Inorganic pigments for coloring concrete and surface coatings<br />

� Dyes and inorganic and organic pigments for coloring plastics<br />

� Plastics additives such as flame retardants and plasticizers<br />

� Solid rubber and rubber chemicals for the rubber and tire industry<br />

� Plastics for automotive, electrical appliances, furniture, sports and<br />

leisure<br />

� Perlon wire for technical applications<br />

Christian Günther, IT-IFS<br />

24-Nov-2010


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

The team is set, the chemistry is right and the strategy fits.<br />

LANXESS is a leader in specialty chemicals and operates in all important global markets.<br />

In 2009, the company achieved sales of EUR 5,057 million.<br />

Many forces combine at LANXESS' 42 sites worldwide to produce the optimal result. This<br />

applies both to the products and processes themselves and to the 14,500 or so staff in 23<br />

countries that are responsible for the company’s day-to-day business.<br />

LANXESS is treading the path that is inherent in its name: Combined from the French verb<br />

“lancer” meaning to thrust forward and the English noun “success”, LANXESS represents<br />

the determined will to achieve and the readiness to embrace continual change.<br />

7<br />

Christian Günther, IT-IFS<br />

24-Nov-2010


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Facts & Figures<br />

8<br />

Sales in the year 2009 EUR 5.057 bn<br />

Sales in 9M / 2010 EUR 5.288 bn<br />

Employees worldwide (as of: 2010-09-30)<br />

Portfolio<br />

Global orientation<br />

LANXESS is one of Germany’s most important providers of polymers and chemicals<br />

Christian Günther, IT-IFS<br />

24-Nov-2010<br />

14,539<br />

Performance Polymers<br />

Advanced Intermediates<br />

Performance Chemicals<br />

42 production sites worldwide


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

9<br />

Storage management is like a Gordian knot. But <strong>Fujitsu</strong> has cut the knot for us,<br />

solving our problems with the growing flood of data by using its <strong>Managed</strong><br />

Storage solution for operations in our European storage environment.<br />

What‘s more, the chemistry between <strong>Fujitsu</strong> and LANXESS is also good. Here<br />

you can learn more about how this concept for flexible capacity provisioning<br />

really works.<br />

Christian Günther, IT-IFS<br />

24-Nov-2010


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

LANXESS is growing<br />

… continuously<br />

10<br />

Christian Günther, IT-IFS<br />

24-Nov-2010<br />

15.09.2010 | Press Release,<br />

LANXESS sets ambitious growth target<br />

EUR 1.4 billion EBITDA pre exceptionals targeted in 2015<br />

FY 2010 earnings forecast confirmed<br />

Focus on megatrends and emerging markets<br />

Further growth from investment projects and acquisitions<br />

Product innovation promotes sustainability<br />

Feasibility study for new Asian Nd-PBR plant


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Screenshot Wirtschaftsnachrichten 2008<br />

11<br />

Christian Günther, IT-IFS<br />

24-Nov-2010


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Context 2008/2009<br />

• End-of-life server hardware because of overdue investments<br />

• Growing demand of storage – storage had to be extended or changed urgently<br />

• Project for consolidation and virtualization was in the pipeline<br />

• Storage is „KEY“ for success<br />

• Worldwide economic crisis<br />

• Revenue forecast fell back to the level of the founding year<br />

• IT was challenged to identify possible savings<br />

• Savings had to take effect in 2009 already<br />

• Investments were limited hardly<br />

12<br />

Christian Günther, IT-IFS<br />

24-Nov-2010


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Need for Decision: Storage System<br />

13<br />

Context 2008/2009<br />

• Dedicated server per application<br />

• Low capacity utilization<br />

• Complex system environment<br />

• High complexity in backup<br />

• High administrative costs<br />

• No Reporting<br />

• Best effort operating<br />

• Technology freeze<br />

Christian Günther, IT-IFS<br />

24-Nov-2010<br />

Target scenario 2010<br />

• One, central storage system with different<br />

performance classes<br />

• High availability based on an SLA with<br />

99.5%<br />

• Virtual environment, high utilization<br />

• Flexible call-off for changing volume<br />

• Low costs<br />

• Consolidated reporting<br />

• SLA based operation<br />

• Technology leap


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Motivation of LANXESS IT<br />

14<br />

Requirements from LXS:<br />

technical equipment which enables LANXESS IT to react flexible and cost-efficient<br />

to their customers’ requirements, step cost need to be reduced<br />

Christian Günther, IT-IFS<br />

24-Nov-2010


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Possible Options<br />

15<br />

Inhouse Operation:<br />

LANXESS IT is responsible<br />

for IT operations and acts as<br />

an internal service provider.<br />

Offshoring / Nearshoring:<br />

The services are provided in<br />

European countries (Nearshoring)<br />

or outside Europe (Offshoring.<br />

Christian Günther, IT-IFS<br />

24-Nov-2010<br />

Outsourcing:<br />

An external service provider is<br />

responsible for IT operations.<br />

WHO:<br />

Outsourcing<br />

vs.<br />

Inhouse<br />

Operation<br />

Sourcing<br />

Decision<br />

<strong>Managed</strong> <strong>Services</strong>:<br />

Centralized management of a<br />

local system, usually in<br />

preparation for an outsourcing.


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Choice of <strong>Managed</strong> Storage<br />

LANXESS evaluated the different types, ranging<br />

from in-house self operation to Outsourcing.<br />

Based on previous experience and present<br />

proposals LANXESS decided for a <strong>Managed</strong><br />

Service for their storage.<br />

16<br />

Christian Günther, IT-IFS<br />

24-Nov-2010


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

LANXESS‘ Decision Criteria<br />

• Reduction of investments, IT-budget becoming more constant and<br />

calculable<br />

• Flexible an SLA-based IT-Service<br />

17<br />

• Pay as you Use<br />

• On Demand (capacity may be resized within few hours / days)<br />

• Entrance to up-to-date technology with reduced risk<br />

• Reduced complexity of IT Infrastructure Management<br />

• Optimized skill-profile for the selected technology<br />

• Savings / benefits take effect in the actual year<br />

• Option for a later Insourcing<br />

• Choice of the hardware location (at the service provider or on-site in<br />

LANXESS‘ data center)<br />

Christian Günther, IT-IFS<br />

24-Nov-2010<br />

�<br />

�<br />

� ��<br />

� ��


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

From the first Contact to Operation Takeover<br />

1. The idea of <strong>Managed</strong> Storage occurred on an exhibition.<br />

2. LANXESS-view: How could we compare in-house self operation, total<br />

Outsourcing and managed Service under the aspects of total costs<br />

analysis, SLA and requirements coverage?<br />

18<br />

Decision<br />

Christian Günther, IT-IFS<br />

24-Nov-2010<br />

RFP<br />

13 Months<br />

Choice<br />

Project<br />

Transition<br />

Operation


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Timeline of the Transition Stage<br />

until the Operation Takeover by <strong>Fujitsu</strong><br />

19<br />

setup systems<br />

and other<br />

infrastructure<br />

Phase 1<br />

19.10.2009 04.12.2009 01.02.2010<br />

31.01.2015<br />

Christian Günther, IT-IFS<br />

24-Nov-2010<br />

Transition<br />

migration data Operation:<br />

further expansion<br />

according to growth<br />

Phase 2<br />

19<br />

Operate (60 Months)


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

RACI*1-Matrix: Responsibilities<br />

Aktivität Lanxess <strong>Fujitsu</strong><br />

Beistellen der Storage-Infrastruktur und aktiven SAN-Komponenten V<br />

Monitoring: Überwachung der Storage-Infrastruktur und aktiven SAN-Komponenten V<br />

Release- und Patchmanagement der Storage-Infrastruktur und aktiven SAN-Komponenten V<br />

Beistellen der RZ-Infrastruktur (Stellfläche, Strom, Klimatechnik, Höheneinheiten, etc.) V<br />

Durchführen der storageseitigen Verkabelung (Storage-Switch) V<br />

Durchführen der serverseitigen Verkabelung (Server-Switch) V<br />

Durchführen der raumübergreifenden Verkabelung (Rack-Rack) V<br />

Beistellen der Netzwerk (LAN) Infrastruktur V<br />

Beistellen der Management-Infrastruktur (Mgmt.-/Reporting-Server, etc.) V<br />

Monitoring: Überwachung der Management-Infrastruktur V<br />

Release- und Patchmanagement der Management-Infrastruktur V<br />

Beistellen des Remote-Zugangs für das Remote Management V<br />

Volume-Management (Anlegen, Verwalten, Mappen, Löschen) V<br />

Snapshot/Checkpoint (Anlegen, Ändern, Löschen, Überwachen) V<br />

Capacity Management: Überwachen der Vorhaltekapazität V<br />

Virenscanning V<br />

Vorgaben für Setup der LAN-Controller/HBAs V<br />

Setup der LAN-Controller/HBAs inkl. Firmware V<br />

Backup V<br />

20<br />

Christian Günther, IT-IFS<br />

24-Nov-2010<br />

*1 Responsible - Accountable -Consulted - Informed


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

<strong>Fujitsu</strong> / LANXESS Operation Model<br />

21<br />

Christian Günther, IT-IFS<br />

24-Nov-2010<br />

ITIL based<br />

SPOC for<br />

LANXESS


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Operation Characteristics<br />

Operation Time<br />

Service Time<br />

Standby Time<br />

Response Time for<br />

incidents<br />

Time to Fix<br />

Max. Workorder<br />

Flexibility<br />

SLA<br />

22<br />

Christian Günther, IT-IFS<br />

24-Nov-2010<br />

Monday 0:00 till Sunday 24:00 (7x24)<br />

Monday till Friday from 8:00 to 18:00 (5x10)<br />

Monday till Friday each from 18:00 to 8:00<br />

+ weekends and holidays<br />

Depending on incident-classification and date/time<br />

from 15 up to 480 minutes<br />

Depending on incident-classification 4 hours up-to<br />

next business day<br />

3 business days for Change Requests<br />

15% of the capacity booked per performance class<br />

98-99,5% availability per month<br />

22


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

100 Days Operation: Experience<br />

23<br />

Positive Experience Lessons Learned<br />

� Very reliable operation<br />

� High SLA fulfillment<br />

� Professional services<br />

� Flexibility of costs via projects<br />

� Technology leap achieved<br />

� Flexibility of costs achieved<br />

� Complexity reduced<br />

� Important IT resources now<br />

available for projects again<br />

Christian Günther, IT-IFS<br />

24-Nov-2010<br />

� The requirements aligned on the<br />

existing data centre infrastructure<br />

had been underestimated. Here we<br />

should have planned more<br />

conservative.<br />

� Contact design for the first <strong>Managed</strong><br />

Service contract was complex, since<br />

many legal questions were<br />

answered for the first time.<br />

� Service Management and Interface<br />

Management needs another skill<br />

profile which needs to bee planned<br />

and built up parallel.


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Yes, <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

• Invoicing depending on consumption „pay-as-you-use“<br />

• Speed-up for processes of procurement and usage<br />

• Possibility for flexible reaction on storage demands from business<br />

units<br />

• Transparent and foreseeable storage costs<br />

• No assets included in property<br />

• Option to use expert skills which internal are not available<br />

• SAL supporting business‘ requirements<br />

• Standardized operation processes and interfaces<br />

• 7x24h ITIL-based operations<br />

• maximum flexibility in future options<br />

24<br />

Christian Günther, IT-IFS<br />

24-Nov-2010


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Next Steps …. @LANXESS IT Roadmap<br />

• <strong>Managed</strong> Backup<br />

• Transparency of performance<br />

• Backup as service not as technology<br />

• Different SLAs to support the business requirements<br />

25<br />

• Transparency of costs<br />

• Foreseeable backup costs (Budget)<br />

• Ability for usage based cost allocation<br />

• Proportion for future increasing capacity demand<br />

• Improved rate of equity<br />

• Assets do not appear in LANXESS’ balance sheet<br />

• Concentration on core competencies<br />

• Own employees are available for more valued tasks<br />

Christian Günther, IT-IFS<br />

24-Nov-2010


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

Questions ?<br />

26<br />

Christian Günther, IT-IFS<br />

24-Nov-2010


Why <strong>Managed</strong> <strong>Services</strong> Pay Off<br />

27<br />

Thank you for your attention<br />

Christian Günther, IT-IFS<br />

24-Nov-2010<br />

Christian Günther<br />

LANXESS Deutschland GmbH<br />

Information Technology<br />

Head of<br />

Global Infrastructure<br />

Chemiepark Leverkusen<br />

Gebäude: E60, Raum: 643<br />

D-51369 Leverkusen, Deutschland<br />

e-Mail: christian.guenther@lanxess.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!