19.02.2013 Views

ENGLISH - Gassco

ENGLISH - Gassco

ENGLISH - Gassco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

eceiving terminals in Europe cont<br />

Last stop before the<br />

market<br />

Gas from the NCS is piped to receiving terminals in four European countries. Upon arrival, it<br />

undergoes a final quality check, metering, and regulation of pressure and temperature before<br />

being delivered to the downstream transport operators.<br />

dunkerque terminal<br />

The receiving terminal for the Franpipe line stands<br />

in Dunkerque’s Port Ouest in northern France.<br />

Established jointly by Gassled and Gaz de France,<br />

this facility was completed in the summer of 1998<br />

and is owned by Franpipe.<br />

Deliveries of sales gas from the NCS via Franpipe<br />

to Dunkerque commenced on 1 July 1998.<br />

The terminal is remotely operated from the<br />

Zeebrugge facility.<br />

0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!