memorandum for claimant - CISG Database
memorandum for claimant - CISG Database
memorandum for claimant - CISG Database
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
- V - SUPERB<br />
Issue IV: If Respondent Qualifies Under Art. 79 (1) and (2) (a) <strong>CISG</strong> For Exemption From<br />
Paying Damages as a Result of the Delayed Installation of the Control System, RELIABLE<br />
Shall Not Be Joined to This Arbitration As It Was Requested by Respondent ....................................... 24<br />
A. No Respective Arbitration Agreement Exists Between SUPERB, Respondent and RELIABLE ..... 24<br />
1. The Three Parties Involved also Did Not Agree on a “Joinder”.............................................. 25<br />
2. The Three Parties Involved Did Not Agree on a „Consolidation“........................................... 26<br />
B. The Contractually Agreed Prerequisites <strong>for</strong> Joining RELIABLE to the Arbitration<br />
Conducted Between SUPERB and Respondent Are Not Met................................................................ 27<br />
C. Joining RELIABLE Would Endanger the Award’s En<strong>for</strong>ceability ................................................ 28<br />
1. An Award Violating the Principles of International Public Policy Is Unen<strong>for</strong>ceable<br />
Under the New York Convention .................................................................................................... 28<br />
2. RELIABLE’S Waiver of the Right to Participate in the Creation of the tribunal<br />
Violates the International Public Policy........................................................................................... 29<br />
III. Conclusion........................................................................................................................................ 30