24.02.2013 Views

Panasonic Air Conditioner - Hurum Kraft

Panasonic Air Conditioner - Hurum Kraft

Panasonic Air Conditioner - Hurum Kraft

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CS-HE9DKE CU-HE9DKE / CS-HE12DKE CU-HE12DKE<br />

9.13.7. Installation (Oxygen) Check Control<br />

• For operation check at installation and breakdown selfdiagnosis,<br />

continuous operation of 2-way valve and vacuum<br />

pump is conducted by checking installation from indoor<br />

room.<br />

9.14. Deice Control <br />

• • • Degree of frosting is expected by operation time, heat<br />

exchanger temperature and outdoor air temperature.<br />

• According to frosting conditions, deicing operation is<br />

effectively performed.<br />

1. Timer for deice control will function when outdoor heat<br />

exchanger temperature after continuous 40 minutes heating<br />

operation is below the primary judgment temperature.<br />

When the timer reaches 20 minutes or heat exchanger<br />

temperature is below the secondary judgment temperature,<br />

deicing operation will start.<br />

2. Four-way valve is switched and deicing is performed by<br />

cooling cycle.<br />

3. Deicing will be stopped when 12 minutes elapsed from<br />

starting of the operation or heat exchanger temperature<br />

reaches 17°C or more.<br />

36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!