INOVGrId is a project aimed at setting up a new,<br />
intelligent electricity distribution system to meet<br />
new challenges facing the distribution grid, such<br />
as the introduction of new functions in the area<br />
of tele-management and micro-generation. The<br />
introduction of intelligence at different levels in<br />
the distribution grid, together with better<br />
interaction with customers, will improve<br />
efficiency and energy supply quality and will<br />
contribute to energy efficiency. This project will<br />
lead to a reduction in both technical and<br />
commercial losses.<br />
my Energy is a new brand created by Edp to<br />
meet the challenge of improving energy<br />
efficiency through the use of micro-generation<br />
products. This programme provides customers<br />
with an initial energy audit for solar water<br />
heating or micro-generation, after which the<br />
best solution will be recommended,<br />
guaranteeing product quality, installation,<br />
after-sales service and maintenance, to take<br />
maximum advantage of the system.<br />
In 2009 <strong>EDP</strong> Gas, a Portuguese gas supplier, drew up an<br />
Environmental Action Plan with objectives and targets to<br />
reduce energy consumption from electricity and natural<br />
gas:<br />
• Objective 1*: Reduce electricity consumption by 1%<br />
(3 year average) by the end of 2009;<br />
• Indicator 1: Average consumption of electricity 2006/7/8<br />
x 1% (kWh);<br />
• Planned Action 1: Communication actions including<br />
measures to rationalise the use of electricity, create<br />
signage / media with messages to raise awareness.<br />
• Objective 2*: Reduce consumption of natural gas by<br />
1% (2–year average) by the end of 2009;<br />
• Indicator 2: Average consumption of natural gas<br />
2006/7/8 x 1% (m3)<br />
• Planned Action 2: Installation of shading devices on the<br />
company’s office buildings (protecting windows against<br />
direct sunlight) and a solar thermal system for water<br />
heating, partly substituting natural gas.<br />
Edp Gas new headquarters<br />
Note* - As part of the National System for Energy<br />
Certification and Indoor Air Quality (Directive 2002/91/<br />
EC of the European Parliament and of the Council of 16<br />
December 2002 on the energy performance of buildings),<br />
all actions are being designed to comply with office<br />
building certification standards.<br />