Ender ŞENKAYA - Ventech Construction & Installation Co.
Ender ŞENKAYA - Ventech Construction & Installation Co.
Ender ŞENKAYA - Ventech Construction & Installation Co.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Ender</strong> <strong>ŞENKAYA</strong><br />
Civil Engineer (M.Sc.)<br />
Deputy General Director<br />
Personal Information<br />
� Nationality: Turkish<br />
� Birth Date: April 5 th , 1968<br />
Education<br />
C U R R I C U L U M V I T A E<br />
� 1993 ODTU - Middle East Technical University, Dept. of Civil Engineering, Ankara<br />
Master of Science (Structural Mechanics)<br />
� 1990 ODTU - Middle East Technical University, Dept. of Civil Engineering, Ankara<br />
Bachelor of Science (Civil Engineering)<br />
� 1986 TED Ankara <strong>Co</strong>llege High School<br />
Languages<br />
� Turkish : Native<br />
� English : Advanced<br />
� Russian & German : Beginner<br />
Professional Work Experience<br />
� 2010 -<br />
<strong>Co</strong>mpany : <strong>Ventech</strong> <strong><strong>Co</strong>nstruction</strong> and <strong>Installation</strong> <strong>Co</strong>mpany<br />
Location : Head Office Ankara, Turkey<br />
Title: Deputy General Director<br />
Project : Various petroleum industry related projects in Middle East and CIS<br />
� 2007 - 2010<br />
<strong>Co</strong>mpany : Palmira Group<br />
Location : Head Office Moscow, Russian Federation<br />
Title: Deputy General Director<br />
Project : Several Industrial facilities constructions in a variety of locations in Russian<br />
Federation<br />
Megalogix Warehouse Logistic <strong>Co</strong>mplex, Novosibirsk / Russia<br />
Scope of works: Earth works, RC works, structural steel, sandwich panel cladding, M&E works, site<br />
infrastructure, asphalt pavement and landscaping as well as fit-out works<br />
1 / 6<br />
Project Figures<br />
Value: 109,000,000 USD<br />
Total Area: 110,000 m2
Megalogix Rostov Warehouse Logistic <strong>Co</strong>mplex, Rostov / Russia<br />
Scope of works: Working stage design, earth works, RC works, structural steel, sandwich panel<br />
cladding, M&E works, site infrastructure, asphalt pavement and landscaping as well as fit-out works<br />
Rexam Aluminium Can Production Plant, Chelyabinsk /Russia<br />
Scope of works: Turn-key construction of the aluminium can production plant and ancillary buildings<br />
including earth works, concrete works, M&E works, steel structure, cladding, finishing works,<br />
landscaping, site infrastructure and asphalt works<br />
� 2005 - 2007<br />
<strong>Co</strong>mpany : MC-Mert<br />
Location : İzmir, Turkey<br />
Title: Freelance <strong>Co</strong>nsultant<br />
Project : <strong><strong>Co</strong>nstruction</strong> of 4 stars holiday village Angora Beach Resort<br />
Scope of works: Feasibility Study and <strong><strong>Co</strong>nstruction</strong> <strong>Co</strong>nsultancy of a boutique Style Holiday<br />
Village at the Aegean <strong>Co</strong>ast of Turkey. Works included design, construction, furnishing and<br />
infrastructure of a complete holiday village for 300 guests.<br />
� 2004 - 2005<br />
<strong>Co</strong>mpany : Metiş - Epik JV and Framaco-Epik-Metiş FEM JV<br />
Location : Head Office Ankara, Turkey<br />
Title: Deputy General Manager and Member of Executive Board<br />
Project : US government contracts for OBO (Overseas Building Operations) as Prime<br />
2 / 6<br />
Project Figures<br />
Value: 89,750,000 USD<br />
Total Area: 101,000 m2<br />
Project Figures<br />
Value: 35,000,000 USD<br />
Total Area: 25,000 m2<br />
Project Figures<br />
Value: -10 mil USD<br />
Total Area: 4500 m2<br />
Land Area: 25000 m2
� 2003 - 2005<br />
<strong>Co</strong>mpany : Epik <strong><strong>Co</strong>nstruction</strong> <strong>Co</strong>.<br />
<strong>Co</strong>ntractor, in Iraq and Afghanistan. Tender documentation and pre-qualification<br />
proposals for US government projects in Africa. Overall 70 million USD projects<br />
carried out and 20 million USD projects awarded.<br />
Location : Head Office Ankara, Turkey<br />
Title: Partner and Deputy General Manager<br />
Project : Preparation of tender documents for international and NATO projects. Main<br />
� 2003<br />
fields of activity continued under FEM JV. structure<br />
<strong>Co</strong>mpany: Epiksan <strong><strong>Co</strong>nstruction</strong> <strong>Co</strong>.<br />
Location : Head Office Ankara, Turkey<br />
Title: Technical Office and Proposals Manager<br />
Project : Infrastructure and utilities contracts in Northern Iraq for UN Habitat program.<br />
� 2002<br />
<strong>Co</strong>mpany : MC-Mert <strong><strong>Co</strong>nstruction</strong> (Subcontractor of Brunner + <strong>Co</strong>.GMBH)<br />
Location : Munich, Germany<br />
Title: Project Manager<br />
Project : Office Space Amar Centre<br />
Scope of Works: Structural and insulation works of 25.000 m 2<br />
Project Figures<br />
Value: 12 mil. USD<br />
<strong><strong>Co</strong>nstruction</strong> period: 5<br />
months (structural)<br />
3 / 6<br />
Project Figures<br />
Value: 70 mil USD<br />
Project Figures<br />
Value: 10 mil. USD<br />
Total Area: several<br />
towns
� 1997 - 2001<br />
<strong>Co</strong>mpany : Enelka <strong>Co</strong>ntracting, Manufacturing and Trading <strong>Co</strong>mpany<br />
(Developer <strong>Co</strong>mpany, subsidiary of Elektrim SA - Poland)<br />
Location : İstanbul, Turkey<br />
Title: Deputy Project Manager<br />
Project : Marin City Project<br />
Scope of Works: Overall Project Management of the complete project; managing FIDIC based<br />
contracts, making subcontracts, carrying out contractor negotiations. Evaluating variation orders, and<br />
selecting technical construction materials with respect to the contract specifications.<br />
Marin City Project constructed as a First Class housing development with full infrastructure, a 500<br />
boats capacity private marina, social and commercial facilities. Project is located on 150 hectares of<br />
land together with a seashore belt of 1300 meters, where numerous sea-front structures are included.<br />
Extensive landslide protection works had been carried out. Main contractors of the project were Tepe-<br />
Akfen JV and STFA.<br />
� 1995 - 1997<br />
<strong>Co</strong>mpany: MİR <strong>Co</strong>ntracting and Trading <strong>Co</strong>. (Subsidiary of GÜRİŞ <strong>Co</strong>.).<br />
Location : Head Office Moscow, Russian Federation<br />
Title: Technical Office Manager<br />
Project : Several commercial and housing projects in a variety of locations in Russian<br />
Scope of works:<br />
Federation, including Most Bank, Tempbank, Interles, IMM Birest, Bolshoi<br />
Annex Building<br />
As a <strong>Co</strong>ntract Administrator; Performed activities such as preparation of contracts and sub-contracts,<br />
maintained client relations regarding contracts, held negotiations with involved parties and carried out<br />
procedures for Handing Over of the projects.<br />
As Planning Analyst; Developed a multi-user relational database software in MS Access for monitoring<br />
productivity in man-hours and machine-ours as well as computation of budgets and cash-flows of<br />
projects.<br />
4 / 6<br />
Project Figures<br />
Value: 65 mil USD
As the Chief Engineer of Maintenance; Carried out maintenance and guarantee operations of<br />
completed projects.<br />
As Site Manager; <strong>Co</strong>mpleted several projects at finishing works stage.<br />
� 1994 – 1995<br />
Military Service<br />
� 1993 - 1994<br />
<strong>Co</strong>mpany: Municipality of Greater Ankara.<br />
Location : Ankara / Turkey<br />
Title: Systems Analyst<br />
Project : Ankara Metro, Ankaray, and other remarkable municipal projects<br />
Scope of works : Developed a multi-user relational database software in Foxpro 2.0 to improve<br />
project monitoring and cash flow systems and remained responsible for watching out timely execution,<br />
reporting and co-ordination of huge projects carried out by the municipality including Ankara Metro<br />
Project<br />
� 1990 - 1993<br />
<strong>Co</strong>mpany: METU Parlar Education and Research Foundation<br />
Location : Ankara / Turkey<br />
Title: Research Engineer<br />
Project : ANDEM – Urban Transformation Projects of Ankara<br />
Scope of works :<br />
As <strong>Co</strong>ntrol Engineer, participated in the ODTU (METU) team performing design and construction<br />
control of Çankaya - Mamak viaduct – Ankara, carried out by Freysinnet and Ceylan <strong><strong>Co</strong>nstruction</strong>.<br />
As Expert Assistant; participated in the team analysing several masonry domed historical buildings<br />
for the research project on “preservation of masonry domed historical buildings in seismic zones<br />
sponsored by Tübitak and American National Science Foundation (NSF). Within this project,<br />
5 / 6<br />
Project Figures<br />
Project<br />
Figures<br />
Total Value:<br />
55 mil USD<br />
Value: 135 mil USD<br />
Span length: 6x115 m<br />
Pier Height: 75 m<br />
Span Width: 27 m single<br />
box
participated in the organization of an international work-shop in İstanbul called “Preservation of<br />
Historical Buildings in Seismic Zones” with the contribution of international experts.<br />
As system analyst and software developer; participated in the team developing a multi-user<br />
relational database software for co-ordination of infrastructure constructions and carried out<br />
relationships among organizations responsible for infrastructure facilities of Ankara at ANDEM (urban<br />
transformation projects of Ankara, coordination centre).<br />
Assisted in preparation of tender documents for Bosphorus Tube Pass and İstanbul Metro Project.<br />
� 1989 - 1990<br />
<strong>Co</strong>mpany: Koray & Heilit Woerner Gmbh<br />
Location : Ankara / Turkey<br />
Title: Part Time Site Supervisor<br />
Project : Karum and Sheraton business centre and 5 stars hotel construction<br />
Scope of Works : Piling and structural works<br />
Publications<br />
� Wasti, S.T., and E. Senkaya, “Simple Versatile Beam on Elastic Foundation Finite Element” Proceedings,<br />
BSSM <strong>Co</strong>nference on Testing Materials, London, England: 1994.<br />
� Karaesmen, E., C.Erkay, E.Senkaya, N.Boyaci, A.Yakut, “Overview of Domed Historic Structures in Seismic<br />
Zones” Report of an International Workshop on Preserving Historic Buildings of Major Importance, US Army<br />
<strong>Co</strong>rps of Engineers, Prepared by National Science Foundation, December, 1993.<br />
� Karaesmen, E., C.Erkay, E.Senkaya, N.Boyaci, A.Yakut, “Idealized Reduction of Load-Bearing <strong>Co</strong>ncrete<br />
Walls into Systems <strong>Co</strong>nsisting of Bars” Proceedings, First International <strong>Co</strong>nference on Seismology and<br />
Earthquake Engineering, Tehran, Iran: 1992.<br />
� Karaesmen, E., E.Senkaya, A.Yakut, “A Preliminary Study of the March 1992 Erzincan Earthquake” Special<br />
Publication of M.E.T.U Parlar Education and Research Foundation, Ankara, 1992.<br />
6 / 6