VENTECH ENGINEERS, LLC.<br />

PROCEDURES<br />

1 OBJECTIVE<br />

<strong>ENGINEERING</strong> <strong>DRAWING</strong> <strong>CONTROL</strong><br />

1 OF 9<br />

4.5-6<br />

Effective Date: Jan. 6, 2011<br />

Revision: 2<br />

Approval: Kyle Ray<br />

The objective of this procedure is to define a standard method of controlling, numbering,<br />

issuing, revising and approving the engineering drawings generated by <strong>Ventech</strong><br />

Engineers, LLC.<br />

2 SCOPE<br />

This procedure applies to all engineering drawings generated for <strong>Ventech</strong> projects,<br />

studies, and proposals. For control of other project documentation and specifications<br />

generated by <strong>Ventech</strong> or outside of <strong>Ventech</strong>, see Procedure 4.5-2 "Project<br />

Documentation Control", and procedure 4.5-9 “Engineering Specification Control”.<br />

3 AUTHORITY<br />

Engineering Department managers are responsible for ensuring that the engineering<br />

drawing documentation is controlled in accordance with this procedure. The Piping<br />

Department Manager is responsible for maintaining this procedure.<br />

4 REFERENCES<br />

Procedure 4.5-2: Project Documentation Control<br />

Procedure 4.5-7: Magnetic Data Control<br />

Procedure 4.5-8: Proposal, Study and Project Number Assignment<br />

Work Instruction 4.4-PD-01: Work Instruction for Isometric Drafting<br />

5 PROCEDURES<br />

5.1 <strong>ENGINEERING</strong> <strong>DRAWING</strong> <strong>CONTROL</strong><br />

5.1.1 A drawing status report (See Example Form 4.5-6.1) shall be developed<br />

by each department manager at the beginning of each project. A drawing<br />

status report is not necessary for proposals and studies.<br />

5.1.2 The Project Secretary shall maintain the drawing status report for all<br />

engineering departments.


VENTECH ENGINEERS, LLC.<br />

PROCEDURES<br />

2 OF 9<br />

4.5-6<br />

Effective Date: Jan. 6, 2011<br />

Revision: 2<br />

Approval: Kyle Ray<br />

5.1.3 The person generating the drawing is responsible for inputting their name<br />

or initials along with the current date in the "BY" (drawn by) area in the<br />

title block. It is the responsibility of the department manager to ensure<br />

that the "start date" is recorded on the document and in the "Drawing<br />

Status Report".<br />

5.1.4 The drawing status report shall be issued to each department manager<br />

periodically as required by changes in drawing status. This will ensure<br />

that the reports are readily available to any employee needing to certify<br />

the status of a drawing.<br />

5.1.5 All magnetic copies of drawings shall be stored and archived in<br />

accordance with Procedure 4.5-7 "Magnetic Data Control".<br />

5.1.6 It is the responsibility of each department manager to maintain files<br />

containing hard copies of drawings. The original drawings shall be stored<br />

in a safe place to be readily retrieved for future copies. If necessary, a<br />

copy of the original can be placed in a stick file or other suitable location<br />

for reference to other disciplines. All drawings that have "hand" signatures<br />

in the proper blocks, as defined in this procedure, shall be the original.<br />

When an approved drawing is revised, the previously approved drawing<br />

shall have the word "VOID" stamped or written in ink on the original. The<br />

word "void" on these drawings shall ensure that only the current revision<br />

is in circulation. Approved drawings that have been voided, shall be kept<br />

for historical or possible legal reference. Each department shall have work<br />

instructions outlining how drawings are to be maintained within their<br />

department.<br />

5.1.7 The drawing status report will be issued periodically in accordance with<br />

the document matrix.<br />

5.2 <strong>ENGINEERING</strong> <strong>DRAWING</strong> NUMBERING ASSIGNMENT<br />

5.2.1 When a drawing is generated for a project, study or proposal a drawing<br />

number shall be assigned. Duplicate drawing numbers shall be<br />

dissimilated by the job number. If the drawing is a computer generated<br />

drawing, then the drawing number and the electronic file name are the<br />

same.


VENTECH ENGINEERS, LLC.<br />

PROCEDURES<br />

3 OF 9<br />

4.5-6<br />

Effective Date: Jan. 6, 2011<br />

Revision: 2<br />

Approval: Kyle Ray<br />

5.2.2 Each drawing shall contain at least the two blocks shown below. The<br />

standard <strong>Ventech</strong> border drawing has these blocks incorporated into the<br />

title block (See Attachment "A").<br />

Assigned Project Number,<br />

Study Number of<br />

Proposal Number<br />

JOB NUMBER<br />

XXXX-XX<br />

<strong>DRAWING</strong> NUMBER<br />

XXXX-XX<br />

Sequential Number<br />

Area Number<br />

Type of Drawing<br />

The X's in the preceding boxes shall be replaced in accordance with the<br />

following information. (Note: The X's will not appear on the actual<br />

drawing, they are for representation only.<br />

5.2.2.1 A project, study or proposal number should be assigned before<br />

a drawing is created. See Procedure 4.5-8 "Proposal, Study or<br />

Project Number Assignment." After an appropriate number has<br />

been assigned, the X's in the job number box shall be replaced<br />

with this number.<br />

5.2.2.2 Type of drawing shall be the first two X's in the drawing number<br />

box. They shall be selected from the list below.<br />

Civil/Structural Department<br />

AR - Architectural<br />

CR - Concrete<br />

CV - Civil<br />

SS - Structural Steel<br />

Electrical Department<br />

ED - Electrical Details<br />

EM - Electrical miscellaneous<br />

EO - Electrical One Lines<br />

EP - Electrical Plans<br />

ES - Electrical Schematics


VENTECH ENGINEERS, LLC.<br />

PROCEDURES<br />

4 OF 9<br />

4.5-6<br />

Effective Date: Jan. 6, 2011<br />

Revision: 2<br />

Approval: Kyle Ray<br />

Instrument Department<br />

ID - Instrument Drawings<br />

IL - Instrument Loops<br />

Mechanical Department<br />

MM - Mechanical Miscellaneous<br />

(Note: Equipment drawing numbers shall be in<br />

accordance with this Procedure, Section 5.2-3)<br />

Piping Department<br />

PA - Plot Plans and Equipment<br />

Arrangement<br />

PF - Process Flow Diagram<br />

PD - Piping & Instrument Diagram<br />

PK - Piping Key Plan<br />

PM - Piping Miscellaneous<br />

PP - Piping Plans and Sections<br />

(Note: Piping isometric drawing numbers shall be<br />

in accordance with 4.4-PD-01, Work Instruction for<br />

Isometric Drafting)<br />

5.2.2.3 The third X in the drawing number box will be separated from<br />

the first two letters with a hyphen. This X will represent the unit<br />

area number. (i.e., If unit area is 100, then this digit will be a<br />

1.) If there is only one area for the project, then area 100 shall<br />

be used.<br />

5.2.2.4 The fourth and fifth X's shall be the sequential number for a<br />

particular type of drawing. If a department exceeds 99<br />

drawings, then a sixth digit may be added.<br />

5.2.3 Equipment drawings shall not receive numbers as defined in 5.2.2. The<br />

equipment number shall be the drawing number. If the equipment<br />

requires more than one drawing, the sheet number shall dissimilate the<br />

drawing number. (i.e., if the equipment number is V-101 and requires<br />

three drawings, all three drawing numbers will be V-101 dissimilated by its<br />

respective sheet number.) If the drawing is a computer generated<br />

drawing, then the drawing number, along with the sheet number, will be


VENTECH ENGINEERS, LLC.<br />

PROCEDURES<br />

5 OF 9<br />

4.5-6<br />

Effective Date: Jan. 6, 2011<br />

Revision: 2<br />

Approval: Kyle Ray<br />

the electronic file name, (i.e., If the equipment number is V-101 and it is<br />

Sheet 2, then the electronic file number will be V101-2.<br />

5.3 <strong>ENGINEERING</strong> <strong>DRAWING</strong> ISSUANCE<br />

5.3.1 Prior to being issued, all drawings shall have the appropriate checked and<br />

approval blocks hand signed with ink in accordance with this Procedure,<br />

section 5.4. (Note: The ink used to sign drawings shall be a different color<br />

than black. This will dissimilate an original from a copy.)<br />

5.3.2 All drawings shall be distributed in accordance with the project document<br />

distribution matrix.<br />

5.3.3 All drawings issued in-house or to the client shall be issued using a<br />

transmittal form. (See Form 4.5-6.2)<br />

5.3.3.1 In-house transmittals of drawings shall be initiated by the<br />

Department Manager, squad leader or engineer.<br />

5.3.3.2 Transmittals to the client shall be initiated by the Project<br />

Manager.<br />

5.3.4 The Project Secretary shall assign a transmittal number to each<br />

transmittal. This number comes from the correspondence register, kept in<br />

the project files.<br />

5.3.4.1 The Project Secretary shall fill in the transmittal with the<br />

following information:<br />

Project Number<br />

Date<br />

Transmittal Number<br />

Page x of x<br />

Transmitted By = Initiator<br />

Item = Drawing Number<br />

Rev = Drawing Revision Number<br />

Description = Drawing Title Type of Transmittal<br />

(i.e., Preliminary/For Information, Approved for<br />

Construction, etc.)


VENTECH ENGINEERS, LLC.<br />

PROCEDURES<br />

6 OF 9<br />

4.5-6<br />

Effective Date: Jan. 6, 2011<br />

Revision: 2<br />

Approval: Kyle Ray<br />

Distribution = Document distribution matrix<br />

5.3.5 After the Project Secretary has completed the transmittal with the above<br />

information, the transmittal, along with the drawing(s), shall be returned to<br />

the initiator for approval.<br />

5.3.6 The initiator of an in-house transmittal shall review the transmittal for<br />

accuracy. When the initiator is satisfied with the information on the<br />

transmittal, that person shall sign or place initials by their name on the<br />

transmittal located in the "transmitted by" area. The initiator, if other than<br />

a department manager, shall turn the package over to the department<br />

manager for approval. If the department manager approves the<br />

transmittal, the department manager shall sign or initial the "approved by"<br />

area on the transmittal.<br />

5.3.6.1 After the in-house transmittal has been approved by the<br />

department manager, the transmittal and drawing(s) shall be<br />

returned to the Project Secretary. The Project Secretary shall<br />

forward the package to the Project Manager for final review.<br />

Once the Project Manager is satisfied with the package being<br />

transmitted, the Project Manager shall sign or initial the<br />

"approved by" area on the transmittal.<br />

5.3.7 The Project Manager shall review the transmittal to the client for<br />

accuracy. When the Project Manager is satisfied with the information on<br />

the transmittal, the Project Manager shall sign or place initials by their<br />

name in the "transmitted by" area.<br />

5.3.8 After the in-house or client transmittal has been finalized by the Project<br />

Manager, the package shall be returned to the Project Secretary. The<br />

Project Secretary shall reproduce and distribute transmittals and drawings<br />

per the transmittal.<br />

5.3.8.1 After drawings have been reproduced, the Project Secretary<br />

shall return originals to the initiator. The initiator shall place<br />

drawing(s) in their proper file.<br />

5.3.9 Any client request for drawings to be issued shall be made through the<br />

Project Manager. The Project Manager shall notify the department<br />

manager for any drawings that will be required.


VENTECH ENGINEERS, LLC.<br />

PROCEDURES<br />

5.4 <strong>ENGINEERING</strong> <strong>DRAWING</strong> REVISIONS AND APPROVALS<br />

7 OF 9<br />

4.5-6<br />

Effective Date: Jan. 6, 2011<br />

Revision: 2<br />

Approval: Kyle Ray<br />

5.4.1 IN GENERAL: The revision description area is located on the left side of<br />

the drawing title block (See Attachment "A"). It shall be used to record<br />

the type of revision that the drawing represents. A maximum of three<br />

revisions will be recorded on any given engineering drawing produced by<br />

<strong>Ventech</strong>. The person that is physically revising the drawing shall input<br />

their initials in the "By" block of the revision description area. They shall<br />

also input the type of revision along with the description. The "CHK"<br />

(checked by), "APP"(approved by) and "DATE" blocks shall be left blank<br />

for hand signatures and dates. Once the revision description area is filled<br />

with three revisions, the oldest revision shall be deleted and replaced with<br />

the new revision. If the preceding revision had hand signatures and/or<br />

dates in the "CHK" (checked by), "APP" (approved by) or "DATE" block,<br />

then these initials shall be electronically entered into their appropriate<br />

locations.<br />

5.4.2 The revision block is located on the lower right of the title block. (See<br />

Attachment "A"). It shall be used to record the current revision level of<br />

the drawing.<br />

5.4.3 PRELIMINARY ISSUES: Preliminary issues made during the<br />

development of a drawing shall bear the letter "A" in both the revision<br />

description area and the revision block. Subsequent revisions shall be<br />

dissimilated by using a numerical sequence, such as A1, A2, A3, etc.<br />

The revision description shall simply state the word "Preliminary".<br />

5.4.3.1 Preliminary drawings that are issued for reference do not need<br />

to be signed off in any of the checked by or the approval areas<br />

of the title block.<br />

5.4.4 CLIENT APPROVAL ISSUES: Drawings that are issued for client<br />

approval shall bear the letter "B" in both the revision description area and<br />

the revision block. Subsequent revisions shall be dissimilated by using a<br />

numerical sequence, such as B1, B2, B3, etc. The revision description<br />

shall simply state the words "Client Approval". At this time all preliminary<br />

revisions shall be deleted from the revision description area and only the<br />

client approval revisions shall be recorded henceforth.


VENTECH ENGINEERS, LLC.<br />

PROCEDURES<br />

8 OF 9<br />

4.5-6<br />

Effective Date: Jan. 6, 2011<br />

Revision: 2<br />

Approval: Kyle Ray<br />

5.4.4.1 Drawings that are being issued to the client shall have the<br />

"CHK" (checked by) and the "APP" (approved by) blocks in the<br />

revision description area hand signed. The "CHK" (checked by)<br />

block shall be hand signed by the person responsible for<br />

checking the drawing. The "APP" (approved by) block shall be<br />

hand signed by the department manager and the Project<br />

Manager. The "DATE" block next to the approval block shall<br />

have the date hand signed by the Project Manager.<br />

5.4.5 APPROVED FOR CONSTRUCTION ISSUES: Drawings that are issued<br />

approved for construction shall bear the number "0" (zero) in both the<br />

revision description area and the revision block. The revision description<br />

shall simply state the words "Approved For Construction". Subsequent<br />

revisions shall be dissimilated by using a numerical sequence, such as 1,<br />

2, 3, etc. The revision description shall briefly describe what was revised<br />

on the drawing.<br />

5.4.5.1 Drawings that are being issued for construction shall follow the<br />

same steps as defined in this Procedure, section 5.4.4.1. In<br />

addition to those steps, the checked and approval blocks next<br />

to the confidential statement are to be hand signed and dated<br />

(See Attachment "A"). These blocks are to be signed only if<br />

the drawing is at revision "0". Revision "0" indicates that the<br />

drawing is "Approved for Construction". The following<br />

personnel shall be responsible for signing and dating these<br />

blocks.<br />

"Drawn" block - Entered electronically by the<br />

person when the drawing was<br />

generated. (See section 5.1.3 of<br />

this Procedure)<br />

"Checked" block - The person responsible for<br />

checking the drawing.<br />

First "Approved" block - Department Manager<br />

Second "Approved" block - Project Engineer<br />

Third "Approved" block - Project Manager


VENTECH ENGINEERS, LLC.<br />

PROCEDURES<br />

6 DOCUMENT<br />

Document Location<br />

Transmittals Project Files<br />

Original Drawings Discipline Files<br />

Drawing Status Report Project Files<br />

9 OF 9<br />

4.5-6<br />

Effective Date: Jan. 6, 2011<br />

Revision: 2<br />

Approval: Kyle Ray