Pressebericht<br />

Press Release<br />

<strong>MAXIMO</strong> <strong>panel</strong> <strong>formwork</strong>:<br />

<strong>One</strong>-<strong>sided</strong> <strong>operability</strong> <strong>shortens</strong><br />

construction time<br />

Semi-detached house, Rosenheim, Germany<br />

The new PERI <strong>MAXIMO</strong> wall <strong>formwork</strong> system created a tremendous<br />

amount of interest with visitors to this year´s bauma trade fair in Munich.<br />

With the <strong>MAXIMO</strong>, a new generation of <strong>panel</strong> <strong>formwork</strong> was presented<br />

which combines the insights and findings gained over many years from<br />

previous <strong>panel</strong> <strong>formwork</strong> systems as well as offering additional<br />

advantages.<br />

For almost two decades now, the TRIO <strong>panel</strong> <strong>formwork</strong> with the optimized<br />

BFD alignment coupler has demonstrated its speed and versatile<br />

functionality – and with the introduction of the TRIO Housing, the handling<br />

was improved even more through the ties being fitted from one side only,<br />

resulting in substantially reduced shuttering times. The new <strong>MAXIMO</strong> has<br />

been designed to include both these outstanding product features. In<br />

addition, the centrically-positioned tie points in all element sizes mean that<br />

concrete surfaces with attractive architecturally-designed tie and joint<br />

arrangements can also be created.<br />

These advantages match the requirements of numerous building<br />

contractors such as those of Mayer Construction, a company which is<br />

based in the town of Ruhpolding in the state of Bavaria. For their wide<br />

range of building projects in the areas of housing development, industrial<br />

construction as well as civil and underground engineering, the speed and<br />

the flexibility of the <strong>MAXIMO</strong> is particularly in demand. On the one hand, a<br />

wall <strong>formwork</strong> system should be quick and easy to use and, on the other,<br />

Seite 1 von 4<br />

PERI GmbH<br />

Schalung Gerüst Engineering<br />

Rudolf-Diesel-Straße<br />

89264 Weißenhorn<br />

Deutschland<br />

Telefon +49 (0)7309.950-0<br />

Telefax +49 (0)7309.951-0<br />

Kontakt:<br />

PERI Redaktion<br />

Tel.: +49 (0)7309.950-1 18<br />

Fax: +49 (0)7309.951-1 18<br />

redaktion@peri.de<br />

www.peri.de


Pressebericht<br />

Press Release<br />

it must exhibit multi-purpose usability for reinforced concrete walls,<br />

foundations, columns and beams.<br />

Mayer´s fourth use of the <strong>MAXIMO</strong> <strong>formwork</strong> involved forming the<br />

reinforced concrete walls of a rectangular-shaped cellar for a semidetached<br />

house, with an 11 x 14 metre ground plan, in two cycles.<br />

Instead of having to set aside the usual four days to complete the job,<br />

foreman Enrico Schirmer required only three days using <strong>MAXIMO</strong> - with a<br />

<strong>formwork</strong> crew of only three men. Schirmer attributes the time-savings<br />

achieved quite clearly to the fact that the <strong>MAXIMO</strong> <strong>formwork</strong> must only be<br />

anchored from one side. As it happens, due to the newly developed,<br />

conical tie system, spacer tubes are no longer required. This keeps site<br />

movements to an absolute minimum and saves on resources as well as<br />

time. Very few different system components, suited for construction sites<br />

and the rigid corner design also contribute to faster forming.<br />

A positive side-effect is also the fact that using the <strong>MAXIMO</strong> with its<br />

centrically-arranged tie points throughout always results in a neat tie and<br />

joint arrangement. Because all tie positions are filled, no unsightly<br />

impressions of PVC plugs appear on the concrete finish itself.<br />

Furthermore, the systematized and clear tie point specifications lead to<br />

error-free forming – this additionally accelerates the shuttering times. "The<br />

<strong>MAXIMO</strong> is unbeatable", said Enrico Schirmer, and added: "I am very<br />

impressed and totally convinced about the system".<br />

Seite 2 von 4<br />

PERI GmbH<br />

Schalung Gerüst Engineering<br />

Rudolf-Diesel-Straße<br />

89264 Weißenhorn<br />

Deutschland<br />

Telefon +49 (0)7309.950-0<br />

Telefax +49 (0)7309.951-0<br />

Kontakt:<br />

PERI Redaktion<br />

Tel.: +49 (0)7309.950-1 18<br />

Fax: +49 (0)7309.951-1 18<br />

redaktion@peri.de<br />

www.peri.de


Pressebericht<br />

Press Release<br />

Seite 3 von 4<br />

Photo 1:<br />

20 % time-savings: The new PERI<br />

<strong>MAXIMO</strong> <strong>panel</strong> <strong>formwork</strong> shortened the<br />

construction time for the cellar walls by<br />

almost one day.<br />

(Photo: PERI GmbH)<br />

Photo 2:<br />

The <strong>MAXIMO</strong> tie is fitted from one side<br />

only which means having one man on the<br />

external wall is no longer necessary.<br />

(Photo: PERI GmbH)<br />

PERI GmbH<br />

Schalung Gerüst Engineering<br />

Rudolf-Diesel-Straße<br />

89264 Weißenhorn<br />

Deutschland<br />

Telefon +49 (0)7309.950-0<br />

Telefax +49 (0)7309.951-0<br />

Kontakt:<br />

PERI Redaktion<br />

Tel.: +49 (0)7309.950-1 18<br />

Fax: +49 (0)7309.951-1 18<br />

redaktion@peri.de<br />

www.peri.de


Pressebericht<br />

Press Release<br />

Contractor:<br />

Mayer Hoch- und Tiefbau GmbH, Ruhpolding<br />

Field Service:<br />

PERI Branch Office Schliersee<br />

Seite 4 von 4<br />

Photo 3:<br />

Site-optimised large elements and<br />

element connections using the BFD<br />

alignment coupler, ensured that the cellar<br />

ground plan could be formed quickly and<br />

simply with PERI <strong>MAXIMO</strong>.<br />

(Photo: PERI GmbH)<br />

Photo 4:<br />

The rigid corner design shortened<br />

shuttering times and minimized crane time<br />

when positioning the <strong>formwork</strong>.<br />

(Photo: PERI GmbH)<br />

PERI GmbH<br />

Schalung Gerüst Engineering<br />

Rudolf-Diesel-Straße<br />

89264 Weißenhorn<br />

Deutschland<br />

Telefon +49 (0)7309.950-0<br />

Telefax +49 (0)7309.951-0<br />

Kontakt:<br />

PERI Redaktion<br />

Tel.: +49 (0)7309.950-1 18<br />

Fax: +49 (0)7309.951-1 18<br />

redaktion@peri.de<br />

www.peri.de

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!