Our vision – our solution – our task - NachhaltigWirtschaften.at
Our vision – our solution – our task - NachhaltigWirtschaften.at
Our vision – our solution – our task - NachhaltigWirtschaften.at
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Page 14<br />
<strong>Our</strong> next step:<br />
Pilot system with utility partner is under construction<br />
Loc<strong>at</strong>ion:<br />
• 750 MW Coal fired power plant of EVN (local<br />
utility for Lower Austria Province)<br />
Technology<br />
• 40 m long, 1.6 m aperture<br />
• Thermal output 25 kW th (1)<br />
• Oper<strong>at</strong>ion from summer 2011 to 2013<br />
• Stand-alone install<strong>at</strong>ion with direct steam<br />
gener<strong>at</strong>ion; potential extension to link with district<br />
he<strong>at</strong> or power plant<br />
• Pressure up to 110 bar, temper<strong>at</strong>ure up to 318 °C<br />
• Concentr<strong>at</strong>ion factor 44 x<br />
Partners<br />
• EVN: site, install<strong>at</strong>ions, found<strong>at</strong>ions<br />
• Vienna University of Technology<br />
thermodynamic design, measurements<br />
(1) <strong>at</strong> standard incident radi<strong>at</strong>ion of 1 kW/m 2<br />
Vienna<br />
HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com