03.03.2013 Views

Our vision – our solution – our task - NachhaltigWirtschaften.at

Our vision – our solution – our task - NachhaltigWirtschaften.at

Our vision – our solution – our task - NachhaltigWirtschaften.at

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 1<br />

<strong>Our</strong> <strong>vision</strong> <strong>–</strong> <strong>our</strong> <strong>solution</strong> <strong>–</strong> <strong>our</strong> <strong>task</strong><br />

Present<strong>at</strong>ion HELIOVIS AG<br />

Felix Tiefenbacher and Samuel Kutter<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 2<br />

Concentr<strong>at</strong>ed Solar Power (CSP):<br />

Various technologies in competition<br />

Parabolic through<br />

Linear Fresnel mirrors<br />

CSP<br />

Dish Sterling<br />

Tower<br />

High m<strong>at</strong>erial consumption imply high investments <strong>–</strong> Industry needs new ideas!<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 3<br />

Heavy metal supporting structures cause high<br />

m<strong>at</strong>erial and install<strong>at</strong>ion cost for parabolic troughs<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 4<br />

Agenda<br />

<strong>Our</strong> <strong>vision</strong>: a solar future<br />

<strong>Our</strong> <strong>solution</strong>: the HELIOtube<br />

<strong>Our</strong> <strong>task</strong>: to bring HELIOVIS AG forward<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 5<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 6<br />

The HELIOtube with high potential<br />

to realise competitive advantage<br />

Reduced m<strong>at</strong>erial usage:<br />

from 50 kg/m 2 to 5 kg/m 2<br />

High production efficiency<br />

„roll to roll“<br />

Install<strong>at</strong>ion by infl<strong>at</strong>ing<br />

Simple transport on a roll<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 7<br />

We replace expensive metal constructions<br />

by light weight plastic films<br />

transparent film<br />

mirror film<br />

supporting film<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 8<br />

Each foil with unique properties<br />

Transparent film<br />

• highly transparent (90%)<br />

• UV stable<br />

• long durability (30 years)<br />

• dust and dirt repellent<br />

Mirror film (protected from we<strong>at</strong>her)<br />

• highly reflective<br />

• light weight<br />

Support film<br />

• robust<br />

• UV stable and we<strong>at</strong>her resistant<br />

• simple handling<br />

ETFE in architecture PU co<strong>at</strong>ing for blades<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 9<br />

Highly cost efficient production „roll to roll“<br />

• P<strong>at</strong>ented „fl<strong>at</strong>“ production process „roll to roll “<br />

• Joining of films by a combin<strong>at</strong>ion of gluing and sewing<br />

à Directed development towards an industrial mass production<br />

<strong>–</strong> High quality<br />

<strong>–</strong> High production speed (up to 600 running meters per h<strong>our</strong>)<br />

<strong>–</strong> Low production costs by high utilis<strong>at</strong>ion<br />

<strong>–</strong> Existing industrial experience for „Roll-to-roll“ processes<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 10<br />

Simple, fast and modular install<strong>at</strong>ion<br />

Simple install<strong>at</strong>ion of the HELIOtubes:<br />

è Disp<strong>at</strong>ch from central production plant<br />

è Unreel <strong>at</strong> install<strong>at</strong>ion site<br />

è Rig receiver line<br />

è Mount to tracking system<br />

è Infl<strong>at</strong>e!<br />

è<br />

Conventional system with tedious and<br />

expensive install<strong>at</strong>ion procedure<br />

• Mounting of individual mirror elements<br />

• Geometrical alginment<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 11<br />

Agenda<br />

<strong>Our</strong> <strong>vision</strong>: a solar future<br />

<strong>Our</strong> <strong>solution</strong>: the HELIOtube<br />

<strong>Our</strong> <strong>task</strong>: to bring HELIOVIS AG forward<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 12<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 13<br />

HELIOVIS AG with a continuous track record of<br />

successful milestones<br />

Models<br />

Vienna University of<br />

Technology<br />

Partnership HELIOVIS OG:<br />

Johannes Höfler and<br />

Felix Tiefenbacher<br />

Prototype 1: 10 m x 0,8 m<br />

Prototype 2: 10 m x 1,2 m<br />

2008 2009 2010<br />

Hall and Test site<br />

Neusiedl am See<br />

Form<strong>at</strong>ion of HELIOVIS AG<br />

together with Business Angels<br />

Grant of p<strong>at</strong>ent<br />

pneum<strong>at</strong>. sun concentr<strong>at</strong>or<br />

Prototype 3: 14 m x 1,5 m<br />

New loc<strong>at</strong>ion<br />

IZ NÖ Süd, Wiener Neudorf<br />

Financing:<br />

545k € by priv<strong>at</strong>e investors<br />

New board member:<br />

Samuel Kutter joins from E.ON<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 14<br />

<strong>Our</strong> next step:<br />

Pilot system with utility partner is under construction<br />

Loc<strong>at</strong>ion:<br />

• 750 MW Coal fired power plant of EVN (local<br />

utility for Lower Austria Province)<br />

Technology<br />

• 40 m long, 1.6 m aperture<br />

• Thermal output 25 kW th (1)<br />

• Oper<strong>at</strong>ion from summer 2011 to 2013<br />

• Stand-alone install<strong>at</strong>ion with direct steam<br />

gener<strong>at</strong>ion; potential extension to link with district<br />

he<strong>at</strong> or power plant<br />

• Pressure up to 110 bar, temper<strong>at</strong>ure up to 318 °C<br />

• Concentr<strong>at</strong>ion factor 44 x<br />

Partners<br />

• EVN: site, install<strong>at</strong>ions, found<strong>at</strong>ions<br />

• Vienna University of Technology<br />

thermodynamic design, measurements<br />

(1) <strong>at</strong> standard incident radi<strong>at</strong>ion of 1 kW/m 2<br />

Vienna<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 15<br />

HELIOVIS‘ p<strong>at</strong>h from a startup company<br />

to an industrial provider of CSP technology<br />

• Scientific valid<strong>at</strong>ion<br />

• Prototyping<br />

• Commercial valid<strong>at</strong>ion<br />

• Develop partnerships<br />

with EPCs and utilities<br />

• Scale up production<br />

• Increase diameter<br />

of HELIOtubes<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com


Page 16<br />

HELIOVIS AG | IZ NÖ-Süd Str. 2d, M16 | 2351 Wiener Neudorf | Austria | www.heliovis.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!