<strong>EIA</strong> of The Nam Ngiep 1 Hydropower Project Draft Report: TOC<br />

CONTENTS (Continued)<br />

Page<br />

7.3 Anticipated Impacts during Operation Phases 7-41<br />

7.3.1 Operation Impacts on Physical Environment 7-41<br />

7.3.2 Operation Impacts on Biological Environment 7-71<br />

7.4 Summary on Impacts and Main Mitigations in the Construction and<br />

Operation Phases<br />

7-76<br />

8 PUBLIC CONSULTATION<br />

8.1 Introduction 8-1<br />

8.2 Methodology 8-1<br />

8.2.1 Use of Suitable Techniques 8-2<br />

8.2.2 The Approach 8-2<br />

8.3 The Stakeholders 8-3<br />

8.4 Public Consultation Process 8-6<br />

8.4.1 Information Collection and Dissemination 8-6<br />

8.4.2 Stakeholder Concerns 8-6<br />

8.4.3 Active Involvement in Project Design and Implementation 8-6<br />

8.5 Consultation and Participation Activities 8-7<br />

8.5.1 Summary of Local Events 8-7<br />

8.5.2 Summary of Regional Events 8-7<br />

8.6 Summary of Public Consultation 8-9<br />

8.6.1 Summary of PCs Zone by Zone 8-9<br />

9 PROJECT GRIEVANCE REDRESS MECHANISM AND ADB<br />

ACCOUNTABILITY MECHANISM<br />

9.1 Rationale 9-1<br />

9.2 Project Grievance Procedure 9-2<br />

9.2.1 Establishment of Grievance Committees 9-2<br />

9.2.2 The Grievance Process 9-4<br />

9.3 <strong>Asian</strong> <strong>Development</strong> <strong>Bank</strong> Accountability Mechanism 9-7<br />

10 ENVIRONMENTAL MITIGATION MEASURES AND MONITORING<br />

PLANS<br />

10.1 Environmental Mitigation Measures during Pre-Construction and<br />

Construction Phases<br />

10-1<br />

10.1.1 Environmental Mitigation Measures for Physical Impacts 10-1<br />

10.1.2 Environmental Mitigation Measures for Biological Impacts 10-22<br />

10.1.3 Unexploded Ordinances 10-32<br />

10.2 Environmental Mitigation Measures during Operations Phase 10-34<br />

10.2.1 Environmental Mitigation Measures for Physical Impacts 10-34<br />

10.2.2 Environmental Mitigation Measures for Biological Impacts 10-43<br />

10.3 Cumulative and Trans-boundary Impacts 10-44<br />

11 ENVIRONMENTAL MONITORING PROGRAM<br />

11.1 Types of Monitoring 11-1<br />